W912BU22R0016 Amendment 0002.pdf
PDF 392 KB Posted
- Attached to
- FT AP Hill Renovations Federal contract opportunity
- Solicitation number
- W912BU22R0016
About this file
This document provides responses to contractor questions on a solicitation for design-build renovation services at Fort A.P. Hill in Virginia. The solicitation seeks proposals from 8(a) small businesses to complete roof, HVAC, and interior renovations at two buildings. Key details include clarifying that carpeting must be removed from the SCIF room and replaced, confirming some equipment is stored for reinstallation, and specifying that HVAC equipment be grade-mounted. Proposal due date is April 18, 2022. The responses aim to clarify scope and requirements for the renovation work at Fort A.P. Hill.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 8-Terracon Floor Crack Analysis_EV205068 Report 12.21.2020.pdf | ||
| Attachment 2 - Past Performance Questionnaire.docx | DOCX document | |
| W912BU22R0016 Amendment 1 Portfolio.pdf | ||
| VA086 SOW Ft AP HILL HVAC-INTERIORS-OMS_02 FEB 22.pdf | ||
| W912BU22R0016 Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to share the Government's responses to the RFIs submitted follow ing the second site viist that w as conducted on 31 MAR 2022. All other terms and conditions remain unchanged.
Proposal due date remains 18 April 2022 at 1700.
Only a w arranted Contracting Officer (either a Procuring Contracting Officer (PCO) or an Administrative Contracting Officer (ACO)), acting w ithin their appointed limits, has the authority to issue modifications or otherw ise change the terms and conditions of this contract. If an individual other than the contracting Off icer attempts to make changes to the terms and conditions of this contract, you shall not proceed w ith the change and shall immediately notify the Contracting Officer. Proceeding w ith any w ork not authorized by the Contracting Officer w ill be at the Contractor's ow n risk.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Apr-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BU22R0016
X 9B. DATED (SEE ITEM 11)
25-Feb-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Apr-2022
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BU22R0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
RESPONSES TO RFIS ROUND II
FT. AP HILL RFIs
RECEIVED: 4 APRIL 2022
Please note: USACE SOW Clarification: It has been brought to the Government’s attention that carpeting exists in the SCIF room. As part of this Contract, the Contractor shall remove all existing carpeting in the SCIF, clean and prep the concrete floor, and install new carpet as specified in the
SOW.
1. 2.1.2.x states that there is various equipment stored on site that that the contractor is to clean, re-assemble, and re-install. This list included, among other things ceiling lights and sconces. Looking at the photos and additional site walk: there did not appear to be any stored light fixtures that need to be re-installed. Please confirm if there are any stored materials.
Response: Stored material is in the assembly hall.
2. 2.1.1.1a states that the contractor shall remove the existing metal roof from the BMA building along with, among other items, curbs around ducts. Do we need to include the removal and reinstallation of HVAC equipment and the associated power connections in our fee?
Response: No, just the penetrations (stacks and vents)
3. 2.1.2.c includes re-installing all door jambs (2.1.2.c). Can we assume that any necessary security equipment for those doors (card readers, mag strips, electronic latches, associated wiring, etc) are all existing and will just be reconnected by the security vendor and that there is no scope for Contractors?
Response: Bid Per SOW.
4. Under TECHNICAL ACCEPTABLE/UNACCEPTABLE RATINGS, Factor 2. Design… Can the three design projects described include designs for projects on non-design-build (DB) design projects? Our designer has completed numerous non-DB designs for buildings more than 10,000 SF with both HVAC and roof design components which we feel will demonstrate the technical capabilities necessary for this solicitation. Please advise if design projects presented for technical acceptability may be for projects using design-bid-build procurement method if they meet the size and type of work in the solicitation and prove the designer’s technical capabilities.
Response: Yes.
5. Under TECHNICAL ACCEPTABLE/UNACCEPTABLE RATINGS, Factor 2. Design… Can the three design projects described include designs by other than the Design-Build Contractor’s proposed designer for this solicitation IF a narrative description for technical and design capability is provided adequately describing the current designer’s technical capabilities for renovations of the size proposed in this solicitation, and including the HVAC and roof design components required?
Response: The 8(a) contractor must have the experience in managing these three projects.
6. Can an option for HVAC Alternate be included in the price schedule? • This project and lay-out would be optimal for a VRF system to replace the existing smaller systems.
Response: No Bid per SOW.
7. Entrances – Replace like existing VCT or do we clean existing floor? The SOW and plans contradict each other.
Response: Entrance vestibules are ceramic tiles. Replace ceramic tile.
8. The Lobby Wood Accent, do we clean in place?
Response: If work associated with the awarded contract occurs in the ceiling above, or immediately adjacent to the wooden architectural accent, then the Contractor shall remove, clean, and reinstall the wooden architectural accent. Otherwise, it can remain in-place and cleaned.
9. There is a missing door found in the storage area, do we replace with new door?
Response: Yes. Office door observed during walk through in storage area shall be replaced if damaged. match existing
10. The drywall ceiling in the lobby, do we leave in place and repair as necessary and paint?
Response: Repair as needed and paint ceiling.
11. It is not clear if the electric service is to be upgraded – the government responded to follow the RFP which does not clarify. It is not possible to know the anticipated new demand or level of design effort during the bidding phase. Therefore, we are excluding any additional design or construction work associated with the increased electrical service if found necessary.
Response: Bid per SOW.
12. During the site visit the KOR stated that the existing Fire Alarm/MNS and Fire Sprinkler were to remain as is (except for the reinstallation of the devices. Therefore, we are excluding any design work associated with the Fire Protection systems (Alarm & Suppression).
13. The electrical As-Built drawings were stampeded and dated July 29, 2005 – are these the most recent record drawings?
Response: yes. The as-built plans included within the SOW contain the information available at this time. Bid per SOW.
14. The electrical panels/equipment seem to be much newer than having been installed circa.
2005. Has there been a more recent renovation and or replacement of the electrical panels/equipment? If so, can you please clarify which pieces of equipment are new
15. Per the HVAC As-built drawing TM01 markup provided in the RFP, there are two (2) new Rooftop units labeled AHU-3 & AHU-4. These AHU’s are clearly shown on this drawing at grade outside the building with ductwork extending into the building to serve various new proposed VAV terminal units. Such ductwork would be exposed to the weather and would need to penetrate the building envelope through the roof because of limited space above the existing ceiling. Is the intent of the RFP to locate the proposed AHU-3 and 4 units at grade or locate them on the roof itself which would require extensive structural work for support and additional maintenance access platforms? Please advise.
Response: All AHU’s shall be grade mounted. Bid per SOW
16. Has structural steel for the two new packaged rooftop units and air distribution systems been installed?
Response: All AHU’s shall be grade mounted. Bid per SOW
17. The existing restrooms and other areas are not listed in contract. Please confirm this is correct for ALL trades including MEP?
Response: Work shall be performed in the restrooms. Bid per SOW.
18. SOW section 5.6.2.3 paragraph 1 indicates all return ducts require motorized dampers.
Please confirm this will not be required and only the AHU damper will require motorization.
Response: Bid per SOW. 5.6.2.3 is for the trunks (for example, in the outside air duct and return air duct where they connect into their respective AHU’s mixing box). 6.13.2.2.3 requires manual balancing dampers at all locations where air streams converge or diverge.
19. Given the large extent of the HVAC replacement and re-design, will a Dedicated Outside Air System (DOA), separate from the individual zones be required? Or will the individual zones be acceptable to handle the DOA independently?
Response: Bid per the design-build SOW.
20. Please confirm a ductless mini split with low ambient controls is acceptable.
21. Please confirm the fire alarm scope only includes reinstallation of the existing devices and testing/priming of the system.
22. Will DALT be required for newly installed ductwork?
23. Will a full set of design documents be required to include 35%, 65%, 100%, and IFC documents?
24. Can the superintendent dual hat as the SSHO?
25. Please confirm all controls, telecom, and security work is by others. If not, please provide requirements and any required systems/installers.
Response: Bid per SOW.
26. Do the bathrooms, to include showers, lockers, doors and benches require ABA compliance?
27. Will any of the interior walls being repaired require installation of insulation? If yes, please provide requirements.
Response: Bid per SOW.
28. Please confirm all switch and outlet materials and locations are to remain "as-is".
29. Section 6.12.7.8 and Appendix H provide conflicting flooring requirements in the vestibules. Please confirm the type of flooring required for the vestibules.
Response: Entrance vestibules are ceramic tiles. Replace ceramic tile.
30. Please identify the location of the SCIF Room called out in Section 01 10 00 par 6.12.1 Some specifications sections such as 01 10 00 page 34 section 6.11, or page 48 section
6.13.2.1 paragraph 7 elude to only painting affected surfaces. Other portions of the specification 01 10 00 page 4 paragraph (s) require all interior surfaces to be painted.
Please confirm painting requirement was intended to cover only interior surfaces affected by work as a result of this contract, and not all walls and Ceilings within the building.
Response: The Mail Room is located at the southeast corner of the administration area.
The Copy Room is west and SCIF is north of the Mail Room.
31. Related Question: If all surfaces are required to be painted, will already painted walls be required to be painted with three coats of paint?
Response: Yes, paint all surfaces. Bid per SOW
(End of Summary of Changes)