W44XGQ80652719
MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) (INDEFINITE DELIVERY/INDEFINITE QUANTITY) IDIQ FOR ELECTRICAL, PLUMBING, AND GENERAL CONSTRUCTION SERVICES, LAKE TEXOMA, OKLAHOMA AND TEXAS
APPROXIMATE VALUE: $250,000-$500,000
NOTE: THIS SOLICITATION IS SET ASIDE FOR SMALL BUSINESS CONTRACTORS
BRENDA K ANDERSON 918-669-7274
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
28-May-2008
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______10 calendar days and complete it within ________ calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section 00800
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ 4 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 27 Jun 2008 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIV
USAED, TULSA 1645 S 101 E AVE
TULSA OK 74128-4609
W912BV
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
11:00 AM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX: TEL: TEL: FAX:
W912BV-08-R-1002 68
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912BV-08-R-1002
CAUTION TO OFFERORS
All information required by the terms of the Solicitation must be furnished. MISTAKES OR OMISSIONS CAN BE COSTLY. Important items for you to check are included in but not limited to, those listed below. This checklist is furnished only to assist you in submitting a proper offer. Check as you read.
( ) Have you acknowledged all amendments?
( ) Have you completed the online "Representations and Certifications"?
( ) Is your offer properly signed?
( ) If a bid guarantee is required, is it included with your offer?
(A late bid guarantee is treated the same as a late offer.)
( ) Is your bid guarantee in the proper amount?
(Usually 20% of total price.)
( ) If your bid guarantee is in the form of a bid bond, is the bond properly signed by both the bidder and surety, and are all required seals affixed?
( ) Is the name in which you submitted the offer the same on your offer as on bid bond?
( ) If required, have you entered a unit price in for each bid item?
(The Solicitation will specifically state when this is necessary.)
( ) Are decimals in unit prices in the proper places? Are your figures legible?
( ) Are the extensions of your unit prices, and your total price correct?
( ) Are all erasures or corrections initialed by the person signing the offer?
( ) Have you not restricted your offer by altering the provisions of the Solicitation?
( ) Is the envelope containing your offer properly identified that it is a sealed offer and does it contain the correct Solicitation number and bid opening time?
PREPROPOSAL CONFERENCE
A Preproposal Conference will be held on 10 June 2008 at 1:00 p.m., at the Texoma Lake Office, located at 351 Corps Road, Denison, TX 75020. You can call 903-465-4990 for directions.
Registration will begin at 12:45 p.m. The purpose of the conference will be to familiarize prospective offerors with the extent and nature of the project and location. The conference will begin with an introductory session in the conference room. Oral questions pertaining to the scope of the work or other contractual matters will not be entertained during this time. Any questions not answered may be turned in, in writing at the end of the session.
Following the preproposal conference, confirmation of answers to all questions considered at the conference will be available to each firm which has been given a copy of the RFP. These answers will be set forth in an amendment to the RFP and will constitute the official Corps answer. The amendment will be mailed by regular postal service.
Due to the uniqueness of this specification and the management requirements, all prospective offers are strongly urged to attend the preproposal conference and to satisfy themselves as to all general conditions that may affect the cost and schedule of performance of this contract.
Prospective offerors who plan to attend the conference shall provide a list of names and titles of no more than three representatives who will attend the conference to Brenda Anderson , 918/669-7274, no later than 11:00 a.m 9 June 2008. Any questions pertaining to this RFP you may have at that time should be submitted with this list so that they can be answered at the conference.
S P E C I F I C A T I O N S
TULSA DISTRICT
MULTIPLE AWARD TASK ORDER CONTRACT (MATOC)
FOR MISCELLANEOUS ELECTRICAL, PLUMBING, AND
GENERAL CONSTRUCTION SERVICES AT
LAKE TEXOMA, OKLAHOMA AND TEXAS
ORGANIZATION OF SPECIFICATIONS
This specification consists of a general section supplemented by exhibits and technical sections. A Table of Contents is provided on the following pages.
The general section contains requirements that apply to all work to be performed under the provisions of this specification. The exhibits contain detailed listings or examples referred to in the general section and reference publications. The sections contain a description of the facilities to be serviced and the work to be performed.
Any references to paragraphs or subparagraphs in this specification will refer to those in the general section unless otherwise noted.
TABLE OF CONTENTS
GENERAL SECTION
Para.
No. Paragraph Title
1 Scope of Work
2 Definitions
3 References
4 Initiation, Execution, & Acceptance of Work
5 Personnel
6 Equipment
7 Materials and Supplies
8 Contractor Quality Control
9 Safety
10 Contractor's Facilities
11 Security
12 Prework Conference
13 Contractor Submittals
14 Billing
EXHIBITS
No. Title
1 Project Description and Information
2 References
3 Request for Proposal (RFP)
TECHNICAL SECTIONS
Section Title
001 Miscellaneous Electrical Service
1. SCOPE OF WORK. The work required under this specification provides for electrical, plumbing, and general construction services at Lake Texoma, Oklahoma and Texas.
2. DEFINITIONS.
2.1. Contracting Officer (CO). The person executing and administering this contract on behalf of the Government.
2.2. Contracting Officers Representative (COR). The person representing the Contracting Officer who is properly designated in writing by the Contracting Officer, and acting within the limits of his written authority.
2.3. Contractor Quality Control (CQC) is the contractor's system of controlling the quality of services provided under the provisions of the contract.
2.4. Deficient service is any service provided by the contractor that does not meet the requirements of the Task Order.
2.5. Government means the United States of America.
2.6. Ordering Officer. The individual authorized to issue Task Orders under this contract and will be appointed in writing by the Contracting Officer.
2.7. Project means all Government property and easements at the Lake Projects listed in Exhibit 1.
2.8. Public use area (PUA) includes parks as well as overlooks, nature and hiking trails, access points, etc.
2.9. Quality is conformance with the contract specification.
2.10. Quality assurance (QA) is the procedure by which the Government determines that CQC is functioning effectively.
2.11. Regulations refer to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.
2.12. Request for Proposal (RFPs). The form used to request proposals for required work. A scope of work will be included with this form that describes the proposed work.
2.13. Task Order is the means by which work is ordered and will be issued by a Contracting Officer or Ordering Officer.
2.14. A workday is any day, Monday through Friday, exclusive of Federal holidays. This definition should not be interpreted to mean that work is not required by this specification on other days.
3. REFERENCES. All documents referenced in this specification are hereby incorporated into this specification.
4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.
4.1. Initiation and execution of all work. The contractor shall initiate and execute all work in accordance with this specification and Task Orders issued by the Ordering Officer.
4.1.1. The Ordering Officer will initiate RFPs by providing to the three (3) contractors who have been awarded an Indefinite Delivery/Indefinite Quantity Contract for Electrical Work at the Texoma Project Office. See Section 00050 that explains what will be provided to the contractors with each Request for Proposal (RFP). The contractor will return his price proposal limited to five (5) pages.
4.1.2. The majority of task orders will be for a lump sum cost proposal for the work. Award will be made to the lowest cost price proposal received unless evaluation factors are provided.
4.1.3. If, in the opinion of the Ordering Officer, the Task Order is too costly, the scope of work may be revised or changed and an amended RFP will be requested from the contractor for another price proposal.
4.1.4. A copy of the Task Order will be furnished the contractor after signature by the Ordering Officer or Contracting Officer.
4.1.5. A Task Order shall be issued, describing the requested work on a lump sum basis, before any work is started. Under emergency situations, the Ordering Officer or the CO may give verbal authority to begin work with a Task Order furnished as soon as possible.
4.1.6. When a Task Order is issued it will contain a total price for the work. The contractor shall be paid this total price upon successful completion of the work
4.1.7. Task Orders may be modified if the cost for the project is over the estimated amount.
4.2. Acceptance of Work.
4.2.1. Upon completion of a Task Order, the contractor shall leave the work area free of construction material and debris. When work is completed, the contractor will notify the Ordering Officer or COR.
4.2.2. If the Ordering Officer notifies the contractor of deficient work the contractor shall initiate immediate action to accomplish corrective work.
4.2.3. The contractor shall notify the Ordering Officer or COR when corrective work is completed.
5. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification within the time limits specified.
5.1. Experience and skills.
5.1.1. The contractor shall provide personnel that are experienced and demonstrate proficiency in the skills required performing the various types of work specified.
5.1.2. Quality control personnel shall be knowledgeable of the work they inspect, inspection procedures, and all portions of this specification that apply to the work they inspect.
5.2. Supervision. Refer to the “Supervision and Inspection Clause”. The contractor shall provide the Ordering Officer or COR a local or toll free 24-hour telephone number in order to talk to the contractor’s supervisor or other representative having equal authority.
6. EQUIPMENT. The contractor shall furnish equipment necessary to accomplish all work required by this specification within the time limits specified.
6.1. Equipment requirements. All equipment used to perform work under this specification must be in satisfactory operating condition and comply with EM 385-1-1, Corps of Engineers Safety and Health Requirements Manual.
6.2. Vehicle operation and parking.
6.2.1. Wheeled or tracked equipment shall not be operated over riprap without approval of the Ordering Officer. Approval will not be given unless the Ordering Officer determines the riprap and related structures will not be damaged.
6.2.2. Prior to using hand- or power-operated equipment for excavation, the contractor shall verify the location of underground utilities through consultation with utility companies and review of the Government's as-built drawings.
6.3. Weight limitations. Wheel loads for vehicles and equipment on Government property shall not exceed 10,000 pounds per axle unless otherwise approved by the COR.
7. MATERIALS AND SUPPLIES.
7.1. Contractor furnished. The contractor shall furnish all materials and supplies necessary to accomplish all work required by this specification except as specified in subparagraph 7.2.
7.1.1. Material specifications. Specifications for materials and supplies are given in the technical sections of this specification. Should materials and supplies not listed in the technical sections be proposed, the contractor shall furnish with his proposal technical data, manufacturer’s catalogs, drawings, performance data, specifications and any other necessary information.
7.1.2. Warranties. The contractor shall furnish documents to the Ordering Officer necessary to execute all warranties available on materials and supplies. Upon request, the contractor shall assist the Ordering Officer in executing claims or adjustments under such warranties.
7.2. Government furnished. The Government may furnish materials and supplies associated with trade and equipment bid items. The Government will furnish other materials as specified in the technical sections. The contractor shall be responsible for transporting these items from storage or borrow sites on the project to work sites. The cost of transportation shall be borne by the contractor.
8. CONTRACTOR QUALITY CONTROL. The contractor shall establish and execute a CQC Plan in accordance with FAR Clause 52.246-12 “Inspection of Construction” to assure that all work required by this specification is completed on schedule and in accordance with the specifications given for each item of work. The results of quality control inspections conducted by the contractor shall be furnished the Ordering Officer upon request.
9. SAFETY. The contractor shall furnish the Ordering Officer a comprehensive safety plan to implement the general policies and procedures for safe operation and maintenance of the project in accordance with EM 385-1-1.
10. CONTRACTOR'S FACILITIES.
10.1. The contractor will not be provided storage space for materials and equipment needed to perform work specified in the contract. The Government shall not furnish utilities, buildings, or other improvements for use by the contractor.
10.2. The contractor may be allowed to locate temporary facilities on Government property as approved by the Ordering Officer. Security of contractor facilities, materials, and equipment is the responsibility of the contractor.
11. SECURITY. The contractor will be required to sign for keys for access to facilities. Security gates to storage and maintenance areas shall remain locked except when employees are present in the immediate area. All storage buildings, storage rooms, equipment rooms, and project buildings shall remain locked when not in use.
12. PREWORK CONFERENCE. Prior to the start of each awarded task order, the COR shall conduct a Prework Conference with the contractor to discuss the scope of work for the Task Order. As a minimum, the on-site supervisor shall represent the contractor. The COR shall establish the date and time of the Prework Conference after consultation with the contractor.
13. CONTRACTOR SUBMITTALS. The contractor shall submit the documents listed below to the COR prior to the Prework Conference. All submittals, other than copies of licenses and contracts, shall be typed and the original and one copy shall be furnished the COR. If the COR determines that any of the proposed plans or schedules does not comply with this specification, the contractor shall resubmit these documents within 1 week. Technical information shall be submitted in accordance with paragraph 7.
13.1. Names and contact information of supervisor and alternative supervisor(s) (subparagraph 5.2.).
13.2. CQC Plan (paragraph 8.).
13.3. Safety Plan (paragraph 9.).
13.4. Certificate of insurance.
14. BILLING.
14.1. The contractor shall submit the original and two copies of invoices for all work that has been completed and formally accepted by the Ordering Officer.
14.2. Invoices and supporting documents shall be delivered or mailed to the Ordering Officer identified in the Task Order. Supporting documents shall include acceptance of work, exposure reports, and payroll records.
EXHIBIT 1
PROJECT DESCRIPTIONS AND INFORMATION
Texoma Project Office
PROJECT DESCRIPTION AND INFORMATION
1. Texoma Lake is located on the Red River about 3 miles North of Denison, Texas occupying parts of Grayson, and Cooke counties in Texas and Bryan, Marshall, Johnston, and Love counties in Oklahoma.
The project office is located about 3 miles north of Denison, Texas, off of Hwy 91.
EXHIBIT 2
REFERENCES
REFERENCES
EM 385-1-1, Corps of Engineers Safety and Health Requirements, dated 3 September 1996, and subsequent amendments thereto.
NFPA 10
National Electrical Code
EXHIBIT 3
REQUEST FOR PROPOSAL
SAMPLE FORMAT
Request for Proposal No. __________
Gentlemen:
This concerns your Contract No. W912BV-___-__-_____, Multiple Award Task Order Contract for
Miscellaneous Electrical, Plumbing, and General Construction Services for the Texoma Project Office, Oklahoma and Texas.
Attached are the Scope of Work, Wage Rates, and Drawings for a proposed task order for the above-described work.
Please submit a lump sum price proposal for accomplishing the described work. The Government reserves the right to award without discussions. However is discussions are necessary, the
Government will conduct them with all contractors. I ask that you submit your proposal by
_____________________. After receiving your proposal, I will contact you only if discussions are necessary. Award will be made to the contractor with the lowest price offered. For your convenience our fax number is _____________.
Please direct all questions concerning this request for proposal to me _______________.
Sincerely, Encl _______________ SOW Ordering Officer/ Contracting Officer Representative
CF:
CESWT-OD-F_ (COR)
SECTIONS 001
SPECIFICATION FOR MISCELLANEOUS ELECTRICAL, PLUMBING AND GENERAL CONSTRUCTION SERVICES FOR THE
TEXOMA PROJECT OFFICE
1. Scope of Work:
The contractor shall furnish all labor, materials, tools and equipment necessary to perform electrical, plumbing and general construction/carpentry type work, at the Texoma Project Office in accordance with the following specifications and as further defined in task orders issued under the contract.
2. Materials and Supplies:
2.1 If specified by task order the Contractor shall furnish all hardware, supplies and materials required for the proposed activity. All electrical materials used will be compliant with the National Electric Code (NEC) for that particular application being performed. Furthermore, any materials used, if required by NEC, must be approved by Underwriters Laboratory (UL) and contain documentation that it is UL listed for that activity. Types of materials needed for this type of work include but are not limited to, junction boxes, outlets, breakers, breaker panels, electrical wire, conduit, switches, pedestal for campsites, hydrants, faucets, pvc pipe, misc. plumbing supplies, lumber, framing materials, roofing materials, misc. building and construction supplies.
3. Tools and Equipment
3.1 The Contractor shall furnish all tools, both manual and power operated, necessary to complete work as described on the task order. The tools shall be sufficient to conduct the work in accordance with the NEC and must be UL listed for that type of activity. Furthermore, all tools and their use must comply with the parameters established in EM 385-1-1.
3.2 The Contractor shall furnish all equipment necessary to complete work as described on the task order. All equipment used to perform the specified work must be in satisfactory operating condition and comply with EM 385-1-1.
4. Specifications:
4.1 Work to be performed:
4.1.1 Electrical - The required work shall be for “electric service” such as but not limited to: repairing, replacing or installing fixtures, breakers, lines, panels, rewiring buildings, provide 50 amp service to campsites, etc. Workers shall be fully qualified, experienced and capable of performing this type of work. Contractor shall do the work in accordance to the NEC and must certify the completed work is in compliance with the NEC.
4.1.2 Plumbing – The required work shall be for “Plumbing service” such as but not limited to: repairing, replacing or installing fixtures, waterlines, hydrants, plumbing for buildings, etc. Workers shall be fully qualified, experienced and capable of performing this type of work.
4.1.3 General Construction/Carpentry - The required work shall be for “General Construction/Carpentry” type of work such as but not limited to: Framing carpentry, general carpentry work such as: installing doors, installing windows, toilet partitions, replacement of roofs of various materials and roof turbines or vents. General construction such as: moving and leveling dirt, pouring small concrete pads and footings. Workers shall be capable of performing work with general skills and abilities with hand tools, either manual or power operated. Workers shall be fully qualified, experienced and capable of performing this type of work.
4.1.4 Miscellaneous – The contractor shall also conduct miscellaneous work associated with the above services. This work would include but is not limited to sheet rock repair, painting, excavate/filling ditches for new lines, and other minor construction activities associated with the above mentioned services.
SECTION 00050
PROJECT DESCRIPTION AND GENERAL INFORMATION
PART 1 GENERAL
1.1 GENERAL DESCRIPTION OF THIS MULTIPLE AWARD TASK ORDER CONTRACT (MATOC)
1.1.1 Intent
The intent of this MATOC is to provide a timely response to the various electrical, plumbing, and general construction needs at the Texoma Project Office. It is anticipated that three (3) contracts will be awarded under this MATOC. Typical efforts include electrical, plumbing, and general construction work at Texoma Lake.
1.1.2 Period and Amount
The MATOC shall be in effect for a three-year period. The agreement resulting from this solicitation will be a multiple award task order contract (MATOC) as defined in FAR 16.5. Services will be provided on a task order basis. Task orders under this MATOC shall be firm-fixed price. The Government is under no obligation to issue any task orders, present or future, against this MATOC.
The guaranteed minimum amount shall be $1,000 per contract for the contract period. Each task order shall not exceed $100,000. The total cost of all task orders issued under this MATOC will not exceed $500,000.
1.1.3 Task Orders
Fixed price task orders shall normally be issued bilaterally against this MATOC. The Contracting Officer will issue a request for proposal stating the efforts to be accomplished to complete the work. The task order will be negotiated on a firm fixed lump sum price basis or a firm fixed unit price basis, as determined by the Government. The scope of work, drawings, and the Davis- Bacon Act wage determination will accompany each request for proposal.
Individual task orders shall be competed among the contracts awarded under this MATOC pursuant to FAR 16.505. Generally, award will be made to the contractor that provides the lowest, responsible, responsive offer to the Government, unless otherwise indicated. However, the Government reserves the right to direct work to a contractor in order to meet its required minimum obligation threshold. Source Selection Decisions shall not be subject to the Disputes Clause of this MATOC (FAR 52.233-1 or its Alternate). In accordance with AFARS 5116.5, task order proposals shall be limited to 5 pages, including attachments.
(1) Each contractor will be afforded a fair opportunity to be considered for each task order in excess of $2,500, except as provided at FAR 16.505 (b)(2).
(2) The contracting officer may consider the following factors when awarding a task order:
cost, price, contractor’s ability to accomplish the task in the required amount of time, past performance on task orders issued against this MATOC, and past performance on other work of a similar nature. The contractor's proposal will include detailed backup cost details. The Contractor may be required to include, but not necessarily be limited to: breakout of labor, materials, subcontractor prices and markups.
(3) The Government reserves the right to award a task order without discussions. However, if discussions are necessary, the Government will conduct them with all contractors submitting technically acceptable proposals.
(4) If the contractor believes it was not fairly considered for a particular task order, the contractor may present a complaint to the Contracting Officer. The contractor may appeal the explanation or decision of the Contracting Officer to the USACE Ombudsman (See paragraph 1.1.5). The Ombudsman will review the contractor's complaint in accordance with FAR 16.505(b)(5).
1.1.4 Resolution of Complaints
The HQUSACE Ombudsman will be the designated ombudsman for this MATOC. The current ombudsman is Maureen Q. Weller, PARC, The Ombudsman's address is Office of the Principal Assistant Responsible for Contracting (PARC -DAL), U.S. Army Corps of Engineers, ATTN: CEPR-DAL, 1100 Commerce St., Suite 840 Dallas, TX 75242-0216. The Ombudsman will have authority to:
(1) Review complaints from contractors awarded MATOCs that they have not been afforded a fair opportunity to be considered for award of a particular task order.
(2) After coordination with the Contracting Officer, and if he/she agrees with the contractor, required that the Contracting Officer take corrective action regarding the complaint.
(3) If the contracting officer does not agree with the Ombudsman, the matter shall be decided by the HQUSACE Principal Assistant Responsible for Contracting.
1.2 TYPICAL ACTIVITIES TO BE PERFORMED UNDER SPECIFIC TASK ORDERS
The activities to be performed by the contractor under this MATOC and subsequent task orders are described in general terms below. Task requirements described below shall be identified, when applicable, in each task order issued under this MATOC. This list is not all-inclusive, and work requirements may be tailored to the specific needs of a task order. A price for the required work will be negotiated and agreed upon prior to the start of effort. Generally, the contractor shall not proceed from one task to another until directed to do so by the Contracting Officer.
1.2.1 Task Order Execution
The contractor shall not proceed with this work until a task order has been issued for this work, the contractor has submitted adequate performance and payment bonds, and the Contracting Officer has issued a NTP. The contractor shall be required to:
(1) Attend a pre-construction conference with Government personnel such as the Contracting Officer or authorized representative, Installation Representative, or Government's Program/Project Manager. The purpose of the conference is to outline the procedures that will be followed by the Government in its administration of the task order and to discuss performance that will be expected from the contractor. The conference will also give the contractor an opportunity to ask questions about the Government's supervision and inspection of task order work, security requirements, regulations, etc. The following items will be reviewed at the conference (not an all inclusive list):
(a) Authorities of the Contracting Officer and authorized representative and procedures for administering the task order.
(b) Contractor labor standard provisions.
(c) Task order modification and administration procedures.
(d) Payment estimate data and procedures.
(e) Contractor insurance requirements.
(f) Contractor performance evaluations.
(g) Installation rules and regulations.
(h) Task Order specific points of contact.
(2) Begin work on the task order in accordance with the task order scope of work and following an approved work schedule. The contractor shall meet the following requirements:
(a) Comply with the approved Site Safety and Health Plan submitted in accordance with this MATOC, as well as adaptations specific to the current task order.
(b) Comply with the approved Quality Control Plan submitted with in accordance with this
MATOC, as well as adaptations specific to the current task order.
(c) Prepare and certify a comprehensive work schedule based on the task order. Any changes to the schedule are subject to the approval of the Contracting Officer.
(d) Construction warranties. Standard commercial warranties shall be turned over to the
Government at the end of the task order. A list of companies (names, addresses, and phone numbers) that honor the warranties shall be provided. In addition to the commercial warranties, the Contractor shall provide a one-year warranty on the work performed under the task order. During this warranty period, the contractor shall remedy, at his expense, any failure to conform, or any defect, damage, or failure of the work. A contractor point of contact shall be provided for 24-hour answering and response capability. If the remedy is not made within 72 hours of notification, the Government has the option of taking steps to remedy the failure and bill the contractor for this remedy.
(e) Submit monthly progress reports in a narrative or tabular form, detailing each activity shown on the work schedule for a reporting period. Contents of the report should include:
progress summary stated by estimated percent of completion; remarks section to describe any problems which may have caused a lag in schedule as well as plans to get back on schedule. A summary report covering all task orders shall also be provided, including similar information in an abbreviated format.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
SECTION 00110
PROPOSAL PREPARATION
Part 1 GENERAL
1.1. METHOD OF PROCUREMENT
The U.S. Army Corps of Engineers, Tulsa District, intends to solicit this requirement under Small Business Set-Aside consideration. One solicitation will be issued however three (3) contractors are selected with three (3) contract numbers.
1.2. SUBMITTAL INSTRUCTIONS
Proposals are due as indicated on the Solicitation, Offer and Award form (Standard Form 1442) found in Section 00010, SOLICITATION, OFFER, AND AWARD, AND PROPOSAL SCHEDULE. Proposals shall be sent to the address indicated in Block 8 of SF 1442 by the date and time shown in Block 13(a) of SF 1442.
Submittal of proposals or modifications to proposals on this solicitation by FAX is not allowed.
Hand deliveries to the Tulsa District shall be delivered to the Welcome Center on the first floor of the building. Call extension 7274 for pickup.
The Tulsa District business hours are from 7:45 am to 4:30 pm, Monday through Friday. Closed on Federal Holidays.
1.3. INFORMATION REQUIRED FOR PROPOSAL
Instructions for the preparation and organization of each proposal are included herein. The proposal shall be submitted in two separate volumes as summarized below and as required by the solicitation.
Proposal submission shall include the original and four (4) copies.
1. PROPOSAL SUBMISSION INSTRUCTIONS.
PROPOSAL FORMAT. Proposals shall be submitted on 8 ½ x 11-inch paper. Each offeror shall submit their management/technical proposal in loose-leaf binders with each binder clearly labeled with the RFP number, description, name of offeror and volume number. The price/cost proposal shall be submitted in a separate envelope labeled with the same information. The proposal shall be typed, pages shall be numbered, sections shall be tabbed, and the appropriate number of copies shall be submitted. An index of sections shall be provided for each volume with the appropriate page numbers where each section may be found. Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g. changes shall be underlined or printed in bold face.
Revised pages shall be numbered, dated, submitted in appropriate number of copies. Offerors shall submit two volumes, divided into sections as follows:
(1) VOLUME I—Management/Technical Proposal (original and 4 copies)
Demonstrate Adherence to Specifications (Task Order Project) Past Experience/Past Performance
(2) VOLUME II—Price/Cost Proposal (original and one copy)
Standard Form 1442 Representations and Certifications (Section 00600)
2. EVALUATION PROCEDURES. Each proposal will be evaluated initially to determine responsiveness.
Responsive proposals will be further evaluated to determine the technical acceptability of the proposals. Negotiations may be initiated with those offerors submitting technically acceptable proposals or proposals capable of being made acceptable.
3. EVALUATION CRITERIA: The evaluation of proposals will be separated into two parts.
Management/Technical and Cost/Price.
a. COST/PRICE.
1. The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirements. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.
2. The cost/price evaluation shall be based upon the realism and reasonableness of the proposed amount. However, award will be made to the lowest cost, technically acceptable, responsible, and responsive offeror.
b. Management/Technical evaluation will be based on the factors listed in paragraph 1 above.
4. MANAGEMENT/TECHNICAL PROPOSAL PREPARATION (VOLUME I). Each offeror shall submit their management/technical proposal in a loose-leaf binder. It shall be typed, pages shall be numbered, sections shall be tabbed, and the original and four (4) copies shall be submitted. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of the proposal. Offers not conforming to the prescribed format may be rejected as nonresponsive. The management/technical proposal shall include the information as described below and shall be presented in the sequence listed.
a. DEMONSTRATE ADHERENCE TO SPECIFICATIONS. The offeror shall provide description of how the system proposed meets all technical specifications. A technically acceptable offeror for this factor will be an offer that meets all technical specifications.
b. PAST EXPERIENCE/PAST PERFORMANCE. The offeror shall provide information indicating projects where similar equipment has been installed. This information shall include date installed, point of contact with phone numbers, description of similarities and differences with this requirement and location of installation. A technically acceptable determination on this factor will be at least three (3) similar projects installed within the last ten (10) years with a satisfied customer.
5. COST/PRICE PROPOSAL PREPARATION (VOLUME II). Each offeror shall submit their cost/price proposal on the Bid Schedule in Section B in an original only. Price proposed shall be firm. The cost/price proposal shall consist of the following:
a. Standard Form 1442. Solicitation, Offer and Award shall be completed appropriately and signed by a principal of the offeror that is authorized to bind the firm.
b. Task Order Project. Complete the bid schedule for this task order.
c. Representations and Certifications (Section 00600). Complete this section as it applies to your organization. Offerors do not need to be registered in the Central Contractor Registration database to submit an offer, but, if selected as the successful offeror, will need to registered to receive an award.
6. AWARD. Award will be made to the lowest cost, technically acceptable, responsible, and responsive offeror.
TASK ORDER PROJECT PAGE
BIDDING SCHEDULE FOR
1&2 RAIL FENCE
LAKE TEXOMA, OKLAHOMA AND TEXAS
Item Unit No. Description Quantity Unit Price Amount
1. Fabrication and Installation of Single and 1 LS xxx $________ Double Rail Fences, Lake Texoma, Oklahoma and Texas, in accordance with the Specification.
TOTAL BASE BID $_________
BIDDING SCHEDULE NOTES
1. Bidders are instructed to bid on all items.
2. Only one contract will be awarded.
SPECIFICATIONS
1&2 Rail Fence
PART 1 – GENERAL
1.1 SCOPE OF WORK
The Contractor shall furnish all labor, materials, equipment, tools and services for the fabrication and installation of single and double rail Fences in compliance with these specifications. Fencing shall be fabricated and installed of the materials, sizes, and locations as shown, indicated or specified elsewhere in the Contract Documents and/or in this specification. Reference drawings for typical fence sections, location reference maps, will be provided in tables and appendices. The work site is located in various parks at Texoma Lake. It is recommended that site visit should be conducted prior to bidding. Construction and provided materials shall meet or exceed requirements outlined in this specifications and attached drawings.
1.2 REFERENCES
a. Safety and Health Requirements Manual, EM 385-1-1
b. American Welding Society (AWS),
c. ASTM
1.3 BASIS FOR PAYMENT
(Lump sum) Payment will be made upon completion and acceptance of all work. Invoice and supporting documents shall be delivered or mailed to the Lake Manager, Texoma Lake Office, 351 Corps Rd, and Denison, TX 75020-6425.
1.4 WORK HOURS
Regular work hours will be from 8:00 am – 4:30 pm Monday through Friday, excluding federal holidays.
Any proposed changes to the work hours must be approved by the Contracting Officer.
1.5 COMPLETION TIME
Work shall be completed within 45 calendar days after award of the task order.
1.6 SAFETY REQUIREMENTS
The contractor shall comply with the Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 dated 3 September 2003 and all applicable Federal, State, and local safety codes and practices. It is the contractor’s responsibility to insure public safety during the entire duration of the contract. Necessary signs, barriers, warning devices, etc. shall be operated and maintained by the contractor at contractor expense. Contractor employees shall comply with the minimum dress requirements as stated in Chapter 7 of EM 385-1-1. (Submission of a written safety plan prior to start of work,)
1.7 EQUIPMENT
All equipment used to perform work under this contract shall be in good operating and mechanical condition and shall comply with Section 18 of EM 385-1-1. Equipment shall be inspected by the contractor and the inspection reports shall be submitted to the Contracting Officer prior to utilization of such equipment to accomplish work on this contract.
1.8 WEATHER LIMITATIONS
Completion Date will be extended, for non work days due to adverse weather.
Work shall stop when damage to Government property will result from conditions caused by adverse weather.
1.9 SUBMITTALS
The contractor may be required to furnish certain submittals. These submittals may be certifications of materials, safety plans, drawings, training certifications, work plans, etc.
These will be specifically listed and shall be furnished to the Contracting Officer. Submittals requiring Government approval shall be formally prepared and approval granted prior to proceeding with work involving these submittals. FIO (For Information Only) submittals do not require Government approval.
1.10 PREWORK CONFERENCE
A prework conference will be held with the Contracting Officer and contractor prior to the commencement of any work. The contractor’s responsible person and necessary administrative staff will be required to attend this meeting. Procedures for proper invoicing and payment, schedule, etc., will be covered at this time.
1.11 ENVIRONMENTAL CLEANUP
The contractor shall maintain a clean work area at all times. The contractor shall be responsible for the protection of the environment and will be required to restore all damages subject to the approval of the contracting officer. The contractor shall remove and dispose of all debris off Government property in a state approved disposal site unless specified otherwise. The contractor will be required to comply with all Federal and State environmental requirements.
1.12 COORDINATION OF WORK
(POC) Mike Upton (Civil Engineering Tech.) Phone no. 903-465-4990 x 7825 Cell no. 580-230-8826 (Financial POC) Joe L. Custer (Lake Manager) Phone no, 903-465-4990 x 7814
PART 2 – PRODUCTS
2.1 MATERIALS
All materials shall be new and undamaged. All materials will require approval from the Texoma Lake Manager or (POC)
2.1.1 Steel pipe 2 3/8” OD. Not less than .154 Wall thicknesses
2.1.2 Steel pipe 2" OD. Not less than .154 Wall thicknesses
2.1.3 Steel pipe 3 ½” OD. Not less than .154 Wall thicknesses
2.1.4 3 ½” weld on pipe caps rounded
2.1.5 Concrete
2.2 DELIVERY AND STORAGE
Materials shall be delivered to the site undamaged and stored out of contact with the ground.
Materials that are damaged during the delivery or improper storage shall be replaced at no cost to the government
2.3 GOVERNMENT FURNISHED PROPERTY
The following materials for this contract will be furnished by the Government. It will be the contractor’s responsibility for the proper care and safeguarding of these items until final acceptance of the job.
a. 25 pieces 3 ½”OD pipe 25’ long
b. 51 pieces 2”OD pipe 28’ long
c. 102, 3 ½” weld on pipe caps rounded
PART 3 - EXECUTION
3.1 ACCOMPLISHMENT OF WORK
The Contractor shall furnish all labor, materials, equipment, tools and services for the fabrication and installation of 1,100’of single rail fence and 990’of double rail fence in compliance with these specifications. The removal and disposal of approximately 700’ of cedar split rail fence will be required. Disposal of split rail fence and all leftover construction materials will be off of Government property. All work shall be accomplished in a safe, workmanlike manner and in accordance with standard industry practices. All welding shall comply with (AWS) for this type of construction.
Double rail fence shall be constructed with 3 ½” OD pipe post with a 2’ bury, and 2” OD pipe horizontals. Single rail fence shall be constructed with 2 3/8” OD pipe for both posts and rail, post shall be saddled at top to fit rail. Typical fence construction drawings can be found in appendices. All post shall be set in concrete (minimum 80 lbs dry) mixed to manufactures instructions. The work sites are located in various parks at Texoma Lake, (East Burns Day Use, Lakeside Park, Juniper Point East and Platter Flats) a list of areas and maps can be found in appendix A. Exact placements of fence shall be coordinated with the (POC) or Lake Manager.
3.2 TESTING
None
3.3 WARRANTY
None
APPENDIX A
Construction
1. Fences to be Constructed FENCE AREAS INVENTORY Table A-1 are at the end of this Appendix.
Construction area maps are at the end of Table A-1. Construction dimensions reference drawings, are at the end of Construction area maps.
2. Removal and Disposal. FENCE REMOVAL and DISPOSAL INVENTORY Table A-2 are at the end of Construction dimensions reference drawings. NOTE: all materials shall be disposed of off Government property.
TABLE A-1
FENCE AREAS INVENTORY
LOCATION Double Rail
(FT)
Juniper Point East 330
Lakeside 330
Platter Flats 330
TOTAL 990
LOCATION Single Rail
East Burns Run 1,100
TOTAL 1,100
Note: Total Feet listed could require + 20’due to fitting the placement of fence.
CONSTRUCTION AREA MAPS
CONSTRUCTION DIMENSIONS REFERENCE DRAWINGS
TABLE A-2
FENCE REMOVAL AND DISPOSAL INVENTORY
LOCATION split rail
Juniper Point East 330
Lakeside 40
Platter Flats 330
TOTAL 700
Note: Total Feet listed are estimated, and disposal is off of Government property.
MATOC, IDIQ
FABRICATION AND INSTALLATION OF RAIL FENCE
TEXOMA LAKE,
GRAYSON COUNTY, TEXAS AND BRYAN COUNTY, OKLAHOMA
APPLICABILITY OF WAGE RATES
Wage Decision No. OK080021, Heavy Construction, dated 02/08/2008, is applicable to work performed in Bryan County, Oklahoma.
Wage Decision No. TX080110, Heavy Construction, dated 02/08/2008, is applicable to work performed in Grayson County, Oklahoma.
PLEASE NOTE: The applicable wage decision must be referenced on each payroll.
General Decision Number: OK080021 02/08/2008 OK21
Superseded General Decision Number: OK20070021
State: Oklahoma
Construction Type: Heavy
Counties: Adair, Alfalfa, Atoka, Beaver, Beckham, Blaine, Bryan, Caddo, Carter, Cherokee, Choctaw, Cimarron, Coal, Comanche, Cotton, Craig, Custer, Delaware, Dewey, Ellis, Garfield, Garvin, Grady, Grant, Greer, Harmon, Harper, Haskell, Hughes, Jackson, Jefferson, Johnston, Kay, Kingfisher, Kiowa, Latimer, Le Flore, Lincoln, Love, Major, Marshall, Mayes, McCurtain, McIntosh, Murray, Muskogee, Noble, Nowata, Okfuskee, Okmulgee, Ottawa, Pawnee, Payne, Pittsburg, Pontotoc, Pushmataha, Roger Mills, Seminole, Sequoyah, Stephens, Texas, Tillman, Washington, Washita, Woods and Woodward Counties in Oklahoma.
HEAVY CONSTRUCTION (does not include Sewer and Water Line Construction Projects); Excluding The City of Muskogee.
Modification Number Publication Date 0 02/08/2008
W912BV-08-R-1002, MATOC, FABRICATION AND INSTALLATION OF RAIL FENCE, TEXOMA LAKE, BRYAN COUNTY, OKLAHOMA
OK080021 - 1 02/08/2008
* SUOK1992-003 05/11/1992
Rates Fringes Carpenter........................$ 8.85 Concrete Finisher................$ 8.35 Form Builder.....................$ 7.00 Form Setter......................$ 7.60 Laborers:
Air tool man................$ 6.05 Asphalt raker...............$ 6.55 Asphalt shoveler............$ 6.50 Common laborers.............$ 6.10 Pipelayers..................$ 6.95 Mechanic.........................$ 9.90 Painter..........................$ 7.50 Power equipment operators:
Asphalt distributor.........$ 7.05 Asphalt paving machine......$ 8.30 Asphalt Plant operator......$ 8.60 Bulldozer operator..........$ 9.10 Concrete paving machine.....$ 9.85 Concrete saw operator.......$ 8.75 Crane, Clamshell, Backhoe...$ 8.40 Crusher and screening plant op....................$ 8.25
FLAGPERSON..................$ 5.85
Front End Loaders...........$ 8.50 Mixer.......................$ 8.20 Motor grader operator.......$ 9.05 Oiler.......................$ 8.75 Power broom operator........$ 6.00 Pug mill operator...........$ 6.00 Roller Pneumatic............$ 6.70 Roller steel wheel..........$ 7.25 Scrapers....................$ 8.60 Screed operator.............$ 8.70 Traveling plant operator....$ 8.35 Reinforcing Steel Setter.........$ 7.90 Tractor operator Crawler.....................$ 6.50 Pneumatic...................$ 7.10 Traffic Signal Installer.........$ 10.25 Truck Driver.....................$ 7.25 WELDERS - Receive rate prescribed for craft performing operation to which welding is…