Solicitation No. W912BV-17-R-0001 issued on 10 January 2017 with proposals due 16 February 2017.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 16 Feb 2017

X

A X B X C

D

EX

X G F 195 - 199

200 - 227 X H 228 - 235

Brenda.K.Anderson@usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 235

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912BV 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 4 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

Room 350 conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

BRENDA K ANDERSON 918-669-7274

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 16

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

17 - 32 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 35 - 36 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 37 - 39 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

40 - 158

PART II - CONTRACT CLAUSES

CONTRACTING DIV

USACE, TULSA 1645 S 101 E AVE

TULSA OK 74128-4609

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

159 - 194

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

10 Jan 2017

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912BV-17-R-0001

Section A - Solicitation/Contract Form

BIDDERS INQUIRY INSTRUCTIONS

INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS

USE OF BIDDER’S INQUIRY

Prospective offerors should submit questions and inquiries related to this solicitation in accordance with the following (collect calls will not be accepted):

a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.fedbizopps.gov

b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.

1. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e-mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

2. From this page you may view all bidder inquiries or add an inquiry.

3. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.

4. The Solicitation Number is: W912BV-17-R-0001 The Bidder Inquiry Key is: DV22BG-PCAVF6

c. The Bidder Inquiry System will be unavailable for new inquiries 4:00pm (Central) Friday, 3 February 2017 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

g. The point of contact for this solicitation is:

Contract Specialist: Brenda Anderson Telephone: 918-669-7274 E-MAIL: Brenda.K.Anderson@usace.army.mil

Section B - Supplies or Services and Prices

PRICE SCHEDULE

SECTION B

PRICING SCHEDULE

Multiple Environmental Government Acquisition (MEGA)

Indefinite Delivery Contract (IDC) Multiple Award Task Order Contract (MATOC)

Environmental Consulting Services for Projects within the Geographic Boundaries of the Southwestern Division (SWD) and Projects assigned to the Southwestern Division in accordance with UAI Subpart 7.1 and ER 5-1-10

21 December 2016

1. This contract is an 8(a) set-aside Indefinite Delivery Contract (IDC) Multiple Award Task Order Contract (MATOC) for Environmental Consulting Services for Projects within the Geographic Boundaries of the Southwestern Division (SWD) and Projects Assigned to the Southwestern Division (within the Continental United States) in accordance with UAI Subpart 7.1 and ER 5-1-10 to be executed through Solicitation No. W912BV-17-R-0001. This IDC MATOC for environmental services under NAICS code 541620 is a part of the U.S. Army Corps of Engineers, Northwestern, Southwestern and South Pacific Divisions’ Multiple Environmental Government Acquisition (MEGA) Strategy. The total amount of the MATOC with shared capacity among all contractors awarded contracts under this solicitation shall not exceed $60 million. There is no limit on the number of orders that may be executed against this contract. The cumulative total of all task orders issued under the MATOC shall not exceed the total contract capacity amount of $60 million. Firm fixed price task orders shall be written against the IDCs. The MATOC pool will be awarded under a Competitive 8(a) solicitation. The intent is to award up to three (3) contracts under this solicitation; however, if the Source Selection Authority (SSA) determines during the source selection process that fewer or more than three (3) contracts should be awarded, based upon the selection criteria, the SSA has the discretion of adjusting that number, or awarding none at all. Each contract awarded under this solicitation shall have a guaranteed base period minimum amount of $2,500.00. The guaranteed minimum will be met with the obligation of a task order meeting or exceeding the guaranteed amount. There is no minimum guarantee for any subsequent option period.

2. The Contract Line Item structure shall be established at the Task Order level. Pricing of Task Orders shall be pursuant to the instructions and limitations in accordance with FAR Clause 52.216-19, Order Limitation. The Contractor shall complete the Discipline Rate Schedules in Tables 1 and 2 for the three-year base period and the two-year option period. These rates will apply to the prime contractor and all teaming subcontractors. A list of all teaming subcontractors will be submitted with the proposal.

3. All costs associated with travel shall be in accordance with the Joint Travel Regulations (JTR).

4. The Period of Performance for the base period for all contracts will be from the date of award + 36 months. In addition, there will be one two-year option period (exercisable at the government’s discretion) not to exceed 5 years. However, if Contract Clause 52.217-8 is exercised it will extend the contract for an additional 6 months at the existing Year 5 rates.

5. To clarify, FAR Clause 52.217-8, Option to Extend Services, the following will apply: An Option period of two years is included as part of this contract. The Government may exercise the option at any time; however, it will be accomplished no later than the last day of the basic contract period of performance. The option period will add an extension to the period of performance.

6. This is a firm fixed price type contract for the services specified in Section C, Statement of Work that may or may not be required during the contract period. The Government is setting forth its anticipated requirements and its obligation under this contract. If the Government has any requirements for this type of work described Section C, Statement of Work, during the contract period, the Government will procure said services on Task Orders under this contract on a per Job basis.

7. ORDERING PROCEDURES UNDER A MULTIPLE AWARD CONTRACT.

a) Fair Opportunity and Contractor Selection Process. According to FAR 16.505(b) and DFARS 216.505-70, all multiple award contractors shall be provided a fair opportunity to be considered for each individual task order in excess of $3,500 issued under this MATOC. Pursuant to the procedures established in the aforementioned clauses, this document standardizes this process and assures uniform application of this policy.

b) Multiple Award Task Order Contract (MATOC) Intent. The intent of the MATOC is to provide environmental services that support programs and projects assigned to and under direct management responsibility of Tulsa District and other Districts within the Southwestern Division (SWD), US Army Corps of Engineers. Task orders will be issued on a project specific basis.

c) Period and Amount. The total amount of the task orders awarded under this MATOC shall not exceed an aggregate ceiling of $60,000,000 for contracts pursuant to section 8(a) of the Small Business Act (15 U.S.C. 637 (a)) over five (5) years.

d) Procedures.

A) After the contracts are awarded, the Government will compete the work among the MATOC awardees based on performance and other factors appropriate to the project. Individual task orders awarded on a competitive basis will involve competition between the MATOC contractors. Each awardee will be provided a “fair opportunity” to be considered for subsequent task orders, except under those circumstances described below:

(1) The government’s need is of such unusual urgency that providing a fair opportunity to all awardees would result in unacceptable delays [FAR 16.505(b)(2)],

(2) Only one source is capable of responding at the level of quality required due to the unique or specialized nature of the work [FAR 16.505(b)(2)];

(3) The new work is a logical follow-on in the interest of economy and efficiency to an existing task order where awardees were originally given a fair opportunity to be considered [FAR 16.505(b)(2)] or;

(4) The order must be placed with a particular contractor in order to satisfy a minimum guarantee. [FAR 16.505(b)(2)]

B) Once a project is identified for competition, the Contracting Officer or his designate will contact the MATOC contractors concerning the anticipated work. Contact may be by mail, phone, fax, or e-mail. Based on the project, the Contracting Officer will request a short technical and cost proposal from each contractor. Technical and cost proposal submissions may range from a short-listing of past performance with verification of already submitted cost information to a five page technical proposal with specific pricing. The Government may use streamlined procedures, including oral presentations and minimized (page limited) submission requirements, at the Contracting Officer’s discretion. Based on the request, awardees shall prepare and submit proposals to the Contracting Office that address the evaluation factors specified in the request. Pre-award task order costs will not be reimbursed.

C) Fair opportunity to be considered for placement of all task orders will consist of a Government review and analysis of submitted proposals. Contractor selection will be based on an integrated assessment of all evaluation factors appropriate to the project. These factors may include some or all of the following nine considerations although cost or price shall be included in all projects.

(1) Specific technical and/or management capabilities and proposed technical approach

(2) Experience/knowledge of the proposed work site.

(3) Availability of labor and resources to avoid delays

(4) Contractor performance on prior task orders including timely performance and quality of products or services provided and timeliness

(5) Cost control

(6) Customer satisfaction and favorable customer relations

(7) Knowledge and experience complying with project specific State and Federal laws and regulations

(8) Ability to meet schedule drivers (regulatory, risk, reuse, obligation rates, etc.)

(9) Costs (using matrix of contractor-specific costs)

An ad hoc panel comprised of government team members who are knowledgeable of the project work requirements will conduct the review. After a selection is made, based on the best value to the government, the selected MATOC contractor shall be contacted for final negotiations.

D) The government is not required to contact each awardee before selection if the Contracting Officer (KO) has information that each awardee is provided fair opportunity to be considered.

The Government reserves the right to award a task order solely on the basis of its review of data and analysis of evaluation criteria without discussions with the awardees. However, if discussions are necessary, the Government will conduct them with the MATOC contractors.

E) Under the provisions of the Federal Acquisition Streamlining Act of 1994, 10 U.S.C.

2304 (c) (Public Law 103-355), a protest is not authorized in connection with the issuance or proposed issuance of an individual Task Order except for a protest on the grounds that the order increases the scope, period, or maximum value of the contract under which the order is issued. If the contractor believes it was not fairly considered for a particular task order, the contractor may present a complaint to the Contracting Officer. The awardee may appeal the explanation or decision of the Contracting Officer to the designated Task Order ombudsman. The ombudsman will be a senior agency official who is independent of the Contracting Officer. However, it is not within the designated ombudsman's authority to prevent the issuance of an order or disturb an existing order

8. The Contractor will not accept instructions issued by any person employed by the U.S. Government or otherwise, other than the Contracting Officer, or the Authorized Representative of the Contracting Officer acting within the limits of his authority.

9. The Contractor will assign a member or employee who will act as Project Manager during the course of this contract (or during the course of a task order if this is an indefinite task order contract). This official will be responsible for affording liaison between the contract forces and the Contracting Officer.

This designation will be in writing and a copy furnished to the Contracting Officer.

10. Accounting and appropriation data will be established at the time of award for each task order.

11. Payments will be made on the Contractor’s estimate of work accomplished upon submission of Engineer Form 93, “Payment Estimate-Contract Performance.” No partial payment will be made for task orders of less than 30 calendar day’s duration. Each task order will include payment information.

12. Rates / Markups for Hourly Labor Rates as Shown in Tables 1 and 2 below:

Base Year 1

Base Year 2

Base Year 3

Option Period 1/ Year 4

Option Period 1/ Year 5

Total Labor (Home Office) Annual Escalation % % % %

Total Labor (Field Labor) Annual Escalation % % % %

Note-Annual escalation rates will not be in addition to fully burdened rates provided in Tables 1 and 2.

13. The following items shall be paid at negotiated cost, plus markups identified below:

2.2.1 G&A on Other Direct Costs (ODCs) %

2.2.2 Subcontracting Effort %

14. Department of Labor Wage Rates. For individual task orders written against the contract, the appropriate Department of Labor Wage Determination will be provided.

DISCIPLINE RATE SCHEDULE

HOME RATES

TABLE 1

Three year base period and one two-year option period.

Labor Rate (in $$/hr, fully burdened, without profit)

Item No

Discipline Base

Period Year 1

Base Period Year 2

Base Period Year 3

Option Period 1 Year 4

Option Period 1 Year 5

Additional Six Months (52.217-8)

1 Program Manager** $ $ $ $ $ $

2 Project Manager, Senior** $ $ $ $ $ $

3 Project Manager, Staff $ $ $ $ $ $

4 Archeologist, Senior** $ $ $ $ $ $

5 Archeologist, Staff $ $ $ $ $ $

6 Archeologist, Junior $ $ $ $ $ $

7 Archeologist Crew Chief $ $ $ $ $ $

8 Archeologist Tech I $ $ $ $ $ $

9 Archeologist Tech II $ $ $ $ $ $

10 Archeologist Tech III $ $ $ $ $ $

11 Archeology Laboratory Technician, Senior

12 Archeology Laboratory Technician, Staff

13 Biologist, Senior** $ $ $ $ $ $

14 Biologist, Staff $ $ $ $ $ $

15 Biologist, Junior $ $ $ $ $ $

16 Ecologist, Senior $ $ $ $ $ $

17 Ecologist, Staff $ $ $ $ $ $

18 Ecologist, Junior $ $ $ $ $ $

19 Outdoor Recreation Planner, Senior

20 Outdoor Recreation Planner, Staff

21 Outdoor Recreation Planner, Junior

22 Historical Architect, Senior

23 Historical Architect, Staff $ $ $ $ $ $

24 Historic Architect, Junior $ $ $ $ $ $

25 Historical Resources Technician, Senior

Item No

Discipline Base

Period Year 1

Base Period Year 2

Base Period Year 3

Option Period 1 Year 4

Option Period 1 Year 5

Additional Six Months (52.217-8)

26 Historical Resources Technician, Staff

27 NEPA Manager** $ $ $ $ $ $

28 Natural Resource Compliance Specialist (NEPA-NEPA Support)

29 Cultural Resources Compliance Specialist (NEPA-NEPA Support)

30 Noise Specialist (NEPA- NEPA Support)

31 Airspace Specialist (NEPA- NEPA Support)

32 Biological Tech I $ $ $ $ $ $

33 Biological Tech II $ $ $ $ $ $

34 Biological Tech III $ $ $ $ $ $

35 Environmental Engineer, Senior**

36 Environmental Engineer, Staff

37 Environmental Engineer, Junior

38 Chemist, Senior $ $ $ $ $ $

39 Chemist, Staff $ $ $ $ $ $

40 Chemist, Junior $ $ $ $ $ $

41 Geologist, Senior $ $ $ $ $ $

42 Geologist, Staff $ $ $ $ $ $

43 Geologist, Junior $ $ $ $ $ $

44 OHSA Specialist $ $ $ $ $ $

45 Environmental Assistant, Senior

46 Environmental Assistant, Staff

47 Environmental Assistant, Jr. $ $ $ $ $ $

48 Environmental Specialist, Senior

49 Environmental Specialist, Staff

50 Environmental Specialist, Jr.

Discipline Base

Period Year 1

Base Period Year 2

Base Period Year 3

Option Period 1 Year 4

Option Period 1 Year 5

Additional Six Months (52.217-8)

51 Hazardous Waste Specialist, Senior

52 Hazardous Waste Specialist, Staff

53 Hazardous Waste Specialist, Junior

54 Recycling Program Manager

55 Environmental Trainer, Sr. $ $ $ $ $ $

56 Environmental Trainer, Staff

57 Environmental Trainer, Jr. $ $ $ $ $ $

58 CADD/GIS/Remote Sensing Specialist, Senior**

59 CADD/GIS/Remote Sensing Specialist, Staff

60 CADD/GIS/Remote Sensing Specialist, Junior

61 Information Technologist, Senior

62 Information Technologist, Staff

63 Information Technologist, Junior

64 Hydraulic/Hydrologic Engineer, Senior

65 Hydraulic/Hydrologic Engineer, Staff

66 Hydraulic/Hydrologic Engineer, Junior

67 Archivist/Librarian, Senior $ $ $ $ $ $

68 Archivist/Librarian, Staff $ $ $ $ $ $

69 Archivist/Librarian, Junior $ $ $ $ $ $

70 Civil Engineer, Senior $ $ $ $ $ $

71 Civil Engineer, Staff $ $ $ $ $ $

72 Civil Engineer, Junior $ $ $ $ $ $

73 Economist/Cost Analyst (NEPA/NEPA Support)

74 Environmental Tech I $ $ $ $ $ $

Discipline Base

Period Year 1

Base Period Year 2

Base Period Year 3

Option Period 1 Year 4

Option Period 1 Year 5

Additional Six Months (52.217-8)

75 Environmental Tech II $ $ $ $ $ $

76 Environmental Tech III $ $ $ $ $ $

77 Industrial Hygienist, Senior $ $ $ $ $ $

78 Industrial Hygienist, Staff $ $ $ $ $ $

79 Industrial Hygienist, Junior $ $ $ $ $ $

80 Preservation Planner, Sr. $ $ $ $ $ $

81 Preservation Planner, Staff $ $ $ $ $ $

82 Preservation Planner, Jr. $ $ $ $ $ $

83 Editor $ $ $ $ $ $

84 Administrative Support, Senior

85 Administrative Support, Staff

86 Administrative Support, Junior

87 Public Affairs/Communication Specialists, Senior

88 Public Affairs/Communication Specialists, Staff

89 Public Affairs/Communication Specialists, Junior

90 Risk Assessor, Senior $ $ $ $ $ $

91 Risk Assessor, Staff $ $ $ $ $ $

92 Risk Assessor, Junior $ $ $ $ $ $

93 Cost Estimator/Engineer $ $ $ $ $ $

DISCIPLINE RATE SCHEDULE

FIELD RATES

TABLE 2

Three year base period and one two-year option period.

Labor Rate (in $$/hr, fully burdened, without profit)

Item No

Discipline Base

Period Year 1

Base Period Year 2

Base Period Year 3

Option Period 1 Year 4

Option Period 1 Year 5

Additional Six Months (52.217-8)

1 Program Manager** $ $ $ $ $ $

2 Project Manager, Senior** $ $ $ $ $ $

3 Project Manager, Staff $ $ $ $ $ $

4 Archeologist, Senior** $ $ $ $ $ $

5 Archeologist, Staff $ $ $ $ $ $

6 Archeologist, Junior $ $ $ $ $ $

7 Archeologist Crew Chief $ $ $ $ $ $

8 Archeologist Tech I $ $ $ $ $ $

9 Archeologist Tech II $ $ $ $ $ $

10 Archeologist Tech III $ $ $ $ $ $

11 Archeology Laboratory Technician, Senior

12 Archeology Laboratory Technician, Staff

13 Biologist, Senior** $ $ $ $ $ $

14 Biologist, Staff $ $ $ $ $ $

15 Biologist, Junior $ $ $ $ $ $

16 Ecologist, Senior $ $ $ $ $ $

17 Ecologist, Staff $ $ $ $ $ $

18 Ecologist, Junior $ $ $ $ $ $

19 Outdoor Recreation Planner, Senior

20 Outdoor Recreation Planner, Staff

21 Outdoor Recreation Planner, Junior

22 Historical Architect, Senior

23 Historical Architect, Staff $ $ $ $ $ $

24 Historic Architect, Junior $ $ $ $ $ $

25 Historical Resources Technician, Senior

Discipline Base

Period Year 1

Base Period Year 2

Base Period Year 3

Option Period 1 Year 4

Option Period 1 Year 5

Additional Six Months (52.217-8)

26 Historical Resources Technician, Staff

27 NEPA Manager** $ $ $ $ $ $

28 Natural Resource Compliance Specialist (NEPA-NEPA Support)

29 Cultural Resources Compliance Specialist (NEPA-NEPA Support)

30 Noise Specialist (NEPA- NEPA Support)

31 Airspace Specialist (NEPA- NEPA Support)

32 Biological Tech I $ $ $ $ $ $

33 Biological Tech II $ $ $ $ $ $

34 Biological Tech III $ $ $ $ $ $

35 Environmental Engineer, Senior**

36 Environmental Engineer, Staff

37 Environmental Engineer, Junior

38 Chemist, Senior $ $ $ $ $ $

39 Chemist, Staff $ $ $ $ $ $

40 Chemist, Junior $ $ $ $ $ $

41 Geologist, Senior $ $ $ $ $ $

42 Geologist, Staff $ $ $ $ $ $

43 Geologist, Junior $ $ $ $ $ $

44 OHSA Specialist $ $ $ $ $ $

45 Environmental Assistant, Senior

46 Environmental Assistant, Staff

47 Environmental Assistant, Jr. $ $ $ $ $ $

48 Environmental Specialist, Senior

49 Environmental Specialist, Staff

50 Environmental Specialist, Jr.

Discipline Base

Period Year 1

Base Period Year 2

Base Period Year 3

Option Period 1 Year 4

Option Period 1 Year 5

Additional Six Months (52.217-8)

51 Hazardous Waste Specialist, Senior

52 Hazardous Waste Specialist, Staff

53 Hazardous Waste Specialist, Junior

54 Recycling Program Manager

55 Environmental Trainer, Sr. $ $ $ $ $ $

56 Environmental Trainer, Staff

57 Environmental Trainer, Jr. $ $ $ $ $ $

58 CADD/GIS/Remote Sensing Specialist, Senior**

59 CADD/GIS/Remote Sensing Specialist, Staff

60 CADD/GIS/Remote Sensing Specialist, Junior

61 Information Technologist, Senior

62 Information Technologist, Staff

63 Information Technologist, Junior

64 Hydraulic/Hydrologic Engineer, Senior

65 Hydraulic/Hydrologic Engineer, Staff

66 Hydraulic/Hydrologic Engineer, Junior

67 Archivist/Librarian, Senior $ $ $ $ $ $

68 Archivist/Librarian, Staff $ $ $ $ $ $

69 Archivist/Librarian, Junior $ $ $ $ $ $

70 Civil Engineer, Senior $ $ $ $ $ $

71 Civil Engineer, Staff $ $ $ $ $ $

72 Civil Engineer, Junior $ $ $ $ $ $

73 Economist/Cost Analyst (NEPA/NEPA Support)

74 Environmental Tech I $ $ $ $ $ $

Discipline Base

Period Year 1

Base Period Year 2

Base Period Year 3

Option Period 1 Year 4

Option Period 1 Year 5

Additional Six Months (52.217-8)

75 Environmental Tech II $ $ $ $ $ $

76 Environmental Tech III $ $ $ $ $ $

77 Industrial Hygienist, Senior $ $ $ $ $ $

78 Industrial Hygienist, Staff $ $ $ $ $ $

79 Industrial Hygienist, Junior $ $ $ $ $ $

80 Preservation Planner, Sr. $ $ $ $ $ $

81 Preservation Planner, Staff $ $ $ $ $ $

82 Preservation Planner, Jr. $ $ $ $ $ $

83 Editor $ $ $ $ $ $

84 Administrative Support, Senior

85 Administrative Support, Staff

86 Administrative Support, Junior

87 Public Affairs/Communication Specialists, Senior

88 Public Affairs/Communication Specialists, Staff

89 Public Affairs/Communication Specialists, Junior

90 Risk Assessor, Senior $ $ $ $ $ $

91 Risk Assessor, Staff $ $ $ $ $ $

92 Risk Assessor, Junior $ $ $ $ $ $

93 Cost Estimator/Engineer $ $ $ $ $ $

** Denotes Key Personnel (both tables): Resumes required

NOTES (both tables):

1. Offerors are to submit their labor rates for each of the ordering periods at the time of proposal submission.

2. The offeror shall complete only one Table 1 and Table 2. For each labor discipline, the offeror shall annotate whether the discipline provided is Prime or Subcontractor. Each table shall show one rate per labor discipline, including those provided by subcontractors. The offeror may not have all personnel on staff. Therefore, if those personnel are subcontracted, their rates shall be provided in the tables as well.

All contracted personnel shall be identified on the tables following “(SUB)” after the title of this discipline title. For example, “Cultural Resources Compliance Specialist (SUB)”. The rates shown per labor discipline shall be fully burdened rates, exclusive of profit.

NOTE: If during the Contract Period of Performance, the Contractor’s original subcontracted personnel are no longer available to the Prime, the Prime shall find a subcontractor that has at a minimum, the same qualifications as the previous subcontracted personnel. The Prime shall be responsible for negotiating the labor rates for those personnel that have been provided in this RFP.

Those rates provided are the maximum that will be paid by the Government for any replacement personnel.

3. See Sections L and M for complete discussion of the content of the Cost/Price Proposal and its evaluation. The Pricing Schedule is only one part of the contents of the required Cost/Price Proposal.

4. Subcontractors: The subcontractors who will be included by the prime in the Pricing Schedule and in the full cost/price proposal are those identified by the prime contractor as “team subcontractors”. Team subcontractors are subcontractors that the prime used in their proposal to the Government to qualify for this contact and/or are subcontractors that the prime wishes to use during the life of the contract without having to obtain competition.

5. The job titles and classifications noted in the Pricing Schedule at the solicitation phase are the

Government’s anticipated job titles and classifications to be used over the life of the contract. All offerors must include and price all of these job titles and classifications, whether through the use of personnel from the prime’s firm or through subcontractors. In other words, the prime contractor must submit a completely filled out Section B pricing schedule (no blanks) and identify any job title and price by a team subcontractor. Offerors shall not modify by adding to or deleting from the Government’s list of anticipated job titles and classifications for both prime and subcontractor(s). If the offeror has a job title and/or classification that is equivalent to one on the Government’s list, they can price that job title using the Government job title and/or classification as a substitute.

6. The Government has shown the job classifications within job titles as Senior, Staff, and Junior levels.

The following definitions apply to the use of these classifications:

o Senior Level of the Profession: Job technical and oversight management with some review function.

o Staff Level of the Profession: Hands-on work effort; responsible for most of the work on a task order.

o Junior Level of the Profession: Relatively new to the profession; still in an apprenticeship, not fully credentialed; works under the supervision of a staff or senior level person.

7. The Offeror and its subcontractors cannot separate the job titles into different classifications other than the Senior, Staff, and Junior scheme. Offeror can define their scheme and give definitions of the levels in their proposal. As stated above, Offerors will not use job titles that will not charge directly to task order work and use of a job title and/or classification not included in the Government’s list will be negotiated on a task order basis.

8. The requirement for any other direct cost not included in the Government’s list will be negotiated on a task order basis. As stated above the unit prices entered into the Pricing Schedule will be “fully burdened” as defined above. Please note that equipment, material, supply, travel and lab costs will be handled as noted below.

9. All Other Direct Costs (ODCs) including but not limited to reproduction, equipment, material and supply direct costs will be negotiated as required on each Task Order and not pre-priced or listed on the Pricing Schedule. The Contractor shall present the Government, as part of each task order’s cost proposal, the equipment, material and supply costs for the task order with support for the proposed costs which indicate that they are fair and reasonable. The Contractor shall present the Government, with the task order’s cost proposal, with at least two quotes on required equipment, materials, and supplies obtained from subcontractors by the Prime Contractor to support the Contractor’s proposed costs. The Contractor will be allowed to apply indirect cost rates as proposed (the multiplier identified as appropriate to ODCs and consistent with the accounting system), and profit or fee as negotiated on each task order to equipment, material and supply costs.

10. Per Diem (lodging and MI & E expenses) shall be paid at the current Government rates in accordance with the Federal Travel Regulation (FTR) per person per calendar day spent in travel status. No per diem will be paid for travel less than the number of hours per day stated in the current FTR. Per diem rate information may be obtained at https://secureapp2.hqda.pentagon.mil/perdiem/. Actual cost of transportation by public conveyance (plane, limited to coach class) shall be paid. Privately owned vehicles shall be paid at the current Government mileage rate in accordance with the FTR. If required by a task order under this contract, cost for travel, lodging, meals, vehicle rental, and mileage are allowable subject to the limitations of FAR 31.205-46. These costs will be negotiated on each task order. The contractor is not allowed to apply indirect costs (G&A) to travel costs.

11. Laboratory costs will be negotiated as required on each Task Order and not pre-priced or listed on the

Pricing Schedule. The Contractor shall present the Government, as part of each task order’s cost proposal, the laboratory costs for the task order with support for the proposed costs which indicate that they are fair and reasonable. The Contractor shall present the Government, with the task order’s cost proposal, with at least two quotes on required laboratory costs obtained from subcontractors by the Prime Contractor to support the Contractor’s proposed costs. The Contractor will be allowed to apply indirect cost rates as proposed (the multiplier identified as appropriate to ODCs and consistent with the accounting system), and profit or fee as negotiated on each task order to laboratory costs.

12. Any labor classification rates or other direct costs for the prime or subcontractors that are needed during the life of the contract but were not included in the Pricing Schedule will be negotiated on the task order and added by modification to the contract as necessary. However, the fully burdened hourly labor rates entered on the Pricing Schedule and thereby, proposed by the Contractor will be the contract’s rates and prices for the period for which they are proposed (base contract period) and will not be renegotiated during that period.

13. Task Orders: Services will be ordered by the Government in accordance with Section I, Contract Clause entitled “Ordering”. All services shall be charged at unit prices set forth in this Section B, Supplies or Services and Prices. There is no guarantee of work beyond the $2,500.00 Guaranteed Minimum on the base year of this contract. Exercising the option period on this contract is at the convenience of the Government and is NOT guaranteed.

Section C - Descriptions and Specifications

STATEMENT OF WORK

SECTION C

STATEMENT OF WORK

Multiple Environmental Government Acquisition (MEGA)

Indefinite Delivery Contract (IDC) Multiple Award Task Order Contract (MATOC)

Environmental Consulting Services for Projects within the Geographic Boundaries of the Southwestern Division (SWD) and Projects assigned to the Southwestern Division in accordance with UAI Subpart 7.1 and ER 5-1-10

21 DECEMBER 2016

1.0 INTRODUCTION

1.1 PURPOSE

The purpose of this contract is to provide a full range of environmental and related services, including on-site support services for projects assigned to the Southwestern Division (SWD) Regional Planning and Environmental Center (RPEC) ) and projects assigned to the Southwestern Division (within the Continental United States), U.S. Army Corps of Engineers (USACE) as approved in accordance with UAI Subpart 7.1 and ER 5-1-10. Work to be performed under this contract may include, but not necessarily be limited to, environmental quality and compliance, environmental engineering and technical support, environmental management system support, environmental analysis, environmental program management support, environmental sampling of various media, laboratory testing, environmental and occupational safety and health compliance audits and training, environmental assessments, environmental data inventories, hazardous and regulated waste handling, management, and recycling, permit applications, community involvement, environmental services, environmental investigation, natural resources conservation support, cultural resources support, and other scientific and technological investigations to accomplish the mission. Wage Determinations will be incorporated with each task order, if required.

1.2 APPLICABLE WORK LOCATIONS

This contract is meant to satisfy requirements primarily within the SWD area of responsibility. However, contract capacity may be shared with other CONUS geographic districts where the principles of the Project Management Business Process and ER-1-10 have been met. The geographic territory for this contract will include the geographic boundaries of the Southwestern Division (SWD) and projects assigned to SWD including any of a variety of military installations, Federal agencies, and civil work entities where the USACE is otherwise authorized to respond. The Contractor shall provide environmental support as requested in the task orders (TOs) issued under this contract. This contract requires the Contractor to perform all work necessary to complete simultaneously executed TOs.

It is noted that the term “installation” is generically used within this Statement of Work to refer to any potential location, agency, or facility as discussed above, that a TO may be awarded to/for under this contract. The Contractor may be required to perform tasks on-site or at their own facilities.

1.3 TECHNICAL REQUIREMENTS

The general technical requirements specified in this statement of work are intended to provide requirements for execution of the contract and an overall understanding of the functions that the Contractor may be required to perform. Specific services required under this contract shall be described in detail within individual scopes of work for each TO. The USACE will prepare the specific statement of work for each TO. However, the Contractor may be required to provide input to support the planning, scheduling, and formulation of the USACE's statement of work. Individual TOs will contain additional detailed requirements and/or plans and specifications for each specific project. The Contractor may also receive available data and work products from past environmental activities performed by other Contractors and/or government personnel.

1.4 GENERAL REQUIREMENTS

The Contractor is required to furnish all plant, labor, materials, and equipment to provide environmental services at project locations, unless otherwise directed by individual TOs. The Contractor's personnel shall comply with Occupational Safety and Health Administration (OSHA) requirements. The Contractor shall provide all support activities, described herein or in individual TOs, necessary to ensure the safe and effective accomplishment of project criteria within specified completion times. All work shall be performed in accordance with this contract, applicable Federal, State, and local installation regulations.

1.5 TASK ORDER REQUIREMENTS AND PERIOD OF PERFORMANCE

TOs will be issued on a standard firm-fixed price (FFP) basis, or as FFP performance-based TOs. For performance based TOs, the Contractor shall be responsible for developing technical and management approaches that directly satisfy the government’s TO objectives, including working with and maintaining good working relationships with regulators on all aspects of their work. As will be detailed in specific TOs, the USACE and its customers will review and comment on all documents prior to their submission to the regulatory agencies.

Any TO issued during the effective period of this contract and not completed within that period of that contract, shall be completed by the Contractor within the time specified in the TO. The Contract shall govern the Contractor's and Government's rights and obligations with respect to that TO's Period of Performance.

2.0 GENERAL CONTRACT INFORMATION

2.1 CONTRACT TYPE

This is an indefinite delivery contract to provide a full range of environmental and related services, including full time on-site support services for projects specified in individual TOs, and it is effective for a period of 5 years from the date of award of the contract if the option is exercised.

2.2 DELIVERY

Delivery or performance shall be made only as authorized by TOs issued in accordance with each ordering clause. The Contractor shall furnish to the Government, when and if ordered, work for the items specified in individual TOs. There is no limit on the number or size of orders that may be issued, and the

Government may issue concurrent orders requiring delivery to multiple destinations or performance at multiple locations.

2.3 COMMENCEMENT OF WORK

The Contractor shall be required to commence the work required by a TO at the time specified on the TO, execute the work, and complete the entire project not later than the completion time specified on the TO.

Unless identified otherwise or modified in the individual TOs, all services, and Contractor personnel qualifications, shall be in accordance with this section.

2.4 PURPOSE

The express purpose of this contract is the provision of environmental services including on-site support services. In order to accomplish this, through TOs, the Contractor shall maintain a management staff and system that ensures flexibility, effective communications, and the diversity of disciplines necessary to successfully execute complex, multi-faceted work. The Contractor shall maintain a staffing and program management system that will promote retention of institutional knowledge and continuity. The Contractor shall maintain a communication program that will apprise key personnel executing various TOs of any significant findings that may impact ongoing or planned environmental support activities.

The Contractor shall initiate recommendations to the Contracting Officer's Representative (COR) about any alternative methods of executing a TO that would result in improved economy, productivity, or quality and immediately notify the COR of any conditions encountered during the execution of a TO that may impact performance.

2.5 REGULATORY COMPLIANCE AND GUIDANCE

The investigations, studies, and reports will pertain to the following, but not limited to: military activities;

the planning, construction, operations and maintenance of the USACE Civil Works projects; activities in support of other Government agencies; and Federal and State regulatory compliance. These studies and reports will be carried out in full accordance with the requirements of the following (but not limited to) acts, laws, and/or statutes, as applicable:

American Antiquity Style Guide Archeological and Historic Preservation Act, as amended Archeological Resources Protection Act Asbestos Hazardous Emergency Response Act of 1986 Bald Eagle Protection Act Clean Air Act, as amended Clean Water Act (CWA or Federal Water Pollution Control Act), as amended Coastal Zone Management Act of 1972, as amended Comprehensive Environmental Responsibility, Compensation and Liability Act Endangered Species Act of 1973, as amended Emergency Planning and Community Right-to-Know Act Estuary Protection Act of 1986, as amended Federal Water Project Recreation Act, as amended Federal Facilities Compliance Act Federal Insecticide, Fungicide, and Rodenticide Act Fish and Wildlife Conservation Act

Military Lands Withdrawal Act National Environmental Policy Act (NEPA), as amended National Historic Preservation Act of 1966, as amended Native American Graves Protection and Repatriation Act Noise Control Act of 1972, as amended Ocean Dumping Act Occupational Safety and Health Act Oil Pollution Act Resource Conservation and Recovery Act Rivers and Harbors Act of 1899, as amended Safe Drinking Water Act Superfund Amendments and Reauthorization Act The Solid Waste Disposal Act Toxic Substances Control Act Watershed Protection and Flood Prevention Act, as amended Wetlands Conservation Act Wilderness Act Wild and Scenic Rivers Act, as amended

In addition to the above, there are Executive Orders, promulgated regulations, and implementing guidance documents including, but not limited to, the following: Executive Order 11593 (Protection and Enhancement of the Cultural Environment); Executive Order 11990 (Protection of Wetlands); Executive Order 13423 Strengthening Federal Environmental, Energy, and Transportation Management; Executive Order 13101 Greening of the Government Through Waste Prevention, Recycling, and Federal Acquisition; Executive Order (EO) 13693 Planning for Federal Sustainability in the next Decade; Air Force Instruction (AFI) 32-7061 "The Environmental Impact Analysis Process"; Engineering Regulation (ER) 200-2-2 "Procedures for Implementing NEPA"; Army Regulation (AR) 200-1 Environmental Protection and Enhancement; AR 200-2 "Environmental Effects of Army Actions"; AR 200-3 Natural Resources - Land, Forest and Wildlife Management; AFI 32-7065 “Historic Preservation”; AR 200-4 "Historic Preservation"; International Organization for Standardization (ISO) 14001 Standard, EMSs – Requirements with guidance for use; CFR 28 Part 61, Procedures for Implementing the National Environmental Policy Act; ER 1102-2-100 Guidance for Conducting Civil Works Planning Studies;

Technical Manual (TM) 5-803-12 Planning of Outdoor Recreation Areas; ER 1165-2-400 Water Resource Policies and Authorities; ER 1130-2-435 Preparation of Project Master Plans; EM 1110-1-400 Recreation Planning and Design Criteria; ER 1130-2-438 Historic Preservation Program; ER 1130-2-400 Management of Natural Resources and Outdoor Recreation at Civil Works Water Resource Projects; Air Force Policy Directive (AFPD) 32-70 Environmental Quality, and AFI 32-7001 Environmental Management. All contract work shall comply with the above, in addition to all applicable State and local statutes and regulations.

2.6 PROFESSIONAL REGISTRATION/CERTIFICATION AND REGULATED PROCEDURES

In performing the work effort, the Contractor shall adhere to professional guidelines and procedures established or approved by applicable Federal, State, and local regulatory agencies. Register of Professional Archeologists certification is acceptable as meeting archeological personnel qualifications.

All other mid and senior level disciplines should have or be able to obtain appropriate certification or registration appropriate to their professional field of endeavor. If the Contractor is providing on-site support services, the Contractor may be required to provide suitably registered or certified personnel for applicable tasks in specific TOs.

In the performance of air and water quality testing, the Contractor shall utilize only collection, transportation, testing, recording, and sample disposal procedures approved by the Environmental Protection Agency, the applicable State agency involved, and local installation requirements, if any. The Contractor must obtain and maintain all transportation and handling documentation and certifications required by the applicable State and Federal agencies. Laboratories used (prime or subcontracted facilities) must obtain approval from the Contracting Officer (KO), COR, or a KO approved point of contact (POC) as designated within specific TOs.

2.7 CONTRACT AUTHORITY AND WORK DEVIATION

The Contractor shall thoroughly coordinate with the USACE KO or COR and other government agency representatives that are involved in the work effort. The USACE KO is the only responsible parties for contractual matters; consequently, the Contractor shall not take any action relating to this contract at the direction of any other party. Any deviation from the established and approved scope of work, including specific methods and techniques, must be proposed in writing by the Contractor and approved by the KO prior to implementation. Unapproved deviations shall not result in any additional cost to the Government.

A KO approved POC may be designated, per TO, to act as a local authority for contract deviation approval regarding minor scope variations or divergences. Primary contact for all technical matters will be established within each specific TO.

Though, as outlined above, the Contractor shall not take any action relating to this contract at the direction of any other party, all Contractors must comply with lawful orders issued by certain authorized officials. Examples of this would be, but not limited to, orders by an Installation Commander to address emergency directions or a Safety Officer’s prerogative to issue stop work notices on-site. Various installations have industrial hygiene, security, and range control programs which have authority to “direct” that certain actions occur or not occur on the installation. Additionally, many installation policies and regulations directly apply to Contractors and all Contractor personnel. Specific circumstances that may apply at any particular installation will be addressed prior to a TO commencement at each particular installation. If the Contractor receives any safety or security direction as outlined in this paragraph that will or potentially will impact TO execution and/or result in deviations that may have a cost impact, the Contractor must immediately notify the KO and COR.

2.8 SAFETY

2.8.1 The Contractor shall at all times conduct operations in a safe manner and in accordance with all applicable Federal, State, and local statutes and regulations as well as the USACE Safety and Health Requirements Manual (EM 385-1-1, latest version). Based on TO award, the Contractor will also comply with all applicable agency or installation/facility safety policies and requirements. The Contractor may be required to develop a health and safety management plan for any TO issued under this contract and to make such a plan available for inspection by the Government.

2.8.2 If Ordnance or Explosives Avoidance Professionals are required to provide/perform surface UXO and subsurface anomaly avoidance to perform any Task Order requirement, the Contractor's proposal must identify the appropriate labor disciplines and levels of effort on their proposals. The applicable Wage Determination will be incorporated with each Task Order, if required.

3.0 SCOPE OF WORK

3.1 ENVIRONMENTAL STUDIES AND EVALUATIONS (GENERAL)

The Contractor may be required to execute and/or support a wide range of studies, evaluations, and field work activities under this contract that are common to one or more environmental programs. The actual degree of support, technical assistance, or administration of tasks associated with any particular study or evaluation will depend on specific TO requirements. Studies and evaluations that may be required under this contract include, but are not limited to: environmental investigation/site characterizations;

environmental impact analyses and documentation; environmental baseline studies; air quality studies and evaluations; historical/records…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .