W912BU25BA008-DPT_Dwgs_AM0001.pdf

PDF 3 MB Posted

Attached to
MAINTENANCE DREDGING - DELAWARE RIVER, PHILADELPHIA TO TRENTON
Solicitation number
W912BU25BA008
Issued by

About this file

These are design and planning drawings for a U.S. Army Corps of Engineers maintenance dredging project on the Delaware River between Philadelphia and Trenton. The project involves dredging approximately 470,000 cubic yards of sediment from the main navigation channel and Fairless Turning Basin, with hydraulic cutterhead dredging to a depth of 41 feet Mean Lower Low Water (MLLW) plus 1 foot overdepth. Dredged materials will be placed in the Money Island Disposal Area in Falls Township, Pennsylvania.

The documents include detailed technical specifications, site maps, and general notes about the dredging project. Key technical details include coordinate references (NAD 83, New Jersey State Plane), survey information from October 2024 to February 2025, and specific instructions for discharge pipe routing and material placement. The project has environmental restrictions requiring completion by March 15, 2026, with a total performance period of 240 calendar days from the Notice to Proceed. The estimated project value is between $10-25 million, using NAICS code 237990 for Heavy and Civil Engineering Construction.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DREDGING LEGEND

COORDINATE - NORTHING AND EASTING

A.S. #8 ACCEPTANCE SECTION

BUOY MARKERS

CHANNEL CENTERLINE

SYMBOLS, ABBREVIATIONS AND GENERAL NOTES

APPROXIMATE BORDERS OF GOVERNMENT

OWNED DISPOSAL AREAS TO BE USED IN

CONTRACT

APPROXIMATE LOCATION OF WORK

REQUIRED DREDGING

ALLOWABLE OVERDEPTH

DATE OF

SURVEYS

X-1011

VIEW NAME

MATCHLINE MATCHLINE

RE: X-XXX RE: X-XXX

X-101

CLOUD

REVISION & AMENDMENT

CLOUD AND SYMBOL

REVISION SYMBOL

(NUMERIC)

AMENDMENT SYMBOL

(ALPHA)

1 a

VIEW TITLE SYMBOL SECTION CUT SYMBOL

VIEW IDENTIFICATION NUMBER

VIEW NAME

DIRECTION OF VIEW

CALLOUT SYMBOL

CALLOUT AREA VIEW

MATCHLINE SYMBOL

CALLOUT IDENTIFICATION

NUMBER

DETAIL SHEET

REF NUMBER

DRAWING SHEET

MATCHING REFERNECE

NUMBER

DRAWING SHEET SYMBOLS

GRAPHIC BAR SCALE SYMBOLS

PRIMARY

SCALE

EXTENSION

SCALE

X

SECTION IDENTIFICATION NUMBER

DETAIL SHEET

REF NUMBER

X X X X

PRIMARY

SCALE

EXTENSION

SCALE

V: X X X X X

X X X XH: X

SCALE IN FEET/METERS

(SINGLE SCALE, SCALE BAR)

SCALE IN FEET/METERS

(HORIZONTAL/VERTICAL SCALE BAR)

DIRECTION OF

MAGNETIC NORTH

NNORTH

PLAN

MAGNETIC

NORTH

PLAN

NORTH

NORTH SYMBOLS

ABBREVIATIONS

ABBRV DESCRIPTION ABBRV DESCRIPTION ABBRV DESCRIPTION

AD AREA DRAIN EXT EXTERIOR PIV POST INDICATOR VALVE

ADDL ADDITIONAL FDN FOUNDATION PSF POUNDS PER SQUARE FOOT

BC BOTTOM OF CURB FF FINISHED FLOOR PSI POUNDS PER SQUARE INCH

BD BOARD FFE FINISHED FLOOR ELEVATION PT POINT OF TANGENCY

BIT BITUMINOUS FIN FINISH PVC POLYVINYL CHLORIDE

BL or BASE LINE FL FLOOR PVI POINT OF VERTICAL INFLECTION

BLDG BUILDING FM FORCE MAIN R, RAD RADIUS

BMP BEST MANAGEMENT PRACTICE FT FOOT, FEET REINF REINFORCEMENT

BOT BOTTOM FTG FOOTING ROW RIGHT OF WAY

BW BOTTOM OF WALL G GROUND RT RIGHT

BVCE BEGINNING OF VERTICAL CURVE ELEVATION GOVT GOVERNMENT S SOUTH

BVCS BEGINNING OF VERTICAL CURVE STATION GR GRADE SCH SCH

CB CATCH BASIN HDPE HIGH DENSITY POLYETHYLENE SECT SECTION

CC or C-C CENTER TO CENTER HORIZ HORIZONTAL SF SQUARE FEET, SILT FENCE CL or CENTERLINE HP HIGH POINT SPEC SPECIFICATION

CMP CORRUGATED METAL PIPE HS HIGH STRENGTH SQ SQUARE

CMU CONCRETE MASONRY UNIT HT HEIGHT SST STAINLESS STEEL

CO CLEAN OUT ID INSIDE DIAMETER STA STATION

COL COLUMN IN INCH STRU or STRUC STRUCTURE, STRUCTURAL

CONC CONCRETE INSUL INSULATION, INSULATED SUSP SUSPENDED

CONSTR CONSTRUCTION INT INTERIOR TEMP TEMPORARY

CONT CONTINUOUS INV INVERT TC TOP OF CURB

COR CONTRACTING OFFICER'S REPRESENTATIVE LL LIVE LOAD TD TRENCH DRAIN

CTRL CONTROL LP LOW POINT TDO TRENCH DRAIN OUTLET

CWL CONTRACTOR WORK LIMIT LT LEFT, LIGHT TELE TELEPHONE

DGA DENSE GRADED AGGREGATE LVC LENGTH OF VERTICAL CURVE TG TOP OF GRATE

DIA DIAMETER JCT JUNCTION TOPO TOPOGRAPHY

DIM DIMENSION MATL MATERIAL TW TOP OF WALL

DMPF DREDGED MATERIAL PLACEMENT FACILITY MAX MAXIMUM TYP TYPICAL

DWG DRAWING MHW MEAN HIGH WATER UD UNDERDRAIN

E EAST MIN MINIMUM UDO UNDERDRAIN OUTLET PIPE

EA EACH MISC MISCELLANEOUS UE UNDERGROUND ELECTRIC

ECM EROSION CONTROL MAT MLLW MEAN LOWER LOW WATER UGND UNDERGROUND

EL or ELEV ELEVATION MLW MEAN LOW WATER UOP UNDERDRAIN OUTLET PIPE

ELEC ELECTRIC N NORTH UXO UNEXPLODED ORDINANCE

ELL ELLIPTICAL NLT NOT LESS THAN VC VERTICAL CURVE

EOP EDGE OF PAVEMENT NTS NOT TO SCALE VOL VOLUME

EOS EDGE OF SHOULDER OC ON CENTER VERT VERTICAL

EQ EQUAL, EQUALITY OD OUTSIDE DIAMETER W/ WITH

EQUIP EQUIPMENT OH OVERHEAD W WEST

EW or E-W EACH WAY OPP OPPOSITE WL WATER LEVEL EXIST or EX EXISTING PC POINT OF CURVE WS WATER SURFACE

EXP EXPANSION, EXPOSED PD PAVEMENT DRAIN WSEL WATER SURFACE ELEVATION

EXP JT EXPANSION JOINT PI POINT OF INFLECTION W/O WITHOUT

GENERAL NOTES:

1. THE EXISTING SITE CONDITION SURVEYS ARE A RESULT OF SURVEYS CONDUCTED IN OCTOBER 2024 (LEHIGH TO FLORENCE), MAY 2024 (FLORENCE TO NEWBOLD), FEBRUARY 2025 (FAIRLESS TURNING BASIN) AND DECEMBER 2024 (BLAKE TO DUCK ISLAND), AND CAN ONLY BE CONSIDERED REPRESENTATIVE OF THE CONDITIONS OCCURRING AT

THAT TIME.

2. HORIZONTAL REFERENCE - NAD 83, NEW JERSEY STATE PLANE, ZONE 2900, US SURVEY FEET.

3. SOUNDINGS ARE EXPRESSED IN FEET AND TENTHS AND REFER TO MEAN LOWER LOW WATER (MLLW). SEE DETAILS

ON THIS SHEET FOR THE TIDAL REFERENCE FROM NOAA'S TIDAL EPOCH - 1983-2001.

4. CHANNEL SOUNDINGS WERE SELECTED FOR PLOTTING PURPOSES ONLY USING THE MINIMUM DEPTH WITHIN A 50'x50' CELL AND SHIFTED TO THE CELL'S CENTER. FAIRLESS TURNING BASIN SOUNDINGS WERE SELECTED FOR PLOTTING PURPOSES ONLY USING THE MINIMUM DEPTH WITHIN A 30'x30' CELL AND SHIFTED TO THE CELL'S CENTER.

HYPACK MATRIX PROGRAM WAS USED TO PERFORM THE SOUNDING SELECTION.

5. DUE TO VARIATIONS IN RESOLUTION BETWEEN COLOR BANDS AND CONTOURS, SOME MINOR DISCREPANCIES MAY BE NOTED. COLOR BANDS ARE FOR PLOTTING PURPOSES ONLY. COLOR BANDS WERE GENERATED USING THE MINIMUM DEPTH WITHIN A 3'X3' CELL, AND SHIFTING TO THE CELL'S CENTER. HYPACK MATRIX PROGRAM WAS USED

TO PERFORM THE SOUNDING SELECTION.

6. THIS SURVEY MEETS STANDARDS AS OUTLINED IN CORPS OF ENGINEERS HYDROGRAPHIC SURVEY MANUAL

EM1110-2-1003, FOR NAVIGATION AND DREDGING SUPPORT SURVEYS.

7. QUESTIONS CONCERNING BOTH HORIZONTAL AND VERTICAL CONTROL SHOULD BE DIRECTED TO PHILADELPHIA DISTRICT CORPS OF ENGINEERS SURVEY BRANCH POC, STEPHEN FARRELL, AT (215) 656-6790.

8. THE POSITIONS OF THE AIDS TO NAVIGATION ARE PROVIDED FOR INFORMATION ONLY, AND SHOULD NOT BE USED

FOR NAVIGATION.

9. FOR CHANNEL CENTERLINE GEOMETRY, SEE THE CONTRACT SPECIFICATIONS.

10. THE CONTRACTOR MUST COORDINATE WITH ALL APPROPRIATE UTILITY COMPANIES AND THE USACE RESIDENT OFFICE FOR MARK-OUT OF ONSITE UTILITIES PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES.

11. SEE SPECIFICATIONS FOR DATUM CONVERSION INFORMATION.

GENERAL NOTES - DREDGED MATERIAL PLACEMENT FACILITY:

1. THE GOVERNMENT FURNISHED DREDGED MATERIAL PLACEMENT FACILITY (DMPF) AVAILABLE FOR USE

UNDER THIS CONTRACT IS MONEY ISLAND CELL B. SEE SHEET C-401 FOR DMPF PLANS.

2. THE END OF ALL DISCHARGE PIPES SHALL BE LOCATED INSIDE THE DISPOSAL AREA LIMITS AS SPECIFIED IN THE CONTRACT SPECIFICATIONS. PIPE SHALL BE LOCATED SUCH THAT THE DISCHARGE DOES NOT SCOUR THE SLOPE FACE OR THE TOE-OF-SLOPE OF THE DISPOSAL AREA DIKE IN THE VICINITY OF THE

DISCHARGE AREA.

3. BORROW FOR DIKING MATERIAL MAY BE OBTAINED FROM WITHIN THE DISPOSAL AREAS, BUT NOT CLOSER

THAN 50 FEET FROM THE INSIDE TOE OF THE DIKE SECTIONS.

4. SHOULD THE CONTRACTOR DESIRE TO MODIFY THE DISCHARGE LIMITS SHOWN, APPROVAL MUST BE

GRANTED BY THE CONTRACTING OFFICER PRIOR TO MODIFICATION.

5. TOPOGRAPHY SHOWN FOR MONEY ISLAND DMPF ARAES A & B WAS DEVELOPED BY EMPLOYING AERIAL ACQUISITION AND GPS COLLECTED CONTROL POINTS COMPLETED ON 4/4/2025. CONTOURS (2 FOOT INTERVAL) AND SPOT ELEVATIONS SHOWN CAN ONLY BE CONSIDERED REPRESENTATIVE OF THE SITE CONDITIONS AS THEY EXISTED AT THE DATES INDICATED. EARTHWORK ACTIVITIES HAVE TAKEN PLACE SINCE THE TOPOGRAPHY WAS GENERATED. CONTRACTORS ARE STRONGLY ENCOURAGED TO VISIT THE SITE WHERE WORK IS TO BE PERFORMED TO ACQUAINT THEMSELVES WITH EXISTING CONDITIONS THAT

COULD AFFECT THE PROJECT COST.

6. TOPOGRAPHY SHOWN OUTSIDE OF THE DMPF WAS GENERATED USING PHOTOGRAMMETRIC METHODS

BASED ON AERIAL PHOTOGRAPHY DATED DECEMBER 19, 2018.THIS MAPPING WAS COMPILED IN

ACCORDANCE WITH THE NATIONAL STANDARD FOR SPATIAL DATA ACCURACY (NSSDA) ACCURACY

STANDARDS FOR MAPS AT 1 INCH EQUALS 200 FT. SCALE.

7. THE SITE IS GENERALLY CLEAR WITH PASSABLE ACCESS ROADS, BUT SOME MINOR CLEARING OF

VEGETATION MAY BE REQUIRED IN ISOLATED LOCATIONS TO GAIN ACCESS.

8. HORIZONTAL REFERENCE - NAD 83, NEW JERSEY STATE PLANE, ZONE 2900, US SURVEY FEET.

9. VERTICAL REFERENCE FOR THE DMPF IS NAVD88 (GEOID 18) IN U.S. SURVEY FEET.

10. VERTICAL REFERENCE OUTSIDE OF THE DMPF IS MSL WHICH IS 0.48 FT ABOVE NAVD88.

BOTTOM SAMPLE

VIBRACORE SAMPLE

a

A

®US Army Corps of Engineers

DISTRICT

D

AT

E

SO

LI

C

IT

AT

IO

N N

U M

BE

R

FI

LE

N

AM

E:

M

AR

K

D W

G . S

IZ

E:

C O

N

TR

AC

T

N U

M

BE

R

SHEET ID

BY

D

ES

C

R

IP

TI

O

N

AC

TI

ON

AN

SI

E x4

IS

SU

E/

SU

BM

IT

TA

L

D

AT

E:

U.

S.

A

RM

Y

CO

RP

S

OF

E

NG

IN

EE

RS

D

IS

TR

IC

T D

R

AW

N B

Y:

SU

BM

IT

TE

D B

Y:

D

ES

IG

N

ED

B

Y:

PL

O

T D

AT

E:

C H

EC

KE

D B

Y:

B

C

E

F

G

H

R

J

D

K

L

M

N

O

P

Q

S

T

U

V

X

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

C-001 AM

DE

LA

W

AR

E

RI

VE

R

PH

ILA

DE

LP

HI

A, P

EN

NS

YL

VA

NI

A

TO

T

RE

NT

ON

, N

EW

JE

RS

EY

MA

IN

TE

NA

NC

E

DR

ED

GI

NG

GE

NE

RA

L I

NF

OR

MA

TI

ON

S

HE

ET

P H

IL

A

D E

LP

H

IA

L.

MU

LV

IH

ILL

L.

MU

LV

IH

ILL

O.

D

UR

R

T.

F

AT

ZI

NG

ER

C-

1 G

EN

ER

AL

IN

FO

RM

AT

IO

N

SH

EE

T.

dw g

JU

NE

W

2B U2

5B A0

- 18 Ju ly

AD

D

JU

L 2

UP

DA

TE

D

GR

ED

GE

D

MA

TE

RI

AL

P

LA

CE

ME

NT

F

AC

ILI

TY

N

OT

ES

AM

a

PHILADELPHIA

MITIGATION

AREA

(SEE NOTE 5)

DENSE VEGETATION

DENSE VEGETATION

DENSE VEGETATION

DENSE VEGETATION

DENSE VEGETATION

COVE

FALLS TOWNSHIP PARKRISER

14.27

13.10

17.43

TRAIL

SUBMERGEDBARGES

17.54

28.20

47.04

RIP-RAP

MH

PIPE

E

0,0

N 474,000

E

1,0

N 474,000

E

2,0

N 474,000

E

3,0

N 474,000

E

4,0

N 474,000

E

5,0

N 474,000

E

5,0

N 473,000

E

5,0

N 472,000

E

5,0

N 471,000

E

5,0

N 470,000

E

4,0

N 470,000

E

3,0

N 470,000

E

2,0

N 470,000

E

1,0

N 470,000

E

0,0

N 470,000

E

1,0

N 471,000

E

0,0

N 471,000

E

0,0

N 472,000 N 472,000 N 472,000

E

0,0

E

1,0

E

1,0

E

4,0

E

4,0

E

4,0

N 471,000

N 473,000N 473,000N 473,000

E

9,0

N 470,000

N 471,000

N 472,000

N 473,000

E

9,0

E

9,0

E

9,0

E

9,0

N 474,000

DISCHARGE LIM

ITS

EXISTING SLUICE

OUTFALL- (2) 30" PIPES

EXISTING

WETLAND (TYP)

CELL A EAST

(NOT AVAILABLE

THIS CONTRACT)

EXISTING SLUICE

EXISTING

BAFFLE DIKE

EXISTING

BAFFLE

DIKE

EXISTING SLUICE

CELL B EAST

(AVAILABLE THIS

CONTRACT)

CELL B WEST

(AVAILABLE THIS

CONTRACT)

MINOR CONTOUR

(TYP)

MAJOR CONTOUR (TYP)

EXISTING SLUICE OUTFALL

(3) 30" PIPES

CELL A WEST

(NOT AVAILABLE

THIS CONTRACT)

CHANNEL LIMITS

8+

9+

0+

0 111+000

112+000

113+000

114+000

115+000

CHANNEL

CENTERLINE

DENSE VEGETATION

DENSE VEGETATION

DE

NS

E V

EG

ET

AT

IO

N

DENSE VEGETA

TIO

N

DE

NS

E

VE

GE

TA

TI

ON

DE

NS

E V

EG

ET

AT

IO

N

DENSE VEGETA

TIO

N

DISCHARGE PIPE ROUTE

(SEE NOTE 1)

4.03'

3.55'

MSL

ELEV 0.00 NAVD88

MLLW

DATUM REFERENCE

0.48'

25' 5' 25'

1' MIN.

COVER

DRIVING DIRECTION

DREDGE PIPE

EXISTING ACCESS ROAD CRUSHED AGGREGATE RAMP, FULL WIDTH OF

ACCESS ROAD. PLACE AND COMPACT HORIZONTAL

LIFTS, MAX. LOOSE LIFT THICKNESS OF 12".

C-401

NORTH

PLAN

1. APPROXIMATE LOCATION OF DISCHARGE PIPE ROUTE. EXACT

LOCATION TO BE COORDINATED WITH AND APPROVED BY THE COR.

2. DREDGED MATERIAL HAS BEEN RECENTLY PLACED IN CELL A EAST AND

HENCE CONTRACTOR MUST EXERCISE CAUTION USING ONLY LOW

GROUND PRESSURE EQUIPMENT WHEN LAYING DISCHARGE LINE TO

CELL B EAST.

3. WHERE THE DREDGE PIPE LINE CROSSES EXISTING ACCESS ROADS, A

RAMP SHALL BE CONSTRUCTED OVER THE PIPE THE FULL WIDTH OF

THE ACCESS ROAD, AS SHOWN IN DETAIL U1/C-401.

4. THE CONTRACTOR SHALL COORDINATE INGRESS, EGRESS AND ALL

CONSTRUCTION ACTIVITIES AT THIS SITE WITH MR. BOB JONES, WASTE

MANAGEMENT INC. SITE MANAGER AT MONEY ISLAND, AT (215) 768-4051

PRIOR TO WORK COMMENCEMENT.

5. THE CONTRACTOR SHALL NOT ENTER THE MITIGATION AREA.

A

®US Army Corps of Engineers

DISTRICT

D

AT

E

SO

LI

C

IT

AT

IO

N N

U M

BE

R

FI

LE

N

AM

E:

M

AR

K

D W

G . S

IZ

E:

C O

N

TR

AC

T

N U

M

BE

R

SHEET ID

BY

D

ES

C

R

IP

TI

O

N

AC

TI

ON

AN

SI

E x4

IS

SU

E/

SU

BM

IT

TA

L

D

AT

E:

U.

S.

A

RM

Y

CO

RP

S

OF

E

NG

IN

EE

RS

D

IS

TR

IC

T D

R

AW

N B

Y:

SU

BM

IT

TE

D B

Y:

D

ES

IG

N

ED

B

Y:

PL

O

T D

AT

E:

C H

EC

KE

D B

Y:

B

C

E

F

G

H

R

J

D

K

L

M

N

O

P

Q

S

T

U

V

X

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

C-401 AM

DE

LA

W

AR

E

RI

VE

R

PH

ILA

DE

LP

HI

A, P

EN

NS

YL

VA

NI

A

TO

T

RE

NT

ON

, N

EW

JE

RS

EY

MA

IN

TE

NA

NC

E

DR

ED

GI

NG

PL

AN

MO

NE

Y

IS

LA

ND

C

EL

L B

D

MP

F

PH

IL

AD

EL

PH

IA

L.

MU

LV

IH

ILL

L.

MU

LV

IH

ILL

O.

D

UR

R

T.

F

AT

ZI

NG

ER

C-

1 P

LA

N

- M

ON

EY

IS

LA

ND

C

EL

L B

D

MP

F.

dw g

JU

NE

W

2B U2

5B A0

- 18 Ju ly

AD

D

JU

L 2

UP

DA

TE

D

DM

PF

C

ON

TO

UR

S, A

DD

ED

D

IC

HA

RG

E

PI

PE

R

OU

TE

, A

ND

C

HA

NG

ED

N

OT

E

AM

a

PHILADELPHIA

GENERAL NOTES

KEY PLAN

0200' 200'100' SCALE: 1" = 200'-0"A1 PLAN - MONEY ISLAND CELL B DREDGED MATERIAL PLACEMENT FACILITYA1 PLAN - MONEY ISLAND CELL B DREDGED MATERIAL PLACEMENT FACILITY

NTSB19 MONEY ISLAND DATUM REFERENCEB19 MONEY ISLAND DATUM REFERENCE

NTSU1 TYPICAL DETAIL - DREDGE PIPE LINE CROSSINGU1 TYPICAL DETAIL - DREDGE PIPE LINE CROSSING

Sheets and Views
C-001 GENERAL INFORMATION SHEET
C-401 PLAN - MONEY ISLAND CELL B DMPF