Solicitation - RS Kerr Mowing Services 20Q0022.pdf
PDF 1 MB Posted
- Attached to
- Mowing Services, Robert S. Kerr Lake, Oklahoma
- Solicitation number
- W912BV20Q0022
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Price Schedule - RS Kerr Mowing 20Q0022.xls | XLS spreadsheet | |
| Exhibit 2 - Quality Assurance Report.pdf | ||
| RSK Mowing Maps.pdf | ||
| Exhibit 3 - Quality Control Inspection Log.pdf | ||
| Exhibit 4 - Job Hazard Analysis.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912BV20Q0022 13-Dec-2019
b. TELEPHONE NUMBER
918.669.7460
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 17 Jan 2020
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912BV9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JOSHUA D HOPE
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
918-669-7436FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$8,000,000
NAICS:
561730
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF85
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912BV20Q0022
Section A - Solicitation/Contract Form
INSTRUCTIONS TO OFFERORS
Instructions to Offerors
Read the solicitation in its entirety and all amendments before submitting documents. Payments will be made after receipt of a proper invoice and receipt of acceptable supplies or services. Regular office hours: Monday to Friday, 8:00 a.m. to 4:30 p.m. CST
MAIL, FAX, EMAIL or HAND DELIVER YOUR DOCUMENTS
Do not include excess information, to include audio-visual materials, electronic media, CD’s, thumbdrives, etc. or pages of the solicitation that do not contain information provided by the perspective offeror. NO cross outs or strike through marks. Submit a legible quote with no correction marks.
Emailed quotes must be received in a supported Adobe or Microsoft Office file format. These formats are the only acceptable methods of submitting a quote electronically. Cloud storage providers, google docs, web based drop boxes, OneNote/OneDrive, URLs, web-based format, or any other virtual/web-based memory service are NOT acceptable methods of submitting a quote electronically. All documents must be attached in one file. Reference the solicitation in the subject line. Send quotes to E-mail address CESWT-CT-SS-Quotes@usace.army.mil and copy
Joshua.D.Hope@usace.army.mil. Ensure your quote is received before the due date and time. In order for your quote to be considered responsive, all required materials must be received before the due date and time. If all required materials are not received your quote will not be considered.
FAX or MAIL
Include a cover sheet that references the Contract Specialist – Joshua Hope and the solicitation number. When submitting through mail ensure you clearly mark the envelope to:
US Army Corps of Engineers, Tulsa District
ATTN: CECT-SWT (Contracting Division), Joshua D. Hope and Wyman W. Walker
2488 E. 81st Street
Tulsa, OK 74137-4290
FAX: (918) 669-7436
Clearly mark the envelope in the lower left hand corner with the solicitation number. All pages should be numbered. Use only 8 ½ by 11 inch paper for fax or mail submissions. Do not use fold-outs (e.g., 11” x 14” or 11” x 17” sheets). Do not use a font size smaller than 10, or condensed print for any submission. Time New Roman or
Arial Font are the only acceptable fonts. All page margins must be at least 1 inch wide, but may include headers and footers. Illegible handwritten quotes will not be considered. Typed quotes are highly encouraged and the preferred method. Do not use spring clamps, staples, or exceed the recommended capacity of the fastener or binder.
Do not use plastic multi-hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages or removal of pages. DO NOT use tabbed dividers, flagged tabs, or any divider that extends beyond the paper size to separate sections. The pages must be able to be removed from their binding without ripping or tearing. Ensure to allow enough time to submit your quote before the due date and time.
HAND DELIVER
If your submission will be hand-carried, please provide notification to the Contract Specialist at least one working day in advance (918-669-7460) or Joshua.D.Hope@usace.army.mil, as unescorted visitors are not allowed in the
Contracting Division offices. Please consider in your arrival that visitors must go through security check points mailto:CESWT-CT-SS-Quotes@usace.army.mil mailto:Joshua.D.Hope@usace.army.mil located on the 16th floor of the small tower. Offerors can only submit their documents to the Contract Specialist or a
Contracting Officer of the Tulsa District Office. The address of the Tulsa District Office is below:
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 EAST 81ST STREET
TULSA, OKLAHOMA 74137
This procurement is being conducted in accordance with Simplified Acquisition Procedures (SAP) of FAR Parts 12 and 13. Any reference to offers or bids or offerors or bidders should be substituted with quotations or quoters. All reference to discussions shall not be interpreted under FAR Part 15, but rather indicate that the Government may communicate with offerors/quoters as allowed under simplified acquisition procedures.
Submit the following documents:
1) A signed copy of the 1st page of the solicitation and all amendments
2) Complete the pricing schedule provided in the solicitation
3) Complete all FAR Clauses with applicable blanks filled in from SECTIONS I, K, L, and M (If responses are filled out in SAM then indicate by marking “SEE SAM”)
INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS
USE OF BIDDER’S INQUIRY
Prospective offerors shall submit questions and inquiries related to this solicitation in accordance with the following
(no other means of questions or inquiries will be answered except through Bidder Inquiry):
a. For information related to amendments, and the dates set for receipt of proposals, please check https://beta.sam.gov
b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via
Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.
1. To submit and review bid inquiry items, offerors will need to be a current registered user or self‐ register into the system. To self‐register go to the aforementioned web page and click on the BID tab.
Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e‐mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continues.
2. From this page you may view all bidder inquiries or add an inquiry.
3. Bidders will receive an acknowledgement of their question via e‐mail, followed by an answer to their question after it has been processed.
4. The Solicitation Numbers are: W912BV20Q0022
The Bidder Inquiry Key is: R7NXN3-HIV6R8
5. Address/enter only one question/issue per entry.
c. The Bidder Inquiry System will be unavailable for new inquiries 6:00pm (Central) Wednesday, 15 January
2020 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
d. Offerors are requested to review the specification in its entirety, and review the Bidder’s Inquiry System for answers to questions prior to submission of a new inquiry.
e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800‐428‐HELP.
f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will
NOT be available after receipt of proposals.
g. The point of contact for this solicitation is:
Contract Specialist: Joshua Hope
Telephone: 918‐669‐7460
E‐MAIL: Joshua.D.Hope@usace.army.mil
PREPROPOSAL/SITE VISIT CONFERENCE
A Preproposal Conference/Site Visit is scheduled for 10:00 AM CT on Tuesday, 7 January 2020 at the US Army
Corps of Engineers Robert S. Kerr Navigation Project Office. The address is 114302 S. 4629 Road, Sallisaw, Oklahoma, 74955.
The point of contact for the site visit is Dennis Guffey who can be reached at 918-799-5843.
https://beta.sam.gov/ https://www.projnet.org/projnet
ANTITERRORISM AND OPERATIONS SECURITY REQUIREMENTS
The Government will provide the successful offeror with the required Army iWatch Antiterrorism Briefing documentation within two (2) business days of Contract Award.
As outlined in AFARS 5132.702(a)(ii)(B), “Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.”
Section C - Descriptions and Specifications
SCOPE OF WORK
S P E C I F I C A T I O N S
ROBERT S. KERR LAKE
OKLAHOMA
MAINTENANCE CONTRACT
FOR MOWING
ORGANIZATION OF SPECIFICATIONS
This specification consists of a general section supplemented by exhibits and appendices. A
Table of Contents is provided on the following page.
The general section contains requirements that apply to all work to be performed under the provisions of this specification. The exhibits contain detailed listings or examples referred to in the general section and the Performance Requirements. The appendices contain a description of the facilities to be serviced and the work to be performed.
Any reference to paragraphs or subparagraphs in this specification will refer to those in the general section unless otherwise noted.
TABLE OF CONTENTS
Para.
No. Paragraph Title
1 Scope of Work
2 Definitions
3 References
4 Initiation, Execution, & Acceptance of Work
5 Personnel
6 Equipment
7 Performance Requirements
8 Contractor Quality Control
9 Deductions for Deficient Work
10 Safety
11 Reporting Defective Facilities
12 Required Insurance and Insurance Certificate
13 Pre-work Conference
14 Contractor Submittals
15 Billing
16 Changes in Amount of Facilities Serviced
EXHIBITS
No. TITLE
1 Performance Requirements Table
2 Quality Assurance Report
3 Quality Control Inspection Log
4 Example of Job Hazard Analysis
5 Invoice Format
APPENDICES
Appendix Title
A Mowing – Improved Area
B Mowing – Semi Improved Area
Facilities Inventory & Mowing Maps
1. SCOPE OF WORK. The work required under this specification provides for the mowing, trimming, and edging of public use areas, the dam embankment, and other project lands at
Robert S. Kerr Lake.
2. DEFINITIONS.
2.1. Contractor Quality Control (CQC). The contractor's system of controlling the quality of services provided under the provisions of the contract.
2.2. Deficient Service. Any service provided by the contractor that does not meet the
Performance Standards specified in the Performance Requirements given in Exhibit 1.
2.3. Government. The term "Government" as used herein means the United States of America.
2.4. Performance Requirement (PR). The Government's requirement for each service provided under the contract. The requirements are stated as Performance Standards (PStd), and specify the minimum standard (quality) for each service provided under the contract.
2.5. Project. The term "project" as used herein means all Government property and easements at
Eufaula Lake.
2.6. Public Use Area (PUA). Parks as well as overlooks, nature and hiking trails, access points, and other areas used by the public for recreation.
2.7. Quality. Conformance with the contract specification.
2.8. Quality Assurance (QA). The procedure by which the Government determines CQC is functioning effectively.
2.9. Regulations. The term "regulations" refers to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.
2.10. Workday. Any day, Monday through Friday, exclusive of Federal holidays. This definition should not be interpreted to mean work is not required by this specification on other days.
3. REFERENCES. Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1) is hereby incorporated into this specification. The Contracting Officer’s Representative (COR) will furnish EM 385-1-1 to the contractor after contract award.
4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.
4.1. PERFORMANCE BASED MOWING.
4.1.1. Initiation and execution of work. Work shall be performed as needed to comply with the performance standards (Performance Requirements Table, Exhibit 1). It is the contractor’s responsibility to determine mowing frequency and perform the mowing without work orders from the COR. Work will be accepted based on compliance with performance requirements.
Refer to Paragraph 7. for inspection criteria and contractor performance evaluation.
4.1.2. Acceptance of work. The Government shall accept work unless the COR notifies the contractor of deficient services.
4.1.2.1. Initial notification of deficiencies may be written or oral; however, all oral notification shall be confirmed by the COR in writing within two (2) workdays. Written notification shall be provided by completing Parts I, II, and III of a Quality Assurance (QA) Report (SWT Form 982, Exhibit 2).
4.1.2.2. If the COR notifies the contractor of deficient work the contractor shall initiate action to accomplish corrective work. Refer to paragraph 10 for deficient work not reperformed.
4.1.2.3. The contractor shall notify the COR when corrective work is completed. Notification shall be made by completing Part IV of the QA Report provided it has been furnished to the contractor. If not, notification shall be made orally. When work has been corrected, the COR shall take necessary action to complete Part V of the QA Report and provide a copy to the contractor.
5. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification within specified time limits.
5.1. Experience and Skills. The contractor shall provide personnel that are experienced and demonstrate proficiency in the skills required performing the various types of work specified.
5.2. Supervision.
5.2.1. The contractor shall provide one supervisor on the project who shall have full authority to direct any work required. This supervisor and alternates, who shall have full authority to execute work during his absence, shall be designated in writing.
5.2.2. The contractor shall provide the COR a local or toll-free telephone number at or through which the supervisor can be reached between 8:00 a.m. and 5:30 p.m. on all days work is being performed. Use of a cellular phone is acceptable, contractor must have a cell phone that receives good service around the lake.
6. EQUIPMENT. The contractor shall furnish equipment necessary to accomplish work required performing the various types of work specified.
6.1. Equipment Inspections. Upon request, the contractor shall present equipment to the COR for inspection. The contractor shall not use equipment until it has passed inspection by the COR.
The COR shall establish the time and location for these inspections.
6.2. Equipment Requirements. All equipment used to perform work under this specification must be in good operating and mechanical condition and shall comply with EM 385-1-1.
6.2.1. Tractors shall be equipped and operated in accordance with the following.
6.2.1.1. Tractors will be four wheel drive and must have duel rear wheels.
6.2.1.2. Power take offs on tractors shall operate at a minimum of 540 rpm during mowing operations.
6.2.1.3. Seat belts shall be worn at all times by tractor operators. Refer to subparagraph 16.B.08.
of EM 385-1-1.
6.2.1.4. A substantial guard or shield shall be installed on the tractor to protect the operator from flying objects during mowing. The guard or shield shall be covered with not less than 1/4-inch woven wire mesh or expanded metal with openings no greater than one inch. Refer to subparagraph 16.B.03.a. and 16.B.11.a of EM 385-1-1.
6.2.1.5. Rollover protection shall be provided. If the structure is not designed and installed by the manufacturer of the tractor, the contractor shall furnish a certificate from a registered professional engineer that the rollover protection is structurally safe for its intended purpose.
Refer to subparagraph 16.B.12. of EM 385-1-1.
6.2.2. Mowers shall be commercial rotary-type or flail-type and shall meet the following requirements:
6.2.2.1. Mowers shall be equipped with rear or side discharge, safety chains, rock guards or other protective devices to prevent flying objects from injuring people or damaging property.
6.2.2.2. Mowers shall be equipped with slides and wheels.
6.2.2.3. Brush hogs shall not be used on the slopes of dikes around oxidation ponds.
6.2.2.4. Mowers used on the embankment of the dam shall have a minimum cutting width of 15 feet.
6.2.2.5. Mulching mowers shall not be used.
6.2.2.6. Brush hogs shall not be used within improved areas.
6.2.2.7. All safety devices provided by the manufacturers of push and riding mowers shall function as designed.
6.2.3. Edger’s shall be equipped with a rotary blade in an upright position. A protective guard for the blade shall be provided.
6.2.4. Signs located on each side of the vehicles shall mark all sedans and trucks used by the contractor to perform work under this specification. Signs may be painted on the doors or magnetic signs may be attached to the doors. Magnetic signs shall not be removed at any time vehicles are at the project. Lettering shall be at least 2 inches high. Each sign shall contain the following:
ROBERT S. KERR LAKE
MOWING SERVICES
PROVIDED BY
(Contractor's Name)
6.3. Equipment Operation.
6.3.1. Mowing equipment shall be operated in a manner that will allow for discharge of grass clippings away from roads, ponds, facilities, etc., and prevent damage to turf.
6.3.2. Power operated trimming equipment shall not be used around any shrubs or trees with a diameter less than 3 inches at breast height.
6.4. Vehicle Operation and Parking. While performing work under this contract, vehicles shall be operated and parked only on roads, parking areas, or pullouts unless the COR approves use of other areas.
7. PERFORMANCE REQUIREMENTS. PRs for work performed under this specification are given in Exhibit 1. The contractor's performance will be evaluated using these PRs as follows:
7.1. Services provided by the contractor will be inspected for compliance with PStds. Those not meeting PStds shall be considered deficient. Major or recurring minor deficiencies will result in a letter of correction being issued by the COR.
7.2. Deficient services are determined during initial QA inspections since the purpose of QA is to determine how well CQC is functioning. The results of inspections are not changed as a result of satisfactory reperformance.
8. CONTRACTOR QUALITY CONTROL. The contractor shall establish and execute a CQC
Program to assure that all work required by this specification is completed on schedule and in accordance with the PRs in Exhibit 1.
8.1. The results of all quality control inspections conducted by the contractor shall be entered on the Quality Control Inspection Log (SWT Form 990, Exhibit 5). A copy of completed inspection logs shall be furnished to the COR weekly.
8.2. The COR may waive the requirements in subparagraph 8.1. if he determines proper CQC can be achieved without the required submissions. The COR will normally make this determination on the basis of actual performance by the contractor.
9. DEDUCTIONS FOR DEFICIENT WORK. Deductions from the contractor's scheduled earnings shall be made for services that do not meet the PStds in Exhibit 1. Deductions for documented defects will be made in accordance with the following procedures:
9.1. Each service found deficient and reperformed by the contractor: No deduction.
9.2. Each service found deficient and performed by the Government: Deduction for loss in value shall be based on the Government's cost for performing the work.
9.3. Each service found deficient and performed by another contractor: Deduction is the contract price paid the other contractor to perform the work.
9.4. Each service found deficient and not reperformed by anyone, or work not performed at all:
Deduction for loss in value shall be based on estimates of the contractor's cost for performing the work, i.e., labor, materials, equipment costs, work schedules, etc. Loss in value shall be based on the contract bid price or applicable portion thereof.
10. SAFETY.
10.1. Safety Plan. The contractor shall furnish the COR a safety plan to implement the general policies and procedures for safe operation and maintenance of the project in accordance with EM
385-1-1. The safety plan shall include, but not be limited to the following:
10.1.1. Procedures for training employees in responsibilities for safety of others, including the general public.
10.1.2. Requirements for wearing or utilizing personal safety equipment and apparel. Hard hats safety glasses and hearing protection are required at all times when mowing and trimming.
10.1.3. Procedures for handling, reporting, and correcting unsafe conditions, practices, and safety violations.
10.1.4. Procedures for treating and transporting injured persons to medical facilities.
10.1.5. Fire prevention plans.
10.1.6. Job hazard analyses shall include an evaluation of hazards that might be encountered for an operation, and proposed methods and techniques for accomplishing each job in a safe manner.
Contractor personnel shall be thoroughly indoctrinated with job hazard analyses, especially at the start of a major job. Initially, the safety plan shall include, but not be limited to, job hazard analyses for the jobs listed below. However, the contractor shall prepare additional analyses as the need arises and/or the COR directs. Job hazard analysis directed by the COR shall be submitted for approval within one (1) week. An example of a job hazard analysis is given in
Exhibit 6.
10.1.6.1. Loading and unloading of equipment (analysis for each type of equipment to be used to perform services required by this specification).
10.1.6.2. Equipment operation and maintenance (for each type of equipment).
10.1.6.3. Vehicle operation and maintenance.
10.2. Safety Violations. If a contractor's employee persists in not following the safety requirements of this specification or the contractor's safety plan, the employee shall be permanently discharged after 3 violations upon the request of the COR/Contracting Officer. The contractor further acknowledges that $100.00 per violation will be deducted from the monthly invoice in which the violation occurs.
10.3. Personal Clothing and Safety Apparel. Contractor personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short-sleeve shirt and long trousers (no sleeveless shirts or tank tops, or shorts). Clothing shall be in good repair. Personnel will wear additional protective apparel when required by Section 5, EM 385-1-1.
10.4. Accident Reports.
10.4.1. The contractor shall immediately notify the COR of all known accidents that occur at the project and result in death or serious injury.
10.4.2. The contractor shall investigate all accidents involving contractor or subcontractor employees that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies and equipment incidental to work performed under this specification. The results of investigations shall be reported to the COR immediately, and in writing on ENG Form
3394, Accident Investigation Report, within one (1) workday following the accident.
10.5. Exposure Reports. The contractor shall maintain an accurate record of exposure data (man-hours worked) and submit the figure in writing monthly by the 2nd workday of the following month.
11. REPORTING DEFECTIVE FACILITIES. While performing work, contractor personnel shall observe the condition of Government facilities. Damaged, defective, and/or inoperative facilities shall be reported to the COR each workday.
12. REQUIRED INSURANCE AND INSURANCE CERTIFICATE. Pursuant to FAR
28.301(b) for the protection of the Government, and FAR 28.306(b) and 52.228-5, Work on a
Government Installation, the Contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:
12.1. Worker’s Compensation and Employer’s Liability: Workers' compensation and employers' liability insurance in compliance with applicable state statutes, with a minimum liability coverage of $100,000.
12.2. General Liability: Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. Property damage liability insurance shall be required in an amount of at least $100,000.
12.3. Automobile liability: Liability insurance shall be written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.
The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
13. PREWORK CONFERENCE. The Contracting Officer/COR shall conduct a Prework
Conference with the contractor to discuss the provisions of this specification and the contractor's submittals listed in paragraph 13 below. As a minimum, the officer of the company that signed the contract and the on-site supervisor shall represent the contractor. The Contracting
Officer/COR shall establish the location, date, and time of the Prework Conference after consultation with the contractor.
14. CONTRACTOR SUBMITTALS. Unless otherwise noted, the contractor shall submit the documents listed below to the Contracting Officer prior to starting work. All submittals, other than copies of contracts, shall be typed and the original and one copy shall be furnished the
Contracting Officer. If the Contracting Officer determines any of the submittals do not comply with this specification, the contractor shall resubmit these documents within one (1) week.
14.1. Names of on-site supervisor and his alternate (submit prior to initiation of work and prior to changing designated employees) (subparagraph 5.2.1.).
14.2. Safety Plan (subparagraph 10.1.).
14.3. Job Hazard Analysis (subparagraph 10.1.6.)
14.4. Exposure reports (submit by 2nd workday of each month) (subparagraph 10.5.).
14.5. Herbicide Certificate (Appendix A subparagraph 3.5 and Appendix B subparagraph 3.2.2.)
15. BILLING.
15.1. The contractor shall submit an original and two copies of invoices on completed work only at the end of each month.
15.2. Invoices shall be prepared in the format shown at Exhibit 7.
15.3. All exposure reports and requested documents shall be submitted before an invoice will be accepted.
15.4. Invoices and supporting documents shall be delivered or emailed to the COR, Eufaula Lake
Office 102 E. BK 200 Rd. Stigler, OK 74462.
16. CHANGES IN AMOUNT OF FACILITIES SERVICED. Adjustment in contract price will be negotiated at the request of either party, only if either or both of the following conditions occur.
16.1. Services required are deleted for a period of one (1) month or longer in an entire park.
16.2. A singular change in the amount of project facilities to be serviced is made and the change results in an annual increase or decrease in the cost of work that exceeds $300. The cost of increases or decreases shall be based upon estimates of the contractor's costs for performing the work.
EXHIBIT 1
PERFORMANCE REQUIREMENTS
PERFORMANCE REQUIREMENTS
SERVICE REQUIREMENT PR NO. PERFORMANCE STANDARDS
APPENDIX A
Improved areas 1 Smooth cut. 1Height of cut grass does not exceed
1/2 inch from that specified. No uncut vegetation.
Lawn areas 2 Smooth cut. 1Height of cut grass does not exceed
1/2 inch from that specified. No uncut vegetation.
Edging 3 Edge of grass is a uniform vertical cut with no runners extending beyond vertical face.
Herbicide Application 4 All vegetation in road cracks, parking areas, each side of boat ramps and courtesy docks etc.
APPENDIX B
Embankment area 5 Smooth cut. 1Height of cut grass does not exceed
1 inch from that specified. 2No uncut vegetation.
APPENDICES A & B
Trimming 6 Uniform cut with no scalping of grass. No damage to trees or shrubs.
Clean designated areas after mowing
7 No vegetation or debris left on paved or concrete surfaces.
Contractor Quality Control 8 Establish & maintain quality control system to satisfactorily inspect & ensure that all required work is performed & is in full compliance with this contract’s PStds, The QC representative shall have full authority and power to act for the contractor on items pertaining to overall work performance, management and coordination. Requirements for the QC are stated in Paragraph 9.3.2.
Submittals 9 All contract required documents submitted on time for COR approval. Contractor Quality Control Plan, Safety Plan, Invoices, Injury & Exposure Reports, Antiterrorism /
Operations Security Requirements
Completion of work requirements
10 All work requirements completed before crew leaves an area. This includes but not limited to lagoons where applicable, lagoon wetlands where applicable, well pump areas where applicable, access roads, to water’s edge where specified, etc.
1. Conformance with height requirement shall be determined by measuring the height of cut grass on smooth ground.
2. The COR will relax this requirement to a degree when the height of grass prior to mowing is excessive. The COR shall make the determination of excessive grass height unilaterally.
EXHIBIT 2
QUALITY ASSURANCE REPORT
See separately attached Exhibit 2.
EXHIBIT 3
QUALITY CONTROL INSPECTION LOG
See separately attached Exhibit 3.
EXHIBIT 4
EXAMPLE OF JOB HAZARD INSPECTION LOG
See separately attached Exhibit 4.
EXHIBIT 5
INVOICE FORMAT
BILLING FOR
MAINTENANCE CONTRACT
PROJECT: ________________________________ SHEET ___ OF ___
CONTRACTOR: _____________________________ DATE: ___________
ADDRESS: ________________________________ CONTRACT NO: W912BV-__-_-____
BILLING PERIOD: ________ THRU __________ INVOICE NO: __________
PAYMENT TERMS: ____________________________
(Payment Discount or N/A)
BID ITEM
NO. DEDUCTION AMOUNT TOTAL
PAYMENT REQUESTED: ______________
CONTRACTOR (Signature/Date)
APPENDIX A
PERFORMANCE BASED MOWING IMPROVED AREAS
1. FACILITIES TO BE SERVICED. Public use areas and Navigation Office complex. An inventory of mowing areas bid by the "month" is given in Table A. All mowing maps are at the end of Appendix B.
2. FREQUENCIES AND TIMES OF SERVICE.
2.1. Work shall be performed between 7:00 a.m. to 7:00 p.m., from 1 April through 31 August and 7:30 am to 6:30 pm from 1 September to 31 October, Frequencies is listed in Table A.
2.2. Mowing of PUAs shall not be accomplished on Saturdays, Sundays, Federal holidays, or one workday before Federal holidays.
3. DESCRIPTION OF WORK. Mowing shall be performed in Improved Areas and shall be cut no lower than a minimum height of 2 inches. In addition, mow the areas described below and around facilities shown on the drawings
3.1. Areas adjacent to all roads and parking areas, mowing shall be accomplished for a distance of 15 feet from each edge of the road or parking area or to the tree line, whichever is closer. The limits of mowing at intersections shall be determined by the COR to provide a safe viewing distance for vehicles approaching the intersections.
3.2. Areas around park and lake entrance signs. Park entrance signs are located beside roads shown on the attached maps. The area to be mowed around these park signs shall follow the mow line of the previous mowing. If there needs to be any changes, the COR will determine the length of the new area to be mowed in front of these signs.
3.3. Trimming shall be maintained around all vertical objects protruding from the ground, including under guardrails, trees, reservation bollard signposts, and fence posts which exist within the limits of improved areas. This includes trimming along railroad ties delineating pullouts and wheel stops. This includes cracks between restrooms and where sidewalks meet, anywhere riprap and vegetation meet and inside playground barriers.
3.4. Edging shall be accomplished along all concrete walkways and curbs.
3.5. The contractor may apply Aquatic herbicides only in lieu of trimming. The COR must approve use of chemicals. The contractor shall submit a list of proposed products with manufacturers Material Safety Data Sheets (MSDS) for review. All herbicides shall be applied by a certified applicator. Proof of certification shall be provided before application of any herbicides. The contractor shall submit an application report each time herbicides are applied.
The COR shall furnish the form.
3.6. Cleanup. Prior to mowing, the contractor shall remove rocks and debris that are likely to damage equipment or be thrown by the mower. After mowing is accomplished, the contractor shall remove vegetation and debris from parking lots, paved walkways and pullouts, and table and picnic shelter slabs.
3.7. Herbicide Spraying. The contractor may apply Aquatic herbicide only to control vegetation growing in the cracks of paved surfaces, on gravel campsites, campsite impact areas, or the interior of the oxidation ponds from the water line to top of embankment on the inside slope.
This includes all woody vegetation inside chain link fence around oxidation ponds. Herbicide may be applied to all rip-rapped areas adjacent to campsites, each side of boat ramps and both sides of courtesy docks in lieu of trimming. For general use pesticides, the contractor shall complete the Tulsa District Pesticide Management Training Requirement or possess a Certified
Pesticide Applicator’s license respective to the State where the pesticide is being applied.
Application of restricted pesticides is limited to State Certified Pesticide Applicators or those working under direct supervision of personnel certified in applying restricted-use pesticides in the specific state categories commensurate with the work to be performed. The contractor shall submit information on the proposed use of any restricted use pesticides prior to their use to the
COR for approval. Completion of the Tulsa District Pesticide Management Training
Requirement or State Certified Pesticide Applicator’s license shall be provided to the COR prior to application of pesticides. The contractor is required to provide the COR an after application report within 10 business days of application including Herbicide trade name, EPA registration number, Target pest (e.g., Johnson Grass or All Vegetation), Location description, Total estimated acres treated, and quantity of actual pesticide used (quantity of pesticide not the total volume of mix). Soil neutralizers will not be allowed for use in herbicide mixtures. Spraying of herbicides shall not be used in lieu of trimming or edging along concrete walkways or curbs.
Special care shall be taken when applying herbicides to not allow overspray outside the approved areas allowed for treatment. The contractor will not spray further than 8” around or along any object that would otherwise be trimmed, any excessive overspray will be considered damage to
Government property, and the cost to repair such damage will be at the contractor expense.
4. RESTRICTIONS ON WORKING. The contractor shall not start work unless the grass and ground are dry enough for smooth cutting and equipment will not cause rutting of the ground.
The contractor shall use good judgment in determining whether conditions are suitable for mowing operations. In cases where the contractor and the COR disagree about the suitability of conditions for mowing operations, the COR will determine whether work shall progress or stop.
Areas excluded by these conditions will also be excluded in the inspections.
TABLE A
INVENTORY OF PERFORMANCE BASED MOWING AREAS
LOCATION
IMPROVED
AREAS(AC)
PLAYGROUNDS
(NO)
TOILETS
SHELTERS
Applegate Cove 20 1 2 1 Cowlington Point 27 1 2 1 Navigation Office 8 0 0 0 Marine Terminal 5 0 0 0
Short Mountain Cove 16 1 2 1
Total 76 3 6 3
Frequencies are as listed. The contractor shall initiate mowing within (3) calendar days of the date specified.
Navigation Office only.
April - 3rd week
May thru October, end of 1st week, middle of 3rd week, end of last week of each month.
All remaining locations listed in Table A.
April - 3rd week
May thru September, 1st and 15th of each month.
October - 1st of the month.
Number of mowing’s each year - 12
APPENDIX B
PERFORMANCE BASED DAM MOWING
AND HERBICIDE AREAS
1. FACILITIES TO BE SERVICED. Dam embankments, saddle dikes, levees and other project lands. An inventory of mowing areas bid by the month is given in Table B. All mowing maps are at the end of Appendix B.
2. FREQUENCIES AND TIMES OF SERVICE.
2.1. Work shall be performed between 7:00 a.m. and 7:00 p.m., from 1 April through 31 October.
2.2. Mowing of PUAs shall not be accomplished on Saturdays, Sundays, Federal holidays, or one workday before Federal holidays.
3. DESCRIPTION OF WORK. The contractor shall perform the following work as listed.
3.1. Mowing.
Contractor shall begin work for mowing of embankment as specified below. The contractor shall initiate mowing within (3) calendar days of the date specified and complete the mowing within 7 calendar days after work is initiated.
May 1st, June 15th, August 1st, September 15th, October 25th
3.2. Trimming.
3.2.1. Every time the embankments is mowed trimming shall be accomplished around piezometers, staff gauges, relief wells, manholes, guard posts, and buildings located on the embankment; along the edge of the embankment riprap; and around guardrail and signposts on both sides of the embankment road.
3.2.2. The contractor may apply Aquatic herbicides only in lieu of trimming. The COR must approve use of chemicals. The contractor shall submit a list of proposed products with manufacturers Material Safety Data Sheets (MSDS) for review. All herbicides shall be applied by a certified applicator. Proof of certification shall be provided before application of any herbicides. The contractor shall submit an application report each time herbicides are applied.
The Contracting Officer shall furnish the forms.
3.3. Herbicide. Vegetative growth shall be controlled with an approved Aquatic herbicide with a colored dye added in the areas listed in Table B and shall be applied on within (3) calendar days of the date specified with a 90 % kill or re-applied within (10) days at no additional cost.
May 1st, June 15th, August 1st, September 15t
3.3.1. All Federal, State and local licensing and application requirements shall be met prior to and during application of herbicides.
3.3.2. Johnson grass Eradication, a pre-emergent and a herbicide will be applied to both north and south embankment areas, the pre-emergent and herbicide will be specific for the elimination of Johnson grass and will be applied annually. Pre-emergent will be applied in April if weather permits and the herbicide will be applied in June.
4. RESTRICTIONS ON WORKING. The contractor shall not start work unless the grass and ground are dry enough for smooth cutting and equipment will not cause rutting of the ground.
The contractor shall use good judgment in determining whether conditions are suitable for mowing operations. In cases where the contractor and the COR disagree about the suitability of conditions for mowing operations, the COR will determine whether work shall progress or stop.
Areas excluded by these conditions will also be excluded in the inspections.
TABLE B
PERFORMANCE BASED EMBANKMENT
MOWING & HERBICIDE AREAS
SEMI-IMPROVED EMBANKMENT
AREAS AREAS
LOCATION (AC) (AC)
Kerr Dam Embankment 14
Kerr Dam site Area 26.5
Leflore Landing Dike 1
Sallisaw DGPS Site 8
Kerr Lake CXT .25
TOTALS 8.25 49.5
Section E - Inspection and Acceptance
CLAUSES INCORPORATED BY REFERENCE
52.246-1 Contractor Inspection Requirements APR 1984
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
52.242-15 Stop-Work Order AUG 1989
Section G - Contract Administration Data
252.201-7000 Contracting Officer's Representative DEC 1991
252.204-7006 Billing Instructions OCT 2005
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
Section H - Special Contract Requirements
WAGE RATES
"REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015-5143
Daniel W. Simms Division of | Revision No.: 11
Director Wage Determinations | Date Of Last Revision: 07/16/2019
Note: Under Executive Order (EO) 13658 an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1 2015.
If this contract is covered by the EO the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination if it is higher) for all hours spent performing on the contract in calendar year 2019. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
State: Oklahoma
Area: Oklahoma Counties of Le Flore Sequoyah
**Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations
01011 - Accounting Clerk I 12.60
01012 - Accounting Clerk II 15.33
01013 - Accounting Clerk III 17.78
01020 - Administrative Assistant 20.20
01035 - Court Reporter 21.63
01041 - Customer Service Representative I 11.53
01042 - Customer Service Representative II 12.96
01043 - Customer Service Representative III 14.14
01051 - Data Entry Operator I 11.97
01052 - Data Entry Operator II 13.05
01060 - Dispatcher Motor Vehicle 17.99
01070 - Document Preparation Clerk 12.66
01090 - Duplicating Machine Operator 12.66
01111 - General Clerk I 11.62
01112 - General Clerk II 13.83
01113 - General Clerk III 16.83
01120 - Housing Referral Assistant 17.43
01141 - Messenger Courier 11.86
01191 - Order Clerk I 14.42
01192 - Order Clerk II 15.73
01261 - Personnel Assistant (Employment) I 13.62
01262 - Personnel Assistant (Employment) II 15.24
01263 - Personnel Assistant (Employment) III 17.57
01270 - Production Control Clerk 20.31
01290 - Rental Clerk 13.33 http://www.dol.gov/whd/govcontracts http://www.dol.gov/whd/govcontracts
01300 - Scheduler Maintenance 13.98
01311 - Secretary I 13.98
01312 - Secretary II 15.64
01313 - Secretary III 17.43
01320 - Service Order Dispatcher 14.95
01410 - Supply Technician 20.20
01420 - Survey Worker 13.71
01460 - Switchboard Operator/Receptionist 12.48
01531 - Travel Clerk I 12.32
01532 - Travel Clerk II 13.14
01533 - Travel Clerk III 13.77
01611 - Word Processor I 12.45
01612 - Word Processor II 13.98
01613 - Word Processor III 15.64
05000 - Automotive Service Occupations
05005 - Automobile Body Repairer Fiberglass 19.15
05010 - Automotive Electrician 18.19
05040 - Automotive Glass Installer 17.24
05070 - Automotive Worker 17.24
05110 - Mobile Equipment Servicer 15.14
05130 - Motor Equipment Metal Mechanic 19.15
05160 - Motor Equipment Metal Worker 17.24
05190 - Motor Vehicle Mechanic 17.91
05220 - Motor Vehicle Mechanic Helper 13.98
05250 - Motor Vehicle Upholstery Worker 16.08
05280 - Motor Vehicle Wrecker 17.19
05310 - Painter Automotive 18.22
05340 - Radiator Repair Specialist 17.24
05370 - Tire Repairer 13.29
05400 - Transmission Repair Specialist 19.15
07000 - Food Preparation And Service Occupations
07010 - Baker 11.15
07041 - Cook I 9.79
07042 - Cook II 11.11
07070 - Dishwasher 9.53
07130 - Food Service Worker 9.65
07210 - Meat Cutter 13.04
07260 - Waiter/Waitress 9.13
09000 - Furniture Maintenance And Repair Occupations
09010 - Electrostatic Spray Painter 17.76
09040 - Furniture Handler 11.67
09080 - Furniture Refinisher 17.42
09090 - Furniture Refinisher Helper 13.06
09110 - Furniture Repairer Minor 15.18
09130 - Upholsterer 16.54
11000 - General Services And Support Occupations
11030 - Cleaner Vehicles 11.50
11060 - Elevator Operator 11.28
11090 - Gardener 15.21
11122 - Housekeeping Aide 11.28
11150 - Janitor 11.28
11210 - Laborer Grounds Maintenance 11.45
11240 - Maid or Houseman 9.77
11260 - Pruner 10.25
11270 - Tractor Operator 14.01
11330 - Trail Maintenance Worker 11.45
11360 - Window Cleaner 12.60
12000 - Health Occupations
12010 - Ambulance Driver 14.86
12011 - Breath Alcohol Technician 17.43
12012 - Certified Occupational Therapist Assistant 23.91
12015 - Certified Physical Therapist Assistant 26.28
12020 - Dental Assistant 16.94
12025 - Dental Hygienist 32.32
12030 - EKG Technician 20.70
12035 - Electroneurodiagnostic Technologist 20.70
12040 - Emergency Medical Technician 14.86
12071 - Licensed Practical Nurse I 15.57
12072 - Licensed Practical Nurse II 17.43
12073 - Licensed Practical Nurse III 19.42
12100 - Medical Assistant 13.64
12130 - Medical Laboratory Technician 20.15
12160 - Medical Record Clerk 13.21
12190 - Medical Record Technician 14.78
12195 - Medical Transcriptionist 17.12
12210 - Nuclear Medicine Technologist 38.28
12221 - Nursing Assistant I 11.42
12222 - Nursing Assistant II 12.84
12223 - Nursing Assistant III 14.00
12224 - Nursing Assistant IV 15.72
12235 - Optical Dispenser 17.57
12236 - Optical Technician 15.57
12250 - Pharmacy Technician 13.79
12280 - Phlebotomist 14.37
12305 - Radiologic Technologist 21.91
12311 - Registered Nurse I 22.22
12312 - Registered Nurse II 27.18
12313 - Registered Nurse II Specialist 27.18
12314 - Registered Nurse III 32.88
12315 - Registered Nurse III Anesthetist 32.88
12316 - Registered Nurse IV 39.41
12317 - Scheduler (Drug and Alcohol Testing) 21.58
12320 - Substance Abuse Treatment Counselor 18.85
13000- - Information And Arts Occupations
13011 - Exhibits Specialist I 20.47
13012 - Exhibits Specialist II 25.35
13013 - Exhibits Specialist III 31.01
13041 - Illustrator I 20.47
13042 - Illustrator II 25.35
13043 - Illustrator III 31.01
13047 - Librarian 28.08
13050 - Library Aide/Clerk 11.22
13054 - Library Information Technology Systems 25.35
Administrator
13058 - Library Technician 20.08
13061 - Media Specialist I 18.29
13062 - Media Specialist II 20.47
13063 - Media Specialist III 22.81
13071 - Photographer I 18.23
13072 - Photographer II 20.47
13073 - Photographer III 24.85
13074 - Photographer IV 30.42
13075 - Photographer V 36.81
13090 - Technical Order Library Clerk 20.47
13110 - Video Teleconference Technician 18.29
14000 - Information Technology Occupations
14041 - Computer Operator I 14.71
14042 - Computer Operator II 16.45
14043 - Computer Operator III 21.59
14044 - Computer Operator IV 25.11
14045 - Computer Operator V 27.62
14071 - Computer Programmer I (see 1) 22.27
14072 - Computer Programmer II (see 1)
14073 - Computer Programmer III (see 1)
14074 - Computer Programmer IV (see 1)
14101 - Computer Systems Analyst I (see 1)
14102 - Computer Systems Analyst II (see 1)
14103 - Computer Systems Analyst III (see 1)
14150 - Peripheral Equipment Operator 14.71
14160 - Personal Computer Support Technician 28.80
14170 - System Support Specialist 24.19
15000 - Instructional Occupations
15010 - Aircrew Training Devices Instructor (Non-Rated) 29.16
15020 - Aircrew Training Devices Instructor (Rated) 35.28
15030 - Air Crew Training Devices Instructor (Pilot) 42.28
15050 - Computer Based Training Specialist /…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .