Formal Abstract 20B0005 BML Road Repair and Paving (1).pdf

PDF 178 KB Posted

Attached to
Blue Marsh Lake Road Repairs and Repaving
Solicitation number
W912BU20B0005
Issued by

About this file

This document provides details for a federal contract opportunity to reconstruct sections of asphalt concrete pavement at the Dry Brooks Day Use Area access road and parking areas within the Blue Marsh Lake recreational site. The Corps of Engineers seeks to mill and repave approximately 27,000 square yards of access road and parking areas under the base contract. Three options to complete additional parking and turnaround areas covering around 10,500 square yards may also be awarded depending on available funding. Bids will be solicited under invitation for bid W912BU-20-B-0005 with an opening date at least 30 days after issuance on or around May 29, 2020 and a period of performance of 90 calendar days. The estimated cost range for the project is $1,000,000 to $5,000,000. A single award will be made to the lowest priced responsive and responsible bidder as a set aside for small business. The bid closing is projected for June 30, 2020 at 1:00 pm EST.

View the file

Other files

File Type Posted
Amendment 1 20B0005.pdf PDF
W912BU20B0005-Specs.pdf PDF
W912BU20B0005-Dwgs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gov't Estimate Gov't Estimate G FORCE Amendments|Bid Bond

Item Number

Description Qty Unit Unit Price Price Price Price

BASE BID Demolition and Demolition and Reconstruction of Roadway (Sta. 0+51 to Sta. 65+53)

1 JOB LS

$1,348,257.10

LS

1,094,302.44$

2 Culvert Extension (Sta. 39+68) 1 JOB LS $5,155.54 LS 21,233.00$

Removal and Replacement of Unstable Materials 300 CY $101.85 $30,555.00 325.00$ 97,500.00$

TOTAL ESTIMATED BASE BID AMOUNT $1,383,967.64 1,213,035.44$

Option 1 Demolition and Reconstruction of Parking Lot D 1 JOB LS $281,176.02 LS 255,570.00$

Removal and Replacement of Unstable Materials 200 CY $101.85 $20,370.00 325.00$ 65,000.00$

TOTAL ESTIMATED OPTION 1 AMOUNT $301,546.02 320,570.00$

Option 2 Demolition and Reconstruction Parking Lot E 1 JOB LS $165,232.27 LS 196,803.60$

Removal and Replacement of Unstable Materials 100 CY $101.85 $10,185.00 325.00$ 32,500.00$

TOTAL ESTIMATED OPTION 2 AMOUNT $175,417.27 229,303.60$

OPTION 3 Demolition and Reconstruction of Roundabout and Turning Area 1 JOB LS $45,867.64 LS 68,586.24$

Removal and Replacement of Unstable Materials 50 CY $101.85 $5,092.50 325.00$ 16,250.00$

TOTAL ESTIMATED OPTION 3 AMOUNT $50,960.14 84,836.24$

TOTAL ESTIMATED BASE BID & ALL OPTIONS $1,911,891.07 $ 1,847,744.68

Certified by:

Robert W. Hutcheon, Jr.

Contracting Officer

Black Marsh Lake Road Repair and Paving ‐ IFB W912BUB0005 ‐ Date Issued: 5/29/2020 Date Opened 7/14/2020

G FORCE

2020-07-23T07:27:31-0400
HUTCHEON.ROBERT.W.JR.1391063210

File details come from the government source that posted it. Updated .