REC_RFQ_W912C319T0004,_Maintenance_&_Improvement_Fuel_Point,_1_Mar_2019.pdf

PDF 1 MB Posted

Attached to
Maintenance & Improvements to Fuel Point at Fort Buchanan, Puerto Rico
Solicitation number
W912C319T0004
Issued by

About this file

Record of Environmental Considerations (REC)

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

HEADQUARTERS, UNITED STATES ARMY GARRISON, FORT BUCHANAN

390 DOUBLE EAGLE AVE., SUITE 300

FORT BUCHANAN, PUERTO RICO 00934-4206

RECORD OF ENVIRONMENT AL CONSIDERATION

REC Number: BUC 01-07-2019

DIRECTORATE OF PUBLIC WORKS

ENVIRONMENTAL DIVISION

1. Title: Maintenance and Improvement of the LRC Fuel Point at Building 613 Fort Buchanan, Puerto Rico.

2. Description of Proposed Action: Improvements will include installation of two (2) emergency shower/eyewash stations; install stainless steel shelter for fuel pump/ dispenser; install catwalks, fall protection and lifeline on four AST's; install antiskid tape on ladders; inspection and cleaning maintenance of existing AST's; removal and installation of new fuel pump and dispensers from diesel tank #2 . This work entails several excavation in order to install pertinent piping systems. Additionally, saw cutting of concrete wall, ramp and asphalt segment will require disposition of demolished materials.

Maintenance work includes minor exterior painting of fuel tanks manways and connection points; and interior maintenance of ATS# 2 in order to remove sludge. Removed material will be characterized for disposal in accordance with local and federal laws. Maintenance will require fuel y transfer.

3. Anticipated date of Proposed Action: FY 19

4. It has been determined that this action:

a. Is categorically excluded under the provision of CX c-1, Section II, 32 CFR 651, appendix B, and meets the screening criteria in Subpart D-Categorical Exclusions, paragraph 651.29, A-1 through A-3, paragraph B, 81 thru 814, paragraph C, C1 thru C4, paragraph D and paragraph E, E1thru E4. It has been determined that this action does not individually or cumulatively have significant effect on the human environment. No exceptional circumstances exist as defined in paragraph A-2 of 32 CFR Subpart D-Categorical Exclusions. There will be no environmentally controversial changes to existing environmental conditions. There are no circumstances, which would require an environmental assessment (EA) or environmental impact statement (EIS) under the National Environmental Policy Act (NEPA).

Date:

Date:

I

IMBC-PWE 07 January, 2019

MEMORANDUM FOR Directorate of Public Works (IMBC-PWE/Ms. Maria A. Lopez, Director), Bldg.34 South Gate Rd ., Fort Buchanan, P.R. 00934

SUBJECT: Maintenance and Improvement of the LRC Fuel Point at Building 613 Fort Buchanan, Puerto Rico.

1. References:

a. 32 CFR Part 651 , Environmental Analysis of Army Actions.

b. AR 200-1, Environmental Protection and Enhancement.

c. Memorandum, Office of the Assistant Secretary of the Army Installation and Environment Sustainable Management of Waste in Military Construction, Renovation and Demolition Activities, February 06, 2006.

2. On 07 January, 2018, the DPW Environmental Division evaluated the subject action. The screening and revision of the proposed action was conducted IAW 32 CFR Part 651 .29 (Screening Criteria).

3. Based on the evaluation performed, the proposed action meets the following screening conditions:

a. The proposed action has not been segmented to meet the definition of Categorical Exclusions described in 32 CFR 651 Appendix B

b. No exceptional circumstances exist such as:

1. Reasonable likelihood of significant effects on public health, safety, or environment.

2. Reasonable likelihood of significant environmental effects.

3. Imposition of uncertain or unique environmental risks.

4. Greater scope or size than is normal for this category of action.

5. Releases of PO L's except from properly functioning engine or vehicle, application of pesticides and herbicides, or where the proposed action results in the requirement to develop or amend a Spill Prevention, Control , or Countermeasure Plan.

6. When a review of an action that might otherwise quality for a record of Non-applicability reveals that air emissions exceed the minimum levels or otherwise that a formal Clean Air Act conformity determination is required.

7. Reasonable likelihood of violating any federal , state, or local law or requirements imposed for the protection of the environment. Unresolved effect on environmentally sensitive resources such as: (i) federally listed threatened or endangered species and/or their designated critical habitats, (ii) properties listed or eligible for listing on the National Register of Historical Places (AR 200-1 , Chapter 6-Cultural Resources) , (iii) areas having special designation or recognition such as prime or unique agricultural lands; coastal zone;

8. Designated wilderness study areas; wild and scenic rivers; National Historic Landmarks;

100 years floodplains; wetlands; sole source aquifers; National Wildlife Refuges; National Parks; areas of critical environmental concern; or other areas of high environmental sensitivity, and (iv) designated cultural resources areas as described in AR 200-1.

9. Involving effects on the quality of the environment that are highly controversial.

1.0. Involving effects on the environment that are highly uncertain, involve unique or unknown risks, or are scientifically controversial.

IMBC-PWE 07 January, 2019

SUBJECT: Maintenance and Improvement of the LRC Fuel Point at Building 613 Fort Buchanan, Puerto Rico.

11. Establishes a precedent for future or subsequent actions that are reasonably likely to have a future significant effect.

12. Potential for degradation of already existing poor environmental conditions. Also, initiation of a degrading influence, activity, or effect in areas not already significantly modified from their natural conditions.

13. Introduction/employment of unproven technology.

c. One or more Categorical Exclusion (CATEX) encompasses the proposed action.

1. Therefore, the proposed project is encompassed by Categorical Exclusion (c-1 ). Neither an Environmental Assessment (EA) nor an Environmental Impact Statement (EIS) is required. A Record of Environmental Consideration (REC) is enclosed for your approval and signature. However, as required by reference (b), disposal activities that involve EPA/DOT regulated hazardous materials shall be coordinated with the DPW Environmental Division. In addition, use, handling, and disposal of non hazardous and hazardous wastes must be conducted following the applicable Federal, State and local regulations.

2. Provisions:

a. Contractor must follow Environmental Protection Work and Procedure Guideline enclosed. Special attention to section 1.7 (Environmental Protection Plan) and section 3.5 (Waste Disposal), 3.5.3 (Hazardous Waste) .

b. No records of Lead Based Paint (LBP) are on record, although other buildings in the same area have had positive results for yellow warning paint on the loading dock apron, as seen in the photo (enclosed).

Testing will be conducted if this area is to be disturbed.

c. As required by 40 CFR 112.7(f) (1 and 3), oil handling personnel are trained to prevent discharges. During fuel transfer adequate trained personnel must be present at all times and the adequate spill containment and response materials readily available.

d. All paints, solvent, and bituminous materials used as part of repairs and maintenance actions must be stored within protected areas. They will not be left exposed or over unprotected soils or adjacent to streams or storm water discharge points. Spill prevention measures will be required. Contractor must submit all paints and or hazardous materials product specification and safety data sheets to environmental division review and approval prior to commencing work.

e. Proposed work site is adjacent to potential flood area that has flooded during heavy rains. This should be taken into consideration when designing repairs and assigning building use.

f. The eyewash wastewater may not discharge to storm water system and must be discharged into sanitary sewer or secondary containment.

g. Excavation work will require excavation permit f

3.

Enclosures

File details come from the government source that posted it.