Exhibit 2 - Quality Assurance Report.pdf
PDF 48 KB Posted
- Attached to
- Mowing Services, Robert S. Kerr Lake, Oklahoma
- Solicitation number
- W912BV20Q0022
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - RS Kerr Mowing Services 20Q0022.pdf | ||
| Price Schedule - RS Kerr Mowing 20Q0022.xls | XLS spreadsheet | |
| RSK Mowing Maps.pdf | ||
| Exhibit 3 - Quality Control Inspection Log.pdf | ||
| Exhibit 4 - Job Hazard Analysis.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE REPORT
DIRECTIVE 1130-2-550
PART 1 - NOTIFICATION
This report constitutes notification to the contractor of the deficiencies cited below.
This report confirms oral notification to the contractor on of the deficiencies cited below.
COR Signature Date
Type or Print name if not electronically signed
PR NO LOCATION DESCRIPTION OF DEFICIENCY
PRIMARY
INSPECTION
SECONDARY
INSPECTION
No. Inspec. No. Def. No. Inspec. No. Def.
SWT Form 982 23 Oct 2010 PROPONENT: CESWT-ODALL PREVIOUS EDITIONS ARE OBSOLETE
PART 2 - QA INSPECTION RESULTS
Cotinued
PART 3 - CO DECISION ON DEFICEINCIES
The deficiencies in meeting PR No. (s) must be corrected before the work will be deducted from scheduled payments to the contractor for the deficiencies
COR Signature Date
Meet PR No.(s)
SWT Form 982 23 Oct 2010 PROPONENT: CESWT-ODALL PREVIOUS EDITIONS ARE OBSOLETE
. Calculations for this deduction are given under part VI.
PART IV - NOTIFICATION
Will be accepted.
I certify that all deficiencies have been corrected in accordance with the contract specifications.
Contractor Signature Date
Type or Print name if not electronically signed
Type or Print name if not electronically signed
PART v - ACCEPTANCE
All work except that for which deductions will be made complies with the contract specifications and is hereby accepted.
Contractor Signature Date
Type or Print name if not electronically signed
DIRECTIVE 1130-2-550
PART 1 - NOTIFICATION
PR NO
LOCATION
DESCRIPTION OF DEFICIENCY
PRIMARY INSPECTION
SECONDARY INSPECTION
No. Inspec.
No. Def.
No. Inspec.
No. Def.
SWT Form 982 23 Oct 2010
PROPONENT: CESWT-OD
ALL PREVIOUS EDITIONS ARE OBSOLETE
PART 2 - QA INSPECTION RESULTS
QUALITY ASSURANCE REPORT
Cotinued
PART 3 - CO DECISION ON DEFICEINCIES
SWT Form 982 23 Oct 2010
PROPONENT: CESWT-OD
ALL PREVIOUS EDITIONS ARE OBSOLETE
. Calculations for this deduction are given under part VI.
PART IV - NOTIFICATION
Will be accepted.
I certify that all deficiencies have been corrected in accordance with the contract specifications.
PART v - ACCEPTANCE All work except that for which deductions will be made complies with the contract specifications and is hereby accepted.
8.2.1.4029.1.523496.503679
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| TextField1: |
| SignatureField1: |
| TextField2: |
| TextField3: |
| NumericField1: |
File details come from the government source that posted it. Updated .