This document is an amendment to a solicitation for a federal contract opportunity. The amendment extends the period of performance for the base contract work from 150 days to 130 days and addresses responses to requests for information (RFIs). The base contract work consists of surveying, excavating, and placing approximately 88,000 cubic yards of sand as part of the Lower Cape May Meadows project in New Jersey. The contract may also include an option for an additional 45,000 cubic yards of sand. The work requires specialized experience in the beneficial use placement of dredged sediments in sensitive marsh environments. The solicitation will be issued on May 1, 2024, with a bid opening at least 30 days later. Bonding requirements, Davis-Bacon wage rates, and affirmative action obligations apply. The contract has a NAICS code of 237990 Dredging and Surface Cleanup Activities, with a small business size standard of $37.0 Million. The estimated cost range for the base contract work is $1,000,000 to $5,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to W912BU24B0005 - Lower Cape May Meadows, newest first.
File Type Posted
Bid Abstract-W912BU24B0005-Cape May - final 1.pdf PDF
24B0005 Amendment 0003-7-25-24.pdf PDF
Amnd U0002 24B0005.pdf PDF
W912BU24B0005 - Dwgs.pdf PDF
W912BU24B0005 - Specs.pdf PDF
Solicitation LCMM W912BU24B0005.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Amendment U0001 is issued to amend the Period of Performance (POP) and address RFIs. All base and option work must be completed by 1 March 2025. This is reflected in the reduced POP of 130 days. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU24B0005

X 9B. DATED (SEE ITEM 11)

02-Jul-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0001

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Jul-2024

CODE

U.S. ARMY CORPS AND ENGINEERS - PHILA

1650 ARCH STREET

PHILADELPHIA PA 19103

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

X 1

W912BU24B0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The Issued By organization has changed from

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: FREDERICK CONWAY, 1650 ARCH STREET 4TH F

PHILADELPHIA PA 19103-004

to

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION 1650 ARCH STREET, 4TH FL

PHILADELPHIA PA 19103-2004

The contractor period of performance end date has decreased by 20 days from 150 days to 130 days.

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 130 calendar days after Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

The Contracting Officer has the right to exercise any or all of the options in this contract by written notice to the contractor within the durations listed on the option Table in 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK.

The time stated for completion shall include final cleanup of the premises. Options 1 through 7, if exercised will provide additional time as follows but also require completion by 1 March 2025 :

W912BU24B0005

Project Name: Lower Cape May Meadows - Cape May Point, NJ Solicitation: W912BU-24-B-0005 P2 Number: 109941

Base Bid Period of Performance from NTP 130 days

Option # Description Days to Exercise Options Additional Days ( if awarded)

1 Sand Excavation 21 days after precondition survey approval 7 days 2 Sand Excavation 21 days after precondition survey approval 7 days 3 Sand Excavation 21 days after precondition survey approval 7 days 4 Sand Excavation 21 days after precondition survey approval 7 days 5 Sand Island 1 21 days after precondition survey approval 3 days 6 Sand Island 2 21 days after precondition survey approval 3 days 7 Sand Island 3 21 days after precondition survey approval 3 days

Total days if all Options awarded 167 days