RFP NO: W912BV-15-R-0042
US Army Corps of Engineers Tulsa District
SINGLE AWARD TASK ORDER CONTRACT
(SATOC) INDEFINITE DELIVERY INDEFINITE
QUALITY (IDIQ)
FOR DESIGN-BUILD AND CONSTRUCTION
SERVICES IN SUPPORT OF VARIOUS MILITARY
AND CIVIL WORKS CONSTRUCTION PROJECTS
WITHIN BOUNDARIES OF THE TULSA DISTRICT
WITH EMPHASIS ON TINKER AFB
2-PHASE SELECTION: PHASE 1 OF 2
SET ASIDE FOR SMALL BUSINESS
JANUARY 2016
PROJECT TABLE OF CONTENTS Page 1
FY16 SINGLE AWARD TASK ORDER (SATOC) 16TAFBSATOC
PROJECT TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 00 STANDARD FORM 1442 AND PRICING (CLIN) SCHEDULE FOR
BASIC CONTRACT
00 21 00 INSTRUCTIONS TO OFFERORS
00 22 00 PHASE 1 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION
CRITERIA, AND BASIS OF AWARD
00 45 00 REPRESETATIONS AND CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 73 00 SPECIAL CONTRACT REQUIREMENTS
00 90 00 DESCRIPTION/WORK STATEMENT
DIVISION 01 - GENERAL REQUIREMENTS
01 01 00.00 44 WORK PLAN REQUIREMENTS
01 33 00.00 10 DIGITAL SUBMITTAL PROCEDURES AND CORRESPONDENCE
01 33 16.00 10 DESIGN AFTER AWARD
01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS)
NOTE: Refer to Individual Task Order for additional Division 01 Sections.
APPENDICES:
Applicable to all Tinker AFB Task Orders unless otherwise specified in Task Order
Appendix A USACE Tinker Resident Office Directions Appendix B Tinker Air Force Base Facility Standard Appendix C Availability and Use of Utility Services Appendix D UFC 4-010-01 DoD Minimum Anti-Terrorism Standards for
Buildings Appendix E UFC 3-190-06 Protective Coatings and Paints Appendix F UFC Fire Protection Engineering for Facilities Appendix G UFC 1-200-01 General Building Requirements Appendix H Tinker Air Force Base Standard for Building Utility
Electrical Distribution System and Teledata Communications
--End of Section--
INDEFINITE DELIVERY, INDEFINITE QUANTITY (IDIQ) Contract for Single-Aw ard Task Order (SATOC) COntract for use w ithin the Tulsa District boundaries of the U.S. Army Corps of Engineers to be used for either civil and military construction projects. The primare place, or area(s) of performance w ithin the Tulsa District boundaries for this IDIQ contract w ill be identif ied at the time of aw ard.
This Procurement w ill proceed as a 100% Total Small Business set aside w ith an estimated amount of $48 million.
Performance and Payment Bonds w ill be required on a per task order basis. Period of Performance and days the Contractor shall begin performance w ill be determined per task order.
PUNNIE CHITTCHANG 918.669.7544
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
26-Aug-2015
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________21 Dec 2015 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIV
USACE, TULSA 1645 S 101 E AVE
TULSA OK 74128-4609
W912BV
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912BV-15-R-0042 65
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912BV-15-R-0042
Section 00 11 00 - SF 1442 and CLIN Schedule
00 11 00 Pricing Schedule, Section 00 11 00, will be issued in Phase 2 of the solicitation process.
Section 00 21 00 - Instructions, Conditions & Notices to Offerors
00 21 00
INSTRUCTIONS TO OFFERORS
SECTION 00 21 00
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK
1.2 GOVERNMENT SECURITY REQUIREMENTS
1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
1.4 OFFEROR'S QUESTIONS AND COMMENTS
1.5 SMALL BUSINESS SIZE STANDARD/NAICS CODE
1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
1.7 PRE-PROPOSAL CONFERENCE
1.8 ACCURACY IN PROPOSALS
1.9 PROPOSAL SUBMITTALS
1.10 JOINT VENTURE PROPOSAL REQUIREMENTS
1.0 GENERAL INFORMATION
1.1. GENERAL DESCRIPTION OF WORK
The SATOC is for design-build construction services to meet the requirements and time constraints for military, civil, and Interagency and International Services (IIS) customers within Southwestern Division (SWD) Boundaries, and mainly for Tulsa District customers.
1.2. GOVERNMENT SECURITY REQUIREMENTS
The Offeror(s) must ensure that ALL mail sent to the Tulsa District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located at 1645 S. 101 E. Ave, Tulsa, OK 74128, if it does not contain a return mailing address. There will be no exceptions.
USACE Tulsa District Point of Contact is Punnie Chittchang:
Phone: 918-669-7544 Email: punnie.chittchang@usace.army.mil
1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted through the Army’s Single Face to Industry (AFSI) to the Federal Business Opportunities (FBO) website at:
http://www.fbo.gov
Solicitation number: W912BV-15-R-0042
It shall be the contractor’s responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
1.4. OFFEROR'S QUESTIONS AND COMMENTS
Questions and/or comments relative to the document should be submitted via Bidders Inquiry at:
https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=HomePagePublic.
Instructions for registering in the ProjNet Bidder Inquiry system are available on the above web site.
The Bidder Inquiry Key for this project is: XXXXXXXX (Bidder’s Key will be issued by amendment)
Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.
Note: All questions and/or comments should be entered in Bidder’s Inquiry no later than 20 calendar days prior to the proposal deadline, so they may be given consideration or action taken prior to receipt of offers.
1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE
The small business size standard for NAICS Code 236220 is $36.5 Million.
1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.7. PRE-PROPOSAL CONFERENCE
The Government intends to hold the pre-proposal conference. The date, location, and time will be announced by Amendment. The offeror must submit, via e-mail, the firm’s name, address, point of contact, telephone number, and number of personnel planning to attend to the following no later than two (2) working days prior to the conference:
U.S. Army Corps of Engineers, Tulsa District ATTN: Punnie Chittchang 1645 S. 101 E. Ave.
Tulsa, OK 74128 Phone: 918-669-7657 Fax: 918-669-7495 Email: punnie.chittchang@usace.army.mil
During this conference, the requirements set forth in the solicitation will be reviewed and discussed, with part of the conference to include a question and answer period.
1.8. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C.
1001.
1.9. PROPOSAL SUBMITTALS
The submittal method for proposals is electronic via AMRDEC SAFE web site or email:
https://safe.amrdec.army.mil/safe/.
The following email addresses must be entered for notification of proposal receipt and download availability:
punnie.chittchang@usace.army.mil nathan.r.kloeckler@usace.army.mil
Proposals will be received until the time and date shown on Standard Form SF 1442 or as amended on SF30. Mail proposals to:
U.S. Army Corps of Engineers, Tulsa District ATTN: Punnie Chittchang, CESWT-CT 1645 S. 101 E. Ave.
Tulsa, OK 74128
The Packaging Proposals shall be marked:
”Proposal for Solicitation Number: “W912BV-15-R-0042”
1.10. JOINT VENTURE PROPOSAL REQUIREMENTS
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration.
If this is an 8(a) or HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively
CLAUSES INCORPORATED BY REFERENCE
52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004 52.215-16 Facilities Capital Cost of Money JUN 2003 52.215-20 Requirements for Certified Cost or Pricing Data or
Information Other Than Certified Cost or Pricing Data
OCT 2010
52.215-22 Limitations on Pass-Through Charges--Identification of Subcontract Effort
OCT 2009
52.232-14 Notice Of Availability Of Progress Payments Exclusively For Small Business Concerns
APR 1984
52.236-28 Preparation of Proposals--Construction OCT 1997
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm fixed-price contract resulting from this solicitation.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
14.8 6.9
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is [Contracting Officer shall insert description of the geographical areas where the contract is to be performed, giving the State, county, and city].
(End of provision)
52.232-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER—OTHER THAN SYSTEM FOR AWARD
MANAGEMENT (JULY 2013)
(a) Method of payment. (1) All payments by the Government under this contract shall be made by electronic funds transfer (EFT) except as provided in paragraph (a)(2) of this clause. As used in this clause, the term “EFT” refers to the funds transfer and may also include the payment information transfer.
(2) In the event the Government is unable to release one or more payments by EFT, the Contractor agrees to either--
(i) Accept payment by check or some other mutually agreeable method of payment; or
(ii) Request the Government to extend payment due dates until such time as the Government makes payment by EFT (but see paragraph (d) of this clause).
(b) Mandatory submission of Contractor's EFT information. (1) The Contractor is required to provide the Government with the information required to make payment by EFT (see paragraph (j) of this clause). The Contractor shall provide this information directly to the office designated in this contract to receive that information (hereafter: “designated office”') by (the Contracting Officer shall insert date, days after award, days before first request, the date specified for receipt of offers if the provision at 52.232-38 is utilized, or “concurrent with first request” as prescribed by the head of the agency; if not prescribed, insert “no later than 15 days prior to submission of the first request for payment”). If not otherwise specified in this contract, the payment office is the designated office for receipt of the Contractor's EFT information. If more than one designated office is named for the contract, the Contractor shall provide a separate notice to each office. In the event that the EFT information changes, the Contractor shall be responsible for providing the updated information to the designated office(s).
(2) If the Contractor provides EFT information applicable to multiple contracts, the Contractor shall specifically state the applicability of this EFT information in terms acceptable to the designated office. However, EFT information supplied to a designated office shall be applicable only to contracts that identify that designated office as the office to receive EFT information for that contract.
(c) Mechanisms for EFT payment. The Government may make payment by EFT through either the Automated Clearing House (ACH) network, subject to the rules of the National Automated Clearing House Association, or the Fedwire Transfer System. The rules governing Federal payments through the ACH are contained in 31 CFR part 210.
(d) Suspension of payment. (1) The Government is not required to make any payment under this contract until after receipt, by the designated office, of the correct EFT payment information from the Contractor. Until receipt of the correct EFT information, any invoice or contract financing request shall be deemed not to be a proper invoice for the purpose of prompt payment under this contract. The prompt payment terms of the contract regarding notice of an improper invoice and delays in accrual of interest penalties apply.
(2) If the EFT information changes after submission of correct EFT information, the Government shall begin using the changed EFT information no later than 30 days after its receipt by the designated office to the extent payment is made by EFT. However, the Contractor may request that no further payments be made until the updated EFT information is implemented by the payment office. If such suspension would result in a late payment under the prompt payment terms of this contract, the Contractor's request for suspension shall extend the due date for payment by the number of days of the suspension.
(e) Liability for uncompleted or erroneous transfers. (1) If an uncompleted or erroneous transfer occurs because the Government used the Contractor's EFT information incorrectly, the Government remains responsible for--
(i) Making a correct payment;
(ii) Paying any prompt payment penalty due; and
(iii) Recovering any erroneously directed funds.
(2) If an uncompleted or erroneous transfer occurs because the Contractor's EFT information was incorrect, or was revised within 30 days of Government release of the EFT payment transaction instruction to the Federal Reserve System, and--
(i) If the funds are no longer under the control of the payment office, the Government is deemed to have made payment and the Contractor is responsible for recovery of any erroneously directed funds; or
(ii) If the funds remain under the control of the payment office, the Government shall not make payment and the provisions of paragraph (d) shall apply.
(f) EFT and prompt payment. A payment shall be deemed to have been made in a timely manner in accordance with the prompt payment terms of this contract if, in the EFT payment transaction instruction released to the Federal Reserve System, the date specified for settlement of the payment is on or before the prompt payment due date, provided the specified payment date is a valid date under the rules of the Federal Reserve System.
(g) EFT and assignment of claims. If the Contractor assigns the proceeds of this contract as provided for in the assignment of claims terms of this contract, the Contractor shall require as a condition of any such assignment, that the assignee shall provide the EFT information required by paragraph (j) of this clause to the designated office, and shall be paid by EFT in accordance with the terms of this clause. In all respects, the requirements of this clause shall apply to the assignee as if it were the Contractor. EFT information that shows the ultimate recipient of the transfer to be other than the Contractor, in the absence of a proper assignment of claims acceptable to the Government, is incorrect EFT information within the meaning of paragraph (d) of this clause.
(h) Liability for change of EFT information by financial agent. The Government is not liable for errors resulting from changes to EFT information provided by the Contractor's financial agent.
(i) Payment information. The payment or disbursing office shall forward to the Contractor available payment information that is suitable for transmission as of the date of release of the EFT instruction to the Federal Reserve System. The Government may request the Contractor to designate a desired format and method(s) for delivery of payment information from a list of formats and methods the payment office is capable of executing. However, the Government does not guarantee that any particular format or method of delivery is available at any particular payment office and retains the latitude to use the format and delivery method most convenient to the Government. If the Government makes payment by check in accordance with paragraph (a) of this clause, the Government shall mail the payment information to the remittance address in the contract.
(j) EFT information. The Contractor shall provide the following information to the designated office. The Contractor may supply this data for this or multiple contracts (see paragraph (b) of this clause). The Contractor shall designate a single financial agent per contract capable of receiving and processing the EFT information using the EFT methods described in paragraph (c) of this clause.
(1) The contract number (or other procurement identification number).
(2) The Contractor's name and remittance address, as stated in the contract(s).
(3) The signature (manual or electronic, as appropriate), title, and telephone number of the Contractor official authorized to provide this information.
(4) The name, address, and 9-digit Routing Transit Number of the Contractor's financial agent.
(5) The Contractor's account number and the type of account (checking, saving, or lockbox).
(6) If applicable, the Fedwire Transfer System telegraphic abbreviation of the Contractor's financial agent.
(7) If applicable, the Contractor shall also provide the name, address, telegraphic abbreviation, and 9-digit Routing Transit Number of the correspondent financial institution receiving the wire transfer payment if the Contractor's financial agent is not directly on-line to the Fedwire Transfer System; and, therefore, not the receiver of the wire transfer payment.
(End of clause)
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Charles Peterson, 1645 S. 101st E. Ave, Tulsa, OK 74128.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-- TBD- Any updated information will be issued by amendment.
(c) Participants will meet at--
TBD
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/
(End of provision)
252.209-7992 REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX
LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW—FISCAL YEAR 2015
APPROPRIATIONS (DEVIATION 2015-OO0005) (DEC 2014)
(a) In accordance with sections 744 and 745 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), none of the funds made available by this or any other Act may be used to enter into a contract with any corporation that—
(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless the agency has considered suspension or debarment of the corporation and made a determination that this further action is not necessary to protect the interests of the Government; or
(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless the agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.
(b) The Offeror represents that—
(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability,
(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.
Section 00 22 00 - Phase 1 of 2 Phase Design Build Selection Process
EVALUATION CRITERIA
Section 00 22 00 - Phase 1 of 2 Phase Design Build Selection Process Section 00 22 00 - Phase 1 of 2 Phase Design Build Selection Process
PHASE 1 EVALUATION CRITERIA
SECTION 00 22 00
PHASE 1 OF 2 PHASE DESIGN-BUILD SELECTION PROCEDURES
1.0 OVERVIEW
2.0 GENERAL INSTRUCTIONS
3.0 PHASE 1 PROPOSAL AND RELATED EVALUATION FACTORS
4.0 TAB A – STANDARD FORM 1442 AND PROPOSAL DATA SHEET
5.0 TAB B – FACTOR 1 – SPECIALIZED EXPERIENCE
5.1 SUBMISSION REQUIREMENTS
5.2 EVALUATION CRITERIA
6.0 TAB C – FACTOR 2 – PAST PERFORMANCE
6.1 SUBMISSION REQUIREMENTS
6.2 EVALUATION CRITERIA
7.0 TAB D – FACTOR 3 – ORGANIZATION AND TECHNICAL APPROACH
7.1 SUBMISSION REQUIREMENTS
7.2 EVALUATION CRITERIA
8.0 PHASE 1 OVERALL RATING
9.0 PHASE 1 EVALUATION PROCEDURES
9.1 SOURCE SELECTION EVALUATION BOARD (SSEB)
9.2 EVALUATION
9.3 DEFINITIONS
9.4 EVALUATION AND RATING SYSTEM
9.5 PAST PERFORMANCE CONFIDENCE ASSESSMENT RATING SYSTEM
PHASE ONE – SECTION 00 22 00 ATTACHMENTS
1 – PROPOSAL DATA SHEETS
2 – COMPANY SPECIALIZED EXPERIENCE CONSTRUCTION OR PRIME CONTRACTOR
3 – COMPANY SPECIALIZED EXPERIENCE DESIGN FIRM OR IN-HOUSE DESIGN CAPABILITY
4 – PAST PERFORMANCE SURVEY FORM, SAMPLE LETTER & TELEPHONE INTERVIEW
QUESTIONNAIRE
5 – KEY PERSONNEL RESUME
6 – LETTER OF COMMITMENT FOR KEY PERSONNEL
7 – LETTER OF COMMITMENT FOR DESIGN FIRM
SECTION 00 22 00
PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, AND BASIS OF AWARD
(Phase 1 of 2)
1.0 OVERVIEW OF PHASE 1 AND PHASE 2 SELECTION PROCEDURES
1.1 This is a two-phase competitive solicitation for a firm, fixed-price Indefinite Delivery Indefinite, Quantity (IDIQ), Single-Award Task Order Contract (SATOC) which will be awarded using the Best Value Trade-Off Process. The SATOC is for design-build construction services to meet the requirements and time constraints for military, civil, and Interagency and International Services (IIS) customers within Southwestern Division (SWD) Boundaries, and mainly for Tulsa District customers.
1.2 The Government is looking for ways to streamline construction, manage labor and other resource constraints in an effort to reduce costs and achieve an aggressive schedule in executing task orders to meet the Army’s Transformation program goals of faster project execution at lower cost, while taking advantage of industry standards, means and methods.
1.3 This SATOC contract is set-aside for Total Small Business. The estimated amount of the contract is $48 million. The contract shall have a three-year base period and no option periods.
The Government intends to award one IDIQ SATOC contract.
1.4 The scope of this SWD SATOC includes, but is not limited to, construction, renovation, repairs, preventive maintenance, and environmental abatement activities. The contracts are not only intended to execute new construction and design-build, but to provide a timely response to repair of real and personal property facilities, e.g., maintenance, repair, asbestos and leadbased paint abatement, and major and minor construction situations relating to, but not limited to, architectural, civil, mechanical, plumbing, structural, electrical, heating, ventilation and air conditioning (HVAC), instrumentation, anti-terrorism and force protection.
1.5 The contractor shall perform in accordance with the attached Scope of Work, with the Scope of Work provided with each Task Order, and with strict accordance with the terms and conditions specified herein.
1.6 Phase 1. The first phase consists of a process known in commercial design-build as the “Request for Qualifications” or the acronym: “RFQ”. This solicitation refers to it as “Phase 1”. In Phase 1 of the 2 phase design-build selection procedure, interested firms or joint venture entities (referred to as “Offerors”) submit specified performance capability proposals, demonstrating their capability to successfully execute the design-build construction contract resulting from this solicitation. The Government will evaluate the performance capability proposals in accordance with the criteria described herein and will select no more than three (3) of the highest rated Phase 1 Offerors to compete for the design-build contract in Phase 2.
1.7 Phase 2. In Phase 2, the selected Offerors will submit preliminary technical-design proposals and the remainder of the performance capability proposals, including identification of key subcontractors, the proposed contract duration, a preliminary schedule, plus a price proposal in response to a Task Order 0001 Request for Proposal. The Government will evaluate the Phase 2 proposals, in accordance with the criteria described for Phase 2 in Section 00 20 20 PROPOSAL SUBMISSION REQURIMENTS, EVALUATION CRITERIA, AND BASIS OF AWARD, and award a firm fixed-price contract to the responsible Offeror, whose proposal conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government, considering technical-design quality, performance capability, and cost. The final evaluation rating used for comparison, selection, and award will reflect both the rating received in Phase 1 and the evaluation rating received in Phase 2. Cost information will not be rated in either phase but will be evaluated for reasonableness in accordance with the cost limitations set out in Section 00 73 10 Supplemental Contract Requirement, paragraph 1 entitled “Construction Cost Limitation (CCL)”.
1.7.1 The proposal must describe the capability of the Offeror to perform the work, describe the Offeror’s understanding of the requirements contained in the Statement of Work and set forth full, accurate, and complete information as required by the RFP. The proposal should be prepared simply and economically and be legible, clear and coherent.
1.7.2 Offerors will not be participating in a sealed bid procurement process under this acquisition method. Issuance of this Request for Proposal does not constitute an award commitment on the part of the Government.
1.7.3 Proposal Submissions and the Trade-Off Process. This process permits tradeoffs among cost or price and non-cost factors and allows the Government to accept other than the lowest priced proposal. Offerors submit their performance and capability information for review and consideration by the Government. Relative weights among technical factors are provided in Section 00 20 20 PROPOSAL SUBMISSION REQURIMENTS, EVALUATION CRITERIA, AND BASIS OF AWARD. The Source Selection Evaluation Board (SSEB) reviews, evaluates, and rates the proposals against the source selection criteria in the RFP. A competitive range consisting of the most highly qualified technical Offerors will be established prior to discussion (if held). The SSEB will review, evaluate and rate the initial task order project technical proposals against the source selection criteria in the RFP for those Offerors included in the competitive range. Concurrently, the Government analyzes price proposals of Offerors utilizing the initial task order project cost proposal. Price will not be rated, but will be a factor in making the final best value determination for award. The Source Selection Authority (SSA) compares proposals to one another and determines the best value for the government. The perceived benefits of the higher priced proposal must merit the additional cost, and the rationale for tradeoffs must be documented.
1.7.4 Initial Task Order Project. Those Offerors selected to compete during Phase 2 of the solicitation shall submit Technical and Cost (Price) proposal for the initial task order as part of Phase 2 Proposal submittals (See Section 00 20 20 PROPOSAL SUBMISSION REQURIMENTS, EVALUATION CRITERIA, AND BASIS OF AWARD). The scope of work for an initial task order TO-0001 project will be provided in Section 01 10 00 TASK ORDER STATEMENT OF WORK, as part of the Phase 2 solicitation. The initial task order project cost proposal will be used to evaluate price for the basic SATOC contract. Proposed contractor General and Administrative (G&A) Rates and Overhead Rates will be evaluated in the proposal to allow the Government to evaluate the total cost impact to the government and its customers for the life of the total $48 million SATOC Contract. The best value initial task order will be awarded to the successful contractor for the SATOC if it is in the best interest of the Government.
2.0 GENERAL INSTRUCTIONS
2.1 Who May Submit: Any legally organized Small Business firm may submit a proposal that is formally organized as design-build entities, Small Business design firms and construction contractors that have associated specifically for this project, or consortia of Small Business firms may submit proposals. Associations may be as joint ventures or as key team subcontractors. To qualify for Phase 2, the Offeror or Offeror’s subcontractor has to have or will have to have professional architects and engineers, registered in the appropriate technical disciplines and the requirements specified in Contract Clause, ”Requirements for Registration of Designers”, must be met. All designs must be under the direct supervision of appropriately licensed professionals for each discipline involved.
2.2 Where to Submit: Offerors shall submit their proposal to the Tulsa District at the address shown in Section 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS.
2.3 Submission Deadline. Proposals shall be received by the Tulsa District no later than the time and date specified in Block 10 of Standard Form 1442.
2.4 GENERAL SUBMISSION REQUIREMENTS
2.5 In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory. Failures to submit and organize proposals as requested may adversely affect an Offeror's evaluation. Offerors should provide sufficient detail and clearly define all items required in this section.
2.6 The Contracting Officer may remove any Offeror from further consideration during any phase of the procurement if the Offeror fails to meet the submittal requirements of the RFP or to reduce the competitive range for purposes of efficiency pursuant to FAR 15.306(c)(2).
2.7 Tabs. Proposal shall be organized and tabbed as shown in paragraph 3.0, “Phase I Proposal and
Related Evaluation Factors”.
2.8 Size of Printed Matter Submissions.
2.8.1 Proposal materials shall be submitted on CD-ROM containing the proposal in PDF file. Proposals shall be tabbed and labeled in a manner to afford easy identification from a Table of Contents.
Font size shall not be less than 10 point. Do not use condensed font. Each page shall be identified with the appropriate page number centered at the bottom of the page. Sheet size of the proposal contents shall be 8-1/2 inches x 11 inches where sheets are prepared specifically for this proposal; however, if drawings, charts, or other graphics are submitted, sheets no larger than 11 inches x 17 inches and folded to 8-1/2 inches x 11 inches shall be used. 11 x 17 inch sheets will be counted as 2 8-1/2 inch x 11 inch sheets. Phase 1 proposals shall not exceed 90 single sided pages, excluding the cover sheet and Table of Contents. The Government will not review any information submitted in an appendix or attachment to the proposal. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers that do not meet these requirements may be subject to rejection.
2.8.2 The proposals shall contain a detailed table of contents. If more than one binder is used, the complete table of contents shall be included in each. A cover sheet identifying the Offeror (name, address, point of contact), project description, and solicitation number shall be provided. The second sheet shall be a Table of Contents. Offers that violate these rules unnecessarily delay the evaluation process and may be rejected by the Government after the initial evaluation without receiving any further consideration. The Government will not evaluate any information beyond the page limitation noted.
2.8.3 Electronic Format: The Offeror shall provide the complete proposal on a CD-ROM (read-only).
The CD-ROM shall contain the entire proposal in .pdf format using Adobe Acrobat software to print to a .pdf file; do not scan or copy the documents into a .pdf file. The text portion of the proposal shall be contained as a single .pdf file. Sections of the proposal shall be linked to the index in logical order through use of bookmarks. Table of Contents to the .pdf shall be shown when the .pdf file is opened.
2.8.4 Number of Copies: Submit 4 copies on a CD-ROM containing read only PDF files.
2.8.5 Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, or
Clarification, or amendment shall be included and be annotated for each revision. Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, shall show the date of revision, shall be submitted in appropriate number of copies (e.g., if two (2) copies of the original page was required, then two (2) copies of the revised page will also be required. A revised copy of the entire proposal in .pdf format shall be provided on two (2) CD-ROM copies.
3.0 PHASE 1 PROPOSAL AND RELATED EVALUATION FACTORS
Location Factor Number Description Relative Importance
Tab A SF 1442 and Proposal Data Sheet N/A
Tab B Factor 1 Specialized Experience 1st (Most Important Factor)
Tab C Factor 2 Past Performance 2nd Most important factor
Tab D Factor 3 Organization and Technical Approach 3rd Most important factor
4.0 TAB A - STANDARD FORM 1442 AND PROPOSAL DATA SHEET
4.1 Submit the SF 1442, completed and signed by a person authorized by the Offeror. Include the completed proposal data sheet (See attachment 1, provided at the end of this Section).
5.0 TAB B – FACTOR 1 - SPECIALIZED EXPERIENCE
5.1 SUBMISSION REQUIREMENTS
The prime contractor and the design firm(s) (or prime contractor if design is to be self-performed) shall each demonstrate recent, relevant experience on similar projects, using Construction – Specialized Experience form – (Attachment 2), and Designer – Specialized Experience Form – (Attachment 3) at the end of the section. Offerors may identify state and local government and private contracts that are similar to the Government’s requirements. Construction and Design experience with Army and Air Force Installations is preferred as these are the primary customers of the Tulsa District. If the offeror is a joint venture, each firm shall provide information, demonstrating experience relevant to their role on this project. Submit projects selected from those discussed in the experience narrative that are currently well underway (designed and at least 50% construction progress completed) or completed and turned over no longer that five (5) years preceding the date of this Solicitation. If any firm has multiple functions or divisions, limit the project examples to those preformed by the division or unit submitting the offer or by the team member. Design firms may list prime contractors they have worked for or government, private or commercial customers. If projects were design-build please identify them as such.
Submit at least three (3) recent projects performed concurrently within the last five (5) years that demonstrate complex maintenance, repair, and/or alteration requirements within areas that disassemble, clean/inspect, remove materials, heat treat, weld, apply thermal coatings, plate, assemble and test major aircraft components. At least one project must be a relevant design/build project with a minimum cost of $5,000,000 performed as the prime. The other two projects may be design/build or construction services projects but must have a minimum cost of $3,000,000 each performed as the prime that demonstrates knowledge and past experience relating to the work described previously. Include a brief description and identify the capacity the firm worked on the project, the risks associated with execution of the work and how those risks were mitigated, the contract type (list “by task order” if IDIQ), contract or task order value, percent complete or date completed, name and title of customer point of contact and point of contact current phone number.
5.3 The offeror may provide a supplemental narrative (not project lists), not to exceed two pages, explaining how any corporate experience that is not directly related to the specific projects above is applicable to this project and how the Government will benefit. The following information may be considered.
5.4 The offeror should describe any previous teaming experience between current team members, if not described in the project list. Describe team members’ experience on LEED projects, if not included on the project list. Offeror may describe design-build experience on other type projects.
The above information is limited to projects that are well underway or that have been completed and turned over no longer than the past five years preceding the date of this solicitation.
5.5 EVALUATION CRITERIA:
5.5.1 The Government will evaluate the extent of recent, related experience of the prime contractor and design firms in design, construction or design-build, as relevant to their role on this project. If the design will be accomplished in-house, rather than by subcontract, then the design element of specialized experience will still be evaluated, realizing that the work is being done in-house.
Experience on the similar projects identified in the project lists will receive more consideration than experience provided in the supplemental narrative. The Government may place greater importance on projects performed as a prime contractor than as a subcontractor, depending upon overall role and relevancy considerations. Federal Government project experience will not be rated inherently more important than non-Federal Government project experience.
5.5.2 The Offeror must submit the requested information to demonstrate a record of recent, related experience in both design and construction, for the facility types (which may include similar state or local government or private counterparts) included in this contract, as described in Section 00 22 00. Recent experience includes projects well underway (see above criteria) or those completed and turned over within five (5) years of the proposal issue date for this RFP for design or construction experience. Joint Venture partners should each demonstrate experience commensurate with their role on this project or explain in the supplemental narrative how their experience qualifies them for their role on this project.
5.5.3 The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Corps of Engineers Construction Contractor (or Architect- Engineer) Appraisal Support System (CCASS/ACASS), other DOD or Government appraisal systems or to interview owners or references. The Government may check any or all cited references to verify supplied information.
5.5.4 To receive credit for extent (amount) of experience, the Offeror and its proposed design firm(s) shall demonstrate a history of recent, relevant experience. A firm will not receive credit under this factor for the relevant experience of key personnel proposed for this project.
5.5.5 The Government will consider extent of recent experience, degree of relationship of such experience to this project, demonstrated familiarity with applicable codes and local conditions.
Some examples of relevancy to this project may include, but not be limited to:
(1) Number, size, type work, complexity, location
(2) Dates (well under way or completed no more than 5 years preceding date of Solicitation)
(3) Firm's role and extent of work self-performed (brokering out all work and simply “pouring the sidewalks” on a cited project are examples of less relevant experience)
5.5.6 Previous design-build experience is not necessary for an acceptable rating. The Government may consider previous D-B experience a strength, even if the experience is on different type projects than this project. Similarly, the Government may consider previous recent teaming experience among the team members as value added, even if on different type design and/or construction projects than this project. The more relevant the experience, the more credit will be given.
5.5.7 The firm(s) preparing the design must demonstrate qualifications and experience in sustainable design and development and design, based on project experience on projects that have achieved US Green Building Council’s LEED certification or were certifiable at LEED silver or better or project experience on completed Corps of Engineers design-build projects that were validated as having achieving LEED silver rating for an acceptable rating. Additional consideration will be given if both the constructor and the design firm(s) demonstrate qualifications and experience on
LEED.
6.0 TAB C – FACTOR 2 - PAST PERFORMANCE
6.1 SUBMISSION REQUIREMENTS:
6.2…