AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

$50M 8(a) Set Aside Multiple Environmental Government Acquisition (MEGA) Indefinite Delivery Contract (IDC) Multiple Aw ard Task Order Contract (MATOC) for Environmental Consulting Services (ECS) Projects Assigned to the Regional Planning and Environmental Center (RPEC) and as assigned to the Southw estern Division (SWD) in accordance w ith UAI Subpart 5107.102-100 and ER 5-1-10

See Page 2 Summary.

1. CONTRACT ID CODE PAGE OF PAGES

1 61

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Dec-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BV21R0024

X 9B. DATED (SEE ITEM 11)

23-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Dec-2021

CODE

CONTRACTING DIV

US ARMY CORPS OF ENGINEERS, TULSA DISTRICT

2488 E. 81ST STREET

TULSA OK 74137-4290

W912BV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BV21R0024

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been added by full text:

AMD #0005 - PAGE 2 SUMMARY

$50M 8(a) Set Aside Multiple Environmental Government Acquisition (MEGA)

Indefinite Delivery Contract (IDC) Multiple Award Task Order Contract (MATOC) for Environmental Consulting Services (ECS) Projects

Assigned to the Regional Planning and Environmental Center (RPEC) and as assigned to the Southwestern Division (SWD) in accordance with UAI Subpart 5107.102-100 and ER 5-1-10

WARNING - this solicitation requires offerors to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS) prior to responding to this solicitation. The NIST score is a MANDATORY responsibility responsiveness item. Those without a NIST score in SPRS will be deemed NON-RESPONSIBLE NON-RESPONSIVE and their bids/offers will NOT be opened, evaluated or will not be considered for award.

Please NOTE that in accordance with DoDI 5200.48, all documentation and written communications related to the subject contract, to include email, are engineering related and thus by default considered CUI, therefore please mark and safeguard all CUI information as required by statute.

1. This Amendment is being issued to modify the National Institute of Standards and Technology (NIST) score requirement (statement above); remove the above CUI Statement; remove DFARS Clause 252.223-7999 (DEV 2021-O0009); change the Ombudsman in FAR Clause 52.216-32; update Clauses 52.204-2, 52.204-8, 52.204-24, 52.204-26, 52.209-13, 52.219-14 (Deviation 2021-O0008); 52.219-28, 52.225-13, 52.252-5, 52.252-6, 252.204- 7007, and 252.204-7017; and replaces Section J, Example Project PWS; Section J, Example Project Attachment L-1 Milestone Payment Schedule without Cost; Section J, Example Project Attachment L-2 Milestone Payment Schedule with Cost; and Section L, Instructions, Conditions, and Notices to Offerors.

The proposal due date remains 18 January 2022, 3:00pm, Central Standard Time. Point of contact for this action is Brenda Anderson, 918-669-7274.

SECTION G - CONTRACT ADMINISTRATION DATA

The following have been modified:

52.216-32 TASK-ORDER AND DELIVERY-ORDER OMBUDSMAN (SEPT 2019)

(a) In accordance with 41 U.S.C. 4106(g), the Agency has designated the following task-order and delivery-order Ombudsman for this contract. The Ombudsman must review complaints from the Contractor concerning all task-order and delivery-order actions for this contract and ensure the Contractor is afforded a fair opportunity for consideration in the award of orders, consistent with the procedures in the contract.

COL Jason K. Jefferis, Deputy Director of Contracting US Army Corps of Engineers 441 G Street NW Washington, D.C. 20314-1000

(202) 761-4707 Jason.K.Jefferis@usace.army.mil

(b) Consulting an ombudsman does not alter or postpone the timeline for any other process (e.g., protests).

(c) Before consulting with the Ombudsman, the Contractor is encouraged to first address complaints with the Contracting Officer for resolution. When requested by the Contractor, the Ombudsman may keep the identity of the concerned party or entity confidential, unless prohibited by law or agency procedure.

(End of clause)

SECTION I - CONTRACT CLAUSES

52.204-2 SECURITY REQUIREMENTS (MAR 2021)

(a) This clause applies to the extent that this contract involves access to information classified "Confidential," "Secret," or "Top Secret."

(b) The Contractor shall comply with (1) the Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (32 CFR part 117); and (2) any revisions to that manual, notice of which has been furnished to the Contractor.

(c) If, subsequent to the date of this contract, the security classification or security requirements under this contract are changed by the Government and if the changes cause an increase or decrease in security costs or otherwise affect any other term or condition of this contract, the contract shall be subject to an equitable adjustment as if the changes were directed under the Changes clause of this contract.

(d) The Contractor agrees to insert terms that conform substantially to the language of this clause, including this paragraph (d) but excluding any reference to the Changes clause of this contract, in all subcontracts under this contract that involve access to classified information.

52.219-14 LIMITATIONS ON SUBCONTRACTING (DEVIATION 2021-O0008) (SEP 2021)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Definition. “Similarly situated entity,” as used in this clause, means a first-tier subcontractor, including an independent contractor, that—

(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and

(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.

(c) Applicability. This clause applies only to—

(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;

(4) Orders expected to exceed the simplified acquisition threshold and that are—

(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or

(ii) Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);

(5) Orders, regardless of dollar value, that are—

(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or

(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and

(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.

(d) Independent contractors. An independent contractor shall be considered a subcontractor.

(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for—

(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding certain other direct costs and certain work performed outside the United States (see paragraph (e)(1)(i)), to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. The following services may be excluded from the 50 percent limitation:

(i) Other direct costs, to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service. Examples include airline travel, work performed by a transportation or disposal entity under a contract assigned the environmental remediation NAICS code 562910), cloud computing services, or mass media purchases.

(ii) Work performed outside the United States on awards made pursuant to the Foreign Assistance Act of 1961, or work performed outside the United States required to be performed by a local contractor.

(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;

(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded; or

(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 75 percent subcontract amount that cannot be exceeded.

(f) The Contractor shall comply with the limitations on subcontracting as follows:

(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause – [Contracting Officer check as appropriate.] XX By the end of the base term of the contract and then by the end of each subsequent option period; or ___ By the end of the performance period for each order issued under the contract.

(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.

(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph

(e) of this clause will be performed by the aggregate of the joint venture participants.

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2021)

(a) Definitions. As used in this clause--

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern--

(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (d) of this clause. Such a concern is "not dominant in its field of operation" when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(2) Affiliates, as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13

CFR 121.103.

(b) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, upon occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts--

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, when the Contracting Officer explicitly requires it for an order issued under a multiple-award contract.

(d) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.

(e) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees if the acquisition--

(1) Was set aside for small business and has a value above the simplified acquisition threshold;

(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or

(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(f) Except as provided in paragraph (h) of this clause, the Contractor shall make the representation(s) required by paragraph (b) and (c) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause, or with its offer for an order (see paragraph (c) of this clause), that the data have been validated or updated, and provide the date of the validation or update.

(g) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (f) or (h) of this clause.

(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code 541620 assigned to contract number TBD.

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.

(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.

(4) Women-owned small business (WOSB) concern eligible under the WOSB Program. [Complete only if the Contractor represented itself as a women-owned small business concern in paragraph (h)(3) of this clause.] The Contractor represents that--

(i) It [ ] is, [ ] is not a WOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and

(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(4)(i) of this clause is accurate for each WOSB concern eligible under the WOSB Program participating in the joint venture.

[The Contractor shall enter the name or names of the WOSB concern eligible under the WOSB Program and other small businesses that are participating in the joint venture: .] Each WOSB concern eligible under the WOSB Program participating in the joint venture shall submit a separate signed copy of the WOSB representation.

(5) Economically disadvantaged women-owned small business (EDWOSB) concern. [Complete only if the Contractor represented itself as a women-owned small business concern eligible under the WOSB Program in (h)(4) of this clause.] The Contractor represents that--

(i) It [ ] is, [ ] is not an EDWOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and

(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(5)(i) of this clause is accurate for each EDWOSB concern participating in the joint venture. [The Contractor shall enter the name or names of the EDWOSB concern and other small businesses that are participating in the joint venture: .] Each EDWOSB concern participating in the joint venture shall submit a separate signed copy of the EDWOSB representation.

(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.

(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.

(8) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that--

(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and

(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture. [The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.

[Contractor to sign and date and insert authorized signer's name and title.]

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)

(a) Except as authorized by the Office of Foreign Assets Control (OFAC) in the Department of the Treasury, the Contractor shall not acquire, for use in the performance of this contract, any supplies or services if any proclamation, Executive order, or statute administered by OFAC, or if OFAC's implementing regulations at 31 CFR chapter V, would prohibit such a transaction by a person subject to the jurisdiction of the United States.

(b) Except as authorized by OFAC, most transactions involving Cuba, Iran, and Sudan are prohibited, as are most imports from Burma or North Korea, into the United States or its outlying areas. Lists of entities and individuals subject to economic sanctions are included in OFAC’s List of Specially Designated Nationals and Blocked Persons at https://home.treasury.gov/policy-issues/financial-sanctions/specially-designated-nationals-and-blocked-persons-list-sdn-human-readable-lists. More information about these restrictions, as well as updates, is available in the OFAC’s regulations at 31 CFR ChapterV and/or on OFAC’s website at https://home.treasury.gov/policy-issues/ office-of-foreign-assets-control-sanctions-programs-and-information.

(c) The Contractor shall insert this clause, including this paragraph (c), in all subcontracts.

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Defense Federal Acquisition Regulation Supplement (DFARS) (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

The following have been deleted:

52.204-2 Security Requirements AUG 1996 52.219-14 (Dev) Limitations on Subcontracting (DEVIATION 2020-O0008) MAR 2020 52.219-28 Post-Award Small Business Program Rerepresentation SEP 2021 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.252-6 Authorized Deviations In Clauses APR 1984 252.223-7999 (Dev) Ensuring Adequate COVID-19 Safety Protocols for Federal

Contractors (Deviation 2021-O0009)

OCT 2021

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Amd #0003 Sec J Ex

Project Attach L-1 w/o Cost

2 05-AUG-2021

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Amd #0005 Attach L-1

MPS wo Cost

2 14-DEC-2021

Attachment 2 Amd #0005 Attach L-2 MPS w/Cost

2 14-DEC-2021

AMD #0005 EX PROJECT PWS

SECTION J

Solicitation #W912BV-21-R-0024

EXAMPLE PROJECT

PERFORMANCE WORK STATEMENT (PWS)

Cultural Survey and National Register Evaluation of Archaeological Sites Camp Desert, NM

Amendment #0005 14 December 2021 17 February 2021

**Note to Offerors: This is an Example Project, with no existing documentation (i.e., site figures, site address, etc.).

This Example Project will not be awarded. Offerors will develop a technical approach and proposed price based on Section L requirements and the information contained therein.

1.0. GENERAL

This an Example Project for a non-personal services, firm-fixed priced Task Order (TO) to provide Phase I Survey and National Register Evaluation of archaeological sites at Camp Desert, New Mexico (a fictitious Army Installation). The Project is geared to inventory areas that have a high probability of mission activities occurring and helps the installation in complying with Section 106 and section 110 of the NHPA of 1966. The Project is intended to build on previous efforts and result in a comprehensive inventory of historic properties in the selected areas on Camp Desert relevant to all cultural periods; the Project will also make final determinations of eligibility for all recorded sites.

Unless otherwise specifically stated, the Contractor shall furnish all labor, management, travel, supplies, equipment, materials, and vehicles to perform the following work (detailed task requirements are in Section 5.0):

1. Perform a Phase I archaeological inventory of 3,000 acres and evaluate all recorded sites in compliance with the New Mexico Cultural Resources Information System 2018 Guidelines NMCRIS standards;

2. Perform a complete recording of 30 new sites and make NRHP eligibility recommendations, including any necessary Phase II subsurface testing. NRHP eligibility testing is required to follow the NMCRIS standards;

3. Collect diagnostic artifacts and curate them according to established NMCRIS standards and consult with the Laboratory of Anthropology in Santa Fe for curation guidelines;

4. Prepare and submit project plans (including Work Plan, PMP, etc);

5. Prepare and submit fully completed state site forms and any required attachments;

6. Prepare and submit a professional technical report describing, among other requirements, the results of that work in paper and electronic formats in accordance with New Mexico SHPO requirements;

7. Prepare and submit all other required deliverables (including GIS data, data analyses, and project notes);

8. Rehabilitate previously collected artifacts and prepare for storage.

The Contractor shall comply with applicable Federal, state, and local laws, regulations, and guidance; and perform all work in accordance with these requirements and any applicable agreements. All work performed by the Contractor under the firm fixed price task order will be accomplished in a manner which conforms to this Performance Work Statement (PWS). The Contracting Officer (KO) must approve any modifications to the TO before implementation. The Contractor shall furnish sufficient technical, supervisory, and administrative personnel at all times to ensure the work is performed in accordance with TO requirements. Professional level skills and management practices are required in the performance of this TO. Accordingly, the Contractor shall establish effective quality control to assure that the end product meets professional standards and complies with the contract requirements. The Contractor, its subsidiaries, affiliates, or associates shall not release any information regarding the project to technical societies, news media, or the general public without obtaining permission from the KO.

Personnel performing work under the TO shall possess training, certification(s) and experience commensurate with the work they will perform and level of responsibility they will exercise.

2.0. INTRODUCTION

Camp Desert is a fictitious Army Installation located in New Mexico. The location and significance of sites dating from the Paleoindian period (ca. 13000 B.P. to Late Formative (ca. AD 1400) to the Cold War is largely unknown. Lack of knowledge concerning the location and significance of these sites can cause regulatory delay and problems in conducting the military mission at Camp Desert. This lack of knowledge could have adverse effects on the eligibility of these sites for the National Register (PL89-665 as amended; 36 CFR 60; 36 CFR 800). Phase II testing will be required on those sites that need more detailed analysis to assess their National Register eligibility status. Those sites that are determined eligible by this work are to be reported to the Camp Desert CRM and the installation will nominate sites to the National Register of Historic Places (NRHP). The Project will assist Camp Desert in compliance with Section 106 and Section 110 of the National Historic Preservation Act of 1966.

3.0. OBJECTIVE

The objective of this project is to conduct a Phase I Survey and National Register Evaluation of archaeological sites on a 3,000 acres area at Camp Desert which require:

TABLE 1 – PERFORMANCE OBJECTIVES AND STANDARDS

Task PWS Section Performance Objective Performance Standards Project Management 5.1 Attend all Meetings, provide all meetings minutes and all required documents in accordance with PWS

USACE and Camp Desert Approved Final Documents

Conduct Archaeological Investigations

5.2 Identify historic

properties in the 3,000-acre Phase I survey area and make NRHP eligibility recommendations for any recorded sites. The Project will include Phase II subsurface testing program necessary to make accurate NRHP recommendations and must ensure compliance with the NMCRIS standard

USACE and Camp Desert Approved Final Survey Data and Phase II Testing Data– GIS .SHP with site polygons to include metadata

State Site Forms 5.3 Produce State Site Forms USACE and Camp Desert approved Final State Site Forms

Technical Report 5.4 Produce a quality technical report and other deliverables to include:

GIS data, data analyses, workplans, and project notes

USACE and Camp Desert Approved Final Technical Report

Rehabilitate Special Collections

5.5 Produce a Rehabilitated

Special Collections Digital Listing/Inventory

USACE and Camp Desert Approved Final Digital Listing/ Inventory of Complete Processed

Artifacts

All work performed by the Contractor under this task order shall be for a 13-month period from date of award.

4.0. PERFORMANCE MILESTONES

Performance Milestones are identified in Table 1 – Performance Milestones. The Contractor shall propose pricing for the performance milestones utilizing Attachment L-2, Milestone Payment Schedule with Cost. (NOTE: The Excel version of Attachment L-2 provided with the RFP shall be submitted with the Offeror’s Volume II, Factor 6.) The Contractor must utilize Attachment L-1, Milestone Payment Schedule without Cost to identify their anticipated scheduled start and completion dates for each milestone, based upon their overall project schedule. The Contractor may NOT propose interim milestones to the Performance Milestones within Table 2. As noted in Section 10, payments will be tied to the successful completion of a milestone, approved by the Contracting Officer, through the COR.

TABLE 2 – PERFORMANCE MILESTONES

CLIN Milestone Task

Performance Acceptance

Standards and Approval Authority

Deliverable

TASK 1 PROJECT MANAGEMENT

0001 Project Kick-Off Meeting via teleconference within 14 calendar days of contract award

Meeting minutes due within 5 calendar days

USACE and Camp Desert

Project Kick-off Meeting Agenda

Project Kick-off Meeting Minutes

0002 Monthly Progress Reports Due by the 15th day of each month

Approved Monthly Progress Report

0003 Project Work Plan (includes PMP, Health and Safety Plan, and Quality Control Plan)

Submit each deliverable in accordance with the Deliverables Schedule

0003AA Draft Project Work Plan

Draft Project Work Plan

0003AB Draft Final Project Work Plan

Draft Final Work Plan

0003AC Final Project Work Plan USACE and Camp Desert

Final Project Work Plan

0004 Contractor Manpower Reporting Complete manpower reporting in accordance with PWS Section 5.1.4

Reporting period shall end 30

USACE and Camp

Copy of Report

Standards and Approval Authority

Deliverable

September of each year Copy of submitted Contractor

Manpower Report shall be submitted to the USACE PM/TM no later than 31 October of each year

2 reports will be required for the following periods:

o Ending 30 Sept 2022 o Ending 30 Sept 2023

TASK 2

Conduct Archaeological Investigations

0005 Field Work, Phase I Survey Data and Phase II Testing Data

Submit each deliverable in

0005AA All Field Work and Phase I Draft Survey Data and Phase II Testing Data – GPS or Total Station to include metadata

Draft Survey Data – GPS or Total Station Phase II Testing Data to include metadata

0005AB Phase I Final Survey Data and Phase II Testing Data – GPS or Total Station to include metadata

Final Survey Data- GPS or Total Station and Phase II Testing Data to include metadata

0005BA Phase II Draft Testing DataDraft Survey Data and Phase II Testing Data – GIS .SHP with site polygons to include metadata

USACE and Camp Desert

Draft Survey Data and Phase II Testing Data – GIS .SHP with site polygons to include metadata

0005BB Phase II Final Testing DataFinal Survey Data and Phase II Testing Data – GIS .SHP with site polygons to include metadata

Final Survey Data and Phase II Testing Data– GIS .SHP with site polygons to include metadata

TASK 3

State Site Forms

0006 State Site Forms Submit each deliverable in

Standards and Approval Authority

Deliverable

0006AA Draft State Site Forms

Draft State Site Forms

0006AB Final State Site Forms USACE and Camp Desert

Final State Site Forms

TASK 4

Technical Report

0007 Technical Report Submit each deliverable in

0007AA Draft Technical Report USACE and Camp

Draft Technical Report

0007AB Draft Final Technical Report USACE and Camp Desert

Draft Final Technical Report

0008AC Final Technical Report USACE and Camp Desert

Final Technical Report

TASK 5

Rehabilitate Special Collections

0008 Rehabilitate Special Collections Digital Listing/Inventory

Submit each deliverable in accordance with the Deliverables Schedule

0008AA Draft Digital Listing/Inventory of Complete Processed Artifacts

Draft Digital Listing/Inventory of Complete Processed Artifacts

0008AB Draft Digital Listing/Inventory of Complete Processed Artifacts

Final Digital Listing/Inventory of Complete Processed Artifacts

5.0. DETAILED TASK REQUIREMENTS

The Contractor shall be required to fulfill the objectives of this task order by completion of the tasks specified below. The deliverable schedule and distribution of submittals for all task requirements is presented in Attachment 1 – Deliverable Schedule.

5.1. TASK 1 – Project Management

The contractor shall provide Contract Management for performing the PWS requirements. The contractor shall provide Contract management including prime and subcontract support as required, internal project controls and Quality Control (QC), status reports on work being performed under this contract, invoicing and pay requests, and other coordination and personnel support for the individuals assigned to this contract. A Project Manager will be designated by the Contractor as the single POC for all contract performance and administrative matters.

5.1.1. Project Kickoff Meeting

The Contractor shall conduct a kickoff meeting within 14 days of TO award via teleconference. The purpose of the meeting will be to identify the points of contact, obtain in-house data, and determine all relevant issues and requirements to develop project documentation. Two days before the kickoff meeting, the Contractor shall provide an electronic copy of the agenda to the USACE Project Manager (PM), and the Camp Desert CRM (Deliverable 1a). Five days after the kickoff meeting the Contractor shall provide an electronic copy of the meeting minutes to the USACE PM, and the Camp Desert CRM (Deliverable 1b).

5.1.2. Monthly Progress Reports (MPR)

The Contractor shall provide a monthly progress report no later than the 15th day of the following month for the previous month’s activities (Deliverable 2). The progress report will summarize work accomplished for each milestone in which payment is being requested. Each Monthly Progress Report shall include status, issues, and anticipated actions. The body of the report shall describe all work accomplished. Monthly progress reports shall be sent electronically to the USACE PM, and the Camp Desert CRM.

5.1.3. Project Work Plan (WP)/ Project Management Plan (PMP). The Contractor shall develop a Work Plan for the survey and evaluation effort adhering to the guidelines for cultural resource surveys on Camp Desert. The Contractor shall include, but not be limited to, project organization, personnel (i.e., key personnel roles and responsibilities), deliverables, coordination and communication procedures, activity schedule, and a program for assessing the research potential and NRHP eligibility of each site recorded. Sites must be recommended “eligible” or “not eligible.” A recommendation of “undetermined” will not be accepted. The Contractor will perform any necessary subsurface testing program, chronometric or chronological dating, and any other analyses, in order to provide a recommendation. Collection strategies will be outlined and will be minimized to either diagnostic or rare finds. The WP shall comply with Department of Defense (DoD), USACE, state, and local regulations regarding the proposed work effort. The WP shall address all tasks required to meet project objectives. The WP shall also describe the quality assurance (QA) and quality control (QC), and safety procedures and activities that will contribute to the successful execution of this project. The WP shall also contain the appropriate elements of a Project Management Plan (PMP) that is based on the Contractor’s proposal and must remain current throughout the task order performance period and be updated when any changes occur.

The WP shall consist of three iterations: 1) Draft [Deliverable 3a], 2) Draft Final [Deliverable 3b] and 3) Final [Deliverable 3c].

The following Plans will be included as appendices or attachments to the overall project Work Plan:

5.1.3.1. Health and Safety Plan (HSP). The Contractor shall prepare a written HSP in accordance with the project PWS and adhere to all DoD and appropriate Army policies, procedures, and regulations, including training and medical screening required by 29 Code of Federal Regulations 1910.120(e). The HSP shall address all safety-related issues and potential hazards that may be encountered during work performed under this contract. The Contractor shall also prepare an Accident Prevention Plan (APP) in accordance with the requirements of Appendix A of the USACE EM 385-1-1 Safety and Health Requirements Manual.

5.1.3.2. Quality Control Plan (QCP). The Contractor shall prepare a written QCP to document the Quality Control (QC) Program to be implemented throughout all aspects of the project to verify the completeness and effectiveness of procedures and activities that will contribute to the successful execution of work.

5.1.3.3. Pre-Project Check of Site Data. The Contractor shall conduct a pre-field check of any historical/archaeological site data. The Contractor shall review relevant files at the New Mexico Archaeological Records Management System files, and available Camp Desert records. This will ensure that sites are not recorded with a different LA number.

5.1.4. Contractor Manpower Reporting

In accordance with FAR 4.1703, Section 743(a)(3) of Division C of Public Law 111-117, Office of Federal Procurement Policy (OFPP) and the Revised Department of Defense Contractor Manpower Reporting Initiative, the contractor shall report required information for Services Contracts meeting specific thresholds and that are within four (4) prescribed Product Service Codes (PSCs). Contractors must log into their SAM profile accounts at www.SAM.gov to perform the contract reporting (also reference the SAM Quick Start Guide for Service Contract Reporting).

SAM receives contract information from FPDS-NG and will enable reporting for entities with contracts that meet the required reporting thresholds and will auto-populate much of the required information for reporting. After logging into the SAM account, the Contractor will select ‘Entity Registration’ and then select ‘Service Contract Reporting’. SAM will display the entities which have service contracts and meet the reporting criteria. Next, select ‘View by Entity’ to see the service contracts for each entity, then select ‘Add’ for the service contract against which a Service Contract Report is to be created. The Contractor will then be taken automatically to the Complete Service Contract Report page. SAM automatically retrieves and displays the contract information.

The required information to be entered is:

a. Total Amount Invoiced: Total dollar amount invoiced for services performed during the previous Government fiscal year under the contract (this amount should include the prime and any subcontract amount).

b. Prime Contractor Hours Expended: Prime Contractor direct labor hours expended on the services performed during the previous Government fiscal year. The amount you enter is automatically divided by 2,080 to calculate a Full Time Employee (FTE) equivalent, displayed under the Prime Contractor Hours Expended as a Prime Contractor FTEs.

c. Tier 1 Subcontractor Information: Report any required Tier 1 subcontractor information by selecting the ‘Add Tier 1 Subcontract Information’ button.

Click ‘Submit’ once the report is completed. This saves the report and returns the user to the ‘Select Service Contract’ page where another report can be created, or an existing report can be edited.

Any previously completed report can be edited as frequently as necessary until the end of the reporting period by selecting ‘View/Edit’ for the selected report.

Reporting must be completed annually by October 31 for each services performed under applicable services contracts during the preceding Government fiscal year (October 1-September 30) and a copy of the report shall be submitted to USACE: 1st annual report (Deliverable 4a) and 2nd annual report (Deliverable 4b).

5.2. TASK 2 – Conduct Archaeological Investigations. The Contractor shall conduct a Phase I archaeological survey in referenced zones/parcels in accordance with NMCRIS standard. The total acreage for archaeological survey is a 3,000 acres area that is relatively flat with minimal changes in elevation (less than 40 foot). The Project location is typical for the area with no access restrictions. The Contractor will assume there are 125 previously recorded sites within the survey area and that no more than 30 new sites will undergo a Phase II survey and be recorded.

The Contractor shall record all historic/prehistoric properties in accordance with NMCRIS. The Contractor shall prepare determinations of eligibility for the NRHP for each newly recorded historic property. The use of “Undetermined” for eligibility shall not be allowed.

The Contractor shall conduct sufficient Phase II in-field analysis activities at the 30 new sites. For bid purposes, the Contractor shall collect 200 diagnostic artifacts and curate them according to established NMCRIS standards. These are generally items that have commercial value or that need identification in a lab setting such as: whole bottles, projectile points, unusual prehistoric ceramics, large ceramic sherds, stone tools such as drills. The Contractor shall not collect every piece of metal, ceramic sherd, ground stone, or fire cracked rock encountered. The Contractor shall record all archaeological manifestations with GPS or total station. The Contractor shall furnish the GPS or total station files in ArcGIS format on CD-ROM for all archaeological sites (Deliverable 5a and 5b). GIS files to be submitted include 1) a polygon of each site boundary; 2) a point in UTM coordinates (WGS 84 datum) for each site datum; 3) a point in UTM coordinates (WGS 84 datum) for each feature. These must be submitted in ArcGIS format. The Contractor must submit one ArcGIS .SHP file with all site polygons in it (Deliverable 5c and 5d). All GIS files must have the metadata prepared and submitted also.

Information collected must be sufficient to complete the required Cultural Resource forms and to meet the detailed reporting requirements per NMCRIS standards.

The Contractor shall prepare two iterations of each as indicated below:

-GPS or Total Station - Draft [Deliverable 5a] and Final [Deliverable 5b] of the report.

-GIS .SHP with site polygons – Draft [Deliverable 5c] and Final [Deliverable 5d]

5.3. Task 3: State Site Forms. The Contractor shall submit one hard copy and one electronic copy of the draft state site forms, with maps, for each recorded site with a state number for review to Camp Desert and USACE for comment. Following comment resolution, the site file packet for newly discovered sites shall consist of two (2) copies of the LA form placed in an archivally stable folder and one electronic copy. For previously discovered sites, the Contractor shall also furnish two hard and one electronic copy of each LA form, but archival folders are not required. LA forms for previously discovered sites will follow the NM State guidelines for updated site forms. The LA forms shall be copied onto a CD in Adobe .PDF format.

The Contractor shall prepare two iterations: Draft [Deliverable 6a] and Final [Deliverable 6b] of the report.

5.4. Task 4: Technical Report. The Contractor shall prepare a Technical Report for submission to Camp Desert and USACE. The installation will provide the Draft Final Technical Report to the New Mexico State Historic Preservation Office and appropriate Indian Tribes for their review and comment. The technical report will include a summary of the background research; a summary of all field and laboratory analyses; a comprehensive inventory of historic properties discovered during the field work; and recommendations for National Register eligibility.

The Contractor shall prepare three iterations: Draft [Deliverable 7a], Draft Final [Deliverable 7b] and Final [Deliverable 7c] of the report.

Reports must follow the NMCRIS. The camera-ready copies of the technical report must be bound unbound originals printed on 25% cotton rag bond paper or other suitable archival paper. Hand drafted figures will be drawn on 25% cotton rag paper or other suitable archival paper. All text and tables will be furnished to the government in MS Word or Excel format. All figures will be furnished in .DXF, .SHP, or .JPG file formats unless drafted by hand.

All GIS files will be furnished in ArcGIS format. All electronic files necessary to reproduce the final report will be submitted on five (5) copies of a CD-ROM disk. The CD-ROM disks will also include a copy of the Final Technical Report converted to Adobe .PDF

5.5. Task 5: Rehabilitate Special Collections. The contractor will rehabilitate approximately 3,900 special collections previously collected at Camp Desert from the same survey area identified within this PWS and provide a digital listing/inventory of those items. Archaeological remains to be rehabilitated are extremely rare, unique, monetarily valuable, museum quality and/or diagnostic to meet minimal standards set forth by the Laboratory of Anthropology in Santa Fe for curation guidelines and established Camp Desert curatorial standards and guidelines.

The Contractor shall prepare two iterations of the Digital Listing/Inventory of Complete Processed Artifacts: Draft [Deliverable 8a] and Final [Deliverable 8b].

The Contractor’s Proposal must provide a plan and an appropriate budget that includes labeling, packaging and re-housing to improve…