RSK Canopy Drawings.docx
DOCX document 3 MB Posted
- Attached to
- CANOPY REPLACEMENT R. S. KERR LOCK AND DAM Federal contract opportunity
- Solicitation number
- W912BV23Q0056
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT 0001 23Q0056.pdf | ||
| RSK Canopy Drawings.pdf | ||
| SOLICITATION W912BV23Q0056 CANOPY FABRICATION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Machinery Platform Canopy - Drawings Work includes the fabrication and of an aluminum canopy for the protection of the machinery on the work platform. The contractor shall furnish all services, materials, labor, supplies, supervision, and travel as required in connection with the aluminum canopy for Pier 12 at RS Kerr Lock & Dam 15 Spillway.
1. Location
Figure 1 - Location MapParking Lot Gate 12 and Pier 11 Entrance Road
Figure 2 - Example of existing canopy
2. Fabrication The Contractor shall be responsible for the fabrication of an aluminum canopy measuring 14’x 21’ and design be comparable to the existing. The use of neoprene isolation gaskets should be utilized when dissimilar metals are adjoined. Canopy will utilize a gutter and spout system to drain water. The canopy will use four aluminum posts to anchor to the support structure and feature stainless steel lifting eyes in four locations on top. Design of the new canopy will be reviewed and approved by the Government before fabrication and Delivery. The contractor will be responsible for field verifying measurements to utilize the original bolt pattern used to anchor the structure to the support beams. No electrical work required in contract. Original Drawing is attached.
Figure 3 - Dimensions of Canopy
Figure 4 – Cut Sheet of Stainless Steel Eye-bolt
Figure 5 - Anchor Bolt Pattern
3. Assembly The new canopy can be assembled onsite, or it can be assembled off site. Assembly methods are the responsibility of the contractor. No Installation is required.
image6.png image1.png image2.jpeg image3.png image4.png image5.png
File details come from the government source that posted it. Updated .