This document is an amendment to a solicitation for a federal contract. The amendment incorporates additional Request for Information (RFI) responses that were not originally included in the previous amendment. The key details are:

The U.S. Army Corps of Engineers, Philadelphia District intends to award a firm fixed-price contract for surveying, excavating, and placing approximately 88,000 cubic yards of sand as part of the base award, with an option for an additional 45,000 cubic yards. The work will take place in the Lower Cape May Meadows in Cape May, New Jersey. The contractor will be required to conduct pre- and post-placement condition surveys. Due to environmental restrictions, the excavation and placement cannot occur between March 1, 2024 and August 30, 2024. The solicitation will be issued on May 1, 2024 with a bid opening at least 30 days later. Bonding, Davis-Bacon wage rates, and equal employment opportunity requirements will apply. The NAICS code is 237990 Dredging and Surface Cleanup Activities, with a small business size standard of $37.0 million. The estimated cost range is $1,000,000 to $5,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to W912BU24B0005 - Lower Cape May Meadows, newest first.
File Type Posted
Bid Abstract-W912BU24B0005-Cape May - final 1.pdf PDF
24B0005 Amendment 0003-7-25-24.pdf PDF
Amend U0001 24B0005-7-22-24.pdf PDF
W912BU24B0005 - Dwgs.pdf PDF
W912BU24B0005 - Specs.pdf PDF
Solicitation LCMM W912BU24B0005.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment U0002 is to incorporate the actual RFIs that didn't save originally in U0001. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU24B0005

X 9B. DATED (SEE ITEM 11)

02-Jul-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0002

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Jul-2024

CODE

U.S. ARMY CORPS AND ENGINEERS - PHILA

1650 ARCH STREET

PHILADELPHIA PA 19103

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

X 1

W912BU24B0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The Issued By organization has changed from

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: FREDERICK CONWAY, 1650 ARCH STREET 4TH F

PHILADELPHIA PA 19103-004

to

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION 1650 ARCH STREET, 4TH FL

PHILADELPHIA PA 19103-2004

The following have been added by full text:

RFIS

RFIs

1. Will the beach be open to the public during the construction period?

Response: The beach will be closed in the areas where construction is occurring. This would include the areas where the sand is harvested, the haul route and the area where the sand is being placed.

2. Will electricity and fresh water be provided?

Response: No. Electricity and fresh water will not be provided.

3. Will the use of articulated off-road dump trucks be permitted for use on the beach?

Response: Yes. These vehicles are permitted.

4. What is the haul route speed on the beach?

Response: Haul speed will need to comply with state and/or local regulations as well as consider specific equipment, site conditions, and construction activity to insure a safe working environment. Details will be further developed during the pre-construction submittal period.

5. Can there be shared positions in the QCM program as SSHO/QC or Superintendent/QC?

Response: No, this is not allowed.

6. Can the trailer-type mobile office replace the government field office?

Response: Yes, if it meets the requirements of Specifications section 01 50 00

7. The contractor staging area appears to be just a small portion of a parking lot, will there be an option to expand that area if needed?

Response: There will be an opportunity for expansion of the parking lot staging area. This would need further coordination and approval with NJDEP and Cape May Point State Park.

W912BU24B0005