Attachment 02-DRAWINGS-W912C321B0002-RESTORATION OF CABANA SOFTBALL FIELD-20210806.pdf
PDF 4 MB Posted
- Attached to
- Renovations Cabana Softball Field
- Solicitation number
- W912C321B0002
About this file
This pre-solicitation notice and related documents outline requirements for renovations to the Cabana Softball Field at Fort Buchanan in Puerto Rico. The U.S. Army Mission and Installation Contracting Command at Fort Buchanan will issue Invitation for Bid W912C321B0002 on or around August 5th, 2021 seeking a firm fixed-price contract for demolition and construction work including removal of existing soils, lighting poles, fencing and installation of a new field layout. Drawings specify demolishing 4 inches of soil within existing areas and 3 inches in grass areas, storing removed materials, and installing a new 20-foot foul pole. The opportunity is designated as a 100% set-aside for certified HUBZone small businesses. The North American Industry Classification code is 236220 for commercial and institutional building construction up to $500,000. Interested parties should monitor https://beta.sam.gov for solicitation details and any amendments, which must be signed and submitted with final bids. Bidders must also be registered in the System for Award Management database to be eligible for award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4 ..--�
DEMOLITION WORKS
SCALE: 1 /16" = 1 '-0"
r ilro··••········· kj"
, r '1 . . l·
•• •• I . . . . . . . " . .
l·· .. ·.·.
I
1 •• l
••••• I••
.·.•1· l l . . l
OUTFIELD AREA··
l l l l l
I l l
DEMOLITION WORKS:
© REMOVE AND DISPOSE 4" OF EXISTING SOIL
AND UNDERGROUND MATERIALS WITHIN IT.
REMOVE AND DISPOSE 3" OF EXISTING SOIL ON
GRASS AREA AND UNDERGROUND MATERIALS
WITHIN IT.
REMOVE AND STORE LIGHTING POLES .
LIGHTING FIXTURES TO BE DISPOSED
INCLUDING JUNCTION BOXES, CONDUITS,
CABLES AND ASSOCIATED ELEMENTS.
REMOVE AND STORE CHAIN LINK WIRE FENCE
AND CORRUGATED PLASTIC FENCE TOPPER.
® REMOVE CABLES AND CONDUITS.
DPW ENGINEERING DIVISION
RECOMMENDED APPROVAL
LUIS E. TORRES
ENGINEERING DIVISION CHIEF
APPROVED BY:
MARIA LOPEZ
DIRECTOR OF PUBLIC WORKS
PROJECT TEAM
PROJECT MANAGER:
R.REYES
CIVIL I ARCH./ DESIGN DEVELOPMENT:
R.REYES
MECHANICAL DESIGN:
J. ROMAN
ELECTRICAL DESIGN:
A. MOJICA/ C. IRIZARRY
DRAFTER:
G. VILLARONGA
REVISED BY:
R.REYES
REVISIONS
REV. NO. DATE APPD.BY
RESTORATION
OF CABANA
SOFTBALL FIELD
CONSTITUTION AVE.
FT. BUCHANAN, PUERTO RICO
DEMOLITION WORKS
DRAWING#:
PROJECT#:
X
IJO:
DATE: MAY/2021
SCALE: 1/16" = 1'- O"
D101
® REMOVE AND DISPOSE EXISTING FOUL POLE.6
®6 raymon.m.reyesnegron Line
NEW FIELD LAYOUT
SCALE: 1 /16" = 1'-0"
OUTFIELD AREA
- I
INFIELD AREA
5'-0''
-q"
I
I
I
I
NEW20'
FOUL POLE�
J
- J
HOME AREA DETAIL
SCALE: 1/4" = 1'-0"
DPW ENGINEERING DIVISION
RECOMMENDED APPROVAL
LUIS E. TORRES
ENGINEERING DIVISION CHIEF
APPROVED BY:
MARIA LOPEZ
DIRECTOR OF PUBLIC WORKS
PROJECT TEAM
PROJECT MANAGER:
R.REYES
CIVIL I ARCH./ DESIGN DEVELOPMENT:
R.REYES
MECHANICAL DESIGN:
J. ROMAN
ELECTRICAL DESIGN:
A. MOJICA/ C. IRIZARRY
DRAFTER:
G. VILLARONGA
REVISED BY:
R.REYES
REVISIONS
REV. NO. DATE APPD.BY
RESTORATION
OF CABANA
SOFTBALL FIELD
CONSTITUTION AVE.
FT. BUCHANAN, PUERTO RICO
NEW FIELD LAYOUT
WORKS PLAN
DRAWING#:
PROJECT#:
X
IJO:
DATE: MAY/2021
SCALE: VARIES
A101
NEW20'
FOUL
POLE�
File details come from the government source that posted it. Updated .