W912BU-17-B-0008_Specs-AM1.pdf
PDF 196 KB Posted
- Solicitation number
- W912BU-17-B-0008
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912BU-17-B-0008_Amendment_0002.pdf | ||
| W912BU-17-B-0008_Dwgs-AM0002.pdf | ||
| W912BU17B0008-Dwgs.pdf | ||
| W912BU17B0008-Specs.pdf | ||
| W912BU-17-B-0008.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
XX The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) as Amendment No. 0001. Failure to acknowledge all amendments may be cause for rejection of the bid.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
W912BU
Beachfill, Long Beach Island, Ocean County, New Jersey
THIS AMENDMENT ANSWERS RFI'S AND MODIFIES WAGE RATES. RFI'S WILL NOT BE ANSWERED
AFTER 29 August 2017. THE BID OPENING DATE REMAINS 11 SEPTEMBER 2017 AT 11:00 A.M.
Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD)
E5CTCRH9
US ARMY ENGINEER DISTRICT, PHILADELPHIA
WANAMAKER BUILDING, 100 PENN SQUARE EAST
PHILADELPHIA, PENNSYLVANIA 19107-3390
US ARMY ENGINEER DISTRICT, PHILADELPHIA
POC: Robert Hilton
WANAMAKER BUILDING, 100 PENN SQUARE EAST
PHILADELPHIA, PENNSYLVANIA 19107-3390
9A. AMENDMENT OF SOLICITATION
NO.
W912BU-17-B-0008
08/28/2017
9B. DATED (SEE ITEM 11)
08/11/2017
1 1
X
This page was intentionally left blank for duplex printing.
Amendment No. 0001
IFB W912BU-17-B-0008
14. DESCRIPTION OF AMENDMENT (continued)
a. REQUESTS FOR INFORMATION (RFI) WITH RESPONSES: RFI’s with responses, annotated Amendment No. 0001, attached hereto.
b. SECTION 00 73 15 – WAGE RATES: Please delete pages 00 73 15-11 to 00 73 15-19 in their entirety and substitute revised pages of the same numbers, annotated Amendment No. 0001, attached hereto.
c. Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0001. Failure to acknowledge all amendments may be cause for rejection of the bid.
RFI# Request for Information Response
Clause 52.228-1; page 133 of the Contract Solicitation sentence (c) the amount of the bid guarantee is not included.
a) Can the Government provide the Bid Guarantee amount as required?
The amount of the bid guarantee shall be 20% percent of the bid price or $3,000,000.00, whichever is less.
Page 73 of the Contract Solicitation- Clause 52.217-9; Option to Extend the Term of the Contract, sentence (c) states the total duration of this contract including the exercise of any options under this clause shall not exceed 180 calendar days. Page 67 of the Contract Solicitation- Clause 52.211-10;
Commencement, Prosecution and Completion, sentence (c) states the Contractor shall complete the base bid work ready for use within 180 calendar days after receipt of NTP. If Options are awarded contract performance would be extended as listed for the option awarded.
a) Can the Government clarify this; will the Contractor be allowed to work additional days past the 180 day completion timeline if options are awarded?
Each option, if awarded, would extend the contract by the number of days listed for that option.
Can the Government specify when the last dredging event occurred in Borrow Area D-2D (specified for use with this Contract)?
a) Was there any MEC encountered in the last dredging event?
November of 2016 was the last time dredging occurred in Borrow Area D-2D. Yes MEC was encountered.
As according to Section 01 35 30- Paragraph 1.4 UXO Technicians, sentence
(a) the Contractor is to provide one UXO Technician. The UXO Technician shall provide 24 hour, 7 day per week MEC support on the beach.
a) Does the Contractor have to provide MEC support on the beach during all dredging operations? One UXO Technician will not be able to provide around the clock service.
b) Is it the Governments intent for the Contractor to provide MEC support for each shift during dredging operations (potentially 2 or 3 Technicians)? If so can the Government revise the Section to state as such?
A UXO Tech is required at the site during dredging operations. The Contractor will determine length and number of shifts (i.e. number of UXO Techs required to meet contract requirements).
As According to Section 01 57 20, Page 13 of the Contract Specifications;
section 3.7.3.1 Avoidance- it is stated “The advice of the onboard NMFS approved observer, if present, shall be followed at all times. If no NMFS observer is on board the COR shall be notified of any whale activity.
a) It is not clear if endangered species, whale/turtle or sturgeon monitors are required to be present on Hopper Dredges during dredging operations. Can the Government clarify this for the Contractors?
Contractor observers (NMFS approved) are not required on hopper or hydraulic dredges as long as the dredges are equipped with MEC screens.
NMFS approved Contractor observers are required at all times on hopper and hydraulic dredges if no MEC screens are in place.
Is there a specific order of work for the Contractor in regards to the beach fill sections? There is no order of work for beachfill operations.
7 Can the Government clarify when pre bid inquiries (questions) are due? All RFI's are due 29 August 2017.
REQUESTS FOR INFORMATION with RESPONSES Solicitation No. W912BU-17-B-0008
Section 00 73 15 Page 11
General Decision Number: NJ170060 08/04/2017 NJ60
Superseded General Decision Number: NJ20160060
State: New Jersey
Construction Type: Heavy
County: Ocean County in New Jersey.
HEAVY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.
The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 02/10/2017 2 03/03/2017 3 04/21/2017 4 05/19/2017 5 06/02/2017 6 06/09/2017 7 08/04/2017
ASBE0089-004 07/01/2016
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR ((includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement))......................$ 42.02 31.83
PAID HOLIDAYS:
The last day prior to the Christmas and New Year's Day
Section 00 73 15 Page 12 observed holiday: 4 hrs. pay.
BRNJ0004-001 11/01/2016
Rates Fringes
CEMENT MASON.....................$ 40.00 29.29
CARP0006-013 05/01/2017
Rates Fringes
CARPENTER (Including Form Work)............................$ 47.28 57%
The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
CARP0454-009 05/01/2016
Rates Fringes
PILEDRIVERMAN....................$ 43.95 31.32
PAID HOLIDAYS:
New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day; provided that the worker works any of the three days in the five-day work week preceding the holiday and the first work day after the holiday.
CARP0715-007 11/01/2016
Rates Fringes
Millwright.....................$ 46.55 56%
Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
* ELEC0400-007 05/29/2017
Rates Fringes
Electrician & Cable Splicer......$ 47.50 34.68
ENGI0825-021 01/01/2016
Section 00 73 15 Page 13
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 47.70 29.80
GROUP 2.....................$ 46.05 29.80
GROUP 3.....................$ 43.91 29.80
GROUP 4.....................$ 42.41 29.80
GROUP 5.....................$ 40.69 29.80
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.
New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided
1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.
DEFINITION OF GROUPS:
GROUP 1:
Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);
Elevating Grader; Excavator; Front End Loader (5 cu. yd.
and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable)
GROUP 2:
Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);
Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom
GROUP 3:
Asphalt Spreader; Bulldozer; Compressor(2 or 3) (in Battery) (within 100 ft.); Crusher; Forklift; Front End Loader (1
cu. yd. and over but less than 2 cu. yd.); Lull; Mechanic;
Paver, Asphalt; Roller, Blacktop; Tractor;
GROUP 4:
Broom; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Roller, Grade; Pump
GROUP 5:
Section 00 73 15 Page 14
Oiler
IRON0011-014 07/01/2016
Northern Third of County
Rates Fringes
IRONWORKER
Reinforcing.................$ 39.24 42.92 Structural, Ornamental and Rigger......................$ 41.54 42.92
IRON0068-018 07/01/2016
Middle Third of County
Rates Fringes
IRONWORKER
Reinforcing.................$ 44.55 20.88 Structural, Ornamental and Rigger......................$ 46.54 20.88
IRON0350-010 07/01/2016
Southern Third of County
Rates Fringes
Ironworkers:
Reinforcing.................$ 45.67 37.75 Structural, Ornamental and Rigger......................$ 46.67 37.75
LABO0172-009 03/01/2017
Rates Fringes
Laborers:
Common or General Laborer;
Landscape Laborer, Power Tool Operator...............$ 38.75 28.60 Pipelayer...................$ 39.45 28.60
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is required to wear Level A, B or C personal protection: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site, where the worker is not required to wear Level A, B, or C personal protection: $1.00 per hour additional.
Section 00 73 15 Page 15
New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided that the worker works three days for the same employer within a period of ten working days consisting of five working days before and five working days after the day upon which the holiday falls or is observed.
LABO0222-013 07/01/2012
Rates Fringes
LABORER
MASON TENDER:
Cement/Concrete.............$ 29.35 23.07
PAIN0711-023 05/01/2017
Rates Fringes
Painters:
Work on bridges (Major Bridges Designed for Commercial Navigation)......$ 54.13 27.12
PAIN0711-024 05/01/2017
Rates Fringes
Painters:
New Construction Brush and roller...........$ 40.19 22.72 Repaint work, on projects on which no major alterations occur.
Brush and roller...........$ 29.05 18.91
PLUM0009-025 03/01/2017
OCEAN COUNTY (north of a line drawn from the Atlantic Ocean following a line westerly through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town of Waretown; then, continuing along County Road Route 532 until County Road Route 532 becomes State Highway Route 72; then, continuing along State Highway Route 72 until it reaches the Burlington County line):
PIPEFITTER.......................$ 47.47 35.51
Service and Repair..........$ 37.48 21.08
PLUM0322-012 05/01/2016
Section 00 73 15 Page 16
OCEAN COUNTY (south of a line drawn from the Atlantic Ocean following a line westerly through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town of Waretown; then, continuing along County Road Route 532 until County Road Route 532 becomes State Highway Route 72; then, continuing along State Highway Route 72 until it reaches the Burlington County line)
PIPEFITTER.......................$ 44.42 36.34
TEAM0469-008 11/01/2016
Rates Fringes
Truck drivers:
Dump Truck; Flatbed Truck;Pick up truck.........$ 38.75 30.085 Dump Truck; Flatbed Truck...$ 36.75 27.935 Off the Road Truck; Pickup Truck.......................$ 36.60 27.935 Off the Road Truck..........$ 38.90 30.085
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour additional.
New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day.
VACATION PAY CREDIT:
Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours).
Section 00 73 15 Page 17
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the
Section 00 73 15 Page 18 most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on
Section 00 73 15 Page 19 a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
| SF30 |
| AMENDMENT DESCRIPTION |
| REQUESTS FOR INFORMATION |
| 00 73 15 WAGE RATES |
File details come from the government source that posted it. Updated .