SEE ADDENDUM
(No Collect Calls)
W912BU18R0016 18-Jan-2018
b. TELEPHONE NUMBER
215-656-6894
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 08 Feb 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912BU9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
KECIA M BLACKWELL
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W25PHS73532627A
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
1,250
NAICS:
336611
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF90
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912BU18R0016
Section SF 1449 - CONTINUATION SHEET
CONTRACTING OFFICER AUTHORITY
Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO) or an Administrative Contracting Officer (ACO)), acting within their appointed limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, you shall not proceed with the change and shall immediately notify the Contracting Officer. Proceeding with any work not authorized by the Contracting Officer will be at the Contractor’s own risk.
SYSTEM FOR AWARD MANAGEMENT REGISTRATION: All contractors are required to register in the System for Award Management (SAM) database before an award can be made.
Contractors can obtain information on registration and annual confirmation requirements by calling 866-606-8220 or via the Internet at https://www.sam.gov.
In accordance with FAR 52.204-10, “Reporting Executive Compensation and First-Tier Subcontract Awards,” contractors are required to report information on subcontract awards for all awards over $30,000.00. The contract shall follow the instructions and report the required information at https://www.fsrs.gov. The contractor is responsible for notifying its subcontractors that the required information will be made public.
VETS-4212 Federal Contractor Reporting: Contractors with a contract of $150,000.00 or more are required by legislation (FAR 22.1310(b)) to file an annual VETS-4212 “Federal Contractor Veterans’ Employment Report” on their affirmative action efforts in employing veterans. Information on submitting your report may be obtained by calling 1-866-237-0275 or by accessing the following internet web site: http://www.dol.gov/vets/vets4212.htm.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
3199 HAYWARD DRY DOCKING CONTRACT
FFP
Period for performance is 45 calendar days after delivery of vessel to contractor's ship yard location.
FOB: Destination
PURCHASE REQUEST NUMBER: W25PHS73532627A
NET AMT
PRICE SCHEDULE
CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0001 General Contract Requirements (SW-1 to SW-6 & SC-1 to SC-16) Sub-Total XXXXX $ -
0002 Hull Repairs Sub-Total XXXXX $ - 0002A Hull Repairs - Definite Items Sub-Total XXXXX $ -
0002AA Dry Docking (TP 1.01) 1 Lump Sum $ - $ - 0002AB Gas-Freeing Compartments (TP 1.02) 1 Lump Sum $ - $ - 0002AC Docking Plugs (TP 1.03) 1 Lump Sum $ - $ - 0002AD Exterior Cleaning and Painting (TP 1.04) 1 Lump Sum $ - $ - 0002AE Interior Cleaning and Painting (TP 1.05) 1 Lump Sum $ - $ - 0002AF Sea Chest Maintenance (TP 1.06) 1 Lump Sum $ - $ - 0002AG Rudders (TP 1.07) 1 Lump Sum $ - $ - 0002AH Hull Anodes (TP 1.08) 1 Lump Sum $ - $ - 0002AI Cleaning of Fuel Tanks (TP 1.09) 1 Lump Sum $ - $ - 0002AJ Keel Cooler Maintenance (TP 1.10) 1 Lump Sum $ - $ - 0002AK Boat Davit (TP 1.11) 1 Lump Sum $ - $ - 0002AL CG-835 Weld Seam Correction (TP 1.12) 1 Lump Sum $ - $ - 0002A MEpoxy Floor Resurfacing (TP 1.13) 1 Lump Sum $ - $ -
0002B Hull Repairs - Indefinite Items Sub-Total XXXXX $ - 0002BA Red Lead Remediation (TP 1.20) 1 Lump Sum 0002BB Steelwork (TP 1.21) 7,500 Lbs $ - $ - 0002BC Welding Seams (TP 1.22) 1,200 Lin - Ft $ - $ - 0002BD Bilge Water Disposal (TP 1.23) 1,000 Gal. $ - $ - 0002BE Gas-Freeing Compartments (TP 1.24) 12 Compartments $ - $ - 0002BF Additional Audio-Gauging Requirements (TP 1.25) 150 Shots $ - $ - 0002BG Tank Testing (TP 1.26) 4 Tank $ - $ - 0002BH Replacement of Docking Plugs (TP 1.27) 2 Docking Plugs $ - $ -
CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0003 Machinery Repairs Sub-Total XXXXX $ -
0003A Machinery Repairs - Definite Items Sub-Total XXXXX $ - 0003AA Propeller Shaft Bearing Clearances (TP 2.01) 1 Lump Sum $ - $ - 0003AB Propeller Shaft Runout Readings (TP 2.02) 1 Lump Sum $ - $ - 0003AC Propellers and Propeller Shafts (TP 2.03) 1 Lump Sum $ - $ - 0003AD Sea Valves (TP 2.04) 1 Lump Sum $ - $ - 0003AE Deck Vents (TP 2.05) 1 Lump Sum $ - $ - 0003AF Propeller Shaft and Gear Output Couplings (TP 2.06) 1 Lump Sum $ - $ - 0003AG Aft Capstans (TP 2.09) 1 Lump Sum $ - $ -
0003AH Sewage Holding Tank Inlet Valve Replacement (TP 2.10) 1 Lump Sum $ - $ - 0003AI Lube Oil Tank (TP 2.11) 1 Lump Sum $ - $ - 0003AJ Exhaust Fans (TP 2.12) 1 Lump Sum $ - $ - 0003AK Stern Tube Stuffing Boxes (TP 2.13) 1 Lump Sum $ - $ - 0003AL Aft Exhaust Vent Stack Ducting (TP 2.14) 1 Lump Sum $ - $ - 0003A MSea Chest Duplex Strainers (TP 2.15) 1 Lump Sum $ - $ - 0003AN 20 Ton Pettibone Deck Crane (TP 2.16) 1 Lump Sum $ - $ - 0003AO Port and Starboard Generators (TP 2.17) 1 Lump Sum $ - $ - 0003AP Number 2 Deck Hatch (TP 2.18) 1 Lump Sum $ - $ - 0003AQ EMS Marcon Alarm System (TP 2.19) 1 Lump Sum $ - $ -
0003B Machinery Repairs - Indefinite Items Sub-Total XXXXX $ - 0003BA Renewal of Deck Vent Stems (TP 2.21) 3 Stems $ - $ - 0003BB Renewal of Deck Vents (TP 2.22) 3 Vents $ - $ - 0003BC Propeller Shaft Bearings (TP 2.23) 4 Bearings $ - $ - 0003BD Rudder Stock Bearings (TP 2.24) 2 Bearings $ - $ - 0003BE Sea Valves Replacement (TP 2.25) 2 Valves $ - $ -
CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
0004 Miscellaneous Repairs Sub-Total XXXXX $ -
0004A Miscellaneous Repairs - Indefinite Items Sub-Total XXXXX $ - 0004AA Miscellaneous Work (TP 3.01) 1 Lump Sum $ - $ -
TOTAL (CLINs 0001 - 0004) Total XXXXX $ -
The Government may reject an offer as non-responsive if it is materially and mathematically unbalanced as to price for any offered item or combination of offered items. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.
The Government will evaluate proposals for award purposes by adding the total price for all definite and indefinite items. Evaluation of indefinite items will not obligate the Government to direct work under the indefinite items.
ALL OFFERORS ARE REQUIRED TO FILL OUT THE PRICE SCHEDULE ABOVE.
ALL LINE ITEMS ON THE PRICE SCHEDULE SHALL BE FILLED OUT INCLUDING UNIT PRICES AND TOTAL AMOUNTS.
ALL LINE ITEMS MUST BE FILLED OUT OR THE PROPOSAL WILL BE DEEMED NON- RESPONSIVE. OFFERORS ARE INSTRUCTED TO ENTER A DOLLER AMOUNT ON EACH LINE ITEM OR THE OFFEROR MUST PUT A “NO CHARGE (N/C)” NOTATION ON THE LINE ITEM.
STATEMENT OF WORK
SPECIFICATIONS FOR 2017-2018 REPAIRS TO DCV "HAYWARD"
STATEMENT OF WORK
SW-1 Description of Work
a. The work consists of furnishing all labor, materials, fittings, equipment, tools, power, compressed air, heat, water, etc., and performing all work on U.S. Drift Collection Vessel "HAYWARD" specified herein. The principal dimensions and physical data for the vessel are shown below:
GENERAL DESCRIPTION
Length Overall 124’-0" Breadth, Molded 38’-0" Depth, Molded 12’-9” Material All Welded Steel Registered (Gross) 385 tons Displacement, light 345.4 Short tons Propellers (2) 78"Dx61"P, 4 blade Draft, light 7’-0” Hull Form/Special Features Monohull/Keel cooler ABS I.D. No. ……………………………..7500277
b. The major workscope includes drydocking the vessel, cleaning and painting the hull, assisting with ABS and USCG required inspections, and miscellaneous modifications and repairs in accordance with these specifications.
c. The Contractor is not responsible for the costs associated with providing the inspection services of ABS.
d. Wherever the term "Plant" is used in these specifications, it is understood to refer to the items of floating plant named in this paragraph, together with their normal appurtenances, equipment, and supplies.
e. General vessel arrangements and details are included in the attached file named “Reference
Drawings.pdf.” The accuracy of these drawings has not been verified. Therefore, the Contractor shall template all work from the vessel. Potential bidders are encouraged to inspect the vessel prior to submitting a bid. See Contract Clause SW-6 for more details.
f. The Contractor shall furnish the necessary facilities for and shall bear the expense of any movement of the plant while it is in his or her possession.
g. Removal and/or relocation of any parts, equipment, fluids, etc. for interference or access shall be the responsibility of the Contractor. Similarly, all interference and access removals shall be reinstalled by the Contractor at his/her expense. Any damage from removal or relocation of parts, equipment, etc. shall be repaired or replaced at the Contractor’s expense.
h. The Contractor's work shall comply with ABS "Rules for Building and Classing Steel
Vessels" and USCG "Rules and Regulations for Subchapter I, Vessels" as found in the Code of Federal Regulations (Title 46, CFR).
SW-2 Indefinite Workscope
a. The Contractor shall notify the Contracting Officer (KO) or the Contracting Officer’s
Representative (COR) when any of the indefinite work items approach 90% of the bid quantity for the respective items noted in the Contract. The Contractor is not authorized to exceed the quantity specified for each indefinite item in this Contract without written authorization from the KO.
b. The Contractor shall perform all definite work items in sufficient time for the KO to direct such indefinite work items as may be revealed to be necessary by the performance of the definite work items.
c. The direction of any indefinite work items by the KO or COR will be prompt so as to allow for completion of the indefinite work items within the Contract duration.
Note – Before any work can be performed under the indefinite items, the COR must first activate the item. After the activation has been issued, the COR may direct work under that indefinite item up to the quantity that is allowed for in the Contract.
SW-3 Mastership Agreement
Prior to the award of this Contract, the Contractor shall enter into a "Mastership Agreement for Repair and Alteration of Vessels". If the Contractor has entered such an agreement prior to this Contract, that agreement may be utilized. For more information, see DFARS Subpart 252.217- 71, Master Agreement for Repair and Alteration of Vessels.
SW-4 Contract Duration
The Contract duration is forty-five (45) calendar days after delivery of the vessel to Contractor’s yard. The Contractor is responsible for completing all definite and indefinite work items within the forty-five (45) calendar day Contract duration. See Paragraph SC-1 for additional details.
SW-5 Distance Restriction From Caven Point Terminal
All Contract work shall be performed at a location no further than 175 nautical miles from Caven Point Terminal, Jersey City, New Jersey.
SW-6 Pre-bid Vessel Inspections
Pre-bid inspections may be held to allow all prospective Offerors to inspect the vessel. The pre-proposal inspections can be held by appointment in Jersey City, NJ. Representatives of prospective Offerors wishing to attend should contact William Lyness at (201) 309-2360 for the specifics of the exact location and time.
During the pre-proposal inspections, Offerors will be allowed unencumbered access throughout the entire vessel. Representatives of the Government will be available, but only to the extent necessary to escort Offerors and assist with access. Government Representatives on the vessel will not discuss the scope of the work or make any technical clarifications or interpretations.
After each inspection, a meeting will be held with all participants to allow for the presentation of any questions. This meeting is not for the purpose of educating Offerors that have not carefully reviewed the plans and specifications and have come unprepared. Questions will not be answered at that time, but will be acknowledged and recorded. The Government will prepare answers to all questions and forward a copy of both the questions and answers to all prospective Offerors through form Solicitation Amendment.
SPECIAL CONDITIONS
SC-1 Pre-Award Survey, Delivery, Commencement, Completion of Work and Return of Plant
a. A Pre-Award Survey may be requested prior to award in accordance with FAR 9.106 to verify that the Contractor is able to comply with the required performance schedule, taking into consideration all existing commercial and government business commitments and has the necessary production, construction, and technical equipment and facilities, or the ability to obtain them.
b. To minimize the vessel’s time out of service and to allow for flexibility in scheduling, the Government will deliver the plant to the nearest slip at the Contractor's facility on a date mutually agreed on by the Government and Contractor, not to exceed 30 Calendar Days after Contract Award.
c. The Government will accept return of the plant in open water, clear of the Contractor's yard or any other berthing facility used in connection with Contract work upon completion of the Contract.
d. The Contractor shall commence the work under the Contract within seven (7) days after delivery of the vessel to the Contractor’s facility, and shall execute the work within the duration stated in the Contract. The Contract duration shall be computed from and including the first calendar day after delivery of the vessel to the Contractor.
e. The time for completion shall be computed to the hour at which the plant is accepted by the COR in open water clear of the Contractor's yard. The date of completion shall be considered as half a day if the plant is accepted by the COR before 12:00 o'clock Noon and as a whole if accepted after 12:00 o'clock Noon. If all work is not satisfactorily completed when the plant is returned to the COR, the Contractor shall complete the work remaining to be done and any working time lost by the plant thereafter, because of any activities of the Contractor in completing said work, shall be included in the computation of time.
SC-2 BERTHING, DRYDOCKING AND SERVICES
The Contractor shall have a suitable drydock facility available on or before 2 February 2018.
Upon receipt of the vessel, the Contractor shall drydock the vessel within five (5) calendar days and for such time that will be necessary to complete all underwater work included in these specifications. Following completion of underwater work, a drydock shall remain available at all times to the vessel for the duration of the contract.
DRYDOCK SUBMITTALS
Unless specified otherwise, at least forty eight (48) hours prior to docking/undocking the vessel, submit to the Contracting Officer Representative the following
1. DRYDOCK CERTIFICATION SUBMITTAL.
Prior to award at the pre-award survey, the Contractor shall submit to the Contracting Officer certification for the drydock or tentative drydocks to be used to lift the vessel. The drydock shall be certified for docking the vessel of the dimensions and weight given by one of the following only:
(a) US Navy, Naval Sea Systems Command
(b) American Bureau of Shipping (ABS)
(c) An independent registered Professional Engineer specialized in drydocks, who shall cover the inspection requirements of item (a) or (b) above.
The Inspection Certificate shall be within three (3) years if the age of the dock is less than ten
(10) years old and within two (2) years if the age of the dock is over ten (10) years old.
Floating drydocks shall be one integral unit. The Government will allow the coupling of two rated docks to meet the load requirements of the vessel, provided that the lifting plan used shall include provisions for ensuring integrity of the coupling in the event of foul weather. Linked drydocks shall be certified as an entity.
SC-3 Liquidated Damages
a. In the case of failure on the part of the Contractor to complete the work within the time frame in the Contract or any extensions thereof, the Contractor shall pay the Government as liquidated damages, the sum of $2,650.00 for each calendar day of delay until the work is completed or accepted.
b. The Contractor shall not be charged with liquidated damages when the delay in delivery or performance arises out of causes beyond the control and without the fault or negligence of the Contractor as defined in the Default Clause of the Mastership Agreement for Repairs and Alterations of Vessels (DFARS Clause 252.217-7009 - Default).
SC-4 Contractor's Custody of Plant
a. On entering and leaving dry dock, or marine railway, the Contractor shall have charge of, and be responsible for a vessel not operating under its own power. If tug or pilot service is required during delivery or return of the plant or at any time during Contractor's custody for maneuvering the plant between open water and dry dock, slip or berth at the Contractor's yard or other facility, or for moving the plant for any reason during the course of Contract work, such service shall be promptly furnished by the Contractor at his/her expense. This shall not exclude the right of the Government to move its plant around the Contractor's premises using the Government's personnel and facilities if the Government representative considers such movement of the plant to be in the interests of safety of the plant, or otherwise in the Government's interests.
b. The Government shall have the right to access the vessel while in the Contractor's custody with Government owned or hired floating plant or personnel for the purpose of delivering equipment, materials or personnel to the plant in the Contractor's custody.
c. The Contractor shall not permit the plant to go aground or bear upon the bottom of any waterway or any submerged object while in his/her possession. The Contractor shall not perform any Contract work on the plant if it should accidentally go aground or bear upon any submerged object, and shall notify the COR immediately and take the necessary steps to refloat the plant. The sole exception to this shall be that the plant shall be allowed to rest or bear upon a drydock which is properly prepared, in accordance with the plant's drydocking plan.
d. If the Contractor anchors the plant offshore for the purpose of performing Contract work on the plant, the Contractor shall convey Government inspectors, crew and hired personnel to and from the plant at the convenience of the Government at the Contractor's expense. While at such anchorage, the plant shall be considered in the custody of the Contractor and subject to any pertaining provision of these conditions.
SC-5 Accident Prevention
The Contractor shall provide a fire protection plan, flood prevention plan, and safety plan to the COR. All plans shall be in compliance with all federal, state, and local regulations as well as USCG, ABS, and USACE regulations. This information shall be submitted no later than 10 days after the Contract award date and shall be a prerequisite to the start of any work on the vessel.
The bulleted items listed below refer to specific areas of accident prevention, however this in no way limits the Contractor’s responsibility to perform all work under this Contract in strict accordance with their fire protection, flood prevention, and safety plans as well as all federal (ex.
29 CFR), state, local, USCG, ABS, and USACE regulations (EM 385-1-1).
a. The Contractor shall take all necessary precautions for the protection of the life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this Contract. The Contractor shall comply with all pertinent provisions of the Mastership Agreement for Repair and Alteration of Vessels and the Corps of Engineers Safety Manual EM 385-1-1, dated 30 November 2014 entitled "Safety and Health Requirements Manual" as amended and shall also take or cause to be taken such additional measures as the COR may determine to be reasonably necessary for the purpose. The Contractor shall also comply with OSHA Safety and Health Standards 29 CFR. The Contractor shall designate the entire area of work as a hardhat area.
b. A qualified employee shall be designated by the Contractor to be directly responsible for full and immediate compliance with all applicable safety and fire protection requirements. The COR will make a safety inspection of shipyard facilities within 48 hours of the vessel's arrival at the Contractor's yard. At such time the Contractor's safety program will be reviewed with the Contractor's safety representative.
c. In addition to other fire protection measures and hose lines required, the Contractor shall connect a shore fireline to the ship's firemain of the same pressure as required by USCG regulations for service at sea. If at any time, it becomes necessary to disconnect the ships firemain or any part thereof, the Contractor shall furnish individual hose lines to the unprotected locations as required by the Inspection and Manner of Doing Work Clause of the Mastership Agreement for Repair and Alteration of Vessels (DFARS Clause 252.217-7005 - Inspection and Manner of Doing Work). When the specifications require work in areas fitted with the fixed CO2 systems (i.e. machinery spaces), the COR shall be notified prior to commencing work. All work in these areas shall be in strict accordance with 29 CFR
1915.506 and substitute fire protection equipment shall be furnished by the Contractor during the test or repair period.
d. Fire watches shall be posted wherever hot work is performed. Fire watches shall also be posted on the opposite side of all adjacent bulkheads, decks, and overheads where the hot work is performed. All fire watches shall remain on site until 30 minutes after the hot work is completed. For additional requirements, see 29 CFR 1915. It should be noted that 29 CFR
1915.52 (b)(3) only requires additional fire watches for specific conditions, however the Contractor shall provide fire watches for all hot work as mentioned above.
e. The Contractor is responsible for compliance with USCG regulations for handling of inflammable and combustible liquids. Whenever hot work is to be performed, a certified marine chemist's gas-free certificate shall be furnished to the Government representative at the Contractor's expense prior to commencing work. Additionally, a copy of the most recent gas-free certificate shall be posted near the vicinity of the work and at each gangway for the vessel. The Contractor shall have the marine chemist recertify the vessel for all ongoing hot work permits in the event of any vessel movement or change in ballasted condition or in the case of any combustible liquid spillage. Following any of these events, inspection for recertification by a Competent Person is unacceptable. NOTE – See TP 1.24 for additional details and requirements.
f. All work in confined areas or enclosed spaces shall be performed in accordance with
Sections 06.I and 19.A.08 of EM 385-1-1, "Safety and Health Requirements Manual", dated 30 November 2014 as amended. In such areas or spaces the Contractor shall test for the concentration of oxygen and have immediately available a sufficient number of respirators for everyone working in such areas or spaces. An attendant shall be stationed outside every confined space while work is being performed therein and a rescuer equipped with respirators and retrieval lines shall be immediately available in case of an emergency.
g. The Contractor shall furnish a gangway, conforming to EM 385-1-1, most recent revision, of suitable strength and construction for safe and convenient boarding of the vessel at all times.
The gangway shall be installed at an angle of less than 40 degrees and shall have 39-inch high guardrails at both sides. Hatches and openings that present a falling hazard shall be provided with suitable and substantial guards.
h. All exits and passageways shall be kept free of obstructions and shall be kept well lighted at all times.
i. The Contractor shall maintain an accurate record of, and shall report to the COR, in the manner and on the forms prescribed by the COR, exposure data and all accidents, resulting in death, traumatic injury, occupational disease, and/or damage to property, materials, supplies and equipment incident to work performed under this Contract.
j. The COR will notify the Contractor of any non-compliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions. Such notice, when delivered to the Contractor or his/her representative at the site of the work, shall be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the KO may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop order shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor.
k. Compliance with the requirements of this provision (SC-4) by any subcontractors shall be the responsibility of the Contractor.
SC-6 Performance of Work by the Government
The Government reserves the right to quarter and subsist the crew on the vessel and to perform certain work while the plant is in the Contractor’s possession. Government personnel, as well as any other Government Contractors, materials, equipment, and tools, shall be permitted to access the vessel while in the Contractor’s possession and to perform the work mentioned above.
SC-7 Labor Reports
The Contractor shall keep and maintain complete payroll records for the duration of time covering the work under this Contract for a period of three (3) years from the end of such periods, and such records shall be made available for Government inspection upon request.
SC-8 Workmanship
a. General
1. All labor shall be especially skilled for each kind of work, thorough and first class in every respect, and under competent direction.
2. Where work of one trade joins, passes through or is on other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damaging of previously acceptable construction shall be cause of Contractor's replacement at no additional cost to the Government.
3. All parts of the work intended to join or bear upon others shall have complete and solid surface contact and fit together neatly without excessive cold work during erection. All faying surfaces shall be painted and be clean and smooth before bolting up. Shims or liners shall not be used for the purpose of overcoming a bad fit. Stopwaters shall be used only in seams or landings passing through or attached to watertight members.
4. All watertight staples and collars shall be malleable castings or forged from angles close fitting and with solid bearing over the entire faying surface. They may be riveted and caulked or welded watertight.
5. Ends of outstanding flanges shall be cropped.
6. Lightening holes may be punched or burned and all edges shall have burrs removed.
7. All hull castings shall be machined or ground to bear solidly against the connecting structure and all holes drilled. Holes in members having sharp curvature shall be avoided whenever practicable.
8. Limber and air holes in adequate size shall be cut in floors and elsewhere to provide free drainage and passage of air. Limber holes shall be located at the level of any cement waterways.
9. All new and disturbed iron and/or steel work shall have its finish restored in kind, or as otherwise indicated by specification.
b. Cutting
1. All edges and corners of plates and shapes shall be smooth and free of burrs. The use of a cutting torch is permissible for cutting plates and shapes to size, but burning of bolt or rivet holes will not be permitted. New hull or bulkhead plates installed under this Contract shall have 2" minimum radius corners unless otherwise directed by the COR.
c. Welders and Welding
1. All welding performed under this Contract shall be accomplished only by welders who have successfully passed the qualification tests of ABS, the American Welding Society and/or the ASME for the type of welding to be performed by each welder. Copies of the certifications of each welder the Contractor wishes to use for Contract work shall be provided to the COR by the Contractor prior to the beginning of Contract work.
2. The Contractor shall bear the expense of conducting these tests and shall certify by name to the COR, welders who have successfully passed the prescribed test. The Contractor shall require any welder to repeat these tests when, in the opinion of the COR, the work of the welder indicated a reasonable doubt of his/her efficiency. In such cases, the welder shall be re-certified as above if he/she successfully passes the re-test.
3. The electrodes used throughout the work shall be suitable for use with the parent metal at each weld. Electrodes shall be received on the job in unbroken packages bearing the manufacturer's label or be otherwise marked. Certified statements shall accompany each shipment of electrodes to the effect that sample pieces, representatives of each kind and size in each shipment, have satisfactorily passed the tests required by ABS.
4. All welding procedures shall conform to American Bureau of Shipping standards where applicable.
5. Welding procedures, as to direction, length, number and sequence of beads, shall be carefully planned so as to minimize locked up stresses, shrinkage and distortion.
d. Standard Parts
1. All articles, fittings, equipment, machinery and supplies used in the work covered by these specifications shall, as far as possible, be the manufacturer's standard articles, of reliable make, the manufacturer's current product, for which spare parts are readily available.
2. All materials, equipment, and machinery installed in or delivered with the vessel shall be new and of the quality specified herein.
SC-9 General Requirements for Surface Preparation, Coating System, and Painting
a. All paint specified to be applied under this Contract shall be furnished by the Contractor unless stated otherwise.
b. Surface preparation, painting, staining, and varnishing of new and old construction, shall be in compliance with "Painting: New Construction and Maintenance", EM 1110-2-3400, 30 April 1995. All paint in use shall be thoroughly mixed at frequent intervals. Any materials not specified shall be the best of their kind suitable for marine work and subject to the approval of the COR.
c. During all exterior sandblasting and painting operations, the Contractor shall ensure that all areas of the drydock that are open to the atmosphere are covered (i.e. curtained) to prevent the dust cloud from spreading to other areas, specifically outside of the drydock. Similarly, if a marine railway is used for removing the vessel from the water, the Contractor shall ensure that all areas surrounding the vessel are covered to prevent the dust cloud from spreading to other areas.
d. Following the completion of all sandblasting, the Contractor shall remove and properly dispose of all sandblasting grit.
e. Hydroblasting may be utilized in conjunction with sandblasting, however all surfaces shall be sandblasted to provide surface profile.
f. Paint shall not be applied when atmospheric conditions will affect its application or durability.
g. Each coat of paint should adhere firmly and uniformly to the surface to which it is applied.
Sufficient drying time shall be allowed between coats.
h. In general, if paint is sprayed, each coat of paint shall consist of a double spray coat in which the surface or section of a surface to be coated is sprayed in a series of half-lapped passes over the surface or section of the surface, and then sprayed again at right angles to the first spraying direction in half-lapped passes.
Following completion of all coatings, the Contractor shall provide a report from the coatings manufacturer’s representative. The report shall document all coatings, environmental parameters during the application of coatings, and all coating thickness readings. The report shall include a statement from the manufacturer’s representative certifying that the application of all coatings has been performed in accordance with their requirements.
SC-10 Standard Hull Materials
All structural hull material shall be in accordance with the current rules of ABS, or with the following specifications:
Standard Specifications for Structural Steel: ASTM A131/A131M Rev A;
Standard Specifications for Carbon and Alloy Steel Forgings for Thin-Walled
Pressure Vessels: ASTM A372/A372M;
Standard Specifications for Steel Castings, Carbon, for General Application: ASTM
A27/A27M;
Standard Specifications for Steel Castings, High Strength, for Structural Purposes:
ASTM A148/A148M
Standard Specifications for Gray Iron Castings: ASTM A48/A48M.
SC-11 Electric Power, Steam, Water, Compressed Air, and Heating Oil
The contractor shallfurnish all necessary steam, compressed air, and electric power for lighting and heating, and for the operations of necessary deck and auxiliary machinery of the plant while it is in his/her possession. The Contractor shall provide water for use on the vessel. The water is intended to be used for sinks and toilets and therefore does not need to be potable. The Contractor shall also furnish No. 2 diesel oil in a portable oil tank for connection to the oil burner heating unit on the vessel.
The Contractor is responsible for providing all labor, hoses, electrical cable, and any other equipment or material needed to make up the connections for the services identified above. The Contractor is also responsible for disconnecting the services at the completion of the Contract.
SC-12 Wharfage, Dockage, Garbage Disposal, Etc.
While the plant is in his/her possession, the Contractor shall be responsible for any, and pay all expenses of wharfage, dunnage, dockage, mooring lines, garbage disposal, security, etc. The Contractor, after making repairs shall move the boat to a convenient berth for the purpose of testing machinery and taking on supplies. Fresh water for the use of the plant shall be provided by the Contractor, at his/her expense, while the plant is in his/her possession, and all fresh water tanks shall be properly filled on completion of the work and return of the plant to the Government.
SC-13 Tests and Trials
All machinery or other equipment installed, repaired or worked on by the Contractor shall be tested upon completion of all work to demonstrate proper installation and operation to the COR.
This shall include all removals for access and/or interference (See Contract Clause SW-1-h. for details).
Rework on any such equipment to demonstrate proper installation and operation shall be performed at the expense of the Contractor.
SC-14 Contractor Cooperation with the U.S. Coast Guard, the American Bureau of Shipping and the Contracting Officer’s Representative
The Contractor shall cooperate with the COR in the recertification and/or inspection of the vessel by the U.S. Coast Guard (USCG), ABS and the COR. All costs associated with the Contractor's cooperation shall be the responsibility of the Contractor. The Contractor's cooperation during or in connection with such investigations may include, but not be limited to, the following:
a. Dye penetrant, water hose, air lance, and/or vacuum box testing of any welds performed under this Contract;
b. Flooding of areas of decks, small voids, small tanks and small spaces for testing of watertight integrity whether worked on under this Contract or not;
c. Hydrostatic pressure testing of all new piping and all piping that has been worked upon by the Contractor;
d. Manual movement of any unattached objects or any objects which can be easily dismounted or opened and moved anywhere on the vessel;
e. The Contractor shall provide the services of a marine surveyor to audio gauge various locations throughout the vessel. The Contractor is responsible for all coordination to ensure that the marine surveyor and their equipment are acceptable to ABS and USCG prior to the start of any audio gauging work. For the purposes of bidding, the Contractor shall assume that fifty (50) audio gauge “shots” are required.
The Contractor is also responsible for having the marine surveyor provide a detailed report of the audio gauge readings.
As part of this work, the Contractor is also responsible for providing all labor and equipment for removal of paint in way of a reading and repairing paint, including non-skid where applicable.
Note - The audio gauging work required by this section is separate from the work identified under TP 1.25. The work under TP 1.25 may or may not be directed by the Contracting Officer depending on the number of shots needed.
f. Minor interruptions of work for purposes of inspection not to exceed eight (8) man-hours of such interruptions.
g. Scheduling of work to accommodate inspections of sea valves, sea chests, tanks, hull sections and spaces, machinery and electrical items.
For the purpose of monitoring the quantity of man-hours used for items f. above, the Contractor shall maintain a log sheet to document the number of man-hours worked throughout the Contract completion. The Contractor shall request approval and signature of the Government Representative on site for each entry on the log sheet to verify the information.
SC-15 Watch Service Requirements
The Contractor shall provide a 24 hour watch service to respond to any emergencies/alarms on the vessel while in the Contractor’s possession. The watchman will be given a key to the HAYWARD for use at night, on weekends and on holidays. The Contractor shall provide the name and qualifications of the watchman in writing to the COR. This information shall be submitted no later than 10 days after the Contract award date and shall be a prerequisite to the start of any work on the vessel.
SC-16 Vessel Security
The Contractor is responsible for security while the vessel is in the Contractor’s possession.
Physical means of preventing unauthorized access (i.e. gated access) to the vessel shall be provided in accordance with Federal Acquisition Regulation (FAR) Clause 252.217-7016 - Plant Protection.
Technical Provisions
Hull Repairs - Definite Items
TP 1.01 Drydocking
a. The vessel shall be drydocked within five (5) calendar days after delivery of the vessel to
Contractor’s yard. See Paragraph SC-1 for additional details on vessel delivery. The vessel shall be drydocked for such time as may be necessary to complete the work required by this Contract. In particular, but not limited to the following, the vessel shall be drydocked for any exterior hull cleaning and painting below the waterline and for any interior or exterior hull plating, cutting, welding, plate replacement or structural repair or replacement within or upon the hull including hull anodes, rudders, shafts and propellers.
b. Irrespective of whether the vessel is in drydock, the Contractor is responsible for ensuring that there is a suitable drydock available for the plant for the entire Contract duration in the event that an emergency drydocking of the plant should be necessary for any reason.
c. The COR may allow exceptions at his/her discretion to the necessity for drydocking for various items of work on a case-by-case basis only when informed by the Contractor and allowed to render a decision prior to any work being performed on the requested exception.
d. The vessel shall be drydocked in accordance with the drydocking plan prepared by the U.S.
Army Corps of Engineers Marine Design Center, Drawing Number 574-E170-01. See the attached file named “574-E170-01.pdf” which is included in the Contract package.
e. Drydocking blocks and other drydocking supports shall not obstruct access to remove, work upon, or replace: docking plugs, discharge openings, seachests, anodes, shafts, struts, stern tubes, propellers, rudders, keel coolers or any other hull fittings. The Contractor shall remove and relocate drydocking blocks and/or supports, or refloat and redrydock the plant, as needed at no additional cost to the Government in order to assure complete coverage in cleaning and painting or for any other work as specified herein. Prior to doing so, the Contractor shall notify the COR of their plan to relocate the blocks to adequately support the vessel.
f. The Contractor shall install temporary grounding straps from the vessel's hull to the dry dock's steel structure. The Contractor shall ensure that the straps will adequately protect the vessel from any stray currents that may be present from shore side power source.
g. Any direction by the COR for work required under these specifications including the direction of indefinite work items which extends drydocking time within the overall Contract duration shall not result in any additional cost to the Government.
h. Prior to undocking the vessel, the Contractor shall notify the COR and the master of the vessel. Notification shall be provided a minimum of twenty-four (24) hours prior to undocking.
i. When undocking the vessel, all interior spaces and systems affected by work performed under this Contract shall be inspected for leakage, watertight integrity and/or seaworthiness by the Contractor and witnessed by COR or designated Government Representatives onsite.
TP 1.02 Gas-Freeing Compartments
a. Within three (3) calendar days after drydocking the vessel, the Contractor shall furnish all labor, material, equipment, and services to gas-free all hull compartments and make each space safe for entry and hot work. The contractor shall use forced air if needed to gas free the hull compartments.
b. The hull compartments to be gas-freed, tested, and certified are listed below (10 total):
Forepeak Fwd Potable Water Tanks (P/S) Reserve Fuel Oil Tanks (P/S) Main Fuel Tanks (P/S) Fuel Day Tanks (P/S) Aft Potable Water Tank
c. The Contractor shall provide a licensed marine chemist’s gas-free certificates for each space and shall then maintain the chemist’s gas-free conditions for entry and hot work throughout the vessel modifications, including all definite and indefinite work, until all work as been verified as complete by the COR, ABS, and USCG.
d. If the gas-free conditions are violated at any point during the performance of this work, the contractor shall bear the full expense of gas-freeing the space and providing an updated marine chemist’s gas-free certificate.
e. The contractor shall strictly comply with the requirements of EM 385-1-1 “Safety and Health
Requirements Manual” as stated above in SC-4 “Accident Prevention” in regard to gas freeing all spaces requiring hot work.
NOTE – Costs associated with gas-freeing shall only be included under TP 1.02 and shall not be included under SC-4. See TP 1.24 for additional gas-freeing requirements, if directed.
TP 1.03 Docking Plugs
a. The Contractor shall remove the thirteen (13) docking plugs near frame locations 6, 16, 23, 36 and 48, port and starboard, according to the docking plan. The contractor shall remove the eleven (11) hull guard fill plugs (4 port, 6 starboard, 1 aft at CL). The contractor shall also remove the thirteen (13) hull guard drains (6 port, 7 starboard). The contractor shall drain the hull compartments and hull guards and dispose of all fluids in accordance with all applicable Federal, State and Local regulations. Prior to vessel refloating, the contractor shall allow Government personnel to clean and dry the interior surfaces of any compartments prior to the reinstallation of the docking plugs by the contractor. (Locations of fills: frames 3s, 7s, 16 p/s, 25 p/s, 30 p/s, 50 p/s, transom cl. Locations of drains: 7s, 16 p/s, 25 p/s, 30 p/s, 34 p/s, 35 p/s, 50 p/s.)
b. Any drainage through the docking plugs or hull guard drains from both normal accumulations and from any cleaning in (a) above or in TP1.05 "Interior Cleaning and Painting" below will be disposed by the contractor as per indefinite item in TP1.23, "Bilge Water Disposal", in accordance with all Federal, State, and Local regulations.
c. Docking plugs shall be reinstalled with new gaskets after cleaning and drying of the interior spaces, if such cleaning and drying is specified elsewhere in these specifications, and prior to any sandblasting/sandwashing of the hull exterior or refloating of the vessel.
d. Hull guard fills and drains shall be reinstalled after drainage from the hull guards stops and prior to any sandblasting/sandwashing of the hull exterior or refloating of the vessel.
TP 1.04 Exterior Cleaning and Painting
a. General
1. The Contractor shall clean and paint the exterior of the vessel using only paints that are compliant with the requirements specified herein in addition to all Federal, State and Local environmental laws.
2. Paint systems shall, in general, consist of three-part epoxy paint systems: primer, anti-corrosive and finish. A system by any given producer once chosen by the Contractor shall be used consistently throughout the vessel and shall be applied according to the manufacturer’s directions. The finish coat on the hull exterior above the waterline shall be a gloss or hi-gloss epoxy, acrylic epoxy or waterborne acrylic. The finish coat below the waterline shall be an environmentally compliant anti-fouling coat. No paint used by the Contractor under this Contract shall be older than its shelf life as determined by its manufacturer at the time of its application to the vessel.
b. Procedure
NOTE - The Contractor shall coordinate an inspection with the Government Representative on site prior to the start of any sandblasting or pressure washing to ensure that all areas, equipment, and fittings are adequately protected.
The Contractor shall perform the following work in sequence:
1. Remove all old hull anodes as follows:
a. Remove all fully and partially consumed anodes; leaving stubs of old anode straps still attached to the hull.
b. The Contractor shall minimize contact with the hull of burning gas jets used to remove anodes.
2. Cover and protect all hull and house openings, equipment and fittings including but not limited to propeller shafts, rudder bearings, sea chests, transducers, windows, deck and crane machinery, antennas, speakers, radar, all fenders, and any other items which could be damaged by exterior cleaning operations. Any items so damaged shall be replaced at the Contractor’s expense. At no time shall sandblasting grit be permitted to enter the vessel.
3. Surfaces to be sandblasted or sandwashed shall be degreased prior to cleaning.