Industry RFI - Questionnaire_WD Mayo Alignment Cell.pdf

PDF 268 KB Posted

Attached to
Questionnaire to Industry Day -- WD Mayo Alignment Cell
Solicitation number
W912BV24SKT01
Issued by

About this file

This document is an Industry Request for Information (RFI) Questionnaire from the U.S. Army Corps of Engineers Tulsa District regarding an upcoming design-build project to replace a damaged pile structure used to align downstream-bound vessels to the lock wall at the W.D. Mayo Lock and Dam facility.

The RFI solicits feedback from industry on their experience with waterway vessel alignment/protection structures and the use of fiber reinforced polymer (FRP) composite materials, as well as potential FRP alignment structure types, foundation installation methods, and techniques to withstand vessel abrasion. The District is exploring the use of FRP in the replacement construction and is seeking additional information that may be needed in the forthcoming Request for Proposal. The virtual Industry Forum is scheduled for June 5, 2024, and the estimated construction price range is between $5,000,000 - $10,000,000.

View the file

Other files

File Type Posted
518789 WDMayo Cell 3 Replacement Industry Day Presentation.pptx PPTX presentation

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questionnaire, WD Mayo Alignment Cell AS OF, 01 July 2024

QUESTIONS & RESPONSES

Company Name: ___________________________ Point of Contact: ___________________________

RFI # QUESTIONS RESPONSES

1 What experience do you have with waterway vessel alignment/protection structures and the use of fiber reinforced polymer (FRP) composite materials?

2 What FRP alignment structure types and configurations seem possible for this project?

3 Utilizing FRP piles, what types of foundation installation methods would be possible?

4 What are possible techniques to withstand vessel abrasion?

5 What additional information will you need in the request for proposal (i.e., drawings, specs, etc.)? Is there any information you believe to be missing or would be nice to have to better understand project requirements?

6 Additional space for questions from Industry

Questionnaire, WD Mayo Alignment Cell AS OF, 01 July 2024

QUESTIONS & RESPONSES

File details come from the government source that posted it. Updated .