This is a pricing template spreadsheet for a double bituminous seal coat project at FE Walter Dam, divided into a base requirement and three options. The base requirement covers 17,500 square yards of double bituminous seal coat and line painting for the Road Top of Dam. Option 1 includes 6,300 square yards for the Carbon County Road Side from the temporary road closure to bottom parking lot. Option 2 covers 1,760 square yards on the Luzerne County Road Side from the kayak launch to bottom parking lot, specifically requiring cutback seal coat. Option 3 encompasses 3,100 square yards for the Operations Parking Lot and Roadway.
The work is being solicited by the U.S. Army Corps of Engineers Philadelphia District, with quotes due to Contract Specialist Katie Sayers by February 10, 2025, at 1:00 P.M. EST. The project location is the Francis E. Walter Dam in White Haven, PA, spanning both Carbon and Luzerne Counties. Electronic submissions are required, with no hard copies accepted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined Synopsis Solicitation_W912BU25R0021.pdf | ||
| Drawings_FE_Walter_Tar_Chip_FY25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Item No. Desciption Quantitiy Unit Unit Price Dollar Amount
| Base: Road Top of Dam | |||
| Double Bituminous Seal Coat, Line Painting | 17,500 | Sq Yards | $ - 0 |
| Total Cost for Base | $ - 0 |
| Option 1: Carbon County Road Side, Temp Road Closure to Bottom Parking Lot | |||
| Double Bituminous Seal Coat, Line Painting | 6,300 | Sq Yards | $ - 0 |
| Total Cost for Option 1 | $ - 0 |
| Option 2: Luzerne County Road Side, Kayak Launch to Bottom Parking Lot | |||
| Double Bituminous Seal Coat (Cutback), Line Painting | 1,760 | Sq Yards | $ - 0 |
| Total Cost for Option 2 | $ - 0 |
| Option 3: Operations Parking Lot and Roadway | |||
| Double Bituminous Seal Coat, Line Painting | 3,100 | Sq Yards | $ - 0 |
| Total Cost for Option 3 | $ - 0 |
Total COST FOR Base Plus 3 Options $ - 0