This document contains a quality assurance surveillance plan and work schedules for park cleaning services. The contractor will be responsible for cleaning several public use areas including toilets, picnic shelters, trailer dump stations, and boat ramps according to the specified schedules. Additional cleanings will be required for certain holiday weekends. The quality assurance surveillance plan establishes performance standards of excellent, very good, satisfactory, marginal, and unsatisfactory. Inspections will be conducted by the Contracting Officer's Representative to ensure the work schedule is properly followed. Failure to meet the acceptable scheduling level may result in affected payments, cure notices, or contract termination.

View the file

Other files

File Type Posted
Released Amendment 0002 Solicitation W912BV23Q0025.pdf PDF
Bid Schedule 2.docx DOCX document
Released Amendment 23Q0025 U00001.pdf PDF
Attachments.docx DOCX document
FG Park Cln Bid Schedule 2018.docx DOCX document
Solicitation W912BV23Q0025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 3 - EXAMPLE OF JOB HAZARD ANALYSIS

ACCIDENT PREVENTION PROGRAM JOB HAZARD ANALYSIS

1. PROJECT 2. CONTRACTOR 3.DATE

4. LOCATION 5. CONTRACT NO. 6. START DATE

7. PHASE OF WORK
8. SAFETY HAZARD
9. PRECAUTIONARY ACTION TAKEN
Park cleaning
Liquids spilled on toilet floors
Spills will be mopped up as soon as possible to prevent an injury from falling.
Mopping floors
When floors are being mopped, signs shall be posted or doors to toilets shall be locked, to warn the public of possible slipping hazard.
Motor vehicle operation
When operating any motor vehicle, personnel will have a current, valid state operator’s license in their possession. Seat belts will be worn at all times when vehicle is in operation. Vehicles will be operated at posted speeds or lesser as indicated by road and weather conditions.

Vehicles will be operated in a safe manner. Personnel will always have vehicles under control. Exit or entrance to vehicles will not be permitted while vehicle is in motion. No vehicle will be left unattended unless the engine is shut off, key removed, parking brake set, and gear selector in park. Every passenger will have a seat and wear a seatbelt. There will be no riders permitted in the back of pickups, flatbed trucks, etc.

Traffic
Practice defensive driving techniques. Properly position mirrors for turning and backing. All vehicles will stop at railroad crossings and determine if a train is approaching before proceeding. Care shall be used in entering access or primary roads. All appropriate State Motor Vehicle Operating laws will always be observed.
Refuse disposal
Trucks used for refuse disposal will be in good operating condition. Vehicles will be operated in a safe manner. Trucks will have covers to prevent trash from flying out causing a driving hazard to others.

W912BV23Q0025 Attachments

7. PHASE OF WORK
8. SAFETY HAZARD
9. PRECAUTIONARY ACTION TAKEN
Lifting
Always use proper lifting techniques. Use adequate manpower or mechanical assistance.
Weather
If lightning is present, personnel will move to a clear area away from trees and equipment and will remain there until the danger passes or if the Foreman directs them to another location.

10. CONTRACTOR (Signature/Date)

11. DISCUSSED WITH CONTRACTOR/ON-SITE SUPERVISOR ON (Date)

12. _______________________________________________________ CONTRACTING OFFICER or REPRESENTATIVE (Signature/Date)

EXHIBIT 4 - WORK SCHEDULE FOR PARK CLEANING

SCHEDULE OF CLEANING SERVICES, To

CREW NO.

No. OF PERSONNEL IN CREW

SHEET OF

PUBLIC USE AREA

COMPLETION TIME

SERVICE
WORKDAYS

Toilets, Change houses, & Overlooks

Picnic Shelters

Picnic & Camping Sites

Trailer Dump Stations

Bulletin Boards

Drinking Fountains

Courtesy Docks

Groundskeeping - PUA’s & Access Roads

Groundskeeping - Small Litter Pickup

Groundskeeping - Nature & Hiking Trails

Groundskeeping - Primitive Areas

Groundskeeping - Fishing Areas

Groundskeeping - Embankment Road

See Reverse for Instructions

INSTRUCTIONS:

1. List all public use areas given in Table A-2 in the order they are to be cleaned.

2. In the boxes to the right of the services listed, enter M, T, W, Th, F, Sa, and/or S, for work performed at a weekly frequency or greater. For work performed at less than a weekly frequency, i.e. monthly, enter M, T, W, Th, F, Sa, or S, preceded by a number to indicate the day of the month, i.e., the second Tuesday of the month would be 2T. Proceed with an asterisk (*) to indicate bimonthly frequency, i.e., *2T.

3. On the Completion Times, give the time (30 minutes) that work will be completed in each public use area.

SCHEDULE OF CLEANING SERVICES, 01 April to 31 October SHEET Crew No./Crew:

OF

PUBLIC USE AREA:

Blue Bill Point

Damsite East

Damsite North

Damsite South

Flat Rock

Overlook

Rocky Point Taylor Ferry Beach - May 1st

ARRIVAL TIME:

SERVICE

WORKDAYS

Toilets, Change houses, & Overlooks

Su M W F Sa Su M W F Sa

N/A

Sa

Su M W F Sa

M W Sa Su M W F Sa

Su M F Sa

Picnic Shelters

M F

N/A

N/A

M F

M F

M F

Cookers/Fire Rings

Monthly

N/A

N/A

Monthly

Monthly

Monthly

Monthly

Semi-Monthly

Trailer Dump Stations

Su M W F Sa

N/A

N/A

Sa

Su M W F Sa

N/A Su M W F Sa

N/A

Courtesy Docks/Boat Ramp Areas & Boat Ramps

Weekly

N/A

M F

M F

Weekly

N/A

Weekly

N/A

Groundskeeping - PUA’s,& Access Roads & Parking Areas

M F

M F

M F

M F

M F

M F

M F

M F

Grounds keeping - Fishing Areas

N/A Su M W F Sa

N/A Su M W F Sa

N/A

N/A

N/A

N/A

Grounds keeping - Embankment Road

N/A

N/A

N/A

Weekly

N/A

N/A

N/A

Refuse Collection

Su M W F Sa (Cans)

N/A

N/A

N/A

N/A

N/A Su M W F Sa (Cans)

1. List all public use areas given in Table A-2 in the order they are to be cleaned.

2. In the boxes to the right of the services listed, enter M, T, W, Th, F, Sa, and/or S, for work performed at a weekly frequency or greater. For work performed at less than a weekly frequency, i.e. monthly, enter M, T, W, Th, F, Sa, or S, preceded by a number to indicate the day of the month, i.e., the second Tuesday of the month would be 2T. Proceed with an asterisk (*) to indicate bimonthly frequency, i.e., *2T.

3. On the Completion Times, give the time (30 minutes) that work will be completed in each public use area.

SCHEDULE OF CLEANING SERVICES, 01 April to 31 October SHEET

OF

Taylor Ferry North
Taylor Ferry South

Wahoo Bay Wagoner Park (Toppers)

Wildwood

Hwy 251A Road

Afton Landing

Bluff Landing

ARRIVAL TIME:

Toilets, Change houses, & Overlooks

Su M F Sa Su M W F Sa

M W Sa

M W Sa Su M W F Sa

N/A

Picnic Shelters

N/A

N/A

N/A

M F

N/A

M F

M F

Cookers/Fire Rings

Monthly

Monthly

Monthly

N/A

Monthly

N/A

Monthly

Monthly

Trailer Dump Stations

N/A Su M W F Sa

N/A

N/A Su M W F Sa

N/A

Su M W F Sa

Su M W F Sa

Courtesy Docks/Boat Ramp Areas

Weekly

Weekly

Weekly

Weekly

Weekly

N/A

Weekly

Weekly

Groundskeeping - PUA’s, Access Roads & Parking Areas

M F

M F

M F

M F

M F

M F

M F

M F

Grounds keeping - Fishing Areas

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Grounds keeping - Embankment Road

N/A

N/A

N/A

N/A

N/A

N/A

Refuse Collection

N/A

N/A

M W Sa

N/A

N/A

2. In the boxes to the right of the services listed, enter M, T, W, Th, F, Sa, and/or S, for work performed at a weekly frequency or greater. For work performed at less than a weekly frequency, i.e. monthly, enter M, T, W, Th, F, Sa, or S, preceded by a number to indicate the day of the month, i.e., the second Tuesday of the month would be 2T. Proceed with an asterisk (*) to indicate bimonthly frequency, i.e., *2T.

3. On the Completion Times, give the time (30 minutes) that work will be completed in each public use area.

SCHEDULE OF CLEANING SERVICES, 2nd Cleanings - Holiday Weekends SHEET OF

SCHEDULE OF CLEANING SERVICES, 2nd Cleanings - Memorial Day Weekend

PUBLIC USE AREA:

Blue Bill Point Damsite Park South

Flat Rock Rocky Point Taylor Ferry South

Wildwood Afton Landing Bluff Landing

Performance Period:

3 pm - 6 pm

3 pm - 6 pm

3 pm - 6 pm

3 pm - 6 pm

3 pm - 6 pm

3 pm - 6 pm 3 pm - 6 pm 3 pm - 6 pm

ARRIVAL TIME:

WORKDAYS

Toilets, Change houses, & Overlooks

Sa Su M

Sa Su M

Sa

Su

M

Sa Su M

Sa Su M

Sa Su M

Sa Su M

SCHEDULE OF CLEANING SERVICES 2nd Cleanings Fourth of July Holiday: July 2,3,4 and 5

Damsite Park South

Flat Rock Rocky Point Taylor Ferry South

Wildwood Afton Landing Bluff Landing

Performance Period:

3 pm - 6 pm

3 pm - 6 pm

3 pm - 6 pm

3 pm - 6 pm

3 pm - 6 pm

3 pm - 6 pm 3 pm - 6 pm 3 pm - 6 pm

See Above

N/A See Above Sa

Su

See Above

See Above

SCHEDULE OF CLEANING SERVICES, 2nd Cleanings - Labor Day Weekend

Damsite Park South

Flat Rock Rocky Point Taylor Ferry South

Wildwood Afton Landing Bluff Landing

Performance Period:

3 pm - 6 pm

3 pm - 6 pm

3 pm - 6 pm

3 pm - 6 pm

3 pm - 6 pm

3 pm - 6 pm 3 pm - 6 pm 3 pm - 6 pm

Sa Su M

Sa Su M

Sa

Su

M

Sa Su M

Sa Su M

Sa Su M

2. In the boxes to the right of the services listed, enter M, T, W, Th, F, Sa, and/or S, for work performed at a weekly frequency or greater. For work performed at less than a weekly frequency, i.e. monthly, enter M, T, W, Th, F, Sa, or S, preceded by a number to indicate the day of the month, i.e., the second Tuesday of the month would be 2T. Proceed with an asterisk (*) to indicate bimonthly frequency, i.e., *2T.

3. On the Completion Times, give the time (30 minutes) that work will be completed in each public use area.

Appendix B Quality Assurance Surveillance Plan (QASP)

Performance Objective

Performance Standard
Quality Level
Methods of Inspection and Frequency
Remedy

The contractor shall conduct tasking within the park cleaning work schedule provided with the contract specifications

The contract specifications are performed without causing programmatic delay to the Government or violating the schedule provided in the contract.
Excellent: Performance and products meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective. No impact to programs.

Very Good: Performance and products meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective. No impact to programs.

Satisfactory: Performance and products meet the standard with few exceptions, resulting in minimal delays.

Marginal: Performance and products result in moderate delay or impact to programs.

Unsatisfactory: Performance and products Each category will be evaluated upon deliverable submissions according to the scope. Inspections will be based upon Government teammates’ evaluation reports, verified customer complaints or 100% inspection method through the performance period.

Unscheduled inspections may be performed at any time. The overall performance rating will be assigned by the Contracting Officer’s Representative (COR).

Contractor teammates input and customer input-surveys may also be considered at the discretion of the COR.

The contractor shall develop a plan for recovery.

Continuous review until performance is satisfactory or better. Elevate to higher level of contract management if actions fail to result in improvement.

If the acceptable scheduling level falls below Satisfactory, payments may be affected, and/or a Cure Notice and/or Show Cause Letter may be issued which may result in contract termination.

QUALITY ASSURANCE SURVEILLANCE PLAN

NOTE:

The Contracting Officer Representative (COR), at their discretion, may utilize qualified and experienced, in-house personnel to perform quality assurance surveillance inspections to assistance and support the designated COR. This individual shall be approved, in writing by the Project Manager and the COR. The quality assurance representative (QAR) shall be individuals deemed qualified to perform QA surveillance without conflict of their regular duties or as their job duties prohibit such action. QAR shall have a complete and thorough knowledge of the specifications and performance requirements of the contract/s they are inspecting. Under no circumstances shall the QAR direct, lead, supervise or interfere with the contractors while they are performing contractual duties (with the exception of the observance of any safety violations). All QARs shall adhere to the Quality Assurance Surveillance Plan (QASP) contained within the contract specifications and shall provide a written QA report to the COR on regular and consistent basis. Any deficiencies or violations reported to the COR shall be reviewed promptly and a follow up inspection may be performed personally by the COR for further required action. Notification of the deficiencies or violations for corrective action will be reported to prime contractor by the COR or Contracting Officer (CO), if applicable.