518789 WDMayo Cell 3 Replacement Industry Day Presentation.pptx
PPTX presentation 23 MB Posted
- Solicitation number
- W912BV24SKT01
About this file
This document is a presentation for an Industry Day hosted by the United States Army Corps of Engineers (USACE) Tulsa District. The purpose is to provide information on an upcoming design-build project to replace the upstream-most cell (Alignment Cell 3) of the pile structure used to align downstream-bound vessels to the lock wall at the W.D. Mayo Lock and Dam.
The key details are: The existing Alignment Cell 3 was destroyed in 2023, and the Tulsa District is exploring the use of Fiber Reinforced Polymers (FRP) in its replacement construction. The estimated construction price range for this project is between $5,000,000.00 to $10,000,000.00. The Industry Day forum will be held virtually on June 5, 2024 from 9:00 AM to 11:00 AM, and interested prime contractors or subcontractors are invited to attend. Specific procurement information will be available in a future solicitation posted on the SAM.gov website.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry RFI - Questionnaire_WD Mayo Alignment Cell.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USACE-TULSA DISTRICT
WD Mayo Lock and Dam 14 Alignment Cell 3 Replacement
Introduction Doing Business with USACE WD Mayo Lock and Dam 14; Alignment Cell 3 Replacement Q&A
This presentation is for general information and will not change the terms and conditions of any subsequent solicitation or contract
This is part of our market research, to be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS PRESENTATION. No reimbursement will be made for any costs associated with providing information in response to this presentation or any follow up information requests.
AGENDA
INTRODUCTIONS
cenwp-od-bsecurity@usace.army.mil
Program Management Justin Smither Contracting:
Dario Rissone, Contracting Officer Tyler Kordel, Contract Specialist Daniel Jernigan, Contract Specialist Technical Team:
Eric Johnson, INDC Lead Designer Rodney Beard, SWT Navigation Chief Jacob Simpson, SWT Navigation Project Engineer Kenneth Todd, SWT Navigation Deputy Chief Robert Steiner, Navigation Systems Operations Manager Joe Schmalz – Channel Surveyor Jarrod Breuer, Technical Manager Inland Navigation Design Center Eric O. Johnson
The USACE Team
DOING BUSINESS WITH USACE
cenwp-od-bsecurity@usace.army.mil
DOING BUSINESS WITH USACE
SAM.gov Registration (https://www.sam.gov/)
PIEE Registration (https://piee.eb.mil/)
Sam.gov. PIEE is where the solicitations and amendments are advertised. Contractors should check every day.
DOING BUSINESS WITH USACE
Industry Day Disseminate Alignment Cell Replacement Information as part of our Market Research Sources Sought / Synopsis / Solicitation WD Mayo Lock and Dam No. 14 Alignment Cell Number 3 replacement Project’s Magnitude of Price Range is between $3,000,000 and $7,500,000
Alignment cell WD Mayo Lock and Dam 14
Scope of Work
W.D. Mayo Lock and Dam is located on the Arkansas River at navigation mile 319.6. It is in LeFlore and Sequoyah Counties about nine miles southwest of Fort Smith, Arkansas. The lock has a 110-foot by 600-foot chamber with horizontally framed miter gates. It has a 20-foot normal lift and 24-foot maximum lift.
Extending approximately 700 feet upstream of the lock’s upstream guidewall are a series of three sheet pile structures used to align downstream-bound vessels to the lock wall. The upstream-most cell (Alignment Cell 3) was destroyed in 2023. The replacement structure will be constructed in the same location (see location map).
Background information on the demolished Alignment cell 3 includes:
Constructed around 1973.
52.5-foot diameter.
The exterior wall was driven 46’ PS-28 steel piling driven approximately 14.5 feet to rock.
The interior was filled with quarry run stone and capped with concrete.
Sheet pile construction had significant historic corrosion.
Alignment cell replacement
BACKGROUND
CUI
CUI
BACKGROUND - Location
CUI
CUI
CUI
LOMA (Lock operations management application) DATA – Towing vessel tracking locations and approaches to lock 14
CUI
The barges can be up to 600 feet in front of the towing vessel – does not show the head of the barges.
Tow Navigation near alignment cell
CUI
The barges can be up to 600 feet in front of the towing vessel – does not show the head of the barges.
Tow Navigation near alignment cell
CUI
The barges can be up to 600 feet in front of the towing vessel – does not show the head of the barges.
BACKGROUND – post removal Bathometric Survey
CUI
Some fill material may still be on the river bed. All debris above the silt line was removed. Probably still some material embedded in the silt. Brought in a salvage company to remove as much as we could. Nothing in the Nav Channel that is effecting Navigation. Only remove something that would prevent installation of the new structure(s).
Wd Mayo alignment cell 3
CUI
CUI
Project includes:
Replacement of the 52.5 foot diameter Alignment cell in the same general location.
Replacement will include FRP (Fiber Reinforced Polymers) Multiple geometric configurations may be considered, including:
Arched guidewall similar to bridge protection structures using large diameter FRP pipe piles and FRP fendering FRP dolphin pile group with a pile cap Ring(s) of FRP piles.
Anticipated vessel impact force is approximately 1,000 kips with a pile stick-up height above bedrock of approximately 46 feet.
Scope of work
CUI
Alignment cell 3 replacement
FRP - EXAMPLES
FRP Options – Piles with concrete fill
FRP Piles and Camels
FRP– impact wall
FRP– dolphin piles
FRP- Fenders
FRP- Fenders
Other Fender Systems configurations
Alignment cell 3 replacement
ORIGINAL DESIGN CONSTRAINTS
Alignment cell replacement Wd Mayo lock wall design constraints Arkansas River & Tributaries Design Memorandum No. 3 – Navigation Lock Part 1 Criteria
*Note, this only informs the alignment cell design
4-02 d. Impact Loading, Lock Walls Maximum size toe consisted of eight 35 by 195 foot barges, having a gross weight of 10,000 tons.
Approach speed of 2.93 feet per second (2 miles per hour) Maximum collision angle was found to be 10 degrees.
Lock Chamber Walls 800 pounds per foot but not less than 40,000 pounds per monolith
Other Walls 2,500 pounds per foot but not less than 120,000 pounds per monolith
Wd Mayo lock wall design constraints Arkansas River & Tributaries Design Memorandum No. 3 – Navigation Lock Part 1 Criteria
*Note, this only informs the alignment cell design
Piling Constraints - Allowable Horizontal Loads
| 15 inch concrete | 7,000 lbs |
| 20 inch concrete | 12,000 lbs |
| 22.4 lb steel sheet | 5.000 lbs |
Data for Preliminary Design
| Sand | Clay | ||||
| Moist Weight Per cubic foot | 110 | 105 | |||
| Saturated Weight per cubic foot | 120 | 110 | |||
| Submerged Weight per cubic foot | 58 | 52 | |||
| Coef. of Active Pressure | 0.3 | 0.7 | |||
| Coef. Of Passive Pressure | 3.0 | 1.0-1.5 | |||
| At-Rest Pressure | 1.0 | 1.0 |
Wd Mayo lock wall design constraints
Design Build Contract anticipated
Schedule for award and construction (on or about) advertisement: august 2024
Award end of calendar year 2024 construction 2025
Q&A Your feedback is important
THANK YOU
please fill out the industry survey on sam.gov for this project image3.png image4.png image8.png image9.jpeg image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.jpeg image19.png image20.png image21.png image22.png image23.png image24.png image25.png image26.png image27.png image28.png image29.jpeg image30.png image31.png image32.png image33.png image34.png image35.png image36.png image37.png image38.png image39.png image40.png image41.svg image1.png image2.png image5.png image6.png