W912BU-17-R-0008_Amendment_0002.pdf
PDF 23 KB Posted
- Attached to
- Analytical Laboratory Services for Environmental Sample Analysis Federal contract opportunity
- Solicitation number
- W912BU-17-R-0008
About this file
Amendment 0002 under W912BU-17-R-0008
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BU-17-R-0008_Amendment_0001.pdf | ||
| Subcontracting_Plan.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| Small_Business_Participation_Plan.pdf | ||
| W912BU-17-R-0008_Solicitation_2-28-2017.pdf | ||
| Schedule_B_Rates_02082017.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US ARMY ENGINEER DISTRICT, PHILADELPHIA
POC: LINDA DOBBS
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation No. W912BU-17-R-0008 Amendment 0002
See attached.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Mar-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-17-R-0008
X 9B. DATED (SEE ITEM 11)
28-Feb-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Mar-2017
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912BU
FACILITY CODECODE
EMAIL:TEL:
W912BU-17-R-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0002
1) The purpose of this amendment is to delete the following proposal submission (portion to be deleted is highlighted in yellow) which was originally required under Schedule B Information, located on Page 3 as this is no longer required:
The laboratory Quality Assurance Manual/Plan shall be submitted with the proposal. Laboratory SOPs for all analyses listed in Schedule B shall also be submitted with the proposal. If there is a need to employ subcontract laboratories to address all testing needs listed in Schedule B, the Quality Assurance Manual/Plan(s) and SOPs for the proposed subcontractor shall also be provided with the proposal.
2) The closing date for the receipt of proposals remains unchanged.
3) All other terms and conditions remain the same.
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
SCHEDULE B INFORMATION
Method references and analytical parameters to be used are summarized in Schedule B and Table 5-3A. The laboratory shall provide unit costs for each of the parameters listed in Schedule B and Table 5-3A. A single unit cost shall be provided by the laboratory for each line item regardless of the sample matrix (i.e., the same price will be applicable for soil, water, or waste samples).
The unit cost shall also include sample bottles, preservatives, and coolers. Test methods to be used will consist of the latest promulgated versions of SW-846, CLP, or other published analytical procedures. No draft versions will be used unless specifically requested prior to analysis. In addition, the unit cost quoted for each analytical method shall include the cost of processing, reducing and delivering the analytical data. Other analytical services not specified in this scope of work may be requested at some point during the course of the contract period. If this occurs, these unit costs will be negotiated at that time.
The laboratory Quality Assurance Manual/Plan shall be submitted with the proposal. If there is a need to employ subcontract laboratories to address all testing needs listed in Schedule B, the Quality Assurance Manual/Plan(s) for the proposed subcontractor shall also be provided with the proposal.
W912BU-17-R-0008
(End of Summary of Changes)
File details come from the government source that posted it. Updated .