AMENDMENT NO. 0003 Multiple Award Task Order Contract (MATOC) for Maintenance, Repair, & Restoration (MRR) W912BV-09-R-1008 Various Locations, Kansas, Oklahoma, and Texas
AMENDMENT OF SOLICITATION
1. CONTRACTOR ID CODE
NOT APPLICABLE (NA) PAGE 1 OF 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If Applicable)
0003 25 FEB 2009 NA NA
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE
DISTRICT ENGINEER
TULSA DISTRICT, CORPS OF ENGINEERS
1645 SOUTH 101ST EAST AVENUE
TULSA, OK 74128-4609
NA
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (%) 9A. AMENDMENT OF SOLICITATION NO.
W912BV-09-R-1008
% 9B. DATED (SEE ITEM 11)
3 February 2009
10A. MODIFICATION OF CONTRACT/ORDER NO.
NA
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE NA
11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS
x The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
NA
NA 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14
(%) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not; is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
INITIAL TASK ORDER, SECTION 00010 - Delete pages 00010-1 and 00010-2 and replace with new pages 00010-1 and 00010-2 attached hereto.
NOTE: IN THIS AMENDMENT “SOLICITATION NO.”, “OFFER”, AND “OFFEROR” MEAN “INVITATION NO.”, “BID”, AND “BIDDER”, RESPECTIVELY Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as hertofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
NA
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
NA NA
(Signature of person authorized to sign) (Signature of person authorized to sign)
NSN 7540-01-162-8070 30-105-02 STANDARD FORM 30 (REV. 10-8)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
TASK ORDER PROPOSAL SCHEDULE
KEYSTONE FLOOD DAMAGE REPAIR 2009 & ARCADIA EROSION REPAIR 2009
Item Estimated Unit No. Description Quantity Unit Price Amount
Revised by Amd 0003 00010-1
KEYSTONE – NORTH BANK
1. Site Work 1 LS $________ $_________
2. 30-Inch Riprap, Area A 1,700 Ton $________ $_________
3. 30-Inch Riprap, Area B 3,700 Ton $________ $_________
4. Sidewalk Length A 130 LF $________ $_________
5. Sidewalk Length B 500 LF $________ $_________
6. Sidewalk Length C 350 LF $________ $_________
7. Ramp Replacement 180 LF $________ $_________
8. Handrail Replacement 60 LF $________ $_________
9. Grout Stairs 1 LS $________ $_________
10. Area C Confluence Repair 1 LS $________ $_________
11. 30-Inch Riprap, Area C 300 Ton $________ $_________
12. Area D Repair 1 LS $________ $_________
KEYSTONE – SOUTH BANK
13. Site Work 1 LS $________ $_________
14. 30-Inch Riprap, Area 1 170 Ton $________ $_________
15. 30-Inch Riprap, Area 2 3,250 Ton $________ $_________
16. 30-Inch Riprap, Area 3 750 Ton $________ $_________
17. 30-Inch Riprap, Area 4 1,250 Ton $________ $_________
18. Replace Sidewalk, Area 5 40 LF $________ $_________
ARCADIA
19. Reshape Existing Channel 1 LS $________ $_________
20. Random Fill 2,350 CY $________ $_________
21. 6-Inch Bedding 1,050 Ton $________ $_________
22. 24-Inch Riprap 2,850 Ton $________ $_________
TASK ORDER PROPOSAL SCHEDULE
KEYSTONE FLOOD DAMAGE REPAIR 2009 & ARCADIA EROSION REPAIR 2009
Item Estimated Unit No. Description Quantity Unit Price Amount
Revised by Amd 0003 00010-2
23. Turf 2,420 SY $________ $_________
TOTAL PROPOSAL $________________
CY = Cubic Yard LF = Linear Foot LS = Lump Sum SY = Square Yard
PROPOSAL SCHEDULE NOTES
1. All costs for items of work which are not listed separately in the
Proposal Schedule or specifically mentioned to be included in a particular item price shall be included in the listed item price most closely associated with the work involved.
2. This solicitation requires submission of a proposal on all items.
Failure to do so will result in the proposal being rejected without further consideration.