W912BV18R0016Amendment0003.pdf
PDF 237 KB Posted
- Attached to
- Webbers Falls, OK- Replace Intake Roller Gate FY18 Federal contract opportunity
- Solicitation number
- W912BV18R0016
About this file
Amendment 0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV18R0016_Site_Visit_SIgn-In_Sheet.pdf | ||
| W912BV18R0016_Amendment_0002.pdf | ||
| W912BV18R0016_Amendment_01.pdf | ||
| W912BV18R0016_Webbers_Falls_Replace_Intake_Roller_Gates_Solicitation(2).pdf | ||
| Webber_Falls_Intake_Roller_Gate_Drawings_RTA.PDF |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Replace Intake Roller Gate FY18, Webbers Falls, OK.
See attached summary of changes for revisions located in Amendment 0003. Proposal due date and time shall remain unchange.
All other terms and conditions shall remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV18R0016
X 9B. DATED (SEE ITEM 11)
30-Jul-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Aug-2018
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SUMMARY OF CHANGES
AMENDMENT 0003
RFP NO. W912BV18R0016
REPLACE INTAKE ROLLER GATES
WEBBERS FALLS LOCK AND DAM 16, OKLAHOMA
Standard Form (SF) 30, Block 14 (continuation):
The proposal documents shall be revised as follows:
CONTRACT CLAUSES
SECTION 00 73 46 – WAGE DETERMINATION SCHEDULE. Delete previously issued General Decision Number: OK180033 05/11/2018 OK33 and replace with new General Decision Number: OK180033 08/10/2018 OK33 attached hereto.
SPECIFICATIONS
Delete previously issued Sections 01 00 00 and 05 59 13 and replace with new Sections 01 00 00 and 05 59 13 attached hereto. Paragraphs containing revisions are highlighted by bold text.
END OF SUMMARY OF CHANGES – AMENDMENT 0003
General Decision Number: OK180033 08/10/2018 OK33
Superseded General Decision Number: OK20170033
State: Oklahoma
Construction Type: Heavy
Counties: Adair, Cherokee, Craig, Delaware, Mayes, McIntosh, Muskogee, Nowata, Okfuskee, Ottawa and Washington Counties in Oklahoma.
HEAVY CONSTRUCTION PROJECTS (including sewer/water line construction; heavy construction projects on treatment plants) (excludes heavy dredging and water well drilling)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 05/11/2018 2 08/10/2018
* ELEC1002-005 07/01/2018
Rates Fringes
ELECTRICIAN......................$ 37.12 29%+5.95
ENGI0627-017 06/01/2017
Rates Fringes
POWER EQUIPMENT OPERATOR:
Group 1.....................$ 28.65 12.98 Group 2.....................$ 26.95 12.98 Group 3.....................$ 26.40 12.98 Group 4.....................$ 25.65 12.98 Group 5.....................$ 25.15 12.98
Group 6.....................$ 24.70 12.98 Group 8.....................$ 22.70 12.98 Group 9.....................$ 22.20 12.98 Group10.....................$ 21.70 12.98
POWER EQUIPMENT OPERATOR
GROUP 1: All Crane Type Equipment 200 ton and larger and including 400 ton capacity cranes. All Tower Cranes.
GROUP 2: All Crane Type Equipment 100 ton capacity and larger cranes, and less than 200 ton capacity.
GROUP 3: All Crane Type Equipment 50 ton capacity and larger cranes, and less than 100 ton capacity. Crane Equipment (as rated by mfg.) 3 cu. yd. and over Guy derrick Whirley Power Driven Hole Digger (with 30' and longer mast).
GROUP 4: CRANES with Boom Incl. Jib less than 100 ft and less than 3 cu. Yd.; Overhead Monorail Crane; MECHANIC; BACKHOE;
TRACKHOE; GRADER/BLADE; Power Driven Hole Digger with less than 30' mast
GROUP 5: BULLDOZER; BOBCAT/SKID STEER/SKID LOADER
GROUP 6: Rotary Drilling Machine when operated from console
GROUP 8: FORK-LIFT; TRACTOR
GROUP 9: PUMPS
GROUP 10:OILER
IRON0584-020 06/01/2017
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 24.00 14.81
TEAM0516-006 06/05/2017
Rates Fringes
TRUCK DRIVER
(3) Flatbed Truck...........$ 25.56 10.82
SUOK2012-011 05/18/2012
Rates Fringes
CARPENTER (Form Work Only).......$ 14.00 0.00
LABORER: Common or General......$ 12.41 0.00
LABORER: Pipelayer..............$ 13.29 0.00
OPERATOR: Scraper...............$ 14.00 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Webbers Falls Replace Intake Roller Gates FY18 WFROLLERGATEFY18
SECTION 01 00 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SCOPE
This section provides a general summary of the work to be performed to provide intake roller gates. See the specifications and drawings for detailed requirements. The Contractor shall provide all plant, materials, equipment, labor, instruments tools, subcontractors, supervision, management, and travel necessary to complete all work in accordance with this summary of work, the attached drawings, the specifications, and all other contract documents and requirements. The Government will provide no materials, equipment, or labor.
1.2 EXPLANATION OF CONTRACT AUTHORITY AND RELATIONSHIPS
The U. S. Army Corps of Engineers (USACE), Tulsa District will award and administer this contract and shall be the sole authority to interact contractually with, direct, and provide oversight to the Contractor.
References to any other organization, entity, or individual either directing, authorizing, approving, or in any other way contractually interacting with the Contractor shall denote such action by the designated representative(s) of the Contracting Officer, USACE, Tulsa District.
1.3 GOVERNMENT FURNISHED EQUIPMENT
None.
1.4 REQUIREMENTS FOR ELECTRONIC SUBMISSIONS
Except where specifically noted, submittals shall be provided in electronic format. Adobe Portable Document Format (Adobe PDF) will serve as the primary file type. Adobe PDF files submitted shall be compatible with Adobe Acrobat Reader XI. In the event another file type is needed, the Contractor shall provide compact disc with file and file reader software, or provide hard copies to the Government.
1.5 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1926 Safety and Health Regulations for Construction
SECTION 01 00 00 Page 1 This Section Revised by Amd 0003
1.6 SUMMARY OF WORK
This project will be a total turn-key contract with all work being performed by the Contractor. See other specifications sections, drawings, contract clauses, and other contract documents for detailed requirements of the work to be performed by the Contractor. The work required is summarized as follows:
a. Fabricate new intake roller gates (including roller chains and seals) each approximately 39 feet by 24 feet in size;
b. Transport the new gates to the intake deck;
c. Install new gates and have the gates ready for service; and
d. Test new gates for operation and leakage. Leakage shall be a maximum of 12 gallons per minute.
NOTE: Structures shall be shipped as soon as they are complete and the Government has performed all Government Witness Point Inspections required before shipment. Reference Attachment A - GOVERNMENT WITNESS POINT INSPECTIONS at the end of this section.
1.7 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Work Plan; G, ECD
1.8 WORK PLAN MINIMUM REQUIREMENTS
Within 30 calendar days of contract award, a Work Plan shall be submitted for all work required by this contract. This work plan is separate from any and all documents submitted before contract award and shall provide greater detail than pre-award submitted work plans (if applicable).
The plan shall include, as a minimum, details for all work listed in paragraph SUMMARY OF WORK above. The work plan shall include detailed fabrication/construction methods and procedures, description of shop facilities, procedures for safe conduct of the work, careful removal and disposition of materials, coordination with other work in progress, all manpower (each trade/skill required and crew sizes, including subcontractors), and all equipment (including make, model, serial number, and date of last calibration).
The Work Plan shall address sequence of fabrication and methods to protect, transport, and label components during fabrication and shipping. The Work Plan shall include the measuring system and devices used in ensuring dimensional tolerances. Measuring devices and certificates of calibration described in the Work Plan shall be available for review and use during Government Witness Point Inspections.
SECTION 01 00 00 Page 2
The Work plan shall address in detail transportation and lifting methods and equipment required to place the new gates on the intake deck.
In addition, the Contractor shall submit any additional information as directed by the Administrative Contracting Officer (ACO). Construction activities and purchasing of materials shall not begin until the Work Plan has been approved by the ACO. The Contractor's work schedule (days of the week and hours per day) shall be stated.
1.9 SAFETY
All work shall be performed in accordance with 29 CFR 1910, 29 CFR 1926, and other references as listed herein. Where the regulations conflict, the most stringent requirements shall apply. If safety violations occur, all work shall cease immediately and no work will resume until all safety violations are corrected. Lost time for safety violations will not be subject to time extensions for contract completion. Any work performed on Government property (if applicable) shall be performed in accordance with EM 385-1-1 and all subsequently issued interim changes and errata.
1.10 WORK HOURS
The Contractor may only work between 6:00 a.m. and 4:30 p.m. Monday through Thursday unless otherwise requested in writing by the Contractor and approved in writing by the ACO.
1.11 GOVERNMENT WITNESS POINT INSPECTIONS
The Government will conduct witness point inspections periodically throughout the fabrication process and upon delivery to the Government facility. Prior to fabrication, during the preconstruction meeting between the Government and Contractor, both parties will agree to the number of witness points which may vary depending on how the fabricator sequences work and the number of intake gates in fabrication at any one time. See Attachment A - "Government Witness Point Inspections" for a preliminary outline of the anticipated witness point inspections. The Contractor shall include in the periodic schedule update the dates in which the progress of fabrication coincides with the witness point for each intake gate. The Contractor shall notify the Government 14 calendar days prior to the defined witness points to allow for scheduling of Government personnel and travel. If the fabricator elects to fabricate multiple structures concurrently, then to the greatest extent possible the fabricator shall schedule witness points such that the witness point inspections can be combined and performed for those structures at their respective levels of completeness during one shop visit.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
-- End of Section --
SECTION 01 00 00 Page 3
SECTION 05 59 13
FABRICATION OF INTAKE ROLLER GATES
08/09
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)
ANSI/ASNT CP-189 (2016) ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel (ANSI/ASNT CP-105-2006)
AMERICAN WELDING SOCIETY (AWS)
AWS D1.5M/D1.5 (2016) Bridge Welding Code
AWS QC1 (2016) Specification for AWS Certification of Welding Inspectors
ASTM INTERNATIONAL (ASTM)
ASTM A109/A109M (2014) Standard Specification for Steel, Strip, Carbon (0.25 Maximum Percent), Cold-Rolled
ASTM A148/A148M (2015) Standard Specification for Steel Castings, High Strength, for Structural Purposes
ASTM A307 (2014) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength
ASTM A449 (2014) Standard Specification for Hex Cap Screws, Bolts, and Studs, Steel, Heat Treated, 120/105/90 ksi Minimum Tensile Strength, General Use
ASTM A563 (2015) Standard Specification for Carbon and Alloy Steel Nuts
ASTM A564/A564M (2013) Standard Specification for Hot-Rolled and Cold-Finished Age-Hardening Stainless Steel Bars and Shapes
ASTM A709/A709M (2017) Standard Specification for Structural Steel for Bridges
ASTM D2000 (2012) Standard Classification System for Rubber Products in Automotive Applications
SECTION 05 59 13 Page 1
ASTM D2240 (2005; R 2010) Standard Test Method for Rubber Property - Durometer Hardness
ASTM D395 (2014) Standard Test Methods for Rubber Property - Compression Set
ASTM D412 (2006a; R 2013) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension
ASTM D471 (2015a) Standard Test Method for Rubber Property - Effect of Liquids
ASTM D572 (2004; R 2010) Rubber Deterioration by Heat and Oxygen
ASTM E165/E165M (2012) Standard Practice for Liquid Penetrant Examination for General Industry
ASTM E709 (2015) Standard Guide for Magnetic Particle Examination
ASTM F3125/F3125M (2015; Rev A) Standard Specification for High Strength Structural Bolts, Steel and Alloy Steel, Heat Treated, 120 ksi (830 MPa) and 150 ksi (1040 MPa) Minimum Tensile Strength, Inch and Metric Dimensions
ASTM F436 (2011) Hardened Steel Washers
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 SYSTEM DESCRIPTION
Provide a detailed Work Plan for fabrication, including descriptions of shop facilities, equipment, number of personnel, and related information prior to the Pre-fabrication Conference, and procedures for safe conduct of the work, careful removal and disposition of materials, protection of property that is to remain undisturbed, and coordination with other work in progress. Include in the procedures a detailed description of the methods and equipment to be used for each operation, and the sequence of operations in accordance with EM 385-1-1. The Work Plan shall include the recommended measuring system for ensuring dimensional tolerances. The fabrication of the intake roller gates shall be performed according to this section of the specifications.
a. Material with welds will not be accepted unless the welding is specified or indicated on the drawings or otherwise approved. Welding shall not be started until welding procedures, inspectors, nondestructive testing personnel, welders, welding operators, and tackers have been qualified and approved. Each Contractor performing welding shall maintain records of the test results obtained in welding procedure, and welder, welding operator, and tacker performance qualifications.
SECTION 05 59 13 Page 2
b. As it is used in these specifications, "The Engineer" refers to the District Engineer of Record. The AWS D1.5M/D1.5 definition of "The Engineer" as specified in AWS D1.5M/D1.5 section 1.1.3 shall refer to the District engineer of record in lieu of the state bridge engineer as specified in section 1.1.3 of AWS D1.5M/D1.5.
c. Schedule a Prefabrication Conference as soon as possible after Notice to Proceed and prior to any fabrication. The Prefabrication Conference shall include, at a minimum, the Prime Contractor, Fabricator, the Fabricator's primary QC representative, the Contracting Officer's Representative (COR), the Government Quality Assurance Representative (GQAR), and the Engineer of Record for the structure or structures being fabricated. The Prefabrication Conference shall occur either at the Fabrication Facilities or a similar location as deemed appropriate.
1.2.1 Weld Tracking Log Template
Submit for approval a weld tracking log template, a minimum of 30 days prior to commencement of fabrication, to identify all necessary components to be addressed in the tracking of all welds for the structures in question. A weld-tracking log will be developed and maintained as described in the following paragraphs.
1.2.2 Weld Tracking Log
Submit a log capable of individually identifying and tracking every weld on the project. Member identification shall follow the numbering scheme shown on the shop drawings. The log shall include the member to be welded, member type (FCM and Non-FCM), type of weld including temporary and tack welds, welding position, applicable WPS reference, AWS joint preparation designation, name or stamping designation of welder, welding operator or tacker, date and time of completion of welding and/or tacking, name and date of CWI visual inspection, NDT testing performed, including the type of inspection, date(s) of inspection, inspector name, and the acceptance criteria used, description of defects found and reason for non-compliance, corrective action taken, or whether the weld is acceptable. Weld identification on the shop drawing shall match weld tracking log identification. A completed log shall be bound together for each structure and two copies shall be submitted to the Contracting Officer immediately upon completion of the fabrication of each structure. Draft copies of NDT testing shall be furnished to the Contracting Officer upon request and shall be available on the shop floor during any inspection.
1.2.3 Welding Procedure Specifications (WPS)
Submit a Welding Procedure Specification (WPS), with attached PQR and supporting test documentation on forms similar or equivalent to the sample forms in AWS D1.5M/D1.5, Annex III, for each weld, including prequalified welds, in accordance with paragraph Welded Connections approved before fabrication is commenced. Welding Procedure Specifications shall be individually identified and shall be referenced on the shop drawings. In case of conflict between this specification and AWS D1.5M/D1.5 as applicable, this specification governs. The following items shall not be considered ancillary items as defined in AWS D1.5M/D1.5 Section 1.3.6 and shall be subjected to the same level of inspection required for primary welds under AWS D1.5M/D1.5:
a. Guide Shoes
SECTION 05 59 13 Page 3
b. Seal Backing Bars and Plates
1.2.4 Fracture Critical Members (FCM)
FCM are shown on the Contract Drawings and include all attachments and connections to these members as defined in AWS D1.5M/D1.5. All materials to be welded shall be ASTM A709/A709M, grade as specified or shown on the drawings, using killed fine-grain mill practice, unless otherwise shown or specified. Mill repairs of base metal are prohibited. Toughness shall meet the requirements of ASTM A709/A709M, Table 9, for Zone 2, unless otherwise indicated or specified. All materials used for the construction of fracture critical components shall meet the requirements of section 10 of ASTM A709/A709M and shall include mill certification showing that the material meets the necessary toughness requirements. Welding for fracture critical members shall meet all requirements of AWS D1.5M/D1.5 Section 12, including:
1.2.4.1 Welding Processes
All procedures shall be qualified as required.
1.2.4.2 Consumable Requirements
All welding consumables shall be heat or lot-tested by the manufacturer to determine conformance with the requirements of the Fracture Control Plan (FCP). Exceptions are not allowed. Toughness test results shall meet the values specified in Table 12.1 of AWS D1.5M/D1.5. Submit a Fracture Control Plan (FCP) for welding on all Fracture Critical Members (FCM) in accordance with AWS D1.5M/D1.5, Section 12. Submit welding procedures, qualifications, and certifications showing compliance with FCP requirements.
1.2.4.3 Welding Procedure Specifications (WPS)
Prequalify or qualify all procedures, including repair welds, by test as required and documented in the WPS and Procedure guidelines of
AWS D1.5M/D1.5.
1.2.4.4 Certification and Qualification
Welders and welding operators shall meet the applicable requirements of
AWS D1.5M/D1.5.
1.2.4.5 Material Handling
Material handling and preparation, including thermal cutting, preparation of base metal, and straightening, curving, cambering shall meet the applicable requirements.
1.2.4.6 Tack Welds and Temporary Welds
Locate all welds within the joint and meet the requirements of AWS D1.5M/D1.5, Table 12.2. Temporary welds on FCM are not permitted.
1.2.4.7 Welding Processes
Welding processes, including preheat, interpass temperatures, and postweld thermal treatment shall meet the applicable requirements.
SECTION 05 59 13 Page 4
1.2.4.8 Weld Inspection
Document the Quality Control inspection program in the FCP. Qualify all inspectors and NDT technicians as required. Test all butt joints with UT and RT. Inspection procedures and documentation are as specified in the applicable sections of AWS D1.5M/D1.5. Strictly adhere to cooling times.
1.2.4.9 Repair Welding
Classify repair welds as "critical repairs" or "non-critical repairs" for all repair welding. Repair procedures shall follow the minimum provisions unless specified otherwise. Repair procedures must be qualified and approved and subject to the same QA/QC inspection requirements as other welds. Minimum preheat for repair welding shall be as defined in AWS D1.5M/D1.5 section 12.17.6. All weld repairs to fracture critical members shall be considered critical welds in accordance with AWS D1.5M/D1.5 Section 12.17.3 and shall be approved by the engineer of record.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Welding Procedure Specifications (WPS); G Fracture Control Plan (FCP); G Weld Tracking Log Template; G Fastener Installation Procedures; G Seal Installation Plan; G Dimension Control Plan; G Functionality Test Plan; G Functionality Report Format; G Tapping and Drilling Test Reports; G
SD-02 Shop Drawings
Shop Drawings; G Assembly; G Welding Repairs - Non-Fracture Critical Members; G Welding Repairs - Fracture Critical Members; G Delivery/Shipping Plan; G
SD-03 Product Data
Materials Disposition Record Neoprene Gaskets; G Bolts, Nuts, And Washers; G Rubber Seals; G
SD-06 Test Reports
Certified Test Reports; G Weld Tracking Log; G Witness Points
SECTION 05 59 13 Page 5
SD-07 Certificates
Work Plan; G Qualification of Welders and Welding Operators; G Inspector Qualifications; G Qualification of Structural Steel Fabricator; G Bolts, Nuts, And Washers; G
SD-09 Manufacturer's Field Reports
Control Dimensions; G
1.4 QUALITY ASSURANCE
Establish Witness Points for the Initial QA Inspection, Intermediate QA Inspections, and Final Inspection as follows. Start the Initial QA Inspection after the Government has determined that there is substantial completion of components that comprise a reasonable sampling of each significant FCM and non-FCM details. The extent of completion and details and the date of the Initial QA Inspection shall be determined at the Prefabrication Conference by the Government after discussion with the Contractor. At that time, produce a detailed schedule showing the progression of work and completion of components. This schedule will be updated weekly and provided by e-mail to the Contracting Officer. Give the Contracting Officer two weeks notice prior to the predetermined date for the Initial QA Inspection, including adjustments for changes in schedule.
Intermediate QA Inspections will be conducted on an as needed basis and at the discretion of the Government. All QA inspections will follow AWS D1.5M/D1.5 and AASHTO/NSBA Steel Bridge Collaboration S 4.1 - 2002 Steel Bridge Fabrication QC/QA Guide Specification. Provide unpainted components for each QA NDT and Visual Inspection. At these stages of construction, give the Contracting Officer three working days to inspect the structure. The QA Inspection period shall not commence until after a minimum period of 72 hours after any welding. After the Contracting Officer and the Engineer of Record has inspected the structure, make any changes required to the structure as directed by the Contracting Officer before proceeding with any additional welding. Proceed with the construction until the next witness point is reached, unless it is waived in writing by the Contracting Officer. Each structure fabricated is subject to a Final Fabrication Inspection prior to painting. A Final Fabrication Inspection shall be conducted after the first structure is completed. Final Fabrication Inspections of additional structures shall be scheduled and coordinated with the Contracting Officer and the Engineer of Record. Give the Contracting Officer a minimum notice of two weeks prior to the Final Fabrication Inspection.
1.4.1 Qualification of Welders and Welding Operators
Submit welder, welding operator and tacker qualification certification for each welder, welding operator or tack welder to the Government Representative/Contracting Officer/ Engineer and approved before fabrication is commenced in accordance with paragraph Welded Connections.
A CWI meeting the specified qualifications shall approve all welder qualifications. Welders, welding operators, and tack welders shall be limited to welding procedures for which they are certified. Test welds shall be prepared, welded, and tested in accordance with the requirements of AWS D1.5M/D1.5. Before assigning any welder, welding operator, or tacker to work under this contract, submit the names of the welders, welding operators, and tackers to be employed, and certification that each
SECTION 05 59 13 Page 6 individual is qualified as specified. The certification shall state the type of welding and positions for which the welder, welding operator, or tacker is qualified, the code and procedure under which the individual is qualified, the date qualified, and the name of the firm and person certifying the qualification tests. The certification shall be kept current for the duration of the contract. Welder and welding operator qualification test records shall be submitted on forms similar or equivalent to the sample forms in AWS D1.5M/D1.5, Annex III. All welders performing fracture critical welds under this specification shall be qualified according to Section 12 of AWS D1.5M/D1.5. All welders performing non fracture critical welds shall be qualified according to Section 6 of AWS D1.5M/D1.5. All qualifications shall be current prior to commencing any work. Submit a log for each welder showing that he/she is current in the process and procedures being proposed for this work.
1.4.2 Inspector Qualifications
All inspectors, performing structural steel inspection in accordance with these specifications, shall be qualified and certified in conformance with AWS QC1. Provide an AWS Certified Welding Inspector (CWI) as the primary point of contact for quality control of welding. When several CWI and NDT technicians are working, one primary individual shall be designated as having primary responsibility for all quality control in accordance with AWS D1.5M/D1.5 Section 6.1.2.2. Non-certified inspectors and certified associate weld inspectors (CAWI) shall not be used for inspection under these specifications. All personnel who perform NDT shall be qualified in accordance with: ANSI/ASNT CP-189 NDT Level II or III. All personnel performing NDT shall be supervised by personnel possessing a Level III ASNT NDT certification in accordance with AWS D1.5M/D1.5 section C-6.1.3.4.
Submit copies of certificates showing evidence of qualifications or certifications for welding inspectors and NDT personnel.
1.4.3 Qualification of Structural Steel Fabricator
The fabricating plant and fabricator shall be certified under the AISC (American Institute of Steel Construction) Quality Certification Program, and shall be designated an AISC Certified Plant, Category Certified Hydraulic Fabricator at time of bid. The fabricator or fabrication plant shall possess five 5 years documented experience on projects of similar scope. Similar scope means projects of similar size and similar amounts of welding and detail types. Submit copies of the AISC certificate indicating that the fabrication plant meets the specified structural steelwork category and documented experience.
1.4.4 Testing by the Government
Material component parts may be subjected to any form of nondestructive testing, as directed by the Contracting Officer. This may include ultrasonic, magnetic partial, dye penetrant, x-ray, gamma ray or any other test that will thoroughly investigate the part in question. The cost of such investigation will be borne by the Government. Any defects will be cause for rejection and rejected materials or parts shall be replaced and retested at the Contractor's expense.
1.4.5 Shop Drawings
Prepare all shop drawings using a Registered Professional Engineer or under the direct supervision of a Registered Professional Engineer. Elements of fabricated items inadvertently omitted on contract drawings shall be
SECTION 05 59 13 Page 7 returned to the Engineer of Record for detailing or shall be detailed by the fabricator and so indicated on the shop drawings. Any and all details developed by the fabricator shall be clouded on the shop drawings for separate approval by the Engineer of Record. Any items designed by the Contractor shall be prepared and sealed by a Registered Professional Engineer. No splices shall be included in the structure without approval of the Engineer of Record. All field welds required shall be identified on the shop drawings. Each weld, both shop and field welds, required shall be provided a unique identifier to permit tracking on the weld tracking log.
Prior to performing any fabrication of the HSS structures listed in paragraph System Description above, submit complete, detailed shop drawings to the Contracting Officer and Engineer of Record for approval. Shop drawings shall show complete details of materials, tolerances, connections, and proposed welding sequences. Shop drawings shall include catalog cuts, templates, fabrication and assembly details, and type, grade, and class of materials, as appropriate. All FCM, including attachments that meet the FCM definition, shall be identified on the shop drawings as well as all temporary and tack welds. Each member shall be identified following the numbering scheme shown on the drawings. A table shall be provided containing a list of all members and a reference to each material certificate and test report that applies to that member. Shop drawings shall identify weld procedures and NDE required for each weld. Any and all splices shall be included in the shop drawings and clouded for engineer approval.
1.5 DELIVERY, STORAGE, AND HANDLING
Notify the Contracting Officer at least 28 days in advance of delivery of the structures. Shipping of the structures shall be at the Contractor's expense. All structures shall be delivered to the USACE Tulsa District, Webbers Falls Powerhouse, Oklahoma. Before shipping, the Contractor shall coordination delivery through the Tulsa District Administrative Contracting Officer. The structures shall be arranged on the delivery vehicles such that no damage occurs during shipping. All sling lifting lugs shall be directed up. Submit a Delivery/Shipping Plan showing orientation and locations of structures on the delivery vehicles prior to shipment for Government approval. Submit drawings providing descriptions of methods of delivering the completed structural units, including details for support during shipment to prevent distortion or other damages, and orientation and location of the structure on transport equipment.
PART 2 PRODUCTS
2.1 FABRICATION
2.1.1 Structural Fabrication
Material shall be straight before being laid off or worked. If straightening is necessary, it shall be done by methods that will not impair the metal. Sharp kinks or bends shall be cause for rejection of the material. Material with welds will not be accepted except where welding is definitely specified, indicated or otherwise approved. Bends shall be made by approved dies, press brakes or bending rolls. Where heating is required, precautions shall be taken to avoid overheating the metal and it shall be allowed to cool in a manner that will not impair the original properties of the metal. Proposed flame cutting of material, other than structural steel, shall be subject to approval and shall be indicated on detail drawings. Shearing shall be accurate and all portions of the work shall be neatly finished. Corners shall be square and true unless
SECTION 05 59 13 Page 8 otherwise shown. Re-entrant cuts shall be filleted round to a minimum radius of 1 inch in accordance with AWS D1.5M/D1.5 section 3.2.4 unless otherwise indicated or approved. Finished members shall be free of twists, bends and open joints.
2.1.1.1 Dimensional Tolerances for Structural Work
a. Measure dimensions by an approved measuring system. Submit the measuring system for approval with the work plan (i.e. calibrated steel tape of approximately the same temperature as the material being measured). The overall dimensions of an assembled structural unit shall be within the tolerances indicated on the drawings or as specified for the item of work. Where tolerances are not specified in other sections of these specifications or shown, a variation of 1/32 inch is permissible in the overall length of component members with both ends milled and component members without milled ends shall not deviate from the dimensions shown by not more than 1/16 inch for members 30 feet or less in length and by not more than 1/8 inch for members over 30 feet in length. These tolerances shall be subordinate to the shop and erection tolerances shown on drawing sheet S-902. The shop and erection tolerances shown shall govern. Seal dimensions shall be within tolerances of 1/32 inch.
b. Structure dimensions indicated are based on a structure temperature of 70 degrees F. Perform dimensional adjustments to compensate for actual temperature variations during construction.
2.1.1.2 Structural Steel Fabrication
Structural steel may be cut by mechanically guided or hand-guided torches, provided an accurate profile with a surface that is smooth and free from cracks and notches is obtained. Surfaces and edges shall be prepared in accordance with AWS D1.5M/D1.5, Subsection 3.2. Hand-guided cuts shall be chipped, ground or machined to sound metal.
2.1.2 Assembly
Provide Assembly Drawings indicating the sequence of fabrication and assembly and provide details for connecting the adjoining fabricated components in the shop. Assembly details shall identify the required order of assembly and details of witness points as described in these specifications.
2.1.3 Materials Disposition Record
Submit three copies of all purchase and mill orders, shop orders for materials and work orders, including all new orders placed by Contractors and old orders extended for each supplier. Furnish, at the time of submittal of shop drawings, a list designating the material to be used for each item. Where mill tests are required, purchase orders shall contain the test site address and the name of the testing agency. Furnish a shipping bill or memorandum of each shipment of finished pieces or members to the project site, giving the designation mark and weight of each piece, the number of pieces, the total weight, and if shipped by rail in carload lots, the car initial and number. Submit material records before the beginning of fabrication. Additional requirements for this submittal are listed below.
SECTION 05 59 13 Page 9
2.1.4 Welded Connections
2.1.4.1 Welding Procedure
a. Welding shall conform to the applicable provisions of AWS D1.5M/D1.5.
Prior to the start of production welding, submit a complete schedule of welding procedures for a typical structure. The schedule shall conform to the requirements specified in the provisions of AWS D1.5M/D1.5. The schedule shall provide detailed procedure specifications and tables or diagrams showing the procedures to be used for each required joint.
b. Submit to the Government Representative/Contracting Officers Representative/Engineer, a Welding Procedure Specification for each weld to be made. Submit Welding Procedure Specifications and Procedure Qualification Records (PQR) to the Government Representative/Contracting Officer for approval before fabrication is commenced. Copies of the Welding Procedure specification and the results of the procedure qualification test for each type of welding which requires procedure qualification shall be submitted for approval. Submit the WPS and PQR with the shop drawings. Each WPS shall be prepared and qualified in accordance with the applicable provisions of AWS D1.5M/D1.5. Welding procedures shall show types and locations of welds designated or specified to receive nondestructive examination and identify the weld as FCM when applicable. A WPS is always required, even if the procedure is considered prequalified in accordance with AWS D1.5M/D1.5. Properly documented evidence of compliance with all requirements of these specifications for previous qualification tests shall establish the welding procedure as prequalified. Each procedure shall be clearly identified as being either prequalified or qualified by tests. If a PQR is performed, a representative of the Government shall witness the test plate welding and the specimen testing. Approval of any procedure, however, will not relieve the Contractor of the responsibility for producing a finished structure meeting all requirements of these specifications. Copies of the WPS shall be made available for reference to the welders, welding operators and tack welders. A CWI meeting the specified qualifications shall approve all WPS's and PQR's.
2.1.4.2 Welder Performance Qualification of Welders and Welding Operators
Welding operators, welders, and tack welders shall be qualified and requalified if necessary for the particular type of work to be done.
Qualification shall be in accordance with AWS D1.5M/D1.5. Before assigning any welder, welding operator, or tacker to work under this contract, submit the names of the welders, welding operators, and tackers to be employed, and certification that each individual is qualified as specified. The certification shall state the type of welding and positions for which the welder, welding operator, or tacker is qualified, the code and procedure under which the individual is qualified, the date qualified, and the name of the firm and person certifying the qualification tests. Copies of the Performance Qualification records shall be submitted to the Government Representative and approved before fabrication is commenced. Require the welder and welding operators to repeat the qualifying tests when, in the opinion of the Government Representative/Contracting Officer's Representative/Engineer, the work indicates a reasonable doubt as to proficiency. In such cases, the welder shall be recertified, as above, after successfully passing the retest; otherwise, he/she shall be disqualified until successfully passing a retest. The period of effectiveness for all welder and welding operator performance
SECTION 05 59 13 Page 10 qualifications shall be in accordance with AWS D1.5M/D1.5. Keep the certification current for the duration of the contract. All expenses in connection with qualification and requalification shall be borne by the Contractor.
2.1.4.3 Welding Process
Welding of structural steel shall be by an electric arc welding process using a method which excludes the atmosphere from the molten metal and shall conform to the applicable provisions of AWS D1.5M/D1.5 for all welds. Welding shall be such as to minimize residual stresses, distortion and shrinkage.
2.1.4.4 Welding Technique
2.1.4.4.1 Filler Metal
The electrode, electrode-flux combination and grade of weld metal shall conform to the appropriate AWS specification for the base metal and welding process being used or shall be as shown where a specific choice of AWS specification allowable is required.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.