Industry Day 2023 - Hereford Inlet to Cape May Inlet Coastal Storm Risk Management Initial Construction
Solicitation number
W912BU24B0004
Issued by

About this file

This presentation provides details for an upcoming federal construction contract opportunity for coastal storm risk management work in Cape May County, New Jersey. The Hereford Inlet to Cape May Inlet project hosted an industry day on March 2024 to solicit input on dredging plans and specifications from marine contractors. The U.S. Army Corps of Engineers and New Jersey Department of Environmental Protection aim to issue bid documents by December 2024 that clearly define requirements for dredging a borrow area offshore, transporting sand via pipeline or other means, and placing fill to construct beach and dune profiles. The anticipated contract award is June 2025. The presentation outlines project needs, including hydraulic placement of fill in some areas; placement around structures; and sequencing work to comply with in-water work windows. It also requests contractor feedback on equipment, access, and estimated production rates to inform contract requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDUSTRY DAY 2023

Hereford Inlet to Cape May Inlet Coastal Storm Risk Management Project Cape May County, NJ

Initial Construction

9:45 REGISTRATION

10:00-10:15 INTRODUCTIONS

10:15-10:45 SCOPE REVIEW

10:45-11:45 INDUSTRY DAY QUESTIONS/ DISCUSSION

11:45-12:00 WRAP-UP

12:15-12:45 SITE VISIT

USACE and NJDEP aim to release Plans and Specifications that are easily understandable, biddable by qualified contractors and constructable with current technology and industry practices.

The purpose of today’s meeting is to solicit input from the marine construction industry and engage in discussions regarding the proposed project to produce high quality construction documents.

INDUSTRY DAY 2023 PROGRAM OVERVIEW

PROJECT OVERVIEW

All drawings and details are presented for discussion purposes and subject to change

BORROW AREA

This represents the permitted borrow. The intent is to use as minimal an area as possible based on the existing conditions at the time of construction. The permissible borrow area under contract is assumed less than the area currently shown.

Overall, the goal is to develop an affordable beach mining protocol that works with nature so that after the mining operation is completed, the beach reaches a new equilibrium condition rapidly, looks natural, and is safe for beach-goers to enjoy.

1. A goal of the project is reducing outfall clogging/maintenance. Priority for dredging locations may be given to areas around existing outfalls.

2. The contract potentially will require dredging operations to begin in Wildwood Crest

3. The intent is to dredge uniformly longitudinally along the beach and not perpendicular to the shoreline. After dredging beach conditions should not have pronounced ridges or scalloping along the shoreline

BORROW AREA DREDGING

PROJECT LAYOUT

Lower Township

PLAN VIEW

NORTH WILDWOOD TYPICAL CROSS SECTION

TYPICAL SECTIONS WILDWOOD/WILDWOOD CREST

TYPICAL SECTION LOWER TOWNSHIP

PEDESTRIAN AND VEHICULAR ACCESS

1. With the location of the borrow area and without being allowed to remove sand outside of this boundary, how would you access the borrow (land, sea or combination)?

2. With the known details for dredging within the borrow area, what type of equipment would you propose to use?

3. Sand placed in North Wildwood for berm construction must be hydraulically placed. In other areas of the project this restriction may not apply. How would you transport and place sand in Wildwood, Wildwood Crest and Lower Township?

4. Based on your anticipated means and methods and proposed equipment, what are the minimum staging requirements and what are the minimum dimensions required for access points?

5. What are the maximum wave heights that dredging within the surf zone would be feasible.

REQUEST FOR INFORMATION DISCUSSION

6. Required back passing distances could be between 5,000 and 22,000 feet. Using a mobile submersible pump:

1. What diameter discharge pipe would be proposed?

2. What would be the estimated losses during pumping?

3. If work hours are assumed 24hours/day, what is the range of production rates (volume sand placed) that could be reasonably accomplished?

7. If sand removal below the MLW is limited to September (Labor Day) – May (Memorial Day), and there are no time restrictions above this point, how would you sequence construction?

8. Is it feasible to track volume for payment based on the BD/ADs similarly to standard USACE beach renourishment projects?

9. The contract may require placement of fill around and under existing features such as piers and outfalls.

How would this impact placement methods? What challenges do you foresee with placement?

REQUEST FOR INFORMATION DISCUSSION

• Market Research and Sources Sought Notification

• Pre-Solicitation Notice Published

• Solicitation Published

• Contract Award

• ALL DATES SUBJECT TO CHANGE

March 2024

December 2024

May 2025

June 2025

ANTICIPATED SCHEDULE

Please contact Cheley Auguste with any follow-on questions or additional information you can provide:

Cheley.auguste@usace.army.mil

CONTACT INFORMATION

BACK UP SLIDES

POTENTIAL DREDGING EQUIPMENT IDEAS

POTENTIAL DREDGING EQUIPMENT IDEAS

Volume Backpassed

(CY)

Working Hours per Day Working Days per Week Average Production Rate cy/hr

Average Daily Production Rate cy/day

Average Weekly Production cy/week

Job Duration (months)

1,000,000 24 7 300 7,200 50,400 4.5

1,000,000 16 6 300 4,800 28,800 7.9

1,000,000 12 5 300 3,600 18,600 12.6

1,000,000 24 7 450 10,800 75,600 3

1,000,000 16 6 450 7,200 43,200 5.3

1,000,000 12 5 450 5,400 27,000 8.4

POSSIBLE PRODUCTION RATES

TYPICAL CROSSOVERS

Industry day 2023
INDUSTRY DAY 2023 Program overview
PROJECT OVERVIEW
Borrow Area
Borrow area dredging
Project layout
Plan view
North wildwood typical cross section
Typical sections wildwood/wildwood crest
Typical section lower township
Pedestrian and vehicular access
Request for information discussion
Request for information discussion
Anticipated schedule
Contact information
Back up slides
Potential Dredging Equipment ideas
Potential Dredging Equipment ideas
Possible production rates
Typical crossovers

File details come from the government source that posted it. Updated .