Solicitation No. W912BV19R0010
US Army Corps of Engineers Tulsa District Arkansas River Watershed Robert S. Kerr Lock and Dam 15, Oklahoma
RS Kerr Powerhouse Bridge Crane Rehabilitation
Specifications
November 14, 2018
JVS
FY19
TABLE OF CONTENTS
SOLICITATION NO. W912BV19R0010
RS KERR POWERHOUSE BRIDGE CRANE REHABILITATION
ROBERT S. KERR LOCK & DAM 15, OKLAHOMA
OCTOBER 25, 2018
TOC-1
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 00 SF 1442 AND CLIN SCHEDULE
00 21 00 INSTRUCTIONS, CONDITIONS, & NOTICES TO OFFERORS
00 22 11 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, BASIS
OF AWARD ONE-STEP-BEST VALUE, DESIGN-BUILD (SINGLE AWARD)
00 45 00 REPRESENTATIONS & CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 73 00 SPECIAL CONTRACT REQUIREMENTS
00 73 46 WAGE DETERMINATION SCHEDULE
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 SUMMARY OF WORK
01 22 00.00 26 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00 QUALITY CONTROL
01 46 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 BULLETIN BOARD, PROJECT SIGN, AND SAFETY SIGN
01 78 00 CLOSEOUT SUBMITTALS
01 78 23.00 26 OPERATION AND MAINTENANCE DATA
DIVISION 02 – EXISTING CONDITIONS
02 82 13 ASBESTOS ABATEMENT
02 83 13 LEAD IN CONSTRUCTION
DIVISION 03 - CONCRETE
03 60 00.01 26 CONCRETE DEMOLITION AND REPAIR OF CONCRETE SURFACES
DIVISION 05 - METALS
05 50 03.00 26 METALWORK FABRICATION, MACHINE WORK, AND MISCELLANEOUS
PROVISIONS
05 50 04.00 26 METALS: MISCELLANEOUS, STANDARD ARTICLES, SHOP FABRICATED
ITEMS
DIVISION 09 - FINISHES
09 90 00.01 26 PAINTS AND COATINGS
TABLE OF CONTENTS
SOLICITATION NO. W912BV19R0010
RS KERR POWERHOUSE BRIDGE CRANE REHABILITATION
ROBERT S. KERR LOCK & DAM 15, OKLAHOMA
OCTOBER 25, 2018
TOC-2
DIVISION 26 - ELECTRICAL
26 05 00.00 26 BASIC ELECTRICAL MATERIALS AND METHODS
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 01 20.71 26 BRIDGE CRANE DATA, TESTING, AND TRAINING
41 01 20.72 26 BRIDGE CRANE MECHANICAL AND STRUCTURAL REHABILITATION
41 01 20.73 26 BRIDGE CRANE ELECTRICAL REHABILITATION
-- End of Table of Contents --
Bridge Crane Rehabilitation at RS Kerr
The Cost Magnitude of this project is $1 to $5 million dollars.
This is a Full & Open Competitive Solicitation
Request for Proposal (RFP) Due Date is December 14th, 2018 at 2:00PM CST
BRUCE E HAYES 918.669.7277
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
14-Nov-2018
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________300 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________FAR 25.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
918-669-7436FAX:TEL: 918-669-7279 TEL: FAX:
W912BV19R0010 72
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 11 00 - SF 1442 and CLIN Schedule
BID SCHEDULE
Tulsa District Corps of Engineers
ROBERT S. KERR POWER HOUSE – REHABILITATION OF BRIDGE CRANE
ITEM
DESCRIPTION
QUANTITY
UNIT
UNIT
PRICE
AMOUNT
BASE BID ITEMS
0001 GENERAL CONDITIONS 1 JOB $_______ $________
REHABILITATION OF EXISTING BRIDGE CRANE
& DESIGN EFFORT
1 JOB $_______ $________
INSPECTIONS & REPORTS OF SPECIFIED
COMPONENTS
1 JOB $_______ $________
TRAINING, COMMISSIONING, & ACCEPTANCE
TESTING
1 JOB $_______ $________
0005 SPARE PARTS 1 JOB $_______ $________
BASE ITEMS TOTAL $_________
OPTIONAL BID ITEMS
0011 MAIN HOIST DRUM REPLACEMENT 2 EACH $_______ $_______
0012 MAIN HOIST DRUM GEAR REPLACEMENT 2 EACH $_______ $_______
0013 MAIN HOIST PINION GEAR REPLACEMENT 2 EACH $_______ $_______
0014 AUXILIARY HOIST DRUM REPLACEMENT 2 EACH $_______ $_______
0015 DRUM STRESS DESIGN CALCULATIONS 2 EACH $_______ $_______
BRIDGE DRIVE FINAL REDUCTION EXTERNAL
GEARING & SHAFT REPLACEMENT
2 EACH $_______ $_______
TROLLEY DRIVE FINAL REDUCTION
EXTERNAL GEARING & SHAFT REPLACEMENT
4 EACH $_______ $_______
OPTIONAL ITEMS TOTAL $_________
PRICING (CLIN) SCHEDULE NOTES
1. Offerors must insert a price on all numbered items of the PRICING SCHEDULE. Failure to do so will disqualify the Offer.
2. All quantities are estimated except where the unit is JOB.
3. The Government will evaluate offers for award purposes by adding the total price for TOTAL OPTIONAL ITEMS to the total price for the TOTAL BASE PROPOSAL (TOTAL BASE PROPOSAL AND ALL OPTIONAL ITEMS). Evaluation of options will not obligate the Government to exercise the options.
4. OPTIONAL ITEMS (Optional Bid Items) as stated above may, at the option of the Government, be awarded at contract award or at any point during the period of performance of the contract. All OPTIONAL ITEMS or any combination thereof may be exercised solely at the discretion of the Government.
5. Only One contract will be awarded under this solicitation.
IMPORTANT: See Section 01 22 00.00 26; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.
Section 00 21 00 - Instructions, Conditions & Notices to Offerors
SECTION 00 21 00
Instructions, Conditions and Notices to Offerors
1.1 GENERAL DESCRIPTION OF WORK
1.2 GOVERNMENT SECURITY REQUIREMENTS
1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
1.4 OFFEROR'S QUESTIONS AND COMMENTS
1.5 SMALL BUSINESS SIZE STANDARD/NAICS CODE
1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
1.7 SITE VISIT
1.8 ACCURACY IN PROPOSALS
1.9 PROPOSAL SUBMITTAL
1.10 PROPOSALS
1.11 JOINT VENTURE PROPOSAL REQUIREMENTS
1.12 DEVIATIONS AND EXCEPTIONS
1.13 EVALUATION CRITERIA
1.1. GENERAL DESCRIPTION OF WORK
1) Description: The work includes rehabilitation of the powerhouse bridge crane and incidental related work. The existing bridge crane is a 250-ton, top-running bridge type with two bridge girders and two trolleys. Each existing trolley has one main hoist rated for 125-tons and one auxiliary hoist rated for 20-tons. The rotor assembly lift was designed for 175-tons and the runner assembly lift for 250-tons. The anticipated generator unit rehabilitations and turbine replacements will be restricted by weight in order not to exceed these crane limits.
Scope of work: The following is a list of the major items of work included in this Contract. All of the items listed here are described in greater detail throughout the rest of the technical sections. The work includes the removal of the existing components and systems of components which are known to have asbestos containing material and lead based paint, without being specifically identified. The work includes, but is not limited to:
a. Inspection of welds on all four hoist drums, inspect for wear on components of four load blocks, inspect all wheels and open gear sets.
b. Optional CLINs may be exercised by the Government in order to replace components or assemblies that are found, by inspection, to be not serviceable.
c. Design, fabricate, and shop test the rebuild of each hoist gear reducer by removing load brake function and extending the input shafts.
d. Remove and dispose of existing operator cab, and replace with new.
e. Remove and dispose of existing crane electrification system, and replace with new.
f. Remove and dispose of existing shaft couplings, bearings, seals, and brakes, and replace each with new.
g. Remove all wheel assemblies in order to inspect wheels, open gears, and shafts for wear. Dispose of all wheel bearings and replace with new.
h. Rehabilitate, inspect, and load test all four hoists after reassembly.
i. Miscellaneous grout repair along crane rail.
j. Coat the entire crane with new paint system which is intended to encapsulate the existing lead based paint.
k. Provide operation and maintenance manuals for the new aspects of the bridge crane.
l. Provide as-built drawings for the new configuration of the existing bridge crane.
The work will be performed at RS Kerr Powerhouse which is located at 29759 Power House Road in Keota, Oklahoma 74941-6569, Le Flore County.
1.2. GOVERNMENT SECURITY REQUIREMENTS
The offeror(s) must ensure that ALL mail sent to the Tulsa District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc.
ANY MAIL addressed to the U.S. Army Corps of Engineers WILL BE REJECTED by the U.S. Army Corps of
Engineers mail room facility located at 2488 E. 81st Street, Tulsa, OK 74137-4290, if it does not contain a return mailing address. There will be no exceptions.
USACE Tulsa District Point of Contact is Mr. Bruce Hayes:
Phone: 918-669-7277
Email: Bruce.E.Hayes@usace.army.mil
1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted on the Federal Business Opportunities (FBO) website at: http://www.fbo.gov
Solicitation number: W912BV19R0010
It shall be the contractor’s responsibility to check the websites for any amendments. The offeror shall submit all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
1.4. OFFEROR'S QUESTIONS AND COMMENTS
All contractual matters, questions and or comments relative to these documents should be submitted via Bidder
Inquiry in ProjNet at http://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=HomePagePublic no later than 10 days prior to the proposal due date, in order that they may be given consideration or actions taken prior to receipt of offers.
The bidder inquiry key for this project is EFZ4RT-6RXBKW.
Instructions for registering in the ProjNet Bidder Inquiry system are available on the above website.
1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE
The NAICS Code selected for this project is 333923 (Overhead Traveling Crane, Hoist and Monorail System
Manufacturing) and the size standard is 1,250 employees. Also see FAR 52.204-8.
1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This request for proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.7. SITE VISIT
All vendors are highly encouraged to attend a site visit which is scheduled by contacting the POC as listed below.
The site visit will take place on 29 November 2018 at 10:00 AM CST, vendors MUST contact the POC, listed below, to attend. This is the ONLY site visit date that will be offered. Offerors MUST contact the POC No
Later than November 26th, 2018 to attend the Site Visit.
POC Name: Jay Surman
E-mail: jay.v.surman@usace.army.mil
Telephone: 918 669 7020
The offeror is to contact Mr. Jay Surman for registration and access instructions. The Location for the site visit is:
RS Kerr Powerhouse
29759 Power House Road
Keota, Oklahoma 74941-6569
Special Instructions: Personal Protection Equipment (PPE) will be steel toe boots and hard hats, US Citizens allowed with prior notice (RSVP), Foreign Nationals can attend after background check but still need clarification from Security Offices.
1.8. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.9. PROPOSAL SUBMITTAL
1.9.1. The submittal method for proposals is electronic via Electronic Format or Email provided the total document, including attachments, does not exceed 10MB ONLY (no mailed proposals).
http://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=HomePagePublic%20
The following email addresses must be entered for notification of proposal receipt and download availability:
Bruce.E.Hayes@usace.army,mil
Brian.C.Hutchison@usace.army.mil
1.9.2. Proposals will be received until the date and time and specified in this Request for Proposal. An electronic version of the fully executed Bid Bond shall be included in your Price Proposal.
1.10. PROPOSALS
The Proposal shall be marked Solicitation Number: W912BV19R0010
Proposals will be received until the time and date shown on Standard Form SF 1442 or as amended on SF30.
1.11 JOINT VENTURE PROPOSAL REQUIREMENTS
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively
1.12. DEVIATIONS AND EXCEPTIONS
Deviations and exceptions to the terms and conditions of the solicitation are neither encouraged nor desired.
Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for the award. Should the offeror have any questions related to specific terms and conditions, these must be resolved prior to submission of the offer.
Notwithstanding the above, if deviations and exceptions are included with the offer, the offeror shall list and describe in detail the deviations and/or exceptions. All deviations and exceptions shall be fully supported with the
Offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the
RFP.
1.13. EVALUATION CRITERIA
Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors of the base proposal. Tradeoffs are not permitted. Proposals will be evaluated for acceptability but not ranked using non-cost/price factors.
An evaluation for acceptability will be performed on each proposal received by the deadline with FAR 15.101-
2(b)(3). The proposal that provides the lowest overall price and is otherwise technically acceptable (LPTA) in all factors will be selected for award. To be considered technically acceptable, no technical factor in the proposal may be determined to be unacceptable. The failure of a proposal to meet any of the factors will result in a technically unacceptable rating and preclude award. Exchanges with offerors may occur. The Government intends to award without discussions, but discussions may occur, when necessary, after a competitive range is established.
Past Performance history shall be evaluated for each vendor and their supplier’s past performance history in the Past
Performance Information Retrieval System (PPIRS). The Government will review the experience forms submitted as well as all CPARS, ACASS, CCASS evaluations regardless of project and past performance questionnaires for projects submitted. Vendors and their suppliers whose proposal having anything other than an “Unsatisfactory” rating in PPIRS are considered eligible under this evaluation criteria.
Price will be evaluated and considered but will not be scored or combined with other aspects of the proposal evaluation. The proposed prices will be analyzed for reasonableness. They may also be analyzed to determine whether they are realistic for the work to be performed, reflect a clear understanding of the requirements, and are consistent with the information provided by the Offeror. Additionally, all offers will be analyzed for unbalanced mailto:Julie.S.Hill@usace.army,mil mailto:Brian.C.Hutchison@usace.army.mil pricing in accordance with FAR 15.404-1(g) and may be rejected if it is determined that the lack of balance poses an unacceptable risk to the Government.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
CLAUSES INCORPORATED BY REFERENCE
52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017
52.215-22 Limitations on Pass-Through Charges--Identification of
Subcontract Effort
OCT 2009
52.217-5 Evaluation Of Options JUL 1990
52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.225-10 Notice of Buy American Requirement--Construction
Materials
MAY 2014
52.225-12 Notice of Buy American Requirement - Construction
Materials Under Trade Agreements
MAY 2014
52.236-28 Preparation of Proposals--Construction OCT 1997
252.236-7008 Contract Prices-Bidding Schedules DEC 1991
252.236-7013 Requirement for Competition Opportunity for American Steel
Producers, Fabricators, and Manufacturers
JUN 2013
CLAUSES INCORPORATED BY FULL TEXT
52.211-13 TIME EXTENSIONS (SEP 2000)
Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.
(End of clause)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Priced contract resulting from this solicitation.
(End of provision)
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 3% percent of the bid price or $3,000,000.00 whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
Mr. Brian C. Hutchison or other warranted Contracting Officer authorized to acknowledge the receipt at 2488 E. 81st
Street, Tulsa, OK. 74137-4290.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/ http://www.acquisition.gov/far/
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
TBD
http://farsite.hill.af.mil/ http://www.acquisition.gov/far/
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defense Federal Acquisition Regulations Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
Section 00 22 11 - Proposal Submission Requirements, Evaluation Criteria, Basis of Award One-Step-Best Value, Design-Build (Single Award)
PROPOSAL PREP & EVAL CRITERIA
SECTION 00 22 11
PROPOSAL PREPARATION AND EVALUATION CRITERIA
PART I -- PROPOSAL INSTRUCTIONS
1. PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
a. REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSALS.
(1) Each Offeror must submit both a Price Proposal and a Technical Proposal. The Price Proposal and the
Technical Proposal must be submitted as separate PDF files. Ensure that each separate file is clearly marked to indicate its contents; and the identity of the Offeror.
(2) Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals.
(3) No dollar amounts from the Price Proposal are to be included in the Technical Proposal.
(4) All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not merely cross-reference similar material in the Price Proposal, or vice versa. Also, do not include links to websites in lieu of incorporating information into your proposal.
(5) Do not include exceptions or deviations to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined "unacceptable" and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to submission of the offer. If the Offeror must make any assumptions prior to submitting the proposal, the Offeror shall list and describe in detail the assumptions on the first page of each Tab. All assumptions shall be fully supported with the Offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the RFP. The Offeror shall clearly describe on the Proposal
Cover Sheet submitted with the Price Proposal any assumption to the contractual and/or technical terms and include the monetary impact on the solicitation with the price proposal. Proposal exceptions/deviations will not be considered a part of the contract after award unless specifically approved by the Contracting Officer in writing at the time of contract award.
b. DISCUSSIONS. The Government does not intend to enter into discussions with offerors prior to making an award. Offerors are encouraged to present their best technical proposal and prices in their initial proposal submission. However, in accordance with FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency in accordance with (IAW) FAR Part 15.306(c)(2).
c. COST OR PRICING DATA. Offerors are not required to submit Cost or Pricing Data with their offers.
However, if deemed necessary, supplemental price breakdown information will be used to assist the Government in performing the price evaluation. This will not be requested until after the initial proposal submission.
d. GENERAL INSTRUCTIONS.
(1) Submit only the electronic files specifically authorized and/or required elsewhere in this section. Do not submit excess information, to include audio-visual materials, electronic media, etc.
(2) Proposal materials shall be submitted in electronic format as shown below (see paragraph entitled
“Electronic Format”). Electronic proposals shall be tabbed and labeled in a manner to afford easy identification from a Table of Contents. Font size shall not be less than 10 point. Do not use condensed font. Each page shall be identified with the appropriate page number centered at the bottom of the page. Sheet size of the proposal contents shall be 8-1/2 inches x 11 inches where sheets are prepared specifically for this proposal; however, if drawings, charts, or other graphics are submitted, sheets no larger than 11 inches x 17 inches shall be used. Eleven-by-seventeen (11 x 17) inch sheets will be counted as two 8-1/2 inch x 11 inch sheets. Technical and Price
Proposals shall be provided as separate files. The Price Proposal file shall be named “Price Proposal”. The
Government will not review any information submitted in an appendix or attachment to the proposal. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers that do not meet these requirements may be subject to rejection.
(3) Electronic Format: The Offeror shall provide the complete proposal to the Contract Specialist via
Electronic Format or Email provided the total document, including attachments, does not exceed 10MB. Provide the
Price Proposal as a separate file. The electronic proposal file shall contain the entire proposal (excluding the Price
Proposal) in .pdf format using Adobe Acrobat software to print to a .pdf file; do not scan or copy the documents into a .pdf file. The text portion of the proposal shall be contained as a single .pdf file. The file must be “searchable”.
Sections of the proposal shall be linked to the index in logical order.
(4) “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.
(5) Pages furnished for organizational purposes only, such as a “Table of Contents” or divider tabs, are not included in the page limitation.
(6) Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision. Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, shall show the date of revision, shall be submitted in via Electronic Format or by Email provided the total document, including attachments, does not exceed 10MB with the entire proposal revised and complete.
e. SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL
(1) Price Proposal. Submit the Price Proposal in electronic format in accordance with paragraph 1.d.(3) above.
(2) Size Restrictions and Page Limits. Use only 8 ½” x 11” pages. There are no page limits set for the price proposal. However, limit your response to information required by this solicitation. Excess information will not be considered in the Government’s evaluation. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission.
(3) Format and Contents of the Price Proposal and List of Tabs. The Price Proposal shall be appropriately labeled as such and shall be organized as indicated in the following chart. Note: If the Offeror is not required to submit any information under a listed Tab in accordance with the instructions below, that tab can be omitted.
However, do not renumber the subsequent tabs.
TAB
CONTENTS OF THE PRICE PROPOSAL (VOLUME 1)
#1
The Proposal Cover Sheet
#2
Signed Letter Responding to RFP and Acknowledgement of Amendments
#3
CLIN Schedule
#4
Bid Guarantee (Bid Bond)
(4) Detailed Submission Instructions for the Price Proposal
(a) TAB 1: The proposal cover sheet is required by FAR 52.215-1(2) (c) (i)-(v) and must be submitted by all offerors. This provision, titled “Instructions to Offerors—Competitive Acquisition,” and the format for the proposal cover sheet as shown here:
PROPOSAL COVER SHEET
1. Solicitation Number:
2. The name, address, and telephone and facsimile numbers of the Offeror
(and electronic address if available):
3. Names, titles, email address, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation:
4. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
5. Tax Identification number of Offeror, CAGE Code and DUNS Number.
(b) TAB 2: The Letter provided to respond to this Request for Proposal is to be completed by all
Offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102. All amendments must be acknowledged by all Offerors in accordance with the instructions on the
Standard Form 30, Amendment of Solicitation.
(c) TAB 3: Section 00 11 00, CLIN Schedule is to be completed in its entirety by all Offerors. See
Section 00 11 00 with attached notes, for further instructions.
(d) TAB 4: Provide a fully executed Bid Bond as required by FAR Clause 52.228-1, Bid Guarantee.
f. SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL
(1) Number of Sets of the Technical Proposal. Submit the Technical Proposal in accordance with paragraph 1.d.(3) above.
(2) Format and Contents of the Technical Proposal and List of Tabs. The technical proposal will be appropriately labeled as such. Each set shall be organized using the PDF bookmarks specified in the following chart. Bookmarks are to be visible immediately after opening.
CONTENTS OF THE TECHNICAL PROPOSAL (VOLUME 2)
LOCATION FACTOR
NUMBER
DESCRIPTION
TAB 1 Factor #1 RELEVANT SPECIALIZED EXPERIENCE
TAB 2 Factor #2 KEY SUBCONTRACTORS & KEY PERSONNEL
TAB 3 Factor #3 PAST PERFORMANCE
(3) Page Limitations. The following page limitations are established for each factor described above:
(a) Factor #1, Relevant Specialized Experience – Limited to 10 pages (a maximum of 5 forms)
(b) Factor #2, Key Subcontractors & Key Personnel – Limited to two (2) pages for each resume provided
(c) Factor #3, Past Performance – No page limitation
Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.
(4) Detailed Submission Requirements for the Technical Proposal. The following is a detailed description of the information to be submitted under each TAB.
(a) TAB 1: FACTOR 1, RELEVANT SPECIALIZED EXPERIENCE:
Demonstrate the experience of the offeror and/or proposed team, including sub-contractors, on projects same/similar to that described in the solicitation for same/similar construction services. If using subcontractors as part of the proposed team to demonstrate experience, describe the role they will play in this project and the percentage of work they will perform.
The Offeror shall complete a minimum of four (4), “Experience Information” forms (Attachment 1), attached at the end of this section, in response to this factor. All blocks must be filled in and all data should be accurate, current, and complete. All projects submitted must be at least 50% complete and completed within the last 10 years. At least two (2) of the projects provided must be valued at over $1,000,000. For evaluation purposes, “similar” is defined as regularly engaged in the rehab of large (100 Tons or greater) overhead bridge cranes. This factor is designed to verify the experience of the offeror having been regularly engaged in the rehab of such systems. Particular emphasis should be placed on demonstrating experience in the analysis and load testing of existing cranes.
Project submittal information should clearly illustrate experience in overhead bridge cranes rehab, capacity up-rates and load testing for bridge cranes 100 tons and above. If more than four projects are submitted, only the first four listed in the proposal will be evaluated. Each project cited shall be at least $500, 000 in construction cost and have been completed within ten (10) years from the date that the proposal for this project is due. Only those projects for which the offeror was the prime contractor should be submitted. The government preference is that project examples submitted be of completed projects (i.e. construction complete). Each project summary must include the following for each project: a description of the project; scope; location; firms on the proposed team that constructed the project;
construction contract award amount and final construction cost; the original contract finish date and actual finish date
(if finished). Narratives of each project should include a brief overview of each project and its relevance to this project. All summaries should also contain the name, address, telephone, e-mail, and fax number of a representative of the customer and an alternate individual not affiliated with the proposer and familiar with the proposer’s experience on the project and can verify the experience cited.
If any of the information required is not included in the form then the Offeror will be considered non-responsive and evaluated as unacceptable.
(b) TAB 2: FACTOR 2, KEY SUBCONTRACTORS & KEY PERSONNEL:
By naming these firms and personnel, the Offeror is making a commitment that barring unforeseen circumstances, they are the firms and personnel that will be working on this project. Any substitutions shall be approved by the
Contracting Officer. All key personnel and subcontractor personnel working on this project must be U.S. citizens or documented U.S. workers and must be able to provide proof of U.S. citizenship or other authorized documentation.
(1) Key Subcontractors: Identify the potential Key Subcontractors chosen for mechanical and electrical installation, describing the extent of their involvement in the project. Submit no more than five Specialized
Experience forms (Attachment 1) for each Key Subcontractor. Subcontractors shall be selected from the list of potential subcontractors.
(2) Key Personnel: The Offeror must provide resume data and commitment form (Attachment
4) for the following key construction personnel: Project Manager, Project Scheduler, Quality Control Manager, Commissioning Agent and Site Superintendent, Site Safety and Health Officer (SSHO). Minimum qualifications for the Project Manager, Construction site superintendent and Contractor Quality Control (CQC) System Manager shall be as required by Section 01 45 00.00 00 QUALITY CONTROL. SSHO minimum requirements shall be as shown in Section 01 35 26.00 00 GOVERNMENTAL SAFETY REQUIREMENTS.
Resume information to be provided shall be limited to no more than two (2) pages per person and shall include the following information as a minimum:
(i) Name and title
(ii) Project assignment
(iii) Name of firm with which associated
(iv) Years of experience with this firm and with other firms
(v) Education degree(s), year, specialization, if applicable
(vi) Active professional registration, year first registered, if applicable
(vii) Other experience and qualifications relevant to same/similar work required under this contract
(c) TAB 3: FACTOR 3, PAST PERFORMANCE:
For each project submitted, Offerors shall submit available performance documentation. If no performance documentation is available, state so on the project information worksheet. The Government will review the experience forms submitted as well as query the Contractor Performance Assessment Reporting System (to include
ACASS, CCASS, and CPARS) to validate past performance ratings on Department of Defense contracts and any other past performance information the Government deems necessary to evaluate a contractor’s past performance.
Firms without a history of past performance will be given a neutral rating. For non-Corps of Engineers contracts, provide a copy of the performance rating issued by the contracting agent.
For each project that does not have a final ACASS, CCASS, or CPARS evaluation, Offerors shall provide a questionnaire (See Attachment 2) to the point of contact, clearly identifying the project to be evaluated. A sample
Past Performance Evaluation Questionnaire is included at the end of this section. When completed, these forms shall be submitted in the proposal package. It is the contractor’s responsibility to ensure that the reference documentation is provided in their submissions
The information contained in the questionnaires will be used to evaluate the offeror’s past performance. If any negative past performance information is received, the contractor will be given an opportunity to provide rebuttal.
Each contractor shall provide at least three (3) past performance ratings. Any rating an offeror has in ACASS, CCASS, and CPARS for the projects listed under Factor 1 will count toward this requirement. The offeror is responsible for ensuring that the proposal contains a minimum of three (3) questionnaires or has provided written notification to the KO that they have current ratings in ACASS, CCASS, and CPARS. Entities that have no past customers shall notify the KO in writing, prior to the date and time established for the RFP closing, that they have had no previous clients and that the minimum number of questionnaires cannot be provided. It is the contractor’s responsibility to ensure that the reference documentation is provided, as the Government may not make additional requests for past performance information from the references. The evaluation form shall be provided in the proposal. Do not request past performance questionnaires on projects that have final ACASS, CCASS, or
CPARS evaluations. If a past performance questionnaire is received on a project where a final ACASS, CCASS, or CPARS evaluation exists, the ACASS, CCASS, or CPARS evaluation will serve as the official rating of record for evaluation purposes.
The Government may contact references provided as part of Factor 1 – Relevant Specialized Experience, for information regarding the offeror’s past performance on the project and for the purposes of assessing and verifying the scope of the work performed. Offerors should provide accurate, current, and complete contact information for references provided in the project descriptions. The Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information
System (FAPIIS), Electronic Subcontract Reporting System (ESRS), and any other sources not provided by the offeror.
Part II. EVALUATION OF OFFEROR PROPOSALS
2. SOURCE SELECTION USING THE LOW-PRICED, TECHNICALLY ACCEPTABLE PROCESS. An evaluation for acceptability will be performed on the low price proposal in accordance with FAR 15.101-2(b)(3).
The proposal that provides the lowest overall price and is otherwise technically acceptable in all factors will be selected for award. To be considered technically acceptable, no technical factor in the proposal may be determined to be unacceptable. The failure of a proposal to meet any of the factors will result in a technically unacceptable rating and preclude award.
2.1 BASIS OF AWARD. Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors of the base proposal. Tradeoffs are not permitted.
Proposals will be evaluated for acceptability but not ranked using non-cost/price factors.
2.2 EVALUATION OF THE PRICE PROPOSALS
a. Price will be evaluated and considered but will not be scored or combined with other aspects of the proposal evaluation. The proposed prices will be analyzed for reasonableness. They may also be analyzed to determine whether they are realistic for the work to be performed, reflect a clear understanding of the requirements, and are consistent with the information provided by the Offeror. Additionally, all offers will be analyzed for unbalanced pricing in accordance with FAR 15.404-1(g) and may be rejected if it is determined that the lack of balance poses an unacceptable risk to the Government.
b. The otherwise technically-acceptable, lowest-priced offeror may be required to confirm its price on either a
CLIN, element, or total price basis, and/or provide additional information in support of their price, prior to contract award at the Government’s request and discretion.
2.3 EVALUATION OF THE TECHNICAL PROPOSAL. Each Technical Proposal will be evaluated based on the following evaluation criteria:
a. FACTOR 1: RELEVANT SPECIALIZED EXPERIENCE: The Government will review the experience of the contractor on projects provided in response to Factor 1. Offerors must meet all of the following minimum acceptability standards to receive an “ACCEPTABLE” on this factor:
(1) Proposed team must have at least four (4) projects that are same/similar to that of the work found in this solicitation; AND
(2) At least two (2) of the projects submitted must be valued at over $1,000,000, and they must have been at least 50% complete within the last 10 years.
Failure to demonstrate the minimally acceptability standards under this factor will result in a “Non-Acceptable” rating and possible elimination from further consideration for contract award.
b. FACTOR 2: KEY SUBCONTRACTORS AND KEY PERSONNEL: The Government will review the resumes provided in response to Factor 2. Offerors must demonstrate all of the following minimum acceptability standards to receive an “Acceptable” on this factor.
The offeror must demonstrate in all resumes that the key personnel proposed have:
(1) A minimum experience as required by the specified sections (see Section 01 45 00.00 00
QUALITY CONTROL and Section 01 35 26.00 00 GOVERNMENTAL SAFETY REQUIREMENTS).
If none is specified, all personnel shall have a minimum of 5 year specialized experience in their field;
AND
(2) Experience on projects same/similar to the work in this solicitation working in the position they are assigned to under this contract.
Failure to demonstrate the minimally acceptability standards under this factor will result in a “Non- Acceptable” rating and possible elimination from further consideration for contract award.
c. FACTOR 3: PAST PERFORMANCE:
The Government will review the experience forms submitted as well as all CPARS, ACASS, CCASS evaluations regardless of project and past performance questionnaires for projects submitted under Factor 1. The
Government may contact points of contacts listed on the “Experience Information” forms submitted under Factor
1. Offerors must demonstrate the following minimum acceptability standards:
Any identified element or overall rating that is LESS than MARGINAL for past performance in the last 3 years OR for any project submitted under Factor 1, shall result in an 'Unacceptable' rating and elimination from further consideration for contract award.
In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)).
Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability “Unknown” shall be considered “acceptable”
3. GENERAL TECHNICAL CRITERIA
a. Material omission(s) may cause the technical proposal to be rejected as unacceptable.
b. Proposals which are generic, vague, or lacking in detail may be considered unacceptable. The offeror’s failure to include information that the Government has indicated should be included may result in the proposal being found deficient if inadequate detail is provided.
c. The Government cannot make award based on a deficient offer. Therefore, receipt of a “Non-Acceptable” determination of acceptability for any factor will make the offer ineligible for award, unless the Government elects to enter into discussions with that Offeror and all deficiencies are remedied in a revised proposal. Note: It is the
Government’s intent to award without discussions.
d. If awarded the contract, the Contractor shall construct the project in accordance with the plans and specifications issued with this RFP.
ATTACHMENT 1
RELEVANT EXPERIENCE INFORMATION
(To be completed by Contractor)
1. Contract/Task Order Number:
Include Brief…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.