W912BV17R0032_Amendment_0001.pdf
PDF 205 KB Posted
- Attached to
- Amendment 0003
- Solicitation number
- W912BV17R0032
About this file
W912BV17R0032 Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912BV17R0032_Amendment_0003.pdf | ||
| SB_MATOC_W912BV17R0032_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Small Business Design Build IDIQ Multiple Aw ard (MATOC).
Section 00 22 00 paragraph 8.0 TAB E is amended to add a 15 page limit for this section.
Proposal Due Date is extended to 24 November 2017 at 2:00PM CST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Oct-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV17R0032
X 9B. DATED (SEE ITEM 11)
03-Oct-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Oct-2017
CODE
CONTRACTING DIV
USACE, TULSA 1645 S 101 E AVE
TULSA OK 74128-4609
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV17R0032
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 03-Nov-2017 02:00 PM to 24-Nov-2017 02:00 PM.
SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS
The following have been added by full text:
AMENDMENT 01
MATOC IDIQ FOR D/B & CONSTRUCTION SERVICES SB
7.1.2 Example Projects. Provide up to five (5) example projects in SF330, Part I, Block F, that demonstrate the designer’s ability to support the design requirements for the variety of work that may be performed under this contract. Refer to Factor 2 above for a list of the variety of work that may be performed under this contract.
7.1.3 CADD Capabilities. In SF330, Part I, Block H, describe your CADD capabilities and experience with MicroStation version 08.11.09.829 and AutoCAD version 2015 and your ability to provide CADD files compatible with each of these CADD formats.
7.1.4 Team Experience. In SF330, Part I, Block H, discuss any prior work experience between the design team and the Offeror. Also discuss design team experience for the Corps of Engineers (COE) or other DOD agencies, and design experience within SWD geographic boundaries, particularly at or near major military installations.
7.2 EVALUATION CRITERIA
7.2.1 Personnel Qualifications. Resumes will be evaluated for qualifications and relevant technical experience to support the design requirements of this contract.
7.2.2 Example Projects. Projects will be evaluated and rated for relevancy compared to the variety of work that may be performed under this contract.
7.2.3 CADD Capabilities. The Government will review the designer’s CADD capabilities, experience, and compatibility with Microstation version 08.11.09.829, AutoCAD version 2015.
7.2.4 Team Experience. Prior work experience between the design team and the Offeror or design experience with the COE or other DOD agencies are not requirements for this solicitation. However, additional consideration will be provided for prior experience in any of these areas.
8.1 TAB E – FACTOR 4 – MANAGEMENT EFFECTIVENESS
The Government will evaluate the Offeror’s management effectiveness by considering the Offeror’s understanding and capability of successfully managing the project to completion. The following elements will be evaluated:
• Personnel Qualifications.
• Home Office Management and Support.
• The submittal for this section is limited to 15 pages, total (AM*01*)
W912BV17R0032
8.1 OFFEROR’S SUBMISSION REQUIREMENTS.
8.1.1 Personnel Qualifications. Offeror shall identify the principal program personnel as outlined in Section 00 90 00, DESCRIPTION/SPECS/WORK STATEMENT, with their areas of responsibility and relationship with the management structure. Principal program personnel are defined as, but not limited to, Program Manager, Project Manager, Site Superintendent, Quality Control System Manager. Qualifications for the Project Manager shall be as required by Section 00 90 00 DESCRIPTION/SPECS/WORK STATEMENT. For evaluation purposes, the requirements for the Quality Control System Manager (CQC Manager) shall be an individual with a minimum of 10 –years’ construction experience on similar type contracts. The requirements for the Site Superintendent shall be an individual with 10‐years’ construction experience managing multiple subcontractors on similar type contracts. Individual task orders may allow reduced requirements for the CQC System Manager and the Site Superintendent based on the scope of the task order. Key design personnel qualifications will not be evaluated as part of this factor. Offeror shall provide key personnel resume information that includes as a minimum, the following. Limit to one (1) page per person:
• Name and Title
• Specific assignment on this project
• Name of Firm (If different from Offeror)
00 22 00 ‐11
(End of Summary of Changes)
File details come from the government source that posted it. Updated .