08r2016.pdf

PDF 4 MB Posted

Attached to
Base Operations Ramp, Sheppard Air Force Base, Texas Federal contract opportunity
Solicitation number
W912BV-08-R-2016
Issued by
Department of the Army Corps of Engineers Engineering District Tulsa

About this file

W912BV-08-R-2016 Base Operations Ramp

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Ramp, Sheppard Air Force Base, Texas, newest first.
File Type Posted
Amended drawings info.txt TXT text file
AM1plans.zip ZIP file
am1.pdf PDF
08r2016.zip ZIP file
Opening Drawings.txt TXT text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No.: W912BV-08-R-2016

US Army Corps of Engineers

BASE OPERATIONS RAMP

Sheppard Air Force Base Wichita Falls, Texas

THIS IS A COMPETITIVE REQUEST FOR PROPOSAL

The seal appearing on this document was authorized by STANLEY M. HERRIN

Il. License no. 062-037434 on July 2, 2008 License expires 11-30-09

VOLUME 1 DIVISION 00 - 01

Prepared by:

Crawford, Murphy & Tilly, Inc.

Springfield, IL

The seal appearing on this document was authorized by JASON E. FRANK Tx. License no. 87979 on July 2, 2008

License expires 12-31-08

J uly 2008

INFORMATION

For information regarding site conditions contact Mr. Rick West, Resident Engineer, Fort Sill Resident Office, US Army Corps of Engineers, P.O. Box 33159, Fort Sill, OK, 73503-0159;

Telephone: 580-355-6148.

For technical information regarding plans and specifications contact Tulsa District 0ffice, Corps of Engineers, Tulsa, Oklahoma, Telephone:

918-669-7317, Mr. Frank Ostrowski.

For information regarding bidding procedures, bonds, contact Contracting Division, Melinda Fair, Tulsa, Oklahoma, Telephone: 918- 669-7135.

NOTE FOR OFFERORS: Solicitation/proposal packages will not be provided. All technical and engineering data, including amendments to this solicitation, will be distributed using the FedBizOpps system located at https://www.fbo.gov

No additional media (CD ROMS, Floppy Disks, Faxes, or paper) will be provided unless the Government determines that it is necessary. It is the offerors responsibility to check FedBizOpps daily for changes to this solicitation (amendments).

Collect calls not accepted.

ckd https://www.fbo.gov

BASE OPERATIONS RAMP SHEPPARD AFB, TX

TABLE OF CONTENTS

DIVISION 00 – PROPOSAL REQUIREMENTS, CONTRACT FORMS, AND CONDITIONS OF THE

CONTRACT

00010 SOLICITATION, OFFER AND AWARD (SF 1442), AND PROPOSAL

SCHEDULE

00050 PROJECT DESCRIPTION – SCOPE OF WORK

00100 INSTRUCTION, CONDITIONS & NOTICES TO OFFERORS

00110 PROPOSAL PREPARATION, EVALUATION, AND CONTRACT AWARD

00600 REPRESENTATIONS AND CERTIFICATIONS

00700 CONTRACT CLAUSES

00800 SPECIAL CONTRACT REQUIREMENTS

DIVISION 01 – GENERAL REQUIREMENTS

01 04 00 COORDINATION, FIELD ENGINEERING, AND MEETINGS

01 10 00 SAFETY

01 30 60 BACKGROUND CHECKS FOR CONTRACTOR PERSONNEL – SHEPPARD AFB,

TX

01 32 01.00 10 PROJECT SCHEDULE

01 33 00.00 10 SUBMITTAL PROCEDURES

01 33 29 LEED(TM) DOCUMENTATION

01 44 00 CONTRACTOR QUALITY CONTROL

01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS)

01 50 02.00 10 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

01 57 20.00 02 ENVIRONMENTAL PROTECTION

01 58 00.00 10 BULLETIN BOARD, PROJECT SIGN, AND SAFETY SIGN

01 60 00.00 50 MATERIAL AND EQUIPMENT

01 62 35 RECYCLED / RECOVERED MATERIALS

01 70 00.00 10 CONTRACT CLOSEOUT

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

DIVISION 02 – EXISTING OPERATIONS

02 41 00 DEMOLITION

DIVISION 03 – CONCRETE

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

03 40 00.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

DIVISION 26 – ELECTRICAL

26 05 19.00 10 INSULATED WIRE AND CABLE

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 55 53.00 10 EXTERIOR LIGHTING

26 56 20.00 10 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS

i

BASE OPERATIONS RAMP SHEPPARD AFB, TX

ii

DIVISION 31 – EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 01 13 BITUMINOUS FOG SEAL COAT

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS

32 11 10 DRAINAGE LAYER

32 11 23 GRADED-CRUSHED AGGREGATE BASE COURSE

32 11 30 LIME TREATED SUBGRADE

32 11 37.00 CONTROLLED LOW-STRENGTH MATERIAL (CLSM)

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 15 HOT-MIX ASPHALT (HMA) FOR AIRFIELDS

32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS

32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS

32 17 24.00 10 PAVEMENT MARKINGS

32 92 19 SEEDING

32 92 23 SODDING

DIVISION 33 – UTILITIES

33 05 23.19 TRENCHLESS EXCAVATION USING MICROTUNNELING

33 11 00 WATER DISTRIBUTION

33 40 00 STORM DRAINAGE UTILITIES

33 46 16 SUBDRAINAGE SYSTEM

33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

DIVISION 34 – TRANSPORTATION

34 73 13 MOORING AND GROUNDING POINTS FOR AIRCRAFT

SECTION 00010

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W912BV-08-R-2016

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

29 July 2008

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

7. ISSUED BY CODE 8. ADDRESS OFFER TO

Department of the Army Corps of Engineers Tulsa District

The Contracting Officer Tulsa District, Corps of Engineers Attn: Contracting Division 1645 South 101st East Avenue Tulsa, OK 74128-4609

9. FOR INFORMATION

CALL: A. NAME

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

BASE OPERATIONS RAMP

SHEPPARD AFB, TEXAS

Approximate Value: $5,000,000 to $10,000,000

DIRECTIONS FOR SUBMITTING BIDS:

ENVELOPES CONTAINING BIDS, GUARANTEE, ETC. MUST BE SEALED, MARKED, AND ADDRESSED AS FOLLOWS:

MARK ENVELOPE: "BID UNDER SOLICITATION NO. W912BV-08-R-2016 TO BE OPENED AT 11:00 AM 29 AUG 08

RECEIPT OF AMENDMENTS NOS ACKNOWLEDGED"

ADDRESS BIDS TO: SEE BLOCK 8 ABOVE

HAND-CARRIED BIDS:

HAND-CARRIED BIDS PRIOR TO 10:30 A.M. MUST BE DEPOSITED IN THE "BID DEPOSITORY" IN ROOM 350. 1645 SOUTH

101ST EAST AVENUE, TULSA, OK 74128.

HAND-CARRIED BIDS AFTER 10:30 A.M. MUST BE DEPOSITED IN THE "BID DEPOSITORY" IN DESIGNATED BID OPENING ROOM PRIOR TO THE TIME STATED FOR OPENING OF BIDS

(FAR 14.401)

11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. *(See Section 00800-Special Contract Requirements.)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and * copies to perform the work required are due at the place specified in Item 8 by 11:00 am local time 29 Aug 2008. *(See

Section 00110) If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required. Bid guarantee is required with any bid in excess of $25,000.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D.

Failure to insert any number means the offeror accepts the minimum in Item 13D.)

A

MOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified) ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contact award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD

DATE

Sheppard AFB Base Ops Ramp SAFB

PROPOSAL SCHEDULE

Item Unit No. Description Quantity Unit Price Amount_________

BASE PROPOSAL

1. All Work shown in the Plans as Base Proposal unless listed Separately Lump Sum Job xxx $______________

2. Base Proposal Concrete 10,208.0 CY $________ $______________ (See Note 6)

3. Base Proposal Hot-Mix Asphalt (See Note 6) 1,217.0 TON $________ $______________

TOTAL BASE PROPOSAL $______________

OPTIONAL PROPOSAL ITEMS

4. Option 1 - Compression Joint Seals for Concrete Pavement shown in the plans as Base Proposal (See Note 6) Lump Sum Job xxx $______________

5. Option 2 – Additional Ramp Pavement Shown in the Plans as Option 2

a. All Work unless listed Separately (See Note 6) Lump Sum Job xxx $______________

b. Option 2 Concrete (See Note 6) 3,963.0 CY $________ $______________

c. Option 2 Hot-Mix Asphalt (See Note 6) 203.0 TON $________ $______________

SUB-TOTAL OPTION 2 $______________

6. Option 3 - Compression Joint Seals for Concrete Pavements shown in the plans as Option 2 (See Note 6) Lump Sum Job xxx $______________

TOTAL OPTIONAL ITEMS $______________

TOTAL BASE PROPOSAL & OPTIONAL ITEMS $______________

00010-3

PROPOSAL SCHEDULE NOTES

1. All quantities are estimated except where the unit is given as job.

2. Offerors shall propose on all items.

3. SPECIAL PROPOSAL CONDITIONS

If a modification to a proposal based on unit prices is submitted which provides for a lump-sum adjustment tot the total estimated cost, the application of the lump-sum adjustment to each unit price in the Proposal Schedule must be stated. If it is not stated, the offeror agrees that the lump-sum adjustment shall be applied on a pro rata basis to every unit price in the Proposal Schedule.

4. Arithmetic Discrepancies (EFARS 14.406-2)

a. For the purpose of initial evaluation of proposals, the following will be utilized in resolving arithmetic discrepancies found on the face of the Proposal Schedule as submitted by offerors:

(1) Obviously misplaced decimal points will be corrected;

(2) Apparent errors in addition of lump-sum and extended prices will be corrected.

b. For the purpose of proposal evaluation, the Government will proceed on the assumption that the offeror intends his proposal to be evaluated on the basis of the unit prices, extensions, and total arrived at by resolution of arithmetic discrepancies as provided above and the proposal will be so reflected on the abstract of proposals.

5. AWARD

Only one contract will be awarded under this solicitation.

6. PROPOSAL ITEMS 2, 3, 4, 5, and 6

a. Proposal Item 1 consists of all work associated with the work shown in the Plans as Base Proposal, including but not limited to earthwork, lime modified subgrade, base course, prime coat, tack coat, drainage layer, tie downs, utility improvements, pavement marking, high mast lights, airfield lighting, subdrains, storm sewers, field molded sealants for joints in rigid pavement (Section 32 01 19) and additional work as required except the PC Concrete Pavement and Hot Mix Asphalt are not included in this Item.

b. Proposal Item 2 consists of PC Concrete Pavement for Airfields covered by Section 32 12 11 and shown in the Plans as Base Proposal. Concrete covered by Division 03 shall not be included in the cost for Proposal Item 2.

c. Proposal Items 3 consists of Hot Mix Asphalt covered by Section 32 12

15 and shown in the plans as Base Proposal. The costs for prime and tack coat, covered by Section 32 12 10, shall not be included in proposal Item 3.

00010-4

d. Proposal Item 4 consists of the additional cost to provide Compression Joint Seals for Concrete Pavements covered by Section 32 13 73 in lieu of Field Molded Sealants for Sealing Joints in Rigid Pavements covered by 32 01 19 for the work shown in the Plans as Base Proposal.

e. Proposal Item 5 consists of all work associated with the work shown in the Plans as Option 2.

Item 5a includes earthwork, lime modified subgrade, base course, prime coat, tack coat, drainage layer, tie downs, pavement marking, subdrains, storm sewers, field molded sealants for joints in rigid pavement (Section 32 01 19) and additional work as required except the PC Concrete Pavement and Hot Mix Asphalt are not included in this Item.

Item 5b consists of PC Concrete Pavement for Airfields covered by

Section 32 12 11. Concrete covered by Division 03 shall not be included in the cost for Proposal Item 5b.

Item 5c consists of Hot Mix Asphalt covered by Section 32 12 15.

The costs for prime and tack coat, covered by Section 32 12 10, shall not be included in proposal Item 5c.

f. Proposal Item 6 consists of the additional cost to provide Compression

Joint Seals for Concrete Pavements covered by Section 32 13 73 in lieu of Field Molded Sealants for Sealing Joints in Rigid Pavements covered by 32 01 19 for the work shown in the Plans as Option 2.

7. OPTIONAL PROPOSAL ITEM DESCRIPTIONS

Optional Proposal items shall be as shown on the drawings and described in

Section 00050.

8. EVALUATION OF OPTIONS

The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the Base Proposal. (Total Base Proposal and Optional Proposal items.) Evaluation of options will not obligate the Government to exercise the options.

9. AWARD OF OPTIONAL PROPOSAL ITEMS

a. Options 1, 2 and 3 may, at the option of the Government, be awarded at the time of contract award or may be exercised at any time from the date of contract award until 90 days after issue of Notice to proceed.

All options or any combination thereof may be exercised by the Government.

b. Proposal Item 6 (Option 3) will only be awarded if Item 5, Option 2, Additional Ramp Pavement, is awarded.

00010-5

00010-6

CAUTION TO OFFERORS

All information required by the terms of the Solicitation must be furnished. MISTAKES OR OMISSIONS CAN BE COSTLY. Important items for you to check are included in but not limited to, those listed below. This checklist is furnished only to assist you in submitting a proper offer.

Check as you read.

( ) Have you acknowledged all amendments?

( ) Have you completed the "Representations and Certifications?"

( ) Is your offer properly signed?

( ) If a bid guarantee is required, is it included with your offer?

(A late bid guarantee is treated the same as a late offer.)

( ) Is your bid guarantee in the proper amount? (Usually 20 percent of total price.)

( ) If your bid guarantee is in the form of a bid bond, is the bond properly signed by both the bidder and surety and are all required seals affixed?

( ) Is the name in which you submitted the offer the same on your offer as on bid bond?

( ) If required, have you entered a unit price in for each bid item?

(The Solicitation will specifically state when this is necessary.)

( ) Are decimals in unit prices in the proper places? Are your figures legible?

( ) Are the extensions of your unit prices, and your total price correct?

( ) Are all erasures or corrections initialed by the person signing the offer?

( ) Have you not restricted your offer by altering the provisions of the Solicitation?

( ) Is the envelope containing your offer properly identified that it is a sealed offer and does it contain the correct Solicitation number and bid opening time?

SECTION 00050 PAGE 1

SECTION 00050

PROJECT DESCRIPTION - SCOPE OF WORK

1 GENERAL

1.1 GENERAL

This project consists of a competitive negotiation procurement process to obtain construction for the Base Operations Ramp at Sheppard Air force Base. The procurement process includes the following:

Selection of one Contractor based on a Management and Cost proposal.

Proposals will be evaluated simultaneously on the categories of management qualifications and contract price through the use of an adjectival rating system. Offerors will be furnished the evaluation criteria as part of this Request for Proposal (RFP). This is not a low-bid award project. If awarded the contract, the offeror shall construct the project as required by the contract documents.

All offerors shall submit a lump-sum, fixed-price cost proposal as outlined in SECTION 00110 - PROPOSAL PREPARATION, EVALUATION AND CONTRACT AWARD.

1.2 GENERAL SCOPE OF WORK

Construct new Ramp in front of the Base Operations Building. The Base bid includes demolition, embankment, subgrade preparation, storm sewers, subdrains, pavement marking, airfield lighting, utility relocation, new airfield ducts, high mast lighting, water main, “Red Carpet” brick walkway, Hot Mix Asphalt shoulders, tie downs, sodding, seeding, SWPPP, PC Concrete Pavement for Airfields, and field molded sealants for sealing joints in rigid pavements, shown in the plans. Option 1 consists of the additional cost to provide compression joint seals for concrete pavements in lieu of field molded sealants for work shown as Base Proposal. Option 2 includes embankment, subgrade preparation, storm sewers, subdrains, pavement marking, Hot Mix Asphalt shoulders, tie downs, seeding, sodding, PC Concrete Pavement for Airfields, and field molded sealants for sealing joints in rigid pavements, shown in the plans. Option 3 consists of the additional cost to provide compression joint seals for concrete pavements in lieu of field molded sealants for work shown as Option 2.

2 PRODUCTS (NOT APPLICABLE)

3 EXECUTION (NOT APPLICABLE)

End of Section

00100-i W912BV-08-R-2016

SECTION 00100

INDEX OF CLAUSES

1. PREPROPOSAL CONFERENCE

2. 52.204-6 Data Universal Numbering System (DUNS) Number APR 2008

3. 52.204-7 Central Contractor Registration APR 2008

4. 52.214-34 Submission Of Offers In The English Language APR 1991

5. 52.214-35 Submission Of Offers In U.S. Currency APR 1991

6. 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Business Concerns JUL 2005

7. 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction FEB 1999

8. 52.225-10 Notice of Buy American Act Requirement--Construction Materials

MAY 2002

9. 52.225-12 Notice of Buy American Act Requirement - Construction Materials Under Trade Agreements JAN 2005

10. 52.228-14 Irrevocable Letter of Credit DEC 1999

11. 52.228-15 Performance and Payment Bonds--Construction NOV 2006

12. 52.0000-4023 BIDDER'S QUALIFICATIONS (APR 1984) (FAR 9.1)

13. 52.0000-4025 PERFORMANCE OF WORK BY CONTRACTOR

14. 52.0000-4515 SECURITY CONTRACT LANGUAGE FOR ALL CORPS OF ENGINEERS'

UNCLASSIFIED CONTRACTS (JUL 2008)

15. 52.211-2 AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA ITEM

DESCRIPTIONS LISTED IN THE ACQUISITION STREAMLINING AND

STANDARDIZATION INFORMATION SYSTEM (ASSIST) (JAN 2006)

16. 52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY

PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

17. 52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)

18. 52.216-1 TYPE OF CONTRACT (APR 1984)

19. 52.228-1 BID GUARANTEE (SEP 1996)

20. 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

21. 52.233-2 SERVICE OF PROTEST (SEP 2006)

22. 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

23. 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)

24. 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

25. 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

00100-1 W912BV-08-R-2016

SECTION 00100

BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

1. PREPROPOSAL CONFERENCE

The Pre-Proposal Conference will be held Thursday, August 14, 2008, at Sheppard AFB. Those wishing to attend must provide their full name and Date of Birth. Attendees shall be transported by Bus to the Pre-Proposal Conference and Site Visit from the Atwood's parking lot at 9:00 a.m. CST, August 14, 2008. The address is: Atwood's, 2047 Loop 11, Wichita Falls, TX, 76306. A valid state drivers license with photo or a government ID with photo shall be required for entry onto the Bus and Base. The bus shall depart Atwood's at 9:15 AM. The bus shall return attendees to Atwood's approximately 11:45 a.m. CST. Carry-on shall be limited to plans and notepads. No brief cases or cameras will be allowed on the bus. No photographs shall be taken during the duration of the conference and site visit.

The purpose of the conference will be to familiarize prospective offerors with the extent and nature of the project. The conference will begin with an introductory session in the conference room followed by a tour of the site. Oral questions pertaining to the scope of work or other contractual matters will not be entertained during the tour. Questions of this nature must be prepared in writing on sheets provided by the Government representatives or on your company letterhead which will be answered in a forthcoming amendment.

Following the preproposal conference, written responses to all questions received at the conference will be provided to each firm which has obtained a copy of the RFP and which has not submitted a "No-Bid" notice. These answers will be set forth in an amendment to the RFP and will constitute the official Government answer. Prospective offerors are urged to attend the preproposal conference in order to observe all conditions that may affect the cost and schedule of performance of the contract. Failure to attend the preproposal conference or to observe conditions shall not be grounds for a claim after award of contract.

NOTE: Prospective offerors who plan to attend the conference MUST provide, by facsimile, a list of names and titles of representatives, not to exceed three (3) per offeror, who will attend the conference NO LATER THAN ll: 00 a.m. CST, Monday August 11, 2008. The list should be transmitted to MELINDA FAIR, fax number, 918-669-7495.

FOREIGN NATIONALS WILL REQUIRE PRIOR CLEARANCE.

CLAUSES INCORPORATED BY REFERENCE

2. 52.204-6 Data Universal Numbering System (DUNS) Number APR 2008

3. 52.204-7 Central Contractor Registration APR 2008

4. 52.214-34 Submission Of Offers In The English Language APR 1991

5. 52.214-35 Submission Of Offers In U.S. Currency APR 1991

6. 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns JUL 2005

00100-2 W912BV-08-R-2016

7. 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction FEB 1999

8. 52.225-10 Notice of Buy American Act Requirement--Construction Materials

MAY 2002

9. 52.225-12 Notice of Buy American Act Requirement - Construction Materials Under Trade Agreements JAN 2005

10. 52.228-14 Irrevocable Letter of Credit DEC 1999

11. 52.228-15 Performance and Payment Bonds--Construction NOV 2006

CLAUSES INCORPORATED BY FULL TEXT

12. 52.0000-4023 BIDDER'S QUALIFICATIONS (APR 1984) (FAR 9.1)

Before a bid is considered for award, the bidder may be requested by the Government to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial resources, and plant available to be used in performing the work.

13. 52.0000-4025 PERFORMANCE OF WORK BY CONTRACTOR

Unless he has submitted such description with his bid, the successful bidder must furnish the Contracting Officer within l4 calendar days after award a description of the work which he intends to perform with his own organization (e.g., earthwork, paving, brickwork, or roofing), the percentage of the total work this represents, and the estimated cost thereof. (See Section 00800 clause entitled "Performance of Work by Contractor.")

14. 52.0000-4515 SECURITY CONTRACT LANGUAGE FOR ALL CORPS OF ENGINEERS'

UNCLASSIFIED CONTRACTS (JUL 2008)

A. AUTOMATED INFORMATION SYSTEM (AIS) EFFORT

All Contractor employees (U.S. citizens and Non- U.S. citizens) working under this contract (to include grants, cooperative agreements and task orders) who require access to Automated Information Systems (AIS), (stand alone computers, network computers/systems, e-mail) shall, at a minimum, be designated into an ADP-III position (non-sensitive) in accordance with DoD 5220-22-R, Industrial Security Regulation. The investigative requirements for an ADP-III position are a favorable National Agency Check (NAC), SF-85P, Public Trust Position. The contractor shall have each applicable employee complete a SF-85P and submit to the Contracting Officer Representative (COR) within three (3) working days after award of any contract or task order, and shall be submitted prior to the individual being permitted access to an AIS.

Contractors that have a commercial or government entity (CAGE) Code and Facility Security Clearance through the Defense Security Service shall process the NACs and forward visit requests/results of NAC to the COR. For those contractors that do not have a CAGE Code or Facility Security Clearance, the contractor is responsible for providing a background check as follows:

00100-3 W912BV-08-R-2016

1. PROVIDE A BACKGROUND CHECK, FOR EACH CONTRACT EMPLOYEE SCHEDULED TO

WORK UNDER THE CONTRACT FOR LESS THAN SIX (6) MONTHS, TO THE CONTRACTING

OFFICER REPRESENTATIVE (COR).

2. PROVIDE A BACKGROUND CHECK, FOR EACH CONTRACT EMPLOYEE SCHEDULED TO

WORK UNDER THE CONTRACT FOR MORE THAN SIX (6) MONTHS TO THE COR. CONDUCT A

BACKGROUND INVESTIGATION (BI) THROUGH THE DEFENSE SECURITY SERVICE (DSS) ON

ALL EMPLOYEES THAT ARE SCHEDULED TO WORK UNDER THE CONTRACT FOR LONGER THAN

SIX (6) MONTHS.

3. ONCE THE CONTRACTOR RECEIVES A RESPONSE FROM THE DSS ON THE STATUS OF

THE INVESTIGATION ON EACH INDIVIDUAL, THE CONTRACTOR SHALL FORWARD THAT

INFORMATION TO THE COR.

4. EACH CONTRACTOR WILL CONTACT THE DEFENSE SECURITY SERVICE,

1-888-282-7682 FOR GUIDANCE ON OBTAINING A BACKGROUND INVESTIGATION FOR

THEIR EMPLOYEES.

B. FOREIGN NATIONALS

In accordance with Engineering Regulation, ER 380-1-18, Section 4, foreign nationals who work on Corps of Engineers' contracts or task orders shall be approved by the HQUSACE Foreign Disclosure Officer or higher before beginning work on the contract/task order. This regulation includes subcontractor employees. (NOTE: exceptions to the above requirement include foreign nationals who perform janitorial and/or ground maintenance services.) The contractor shall submit to the COR the names of all foreign nationals proposed for performance under this contract/task order, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B).

Classified contracts require the issuance of a DD Form 254 (Department of Defense Contract Security Classification Specification).

15. 52.211-2 AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA ITEM

DESCRIPTIONS LISTED IN THE ACQUISITION STREAMLINING AND

STANDARDIZATION INFORMATION SYSTEM (ASSIST) (JAN 2006)

(a) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:

(1) ASSIST (http://assist.daps.dla.mil);

(2) Quick Search (http://assist.daps.dla.mil/quicksearch);

(3) ASSISTdocs.com (http://assistdocs.com).

(b) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by--http://assist.daps.dla.mil http://assistdocs.com http://assist.daps.dla.mil/quicksearch

00100-4 W912BV-08-R-2016

(1) Using the ASSIST Shopping Wizard (http://assist.daps.dla.mil/wizard);

(2) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or

(3) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone (215) 697-2667/2179, Facsimile (215) 697-1462.

(End of provision)

16. 52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY

PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

Any contract awarded as a result of this solicitation will be ___ DX rated order; (XX) DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.

(End of provision)

17. 52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)

(a) Definitions. As used in this provision--

"Discussions" are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.

"In writing or written" means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

"Proposal modification" is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

"Proposal revision" is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

"Time", if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the http://assist.daps.dla.mil/wizard

00100-5 W912BV-08-R-2016

proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.

(2) The first page of the proposal must show--

(i) The solicitation number;

(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and

(v) Name, title, and signature of person authorized to sign the proposal.

Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.

(3) Submission, modification, or revision, of proposals.

(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.

(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--

(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or

(3) It is the only proposal received.

(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

00100-6 W912BV-08-R-2016

(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals.

Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.

(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.

(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S.

dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.

(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.

(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.

(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.

(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).

(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall--

(1) Mark the title page with the following legend: This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed--in whole or in part--for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of--or in connection with-- the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and

(2) Mark each sheet of data it wishes to restrict with the following legend:

Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

00100-7 W912BV-08-R-2016

(f) Contract award. (1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.

(2) The Government may reject any or all proposals if such action is in the Government's interest.

(3) The Government may waive informalities and minor irregularities in proposals received.

(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.

(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government's best interest to do so.

(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.

(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.

(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.

(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

(i) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.

00100-8 W912BV-08-R-2016

(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.

(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.

(iv) A summary of the rationale for award.

(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.

(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.

(End of provision)

18. 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Priced contract resulting from this solicitation.

(End of provision)

19. 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and

(2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be ________ percent of the bid price or $________, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of clause)

00100-9 W912BV-08-R-2016

Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

(End of clause)

21. 52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Chief, Contracting Division, 1645 South 101st East Avenue, Tulsa, Oklahoma 74128-4609.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

22. 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

SEE PARAGRAPH ENTITLED "PREPROPOSAL CONFERENCE" LOCATED AT THE FRONT OF

THIS SECTION 00100

(c) Participants will meet at ---- SEE (b) ABOVE

(End of provision)

23. 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)

(a) Proposals must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a proposal must initial each erasure or change appearing on any proposal form.

(b) The proposal form may require offerors to submit proposed prices for one or more items on various bases, including--

(1) Lump sum price;

(2) Alternate prices;

(3) Units of construction; or

(4) Any combination of paragraphs (b)(1) through (b)(3) of this provision.

20. 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

00100-10 W912BV-08-R-2016

(c) If the solicitation requires submission of a proposal on all items, failure to do so may result in the proposal being rejected without further consideration. If a proposal on all items is not required, offerors should insert the words "no proposal" in the space provided for any item on which no price is submitted.

(d) Alternate proposals will not be considered unless this solicitation authorizes their submission.

(End of provision)

24. 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://www.arnet.gov/far http://farsite.hill.af.mil http://www.dtic.mil/dfars

(End of provision

25. 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(iv) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of provision) http://www.arnet.gov/far http://farsite.hill.af.mil http://www.dtic.mil/dfars

SECTION 00110 PAGE 1

SECTION 00110

PROPOSAL PREPARATION, EVALUATION, AND CONTRACT AWARD

PART 1 – GENERAL

This section covers the requirements for preparation of proposals, the criteria used to evaluate proposals, and contract award.

Proposals will be evaluated in four areas (Management, Past Performance, Technical, and Cost) by a Source Selection Evaluation Board (SSEB). The SSEB will be composed of Corps of Engineers and Sheppard Air Force Base personnel. Identities of SSEB members are confidential and members will not be available for contact or discussion prior to submission of proposals.

All evaluation factors (other than cost or price), when combined, are more important than the cost or price.

1.1 WHERE AND WHEN TO SUBMIT PROPOSAL

Proposals are due as indicated on the Solicitation, Offer and Award form

(Standard Form 1442) found in Section 00010, SOLICITATION, OFFER, AND

AWARD.

1.2 INQUIRIES ABOUT THIS REQUEST FOR PROPOSALS (RFP)

Inquiries about this RFP shall be directed to the individuals listed on the inside of the Cover Sheet, Volume 1.

1.3 PROPOSAL PREPARATION SUMMARY

Instructions for the preparation and organization of each area of the complete proposal are included herein. The proposal shall be submitted as summarized below and as required by the specifications.

a. Volume I – Management Proposal.

(1) Offeror Experience.

(2) Project Organization and Personnel.

(3) Management Control Systems, Implementation, and Past Success.

(4) Utilization of Small and Small Disadvantaged Businesses.

(5) Historical Cost and Schedule Growth.

b. Past Performance (To be tabbed separately and included in Volume I).

c. Volume II – Technical Proposal.

(1) Project Schedule.

d. Volume III - Cost/Price Proposal.

(1) Standard Form 1442.

(2) Proposal Schedule.

SECTION 00110 PAGE 2

(3) Representation & Certifications.

(4) Bid Bond.

(5) Cost Breakout by CSI Divisions.

1.4 MANAGEMENT PROPOSAL (VOLUME I)

1.4.1 Content

The Management area of the proposal shall include the information as described below and shall be presented in the sequence listed.

a. Offeror Experience.

(1) Experience. Demonstrate the experience of the team to successfully complete construction of this facility. This section may be in any format but must, however, as a minimum, provide the following:

(a) A list of relevant construction projects, currently underway or completed in the last 5 years, that best demonstrates your experience with this type project. List no more than 10 projects total. The list of projects shall include the following information:

Project Name and Location.

Nature of Firm’s Responsibility (relating to construction).

Project Owner’s Name and Address and Project Manager’s (Point of Contact) Name and Phone Number.

Project Completion Date (actual or estimated).

Overall Size of Facility (in square feet or square meters).

Construction Cost.

Duration of Construction.

(b) For each listed project, provide a brief statement (not to exceed 150…