AMENDMENT 0001 23Q0056.pdf
PDF 412 KB Posted
- Attached to
- CANOPY REPLACEMENT R. S. KERR LOCK AND DAM Federal contract opportunity
- Solicitation number
- W912BV23Q0056
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RSK Canopy Drawings.docx | DOCX document | |
| RSK Canopy Drawings.pdf | ||
| SOLICITATION W912BV23Q0056 CANOPY FABRICATION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W912BV23Q0056 CANOPY REPLACEMENT RS KERR
1. Amendment 0001 is hereby executed to Remove Install or Installation in Requirement Description of Scope of Work and RSK Canopy Draw ing. NO INSTALLATION REQUIRED.
2. Offers are now due at 5:00PM Central Time on 9-May-2023.
3. All other terms and conditions remain unchanged.
4. The Government Point of Contact is Jereme Kemp, Contract Specialist, (918)669-4392 (Jereme.a.kemp@usace.army.mil)
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-May-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BV23Q0056
X 9B. DATED (SEE ITEM 11)
17-Apr-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-May-2023
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV23Q0056
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 05-May-2023 02:00 PM to 09-May-2023 02:00 PM.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
Statement of Work Replace Gate 12 Canopy
Robert S Kerr Navigation Project Office, Sallisaw, Ok. (Sequoyah County)
PART 1 GENERAL
1.1 Project Summary of Work
Work includes the fabrication and assembly of an aluminum canopy measuring 14’x 21’. Design shall be comparable to the existing canopies for the protection of the machinery on the work platform. The contractor shall furnish all services, materials, labor, formwork, equipment, permits, supplies, supervision, and travel. The canopy will be delivered to and assembled at Robert S. Kerr Marine Terminal, 460360 E. 1137 Rd, Sallisaw, OK 74955.
The contractor shall provide 48 hour notice prior to delivery.
The Contractor shall be responsible for the fabrication and assembly of an aluminum canopy measuring 14’x 21’ and design be in accordance with provided drawings. The use of neoprene isolation gaskets should be utilized when dissimilar metals are adjoined. Canopy roof shall not leak and will utilize a gutter and spout system to drain water.
The canopy will use four aluminum posts to anchor to the support structure and feature stainless steel lifting eyes in four locations on top. Design of the new canopy will be reviewed and approved by the Government before fabrication. The contractor will be responsible for field verifying measurements to utilize the original bolt pattern used to anchor the structure to the support beams. No electrical work required in contract.
1.2 BASIS FOR PAYMENT
The payment shall be made after completion after final delivery and fabrication. Send invoice for payment to Jody Perkins, Contracting Officer Representative (COR), by email: jody.c.perkins@usace.army.mil.
1.3 WORK HOURS
Regular work hours, from Monday through Friday, shall be coordinated with Jody Perkins (COR) to exclude federal holidays. Any proposed changes to the work hours must be approved by the Contracting Officer.
1.4 COMPLETION TIME
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after receipt of award, and complete final delivery not later than 60 days.
1.5 LIQUIDATED DAMAGES-52.211-11 Liquidated Damages-Supplies
If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $510.00 for each calendar day of delay until the work is completed or accepted.
If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
1.6 SAFETY REQUIREMENTS
The contractor shall comply with the Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 latest Edition, and all applicable Federal, State, and local safety codes and practices. Contractor shall provide to the government a detailed safety plan for accomplishment of work. The safety plan shall be approved by the government before start of work. It is the contractor’s responsibility to ensure public safety during the entire duration of the contract. Necessary signs, barriers, warning devices, etc. shall be operated and maintained by the contractor at contractor expense. Contractor employees shall comply with the minimum dress requirements as stated in Chapter 7 of EM 385-1-1.
1.7 EQUIPMENT
All equipment used to perform work under this contract shall be in good operating and mechanical condition and shall comply with Section 18 of EM 385-1-1. Equipment shall be inspected by the contractor and the inspection reports shall be submitted to the Contracting Officer prior to utilization of such equipment to accomplish work on this contract.
1.8 WEATHER LIMITATIONS-52.212-4(f) Excusable Delays
The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
1.9 SUBMITTAL DESCRIPTIONS
Prior to Commencement of Fabrication, Coordinate with Contracting Officers Representative for reviews and approvals regarding Shop drawings, diagrams, instructions from a manufacturer of fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
1.10 PREWORK CONFERENCE
A prework conference will be held with the Contracting Officer and contractor prior to the commencement of any work. The contractor’s responsible person, necessary administrative staff, and major subcontractors will be required to attend this meeting. Procedures for proper invoicing and payment, schedule, submittals, etc., will be covered at this time.
1.11 ENVIRONMENTAL CLEANUP
The contractor shall always maintain a clean work area. The contractor shall be responsible for the protection of the environment and will be required to restore all damages subject to the approval of the contracting officer. The contractor shall remove and dispose of all debris off Government property in a state approved disposal site unless specified otherwise. The contractor will be required to comply with Federal and State environmental requirements.
1.12 KEY PERSONNEL
Contracting Officer, Contracting Officers Representative (COR) and official representative for contractor with authority to
1.14 Sustainability
The contractor shall meet the recycled paper content requirements set forth by EPA for post-consumer recycled copy paper. Identifying Greener Paper and environmental attributes to consider when selecting copy paper to comply with EPA – Designated Recovered Material Products can be found at https://www.epa.gov/greenerproducts/identify-greener-products-and-services. See contract clauses 52.204-4 and 52.223-17
PART 2 EXECUTION
2.1 CONTROL OF WATER
The Contractor shall take all precautions and actions necessary to keep the work area free from surface water and seepage water until completion of work. The Contractor shall adequately protect exposed materials at the end of each workday or when rainfall is imminent.
2.2 PUBLIC SAFETY
The Contractor shall perform all activities in accordance with EM 385-1-1.
In addition, the Contractor's work plan, and construction methods shall be developed and executed with the understanding that public safety will not be compromised. The Contractor shall plan and execute the work to maintain public safety during both active work times and non-work times. The Contractor shall leave the work area daily in such a manner that public safety is maintained during non-work hours.
2.3 CONTRACTOR STAGING AREA
The Contractor will be provided an area at the RS Kerr marine terminal for staging building materials during the assembly of the canopy, limits for staging, storage, and any other contract activities. The Contractor shall provide all necessary facilities (gates, fences, gravel, office trailers, storage buildings, fuel tanks, etc.) and utilities. The Government will provide no facilities. The Contractor shall obliterate all facilities and return all areas to pre-contract state (including grading and turfing, as applicable) before the contract is deemed by the Government to be complete.
Payment may be withheld pending acceptable obliteration of these facilities.
2.4 SPECIFICATIONS
The Contractor shall obtain all required information, measurements, dimensions, etc. necessary to field verify all existing conditions and dimensions and provide the specified Detailed Work Plan, and all other necessary submittal information. If there are existing conditions that appear to affect the proposed construction, the Contractor shall inform the COR in writing before proceeding with any manufacturing or construction processes, including ordering of materials.
PART 3 PRODUCTS
3.1 MATERIALS AND CONSTRUCTION
Work includes the fabrication and assembly of an aluminum canopy for the protection of the machinery on the work platform. The contractor shall furnish all services, materials, labor, supplies, supervision, and travel as required in connection with the fabrication of an aluminum canopy for Pier 12 at RS Kerr Lock & Dam 15 Spillway.
Height:
Overall height 7’ 6 ½” Support Column:
4 3” Sch 40 aluminum posts 7’ height Post base plate:
Aluminum 7” x 5/8” x 7” with bolt pattern that matches existing mounting holes on Robert S. Kerr gate 12 work platform.
Fittings:
All fittings to be first grade malleable iron, pressed steel or aluminum. Hardware must meet or exceed original specifications.
Assembly The new canopy will be assembled onsite. Assembly methods are the responsibility of the contractor.
3.2 DELIVERY AND STORAGE
Materials shall be delivered with 48 hour notice to the Robert S. Kerr Marine Terminal undamaged and stored out of contact with the ground. Materials that are damaged during the delivery or improper storage shall be replaced at no cost to the government.
3.3 GOVERNMENT FACILITIES
The Contractor shall be furnished a laydown area at the RS Kerr marine terminal.
3.4 WARRANTY
Contractor will guarantee warranty on all parts, and all completed work shall be free of any defects and poor workmanship for a period of 1 year from date of receipt and acceptance. All defects and poor workmanship found will be corrected with no extra charge to the government.
(End of Summary of Changes)