Released Amendment 0003 Solicitation W912BV21R0025 50M SDVOSB MEGA IDC.pdf
PDF 410 KB Posted
- Solicitation number
- W912BV21R0025
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
$50M Service-Disabled Veteran-Ow ned Small Business (SDVOSB) Multiple Environmental Government Acquisition (MEGA) Indefinite
Delivery Contract (IDC) for Environmental Remediation Services (ERS) Projects Assigned to the Regional Planning and Environmental Center
(RPEC) and as Assigned to the Southw estern Division (SWD) and South Pacif ic Division (SPD)
1. Amendment #0003 is being issued to replace Section B, Pricing Schedule; Section J, Example Project PWS; Attachment L-1, Milestone
Payment Schedule Without Cost; and Attachment L-2, Milestone Payment Schedule With Cost.
2. The point of contact for this action is Joshua Hope, 918-669-7460.
1. CONTRACT ID CODE PAGE OF PAGES
1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-May-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV21R0025
X 9B. DATED (SEE ITEM 11)
25-Mar-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-May-2021
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV21R0025
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Section B, Price Schedule 22 16-MAR-2021
Attachment 2 Section J, Example
Project Attach L-1 w/o
Cost
2 16-MAR-2021
Attachment 3 Section J, Example
Project Attach L-2 With
Cost
3 16-MAR-2021
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Amndmt 0003 Section B, Pricing Schedule
22 13-MAY-2021
Attachment 2 Amndmt 0003 Attach L-1
MPS wo Cost
2 13-MAY-2021
Attachment 3 Amndmt 0003 Attach L-2
MPS w/Cost
3 13-MAY-2021
The following have been added by full text:
AMDMT 0003 EXAMPLE PROJECT PWS
Section J
Solicitation #W912BV-21-R-0025
EXAMPLE PROJECT
PERFORMANCE WORK STATEMENT (PWS)
EXCAVATION AND DISPOSAL
TNT CONTAMINATED AREA
LSAAP, TEXARKANA, TEXAS
Amendment #0001
Amendment #0003
13 April 2021
23 April 2021
16 March 2021
**Note to Offerors: This is an Example Project, with no existing documentation (i.e. RI/FS, Decision Document, site figures, site address, etc.). This Example Project will not be awarded. Offerors will develop a technical approach and proposed price based on Section L requirements and the information contained therein.
1.0. INTRODUCTION
This an Example Project for a non-personal services contract to provide in excavation and disposal remediation actions at Lonestar Army Ammunition Plant (LSAAP) approximately 12 miles west of Texarkana, TX. The
Government shall not exercise any supervision or control over the Contractor and its subcontractors performing the services herein. Such contract service providers shall be accountable solely to the primary Contractor who, in turn is responsible to the Government.
1.1. Background
LSAAP was constructed during World War II. Immediately following the completion of initial construction, the
Lone Star Defense Corporation, a subsidiary of the B.F. Goodrich Company, Akron, Ohio, placed the plant into active production. Goodrich operated the plant during World War II and for several months thereafter in conjunction with closeout procedures. Effective November 4, 1945, Lone Star Ordnance Plant was incorporated with Red River
Ordnance Depot, and a few months later the name of the installation was changed to Red River Arsenal. In the early part of 1950, Lone Star was selected for reactivation and Day and Zimmermann, Inc. was selected as the architect and operating engineer. Effective November 1, 1951, the plant was designated Lone Star Ordnance Plant, a Class II industrial activity under the jurisdiction of the Chief of Ordnance. On July 1, 1963, the plant was re-designated
LSAAP. Early in 1969, ammunition production activities began to decline.
LSAAP was a government owned/Contractor operated (GOCO) facility that produced a variety of military munitions. LSAAP occupied over 15,000 acres of land on which the various functions necessary to load, assemble and pack (LAP) ammunition items for the Army were performed and maintained. The plant contained an administration area, thirteen (13) production lines, seven (7) storage areas, maintenance shops, a railroad classification yard, a sewage treatment plant, demolition areas, a high explosives (HE) burning ground, a munitions test area, landfills (active and closed) and a fire-fighting pumping station.
The site referenced in this PWS is a 100 ft x 135ft area that is easily accessed by paved roadways (the excavation site is approximately 50 feet from the roadway) and no overhead or underground utilities remain active or are abandoned in place. While electricity is the only utility available for the contractor’s use, at the contractor’s cost after coordination with the local utility company, from a pole approximately 25’ from the excavation site, a fire hydrant is located approximately 2 blocks away and can be used at no charge for dust control and other contract requirements. The contractor can also utilize the area near the power pole as their laydown area during field activities, but must provide their own security for all equipment. The excavation site area remains to be developed for use; therefore, the contractor can expect little to no traffic during field activities.
1.2. The contractor is ultimately responsible for meeting all performance objectives within the task order’s performance period specified in this PWS. Performance Objectives and Standards are presented in Table 1 below:
TABLE 1 – PERFORMANCE OBJECTIVES AND STANDARDS
DESCRIPTION Task Performance Objective Performance Standard
Project Management Task 1 Complete all Project
Management Plans and
Deliverables
USACE Accepted Final Documents
Optimized UFP-
QAPP/SWPPP
Task 2 Prepare an acceptable
Optimized UFP-QAPP
/SWPPP identifying all activities that will take place to achieve site closure.
USACE and TCEQ Approved Final
Optimized UFP-QAPP/SWPPP.
Explosive Safety
Submission (ESS)
Task 3 Prepare an acceptable ESS and approval through
DDESB
USACE and DDESB Approved Final
ESS.
Soil Excavation and
Disposal
Task 4 Implement the Proposed
Plan’s and Decision
Document’s Primary
Remediation Alternative
USACE Accepted Final Completion
Report with Photo Documentation, and
Waste Manifests and Landfill Receipts
Excavation Site
Sampling
Task 5 Laboratory validation that no residual contamination remains at excavated site
USACE Accepted Sampling Report
Excavation Site
Backfill
Task 6 Backfill excavated site in accordance with ASTM
D698
USACE Accepted Compaction Report
Excavation Site Re-vegetation
Task 7 Restore excavated site with native grass with at least 70% survival rate
USACE Verified Vegetation Survival
Rate
Response Action
Completion Report
(RACR), Request for
No Further Action
(NFA) and Site Closure
Task 8 Achieve Site Closure USACE and TCEQ approved Final
RACR
After Action Report
(AAR)
Task 9
Prepare an acceptable AAR that identifies all activities completed and closes out the
ESS
USACE and DDESB approved Final
AAR
2.0. SCOPE
A site-specific Remedial Investigation and Feasibility Assessment (RI/FS) was conducted in 2016, which identified
Trinitrotoluene (TNT) contamination in the area caused by previous demolition activities. A Feasibility Study was developed with various alternatives for remediation of this site. Based on this Feasibility Study, Excavation and
Disposal was selected as the primary remediation alternative in the proposed plan and decision document.
The overall objective of this task order is to excavate and dispose of TNT contaminated soil to reduce the concentration of TNT to meet the TCEQ Tier 1 Residential Total Soil Combined PCL of 3.3E+01 mg/kg.
The contractor shall provide all personnel, supervision, equipment, supplies, facilities, transportation, tools, materials, and any other items or services necessary to perform the environmental remediation services to meet the performance objectives of this PWS in accordance with all applicable federal, state and local laws and regulations, and relevant Department of Defense (DoD), Army and USACE policies for the duration of the contract.
3.0. PROJECT MILESTONES
Performance Milestones are identified in Table 2 – Performance Milestones. The Contractor shall propose pricing for the performance milestones utilizing Attachment L-2, Milestone Payment Schedule with Cost. (NOTE: The
Excel version of Attachment L-2 provided with the RFP shall be submitted with the Offeror’s Volume II, Factor 6.) The Contractor must utilize Attachment L-1, Milestone Payment Schedule without Cost to identify their anticipated scheduled start and completion dates for each milestone, based upon their overall project schedule. The
Contractor may NOT propose interim milestones to the Performance Milestones within Table 2. As noted in
Section 10, payments will be tied to the successful completion of a milestone, or an interim milestone, approved by the Contracting Officer, through the COR.
Table 2 – Performance Milestones
TABLE 2 – PERFORMANCE MILESTONES
CLIN Milestone Task
Performance Acceptance
Standards and Approval
Authority
Deliverable
TASK 1 – PROJECT MANAGEMENT
0001 Project Kick-Off Meeting via teleconference within 15 calendar days of contract award
Meeting minutes due within 7 calendar days
USACE
Project Kick-off
Meeting Minutes
0002 Project Management Plan (PMP)
Draft PMP due within 21 calendar days of contract award.
Government will provide comments to the Draft PMP within
15 calendar days.
Final PMP due within 21 calendar days after receipt of Government comments on Draft.
Draft PMP
Approved Final
PMP
Authority
Deliverable
0003 Quality Assurance/Quality Control
(QA/QC) Plan
Draft QA/QC Plan due within 15 calendar days of contract award.
Government will provide comments to the Draft QA/QC
Plan within 21 calendar days.
Final QA/QC Plan due within 10 calendar days after receipt of
Government comments on Draft.
Draft QA/QC Plan
Approved Final
QA/QC Plan
0004 Monthly Progress Reports
Submitted with the invoice not later than the 10th of each month via email
USACE Approved Monthly
Progress Report
0005 Accident Prevention Plan (APP)/Site Safety and Health Plan (SSHP)
Due within 21 calendar days prior to site mobilization
USACE Approved
APP/SSHP
0006 Annual Contractor Manpower Reporting
Complete manpower reporting in accordance with PWS Section
4.1.6
Reporting period shall end 30
September of each year
Copy of submitted Contractor
Manpower Report shall be submitted to the USACE PM/TM no later than 31 October of each year
2 reports will be required for the following periods:
o Ending 30 Sept 2022 o Ending 30 Sept 2023
USACE Annual Contractor
Manpower Report
TASK 2 – UFP-QAPP
0007 Optimized UFP-QAPP
Draft UFP-QAPP due within 30 calendar days of kick-off meeting
Government will provide comments within 30 calendar days
Final due within 14 calendar days of receipt of comments on the
Draft
TCEQ
Draft UFP-QAPP
Optimized UFP-
QAPP approved by
Authority
Deliverable
0008 Stormwater Pollution Prevention Plan
(SWPPP)
Draft and Final SWPP due in accordance with the approved
UFP-QAPP
USACE and TCEQ Final SWPPP approved by TCEQ
TASK 3 - ESS
0009 Explosive Safety Submission (ESS)
Draft ESS due within 60 calendar days of kick-off meeting
Government will provide comments within 30 calendar days
Final due within 14 calendar days of receipt of comments on the
USACE, USATCES, and
DDESB
ESS approved by
TASK 4 – EXCAVATION AND DISPOSAL
0010 Excavation and Disposal
Excavate and dispose of 3,000 CY of contaminated soil from the TNT contaminated area
Excavation site boundary is clearly marked; dimensions are approximately 100’ x 135’ x 6’
USACE Excavated Soil
Waste Manifests and Landfill
Receipts
TASK 5 – EXCAVATION SITE SAMPLING
0011 Sampling
Sampling Report due within 14 calendar days after laboratory validation
USACE Sampling Report
TASK 6 – EXCAVATION SITE BACKFILL
0012 Backfill
Backfill placed in lifts no greater than 8-inches and compacted to
95% Proctor (IAW ASTM D698)
Upper compacted layer may be less than 95% to achieve the required re-vegetation rate
Compaction Test Report due within 7 calendar days of compaction test
USACE Compaction Test
Report
Authority
Deliverable
TASK 7 – EXCAVATION SITE RE-VEGATATION
0013 Re-vegetation
Shall be grass seed mixture native to the Texarkana area to completely re-vegetate the excavated area
Shall achieve a survival rate of at least 70% coverage of the excavation site
USACE Letter of
Completion and
Photo
Documentation
TASK 8 – RACR, NFA, SITE CLOSURE
0014 Final Response Action Completion Report
(RACR) & Site Closure
Draft RACR due within 60 calendar days of completion of all field activities
Government will provide comments within 21 calendar days
Final RACR due within 14 calendar days of receipt of comments on the Draft
Draft RACR
Final RACR approved by TCEQ
TASK 9 8 – AAR, ESS CLOSEOUT
0015 Final After Action Report (AAR)
Draft AAR due within 60 calendar days of completion of all field activities
Government will provide comments within 21 calendar days
Final AAR due within 14 calendar days of receipt of comments on the
Draft
USACE, EMCX,
USATCES, and DDESB
Final AAR approved by
4.0. TASK DESCRIPTIONS
4.1. Task 1 – Project Management:
The contractor shall provide Contract Management for performing the PWS requirements. The contractor shall provide Contract management including prime and subcontract support as required, internal project controls and
Quality Control (QC), status reports on work being performed under this contract, invoicing and pay requests, and other coordination and personnel support for the individuals assigned to this contract. A Project Manager will be designated by the Contractor as the single POC for all contract performance and administrative matters. A list of required submittals and their review times are identified in PWS Attachment 1 – Deliverables Schedule.
4.1.1. Project Kick-Off Meeting (DELIVERABLE)
The Contractor shall participate in a kick-off meeting via teleconference within 15 calendar days of task order award. The kick-off meeting will provide an introduction of both contractor and Government personnel, personnel roles and responsibilities, discuss the contractual requirements, and lay out the path forward for successful contract execution. The Contractor shall prepare meeting minutes and provide them to all meeting participants within 7 calendar days of the kick-off meeting. All contractor key personnel will attend this meeting. (See Section 5 of this
PWS for Key Personnel)
4.1.2. Project Management Plan (DELIVERABLE)
The Contractor shall prepare and maintain a Project Management Plan (PMP) that is based on the Contractor’s proposal that, at a minimum, includes technical approach, management organization and integration of the contractor’s project team, their responsibilities and authorities, schedule and schedule management, transitional activities (if any), risk management, quality management, health and safety management, project communications and stakeholders, and security management. The PMP must remain current throughout the performance period of the contract and be updated when any changes occur.
The PMP shall also present a detailed discussion of lines of communication. The contractor shall coordinate and receive approval from USACE prior to communicating with regulatory and external stakeholders with the exception of routine and necessary coordination with the landowners adjacent to the excavation site, if necessary, during the field efforts. All written correspondence (except for email) from USACE to any stakeholder will be signed by an
USACE representative unless otherwise directed. For other communications, the Contractor shall coordinate with the USACE COR or USACE Project Manager (PM). The USACE COR or PM will provide guidance to the
Contractor on communications with upper level management. If conference calls are required to adequately address concerns, issues, and/or questions, the Contractor shall be responsible for setting up conference call lines.
Contractual issues will be directed to the USACE COR or contracting officer (KO).
As part of the PMP, the Contractor shall, 1) develop and maintain a Work Breakdown Structure (WBS). The
Contractor shall submit a WBS in the PMP. The WBS shall be prepared in hard copy and electronic copy in
Microsoft Project version 2007 or 2010 (or compatible.) The WBS shall be provided to USACE monthly and upon request, and updated as required. The WBS shall include 100% of the work defined by this PWS and capture all field work elements and submittal development and deliverables. PMP shall describe the process by which the contractor will deliver weekly and monthly progress reports. Weekly and monthly progress reports shall be submitted during all fieldwork activities. During no fieldwork, or during demobilizations, the contractor shall submit only monthly progress reports.
The WBS shall fully support the technical approach and outline all activities and milestones defined at the appropriate level of detail, logically sequenced to support and manage completion of the performance objectives in the PWS and which allows for sufficient review time of deliverables. Additionally, the due dates for all payable deliverables shall be identified. Activities identified in the respective QASPs should be appropriately coded to allow for planning of QA inspections. USACE will make all payments after verification of milestone completion in accordance with the approved MPS. The Contractor will submit monthly invoices with appropriate back-up documentation no later than the 10th day of each month. Partial or bi-monthly invoicing is not allowed. All performance objectives must be completed within the allowable period of performance for the contract.
The draft PMP shall be submitted to the COR within 21 calendar days of Task Order award. USACE will provide comments within 15 calendar days. All comments shall be addressed by the Contractor and submit the Final PMP within 21 calendar days of receipt of USACE comments.
4.1.3. Quality Assurance/ Quality Control (QA/QC) Plan (DELIVERABLE) The Contractor shall prepare a separate QA/QC Plan that specifically addresses the work outlined in this PWS and what measures and techniques the contractor will be implementing to ensure the work performed is adequately monitored and verified for successful completion in accordance with the PWS requirements. The contractor’s quality control program is the means by which he/she is assured the work performed complies with the contract.
The Draft QA/QC Plan must be submitted to the PM and COR within 15 calendar days of task order award.
USACE will provide comments within 21 calendar days. All comments shall be addressed by the Contractor and submit the Final QA/QC Plan within 10 calendar days of receipt of USACE comments. The QA/QC Plan must be updated as necessary to remain current.
A list of required submittals and their review times are identified in PWS Attachment 1.
4.1.4. Progress Reports (DELIVERABLE)
The contractor shall submit to the COR and USACE PM a Monthly Progress Report by close of business the 10 th day of each month reporting the previous month’s activities. During all field work activities, the Contractor shall provide the COR and USACE PM a Weekly Progress Report in addition to the Monthly Progress Report, documenting the work in progress. The report for any week shall be provided by close of business on Monday of the following week. All reports must be as concise as possible, highlighting important progress, identifying potential issues (and a plan for their resolution) as well as key upcoming activities or events. When no fieldwork is in progress, or during demobilizations, the contractor shall submit only a Monthly Progress Report.
4.1.5. Accident Prevention Plan (APP) / Site Safety and Health Plan (SSHP) (DELIVERABLE) The contractor shall develop an Accident Prevention Plan (APP) / Site Safety and Health Plan (SSHP) for this contract as a standalone document and shall be submitted separately which will only be reviewed by USACE. Field activities shall not begin until the APP/SSHP has been reviewed and accepted by the COR. The AAP / SSHP shall be specific and shall address procedures to implement all of the activities described in the UFP-QAPP. The APP /
SSHP shall be submitted to the COR a minimum of 21 calendar days for review acceptance prior to starting field work; therefore, the contractor shall allow sufficient time for review and any revisions to the AAP/SSHP prior to mobilization. The contractor shall use the same APP / SSHP on all mobilizations, including corrective actions and update the Plan as area conditions warrant. In addition to the APP / SSHP, the contractor shall develop initial
Activity Hazards Analysis/Analyses (AHAs). The AHAs shall be posted in an area(s) available to all workers. The
AHAs shall be included in the APP. The APP / SSHP and AHAs shall be prepared in accordance with the most current edition of USACE Safety Manual, EM 385-1-1, as amended. A list of required submittals and their review times are listed in PWS Attachment 1.
Any changes to the risk assessment code (RAC) on an AHA must be submitted to USACE for approval before they are implemented by the field crew.
The Contractor shall ensure that its subcontractors, suppliers, and support personnel comply with the approved APP
/ SSHP. The USACE reserves the right to stop work under this contract for any violations of the APP / SSHP at no additional cost to the Government. Once the USACE verifies through the COR that a safety violation has been corrected, the Contractor will be authorized to continue work.
Engineering Manual 385-1-1, part 01.D "Accident Reporting and Recordkeeping" is required for the work identified in this PWS. The Contractor shall comply with all USACE guidance. The contractor shall report every accident, no matter how small or minor.
4.1.6. Contractor Manpower Reporting (CMR) (DELIVERABLE)
In accordance with FAR 4.1703, Section 743(a)(3) of Division C of Public Law 111-117, Office of Federal
Procurement Policy (OFPP) and the Revised Department of Defense Contractor Manpower Reporting Initiative, the contractor shall report required information for Services Contracts meeting specific thresholds and that are within four (4) prescribed Product Service Codes (PSCs). Contractors must log into their SAM profile accounts at www.SAM.gov to perform the contract reporting (also reference the SAM Quick Start Guide for Service Contract
Reporting).
SAM receives contract information from FPDS-NG and will enable reporting for entities with contracts that meet the required reporting thresholds and will auto-populate much of the required information for reporting. After logging into the SAM account, the Contractor will select ‘Entity Registration’ and then select ‘Service Contract
Reporting’. SAM will display the entities which have service contracts and meet the reporting criteria. Next, select
‘View by Entity’ to see the service contracts for each entity, then select ‘Add’ for the service contract against which a Service Contract Report is to be created. The Contractor will then be taken automatically to the Complete Service
Contract Report page. SAM automatically retrieves and displays the contract information.
http://www.sam.gov/
The required information to be entered is:
a. Total Amount Invoiced: Total dollar amount invoiced for services performed during the previous Government fiscal year under the contract (this amount should include the prime and any subcontract amount).
b. Prime Contractor Hours Expended: Prime Contractor direct labor hours expended on the services performed during the previous Government fiscal year. The amount you enter is automatically divided by 2,080 to calculate a
Full Time Employee (FTE) equivalent, displayed under the Prime Contractor Hours Expended as a Prime Contractor
FTEs.
c. Tier 1 Subcontractor Information: Report any required Tier 1 subcontractor information by selecting the ‘Add
Tier 1 Subcontract Information’ button.
Click ‘Submit’ once the report is completed. This saves the report and returns the user to the ‘Select Service
Contract’ page where another report can be created, or an existing report can be edited.
Any previously completed report can be edited as frequently as necessary until the end of the reporting period by selecting ‘View/Edit’ for the selected report.
Reporting must be completed annually by October 31 for each services performed under applicable services contracts during the preceding Government fiscal year (October 1-September 30).
4.2. Task 2 –Optimized UFP-QAPP (DELIVERABLE)
The Contractor shall prepare a draft and final Optimized UFP-QAPP and a Stormwater Pollution Prevention Plan
(SWPPP), in accordance with PWS Attachment 1 – Deliverables Schedule, to identify all the activities that will take place during the period of performance.
A draft Optimized UFP-QAPP shall be submitted to the USACE COR and the USACE PM for review and comments and the final Optimized UFP-QAPP shall be prepared based upon the resolution of the submitted comments and then submitted to the USACE COR and the USACE PM. Once final approval is given from the
USACE COR for the Optimized UFP-QAPP, the USACE shall submit it to the Texas Commission on
Environmental Quality (TCEQ) for review. The draft Optimized UFP-QAPP shall be submitted no later than 30 days from the date of kick off meeting. The Government will provide comments NLT 30 calendar days after submission of the Draft. The Final Optimized UFP-QAPP shall be submitted no later than 14 days from receipt of comments.
4.3. Task 3 – Explosive Safety Submission (DELIVERABLE)
The Contractor shall prepare a Draft Explosive Safety Submission (ESS) to be submitted to the USACE COR and
USACE PM within 60 calendar days of the kickoff meeting. USACE will review and provide comments to the
Draft within 30 calendar days. The Contractor shall address all comments and submit the Final ESS to the USACE
COR and USACE PM within 14 calendar days of receipt of comments. Once the Final ESS is approved by USACE, it will then be submitted to the DoD Explosive Safety Board (DDESB) for approval. The Contractor shall address any comments based on the DDESB review NLT 14 calendar days from receipt of comments.
Note: For purposes of this Example Project, assume no comments are received from USATCES and
DDESB on the Final ESS.
4.4. Task 4 – Excavation and Disposal (DELIVERABLE)
The Contractor shall perform excavation and disposal at the TNT contaminated site location in accordance with the proposed plan and decision document to remove 3,000 cubic yards of contaminated soil; for the purposes of this
Example Project, assume the excavation site dimension are approximately 100ft x 135ft x 6ft. The boundaries of the excavation site have been clearly marked; therefore, there are no survey requirements. The groundwater level is below the bottom of the excavation area.
The excavated soil shall be disposed of at a permitted facility authorized to handle the contaminated soil. The
Contractor will be required to submit to the USACE COR and USACE PM a copy of all associated waste manifests as well as a copy of all landfill receipts as evidence of proper soil disposal. For purposes of this project, the excavated contaminated soil shall be considered less than 10% contamination and therefore considered non-hazardous waste. No municipal solid waste (MSW) or any other contaminants are present at the site. The nearest licensed landfill is the New Boston Landfill, estimated to be 8 miles north of west of the site along U.S.
Highway 82, and approximately 12 miles west of Texarkana.
Note: For the purposes of this example, assume that the excavation site is grass covered with no trees, shrubs, utilities or other infrastructure. The boundaries of the excavation site have been clearly marked;
therefore, there are no survey requirements. The Contractor can assume the concentration of TNT is below
10% and can be disposed of at a landfill accepting non-hazardous waste. The Contractor can assume the landfill will accept the soil for use as top cover.
4.5. Task 5 – Sampling
The Contractor shall perform confirmatory sampling at the excavated site to ensure no residual contamination remains. Sampling shall occur prior to backfilling. A sampling report shall be prepared and submitted to the
USACE COR and USACE PM within 14 days after completion of the laboratory validation.
Note: For purposes of this Example Project, assume soil sampling resulted in no need for further excavation.
4.6. Task 6 – Backfill
The Contractor shall backfill the excavated area only with clean backfill soil that is available, at no cost to the contractor, within ¼ mile of the site. The backfill shall be placed in lifts no greater than 8” and shall be compacted to 95% Proctor (in accordance with ASTM D698) and the site graded to match the original condition. The upper compacted layer may be compacted to less than 95%, if necessary, to achieve the required re-vegetation rate identified in Task 6. All Proctor tests shall be in accordance with American Society for Testing and Materials
(ASTM) guidelines D698. The results of the compaction test shall be submitted to the USACE COR and the
USACE PM within 7 days of the completion of the test. This information will also be included in the final report.
The contractor shall invoice only for the actual quantity removed, based on a survey of the completed open excavation(s). The contractor shall provide evidence that the soil was disposed of at a landfill licensed to accept the contaminated soil. The contractor shall assume the soil is non-hazardous.
Note: For purposes of this Example Project, assume known clean soils exist within ¼ mile of the project and is suitable for re-vegetation purposes. Assume no sampling is required for borrow soils. The excavated waste is considered to be less than 10% TNT and therefore considered non-hazardous waste.
4.7. Task 7 – Re-Vegetation
The Contractor shall apply a grass seed mixture native to the Texarkana (can be found via an internet search) area to completely re-vegetate the excavated area to prevent future erosion. The Offeror must achieve a vegetation survival rate of at least 70% coverage of the excavation site. The vegetative cover must be established before payment for this task is approved. After establishment of the vegetation, the SWPPP will be terminated by the contractor.
4.8. Task 8 – Final Response Action Completion Report (RACR) & Site Closure
The Contractor shall prepare a Draft RACR to be submitted to the USACE COR and USACE PM within 60 calendar days of completion of field activities. USACE will review and provide comments to the Draft within 21 calendar days. The Contractor shall address all comments and submit the Final RACR to the USACE COR and
USACE PM within 14 calendar days of receipt of comments. Once the Final RACR is approved by USACE, the
Contractor shall then submit it to TCEQ for review.
Note: For purposes of this Example Project, assume no comments are received from TCEQ on the Final
RACR.
4.9. Task 9 – Final After-Action Report (AAR)
The Contractor shall prepare a Draft AAR to be submitted to the USACE COR and USACE PM within 60 calendar days of completion of field activities. USACE will review and provide comments to the Draft within 21 calendar days. The Contractor shall address all comments and submit the Final AAR to the USACE COR and USACE PM within 14 calendar days of receipt of comments; USACE will coordinate AAR review by EMCX and USATCES.
Once the Final AAR is approved by USACE, it will then be submitted to DDESB to be utilized in closing out the
ESS.
Note: For purposes of this Example Project, assume no comments are received from EMCX, USATCES or
DDESB on the Final AAR.
5.0. KEY PERSONNEL
In accordance with the Base IDC Section C SOW, Section 4, the contractor shall designate a Project Manager (PM) for this task order. The designated PM shall meet the qualifications identified in the Section C SOW and will be responsible for successfully achieving the performance objectives of this PWS. The name of this person and an alternate, who shall act for the contractor when the Project Manager is absent, shall be designated in writing to the
Contracting Officer. The Project Manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this task order.
6.0. PERIOD OF PERFORMANCE
The Period of Performance is 365 calendar days from the date of task order award.
7.0. GENERAL INFORAMTION
7.1. Quality Control
The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS (see also PWS Section 4.1.3). The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract.
7.2. Quality Assurance
The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality
Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
7.3. Government Holidays
The following holidays will not be worked:
New Year’s Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day
President’s Day Veteran’s Day
Memorial Day Thanksgiving Day
Independence Day Christmas Day
7.4. Hours of Operation
The contractor may work onsite between the hours of 7:00am to 5:00pm Monday through Friday.
7.5. Place of Performance
The work to be performed under this contract will be performed at LSAAP, Texarkana, Texas.
7.6. Type of Contract
The government’s intent is to award a Firm-Fixed-Price, performance-based task order.
7.7. Protection of Property
The Contractor shall be responsible for any damage caused to Government property resulting from negligence or willful misconduct by its employees, sub-contractors, or suppliers. Any damage must be repaired promptly at no additional cost to the Government to the satisfaction of the Contracting Officer. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost the
Contractor in accordance with FAR clauses 52.236-9 and 52.237-2.
7.8. Contractor Travel
The contractor is responsible for travel associated with executing the PWS requirements. Contractor will be authorized travel expenses consistent with the Joint Travel Regulation (JTR).
7.9. Periodic Progress Meetings
The Contracting Officer or Contracting Officers Representative (COR) may require the Contractor to meet periodically to review the Contractor's performance. These meetings would be outside regular project status meeting conducted with the Project or Technical Manager. At these meetings the Contracting Officer or COR will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the
Government of any problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
7.10. Contracting Officer Representative (COR)
The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor contractor's performance and notifies both the KO and contractor of any deficiencies;
coordinate availability of government furnished property (if applicable); and provides area entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms or conditions of the contract.
7.11. Data Rights
The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the
Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
7.12. Public Affairs
The contractor shall not publicly disclose any data generated or reviewed under this contract unless specifically authorized. The contractor shall refer all requests for information concerning site conditions to the COR. All reports and other information generated under this PWS shall become the property of the Government, and distribution to any other source by the Contractor is prohibited unless authorized by the Contracting Officer.
8.0. SECURITY REQUIREMENTS
8.1. Physical Security
At the close of each work period, all contractor facilities, equipment, and materials shall be secured. Contractors, along with all subcontractors, shall display company signs on their vehicles at all times while on government property.
8.2. Identification of Contractor Employees
The Contractor and its sub-contractors shall provide each of its employees who will be involved in the performance of this contract an identification (ID) badge. The ID badge shall clearly display the Contractor’s name and the employee’s name and color photograph. It is the Contractor’s responsibility to ensure that all Contractor and sub-contractor personnel wear their ID badge at all times when performing work under this contract. Unless otherwise specified in the contract, each Contractor and sub-contractor employee shall wear the ID badge in a conspicuous place on the front of their clothing and above their waist, except when safety or health reasons prohibit such placement. This requirement is in addition to any Government facility security provisions that require that a
Government-issued security badge also be worn.
Contractor personnel shall clearly identify themselves to all attendees as a Contractor employee before the commencement of meetings with Government or other Contractor personnel. Contractor personnel shall clearly and immediately identify themselves as a Contractor employee when placing, answering or participating in telephone/VTC conversations with Government or other Contractor personnel.
When Contractor personnel send e-mail messages from or to a Government-owned computer, they shall include a signature block that includes their employer’s name and the employee’s full name and e-mail address.
Each of the requirements set forth above, must be included in all sub-contracts at any tier.
9.0. CERTIFICATION AND APPROVAL OF PROJECT MILESTONES AND DELIVERABLES
The COR will be responsible for contract management, inspection, oversight, review, and approval activities.
Certification and approval of project milestones by the COR is necessary before approval of invoices and distribution of payments.
10.0. PAYMENT REQUESTS (DELIVERABLE)
Monthly invoices must be submitted by the 10th of every month. Partial payment for established payment milestones is not permissible. Upon completion of one or more milestones, the contractor may submit payment requests no more frequently that monthly, with corresponding documentation attached, via email to the USACE
Regional Planning and Environmental Center (RPEC) – Tulsa:
USACE Regional Planning and Environmental Center - Tulsa
E-mail: Invoices-RPEC@usace.army.mil
11.0. GOVERNMENT POINT OF CONTACT (POC)
Contract Specialist: Joshua Hope
Tulsa District Corps of Engineers
CECT-SWT
2488 East 81st Street
Tulsa, OK 74137-4290
(918) 669-7460
Joshua.D.Hope@usace.army.mil
Additional government points of contact will be provided after task order award. All written correspondence pertaining to this Performance Work Statement should be addressed to the Contract Specialist unless otherwise directed by the KO. Written directions or clarifications to this Performance Work Statement may only be given to the contractor by the KO or contract specialist. A change in Government Points of Contact during the period of performance for Task Order execution does not constitute a change to the PWS.
12.0. SUSTAINABILITY
The contractor shall meet the recycled paper content requirements set forth by EPA for post-consumer recycled copy paper. For identifying Greener Paper and environmental attributes to consider when selecting copy paper and other items to comply with EPA-Designated Recovered Material Products, please visit https://www.epa.gov/greenerproducts/identify-greener-products-and-services .
The contractor shall also meet USDA-Designated Bio-preferred Program requirements for products such as fertilizers, mulch and erosion control. For minimum bio-based contents to meet USDA guidance for products please visit https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml and select the appropriate product category.
See contract clauses 52.204-4, 52.223-2, and 52.223-17.
mailto:Joshua.D.Hope@usace.army.mil https://www.epa.gov/greenerproducts/identify-greener-products-and-services https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml
13.0. ATTACHMENTS
Attachment 1– Deliverables Schedule
ATTACHMENT 1 – DELIVERABLES SCHEDULE
Deliverable
Number Deliverable Frequency
# of
Copies
Medium/Form at Submit To
1 Kick-off Meeting
Minutes
(PWS Section
4.1.1)
7 calendar days after kick-off meeting
1 Electronic
(Adobe.pdf)
All meeting participants
2 Project
Management Plan
(PMP)
(PWS Section
4.1.2)
Draft PMP-21 calendar days after award
Final PMP-21 calendar days after receipt of comments to the Draft
Electronic (MS
Word for Draft, MS Word and
.pdf for Final)
USACE COR,
USACE PM
3 Quality
Assurance/Quality
Control Plan
(QA/QC)
(PWS Section
4.1.3)
Draft QA/QC-15 calendar days of award
Final QA/QC-10 calendar days of receipt of comments to the Draft
Updates as necessary
Electronic (MS
Word for Draft, MS Word and
.pdf for Final, updates in MS
Word and .pdf)
USACE COR,
USACE PM
4 Accident
Prevention Plan
(APP)/Site Safety and Health Plan
(SSHP)
(PWS Section
4.1.5)
Minimum of 21 calendar days prior to site mobilization
1 Electronic (MS
Word for Draft, MS Word and
.pdf for Final)
USACE COR
5 Progress Reports
(PWS Section
4.1.4)
Monday of the following week during which field work was performed.
Otherwise, 10th day of every month
1 Electronic
(Adobe .pdf)
USACE COR,
USACE PM
6 Monthly Invoice
(PWS Section
10.0)
10th of every month 1 Electronic
(Adobe.pdf)
Identified
USACE POCs
7 Draft Optimized
UFP-QAPP
(PWS Section 4.2)
30 calendar days after kickoff meeting
Electronic
(Adobe .pdf)
8 Final Optimized
UFP-QAPP
(PWS Section 4.2)
14 calendar days after receipt of comments to the
6 (2
Copies to
TCEQ)
Hard Copy
USACE PM,
9 Draft SWPPP
(PWS Section 4.2)
Per the approved UFP-
QAPP
1 Electronic
(Adobe .pdf)
10 Final SWPPP
(PWS Section 4.2)
Per the Approved UFP-
QAPP
2 Hard Copy USACE PM, TCEQ
11 Draft ESS
(PWS Section 4.3)
60 calendar days after kickoff meeting
1 Electronic
(Adobe .pdf)
ATTACHMENT 1 – DELIVERABLES SCHEDULE
Deliverable
Number Deliverable Frequency
# of
Copies
Medium/Form at Submit To
12 Final ESS
(PWS Section 4.3)
14 calendar days after receipt of comments to the
Draft
1 Electronic
(Adobe .pdf)
USACE COR,
USACE PM
13 Excavated Soil
Waste Manifests, Landfill Receipts
(PWS Section 4.4)
Upon completion of excavation and disposal activities
1 Hard Copy USACE COR, USACE PM
14 Sampling Report
(PWS Section 4.5)
14 calendar days after laboratory validation
1 Electronic
(Adobe .pdf)
USACE COR,
USACE PM
15 Compaction Test
Report
(PWS Section 4.6)
7 calendar days after completion of the test
1 Electronic
(Adobe .pdf)
USACE COR,
USACE PM
16 Draft RACR
(PWS Section 4.8)
60 calendar days after completion of field activities
1 Electronic
(Adobe .pdf)
USACE COR,
USACE PM
17 Final RACR
(PWS Section 4.8)
14 calendar days after receipt of comments on the
Draft
1 Electronic
(Adobe .pdf)
USACE COR,
USACE PM,
TCEQ
17 Draft AAR
(PWS Section 4.9)
60 calendar days after completion of field activities
1 Electronic
(Adobe .pdf)
USACE COR,
USACE PM
18 Final AAR
(PWS Section 4.9)
14 calendar days after receipt of comments on the draft AAR
1 Electronic
(Adobe .pdf)
USACE COR,
USACE PM,
DDESB
19 Contractor
Manpower Report
(PWS Section
4.1.6)
By 31 October for each year in which any type of work was performed for the year ending 30 September
1 Electronic
(Adobe .pdf)
The following have been deleted:
AMDMT 0002 EXAMPLE PROJECT PWS
(End of Summary of Changes)
File details come from the government source that posted it. Updated .