SF 30 BLOCK 14 CONTINUATION PAGE AM0003 - W912BV23Q0001.pdf

PDF 175 KB Posted

Attached to
Motor Control Center
Solicitation number
W912BV23Q0001
Issued by

About this file

This amendment to a solicitation extends the proposal due date for a supply contract seeking a 480V motor control center. Amendment 0003 to solicitation W912BV23Q0001 shifts the response deadline from November 25th, 2022 at 2:00 PM CST for the "RS Kerr Powerhouse, 480V Motor Control Center Supply" project being procured by the Department of the Army Corps of Engineers Engineering District Tulsa. No other changes are made by this amendment and all other solicitation terms and conditions remain the same.

View the file

Other files

File Type Posted
SF 30 BLOCK 14 CONTINUATION PAGE AM0004.docx DOCX document
RMS Supply.docx DOCX document
Bidder questions and reply_AM0004.pdf PDF
13 48 00.00 26.pdf PDF
SF 30 BLOCK 14 CONTINUATION PAGE AM0002.pdf PDF
RS Kerr MCC Replacement Reference Drawings.pdf PDF
Wire and Cable .pdf PDF
SF 30 BLOCK 14 CONTINUATION PAGE AM0001.pdf PDF
W912BV23Q0001.pdf PDF
RS Kerr MCC Supply RTA Contract Drawings-20220112_r1.pdf PDF
Specs.pdf PDF
Draft - W912BV23Q0001.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912BV23Q0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. Amendment 0003 is issued to extend the RFP due to 25 November 2022 at 2:00 PM CST. All other terms and conditions remain unchanged by this amendment.

2. Delete the following sections in their entirety:

DELETED SECTIONS

N/A

3. The revised drawings listed below are hereby added to or revised and made a part of the solicitation:

REVISED DRAWINGS

N/A

ADDED DRAWINGS

N/A

-- END CONTINUATION SHEET --

File details come from the government source that posted it. Updated .