W912BU-17-B-0005_Specs-AM3.pdf

PDF 1 MB Posted

Attached to
Assunpink Creek Stream Daylighting Federal contract opportunity
Solicitation number
W912BU-17-B-0005
Issued by
Department of the Army Corps of Engineers Engineering District Philadeplhia

About this file

Amendment 3 Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Assunpink Creek Stream Daylighting, newest first.
File Type Posted
Formal_Abstract.pdf PDF
W912BU-17-B-0005_Dwgs-AM4.pdf PDF
W912BU-17-B-0005_Specs-AM4.pdf PDF
W912BU-17-B-0005_Dwgs-AM3.pdf PDF
W912BU-17-B-0005_Specs-AM2.pdf PDF
Lower_Assunpink_Final_RIR-RAR_-_Watermark_Env._(11.04.16).pdf PDF
Site_Visit_Sign-In_Sheet_-_Assunpink_17-B-0005.pdf PDF
17B0005-SPECS-VOL1-100_.PDF PDF
17B0005-DWGS-100_.pdf PDF
17B0005-SPECS-VOL2-100_.PDF PDF
17B0005-SPECS-VOL3-100_.PDF PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

STREAM DAYLIGHTING AND ECOSYSTEM RESTORATION, LOWER ASSUNPINK CREEK, MERCER COUNTY, NEW JERSEY

THIS AMENDMENT WILL EXTEND THE BID OPENING DATE FROM 16 JUNE 2017 TO 28 JUNE 2017 AT 3:00 P.M. EST.

ALL RFI's HAVE BEEN EXTENDED TO 12 JUNE 2017 COB.

E5CT9RH9

US ARMY ENGINEER DISTRICT, PHILADELPHIA

WANAMAKER BUILDING, 100 PENN SQUARE EAST

PHILADELPHIA, PENNSYLVANIA 19107-3390

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: ROBERT HILTON

WANAMAKER BUILDING, 100 PENN SQUARE EAST

PHILADELPHIA, PENNSYLVANIA 19107-3390

9A. AMENDMENT OF SOLICITATION

NO.

W912BU-17-B-0005

06/7/2017

9B. DATED (SEE ITEM 11)

05/16/2017

XX

1 1

Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0003. Failure to acknowledge all amendments may be cause for rejection of the bid.

This page was intentionally left blank for duplex printing.

Amendment No. 0003

IFB W912BU-17-B-0005

14. DESCRIPTION OF AMENDMENT (continued)

a. REQUESTS FOR INFORMATION (RFI) WITH RESPONSES: RFI’s with responses, annotated Amendment No. 0003, are attached to this amendment.

b. SECTION 00 45 05 – SMALL BUSINESS SUBCONTRACTING PLAN: Please delete Section 00 45 05 in its entirety and substitute revised Section 00 45 05, annotated Amendment No. 0003, attached hereto.

c. SECTION 00 73 15 – WAGE RATES: Please delete pages 00 73 15-24 to 00 73 15-45 in their entirety and substitute revised pages of the same numbers, annotated Amendment No. 0003, attached hereto.

d. TECHNICAL SPECIFICATIONS:

(1) Section 01 33 00 – SUBMITTAL REGISTER: Please delete page

01 33 00-15 through 01 33 00-31 in their entirety and substitute the revised pages 01 33 00-15 through 01 33 00-31, annotated

Amendment No. 0003, attached hereto.

(2) Section 01 50 00 – TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS:

Please delete Section 01 50 00 in its entirety and substitute the revised Section, annotated Amendment No. 0003, attached hereto.

(3) Section 01 57 20 – ENVIRONMENTAL PROTECTION: Please delete pages 01 57 20-9 to 01 57 20-16 in their entirety and substitute the revised pages, annotated Amendment No. 0003, attached hereto.

(4) Section 01 57 20 – ENVIRONMENTAL PROTECTION: Please add pages

01 57 20-24 through 01 57 20-26 to Section 01 57 20, annotated Amendment No. 0003, attached hereto.

(5) Section 02 41 00 – DEMOLITION: Please delete Section 02 41 00 in its entirety and substitute the revised Section, annotated Amendment No. 0003, attached hereto.

e. CONTRACT DRAWINGS:

Please delete the drawings CD-101, C-301, C-501, and S-101 in their entirety and substitute the revised drawings, of the same drawing numbers, with the latest revision date of 6 June 2017, attached hereto:

f. Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0003. Failure to acknowledge all amendments may be cause for rejection of the bid.

RFI# Request for Information Response

Section 00 45 05 on Page 1 lists a different Item/Service description than that of the Assunpink Creek Daylighting project. Please clarify and confirm that the Small Business Subcontracting percentage goals listed are correct for this Solicitation.

Section 00 45 05 has been updated to correct the Item/Service. The Small Business Subcontracting percentage goals remain unchanged. See Amendment No. 0003.

Section 00 73 00 lists the hours of work as 7:30 AM to 4:00 PM Monday through Friday with no work permitted on Saturday and Sunday. Section 01 11 00 lists the hours of work as 8:00 AM to 6:00 PM Monday through Friday with work outside these hours requiring CO approval. Please confirm the correct working hours that prevail and please definitively confirm which days of the week can and cannot be worked.

Work Hours are between 7:30 AM to 4:00 PM Monday through Friday. Work is not permitted on Saturday and Sunday. Any work proposed outside this window requires CO approval. See Amendment No. 0002.

Please clarify Section 01 57 20 Page 19 “Pre-Construction Conditions” Article 7 and 8. Are these environmental permit timing restrictions to be construed to mean that no work can be performed on site 4/1 through 6/30 and 8/1 through 10/31 of each year? If so, please re-evaluate the time for completion and add additional time to the contract as this could restrict the 365 calendar days allowed to complete the contact to six (6) months of actual construction time.

If work is allowed to be performed within these permit timeframes, please explicitly state what work can be performed in these time periods.

Section 01 57 20 Paragraph 3.1.a. states “for bidding purposes assume that there will be no restrictions for working in the stream.”

Article 8 was modified by an approved modification to the Flood Hazard Area and Freshwater Wetlands General Permits. Both Article 7 and 8 provide that as long as the contractor employs the appropriate BMPs, there are no timing restrictions. Otherwise the timing restrictions shall remain.

The Government believes the appropriate BMPs are reasonable and therefore the time for completion remains at 365 calendar days. See Amendment No. 0003.

Please provide as-built drawings of the existing double-celled concrete culvert between South Broad Street and South Warren Street. As-built drawings of the culvert are not available.

The Limit of Disturbance, Contractor Work Limit, and Contractor Staging/Storage Area on the South Side of the project appear to take up to one half of the width of Assunpink Drive. Is a traffic shift or permanent lane closure required to be implemented on Assunpink Drive in order to allow for this access? Please provide traffic control plans and details for this work if it is to be the Contractor’s responsibility.

The Contractor is responsible for submitting a road closure request to the City of Trenton to include a contractor developed traffic control plan. Language in Section 01 50 00 of the Specifications has been updated to clarify this requirement. See Amendment No. 0003.

Sheet Number CD-101 indicates the “Approx Limits of Required Temporary Shoring”, however, no further plans or details are given. Please provide the additional plans, sections, and details required for the temporary shoring sequencing, installation, and removal.

Section 31 00 00 of the Specifications includes additional information regarding shoring requirements.

Does the concrete investigation prepared by AMO Environmental Decisions included in the project specifications meet the NJDEP Guidance for Characterization of Concrete and Clean Material Certification for Recycling requirements for recycling the concrete or will additional sampling, characterization and reporting be required?

The AMO Environmental Decisions included meets the NJDEP Guidance for Characterization of Concrete and Clean Material Certification. However, there is no onsite recycling to be done as per the specifications. The Contractor may wish to use concrete removed from the site in offsite recycling applications. It is likely that sampling, characterization, and reporting requirements will be dependent on the final disposal facility or recycling usage of the concrete removed from the site.

Are there any additional specifications on the bench stones other than dimensions shown on the plans? See Amendment No. 0002

Drawing C-101 shows clearly defines contractor access points to the work area and clearly defines the contractor work limits. Will the contractor be allowed to access the underside of the South Broad Street Bridge via the opening between the west fascia of the bridge and the start of the Assunpink Creek Culvert (approximate STA 1+20)? This access point would be utilized to aid in the installation of the upstream water diversions required for the project. Access could be limited to foot traffic only if there is a concern with the buried utility lines in this area.

No. The Contractor will not be allowed to access the site via this point.

REQUESTS FOR INFORMATION with RESPONSES Solicitation No. W912BU-17-B-0005

RFI# Request for Information Response

Please clarify the required limits for the existing culvert removal (notes on the drawings contradict each other). Note 1 on drawing sheet C-501 states to remove the culvert in its entirety other than partial removal between STA 1+89.3 and STA 1+92.3. Typical section 3 and note 2 on drawing sheet C-301 notes that a portion of the slab can remain in place between STA 2+94.3 and STA 3+78.9. Other drawing notes and specifications notes state that that portions of the north tube wall can be left in place for temporary ground support of the building (Southeast corner of building) but this is not noted or shown in typical section 4 on drawing sheet C-501. Can some of the north tube slab be left in place as well for temporary support (similar to that shown on typical section 3)?

Note 1 on Sheet C-501 has been revised. Typical Section 3 and Note 2 on Sheet C-301 are correct. See Specifications Section 31 00 00, 3.4.2 for information regarding use of a culvert section for temporary support. Typical Sections do not indicate the culvert section allowed to be left in place.

Contractor shall determine these limits within the requirements set forth in the Specifications. See Amendment No. 0003

Is any additional as-built information or details available for the existing culvert (other than that shown on sheet C-501)? Is there any estimate on the spacing of the pilasters for the existing culvert (as shown in detail and noted in note 2 on C-501)? No. There is no additional as-built information available.

Elevation 2 on drawing sheet S-101 notes that the bottom of the culvert footing is founded on bedrock (assumed elevation of 5.66). Is it assumed that the culvert is founded on bedrock over the entire length of the culvert? Is rock excavation anticipated as being required for the installation of the 30” thick rip rap (proposed subgrade is lower than bottom of existing culvert)?

Elevation 2 Sheet S-101 has been revised. It is NOT assumed that the culvert is founded on bedrock over the entire length of the culvert. Bidders should review the subsurface information provided in the Specifications, and refer to Specifications Section 31 00 00, 1.4.1 for Classification of Excavation. No special removal requirements are anticipated for material to be excavated, either for installation of the full thickness of riprap, or for construction of the wall footings, as queried. See Amendment No. 0003.

Regarding detail 9 on drawing sheet S-502, can the support angles for the precast panels be field welded after completing installation of the steel piles (as shown the angles are shop welded)? Field welding will help ensure that angles are set precisely at the correct elevation for installation of the precast panels.

The support angles may be field welded as long as the primer and paint are properly repaired after welding operations. The intended procedure should be reflected on the pile shop drawings and in the pile installation plan.

Please confirm that note 2 on drawing sheet S-102 is correctly stated (wording is also same within the Excavation specifications)? As stated, and assuming rock is at the assumed elevation of +2 as shown on S-202, this would result in a 17’ deep rock socket with end bearing at EL -15. As stated if rock is actually encountered at EL -10 (for instance), the end bearing depth would be at EL -20 (minimum 10’ below top of rock). Is this correct? This is correct.

Considering the potential variability in the rock depth for the Drilled Concrete Shafts (Item 10), can this item be broken down into two items (Drilled Concrete Shafts (in Soil) and Drilled Concrete Shafts (in Rock))?

Drilled soil depth may vary depending on the Contractor’s chosen method of construction (means & methods).

Bid as shown.

Please clarify the working hours for the project. As stated there is a discrepancy between what is stated in the 00 73 00 (Special Clauses) and Section 01 11 00 (Summary of Work).

Work Hours are between 7:30 AM to 4:00 PM Monday through Friday. Work is not permitted on Saturday and Sunday. Any work proposed outside this window requires CO approval. See Amendment No. 0002.

Are there any performance or material specifications for the “Soil Choked Riprap” (above the 4’ level of the channel invert) as show in detail 7 on C-301?

Similarly are there any performance or material specifications for the filling of the rip rap voids below the 4’ level (with native sediments as noted in note 4 on C-301)?

No performance or material specifications will be provided. Soil Choked Riprap is top soil. Material used to fill the voids below the 4' level are native sediments which are found within the limits of excavation on the site. See Amendment No. 0003.

00 45 00 - 1

SECTION 00 45 05

SMALL BUSINESS SUBCONTRACTING PLAN

DATE:

CONTRACTOR:

ADDRESS:

SOLICITATION OR CONTRACT NUMBER: W912BU-1 -B-00

ITEM/SERVICE:

The following, together with any attachments, is hereby submitted as a Subcontracting Plan to satisfy the applicable requirements of Public Law 95-507 as implemented by OFPP Policy Letter 80-2. NOTE: To assist you in preparing your subcontracting plan, the U.S. Army Corps of Engineers considers the following goals reasonable and achievable for fiscal year 2017:

(a) Small Business: 0.0% of total planned subcontracting dollars

(b) Small Disadvantaged Businesses (SDB), including Historically Black Colleges and Universities or Minority Institutions: 1 .0% of total planned subcontracting dollars*

( c) Women-owned small businesses (WOSB), .0% of total planned subcontracting dollars*

(d) Hubzone Small Business (HubSB), .0% of total planned subcontracting dollars *

(e) Service-Disabled Veteran-Owned .0% of total planned subcontracting dollars *

(f) Veteran-Owned Small Business .0% of total planned subcontracting dollars *

*small business concerns owned and controlled by.

1. (a) The following percentage goals (expressed in terms of a percentage of total planned subcontracting dollars) are applicable to the contract cited above or to the contract awarded under the solicitation cited.

(i) Small Business Concerns: % of total planned subcontracting dollars under this contract will go to subcontractors who are small business concerns.

(ii) Service-Disabled Veteran-Owned Small Business Concerns: _% of total planned subcontracting dollars under this contract will go to subcontractors who are service-disabled veteran-owned small business concerns.

(iii) HUBZone Small Business Concerns: % of total planned subcontracting dollars under this contract will go to subcontractors who are small business concerns located in a historically underutilized business zone which is an area located within one or more qualified census tracts, qualified nonmetropolitan counties, or lands within the external boundaries of an Indian reservation and appear on the List of Qualified HUBZone Small Business Concerns maintained by the SBA. (http://www.sba.gov/hubzone/).

(iv) Small Disadvantaged Business Concerns: % of total planned subcontracting dollars under this contract will go to subcontractors who are small concerns owned and controlled by socially and economically disadvantaged individuals. This percentage is included in the percentage shown under 1.(a)(i) above, as a subset.

00 45 00 - 2

(v) Women-Owned Small Business Concerns: % of total planned subcontracting dollars under this contract will go to subcontractors who are women-owned small business concerns. This percentage is included in the percentage shown under 1.(a)(i) above, as a subset.

(vi) Veteran-Owned Small Business Concerns: % of total planned subcontracting dollars under this contract will go to subcontractors who are veteran-owned small business concerns. This percentage is included in the percentage shown under 1 (a)(i) above, as a subset.

(b) The following dollar values correspond to the percentage goals shown in (a) above.

(i) Total dollars planned to be subcontracted to small business concerns:

(ii) Total dollars planned to be subcontracted to service-disabled veteran-owned small business concerns:

(iii) Total dollars planned to be subcontracted to HUBZone small business concerns:

(iv) Total dollars planned to be subcontracted to small disadvantaged business concerns: $ - _. This dollar amount is included in the amount shown under 1.(b)(i) above, as a subset.

(v) Total dollars planned to be subcontracted to women-owned small business concerns:

$ . This dollar amount is included in the amount shown under 1.(b)(i) above, as a subset.

(vi) Total dollars planned to be subcontracted to veteran-owned small business concerns:

$ . This dollar amount is included in the amount shown under 1 (b)(i) above, as a subset.

(c) The total estimated dollar value of all planned subcontracting (to all types of business concerns) under this contract is

(d) The following principal products and/or services will be subcontracted under this contract, and the distribution among small, service-disabled veteran-owned small, HUBZone small business, small disadvantaged, women-owned, and veteran-owned small business concerns is as follows:

(Products/services planned to be subcontracted to small business concerns are identified by *, service disabled veteran-owned small business concerns by **, HUBZone small business concerns by ***, small disadvantaged business concerns by **** and women-owned small business concerns by *****, veteran-owned small business concerns******)

(Attachment may be used if additional space is required)

(e) The following method was used in developing subcontract goals (i.e., statement explaining how the product and service areas to be subcontracted were established, how the areas to be subcontracted to small, service-disabled veteran-

00 45 00 - 3 owned small, HUBZone small, small disadvantaged, women-owned small, and veteran-owned small business concerns were determined, and how small, service-disabled veteran-owned small, HUBZone small, small disadvantaged, women-owned small, and veteran-owned small business concerns capabilities were determined, to include identification of source lists utilized in making those determination).

(f) Indirect and over head costs [ ] have [ ] have not been included in the goals specified in 1(a) and 1(b).

(g) If “have” is checked, explain the method used in determining the proportionate share of indirect and overhead cost to be allocated as subcontracts to small business concerns, service-disabled veteran-owned small, HUBZone small business concerns, small disadvantaged business concerns, women-owned small business concerns, and veteran-owned small business concerns.

2. The following individual will administer the subcontracting program:

Name:

Address/Email Address:_____________________________________________________

Telephone:

This individual’s specific duties, as they relate to the firm’s subcontracting program are as follows:

General overall responsibility for this company’s Small Business Program, the development, preparation and execution of individual subcontracting plans and for monitoring performance relative to contractual subcontracting requirements contained in this plan, including but not limited to:

(a) Developing and maintaining bidders lists of small, service-disabled veteran-owned small, HUBZone small, small disadvantaged, women-owned small, and veteran-owned small business concerns from all possible sources.

(b) Ensuring that procurement packages are structured to permit small, service-disabled veteran-owned small, HUBZone small, small disadvantaged, women-owned small, and veteran-owned small business concerns to participate to the maximum extent possible.

(c) Assuring inclusion of small, service-disabled veteran-owned small, HUBZone small, small disadvantaged, women-owned small, and veteran-owned small business concerns in all solicitations for products or services which they are capable of providing.

(d) Reviewing solicitations to remove statements, clauses, etc., which may tend to restrict or prohibit small, service-disabled veteran-owned small, HUBZone small, small disadvantaged, women-owned small, and veteran-owned small business concerns participation.

(e) Ensuring periodic rotation of potential subcontractors on bidders lists.

(f) Ensuring that the bid proposal review board documents its reasons for rejecting low bids submitted by small, service-disabled veteran-owned small, HUBZone small, small disadvantaged, women-owned small, and veteran-owned small business concerns.

(g) Ensuring the establishment and maintenance of records of solicitations and subcontract award activity.

00 45 00 - 4

(h) Attending or arranging for attendance of company counselors at Business Opportunity Workshops, Minority Business Enterprise Seminars, Trade Fairs, etc.

(i) Conducting or arranging for conduct of motivational training for purchasing personnel pursuant to the intent of P.O.

95-507.

(j) Monitoring attainment of proposed goals.

(k) Preparing and submitting periodic subcontracting reports required.

(l) Coordinating contractor’s activities during the conduct of compliance reviews by Federal Agencies.

(m) Coordinating the conduct of contractor’s activities involving its small, service-disabled veteran-owned small, HUBZone small, small disadvantaged, women-owned small, and veteran-owned small business subcontracting program.

(n) Additions to (or deletions from) the duties specified above are as follows:

3. The following efforts will be taken to assure that small, service-disabled veteran-owned small, HUBZone small, small disadvantaged, women-owned small, and veteran-owned small business concerns will have an equitable opportunity to compete for subcontracts:

(a) Outreach efforts will be made as follows:

(i) Contacts with minority and small business trade associations

(ii) Contacts with business development organizations

(iii) Attendance at small and minority business procurement conferences

(iv) Sources will be requested from SBA’s PASS system.

(b) The following internal efforts will be made to guide and encourage buyers:

(i) Workshops, seminars and training programs will be conducted

(ii) Activities will be monitored to evaluate compliance with this subcontracting plan.

(c) Small, service-disabled veteran-owned small, HUBZone small, small disadvantaged, women-owned small, and veteran-owned small business concerns source lists, guides and other data identifying small, service-disabled veteran-owned small, HUBZone small, small disadvantaged, women-owned small, and veteran-owned small business concerns will be maintained and utilized by buyers in soliciting subcontracts.

(d) Additions to (or deletions from) the above listed efforts are as follows:

00 45 00 - 5

4. The bidder (contractor) agrees that the clause entitled Utilization of Small Business Concerns (FAR 52.219-8) will be included in all subcontracts which offer further subcontracting opportunities, and all subcontractors except small business concerns who receive subcontracts in excess of $500,000 will be required to adopt and comply with a subcontracting plan similar to this one.

Such plans will be reviewed by comparing them with the provisions of Public Law 95-507, and assuring that all minimum requirements of an acceptable subcontracting plan have been satisfied. The acceptability of percentage goals shall be determined on a case-by-case basis depending on the supplies/services involved, the availability of potential small, service-disabled veteran-owned small, HUBZone small, small disadvantaged, women-owned small, and veteran-owned small business concerns subcontractors, and prior experience. Once approved and implemented, plans will be monitored through the submission of periodic reports, and/or, as time and availability of funds permit, periodic visits to subcontractors facilities to review applicable records and subcontracting program progress.

5. The bidder (contractor) agrees to submit such periodic reports and cooperate in any studies or surveys as may be required by the contracting agency or the Small business Administration in order to determine the extent of compliance by the bidder with the subcontracting plan and with the clause entitled Utilization of Small Business Concerns, contained in the contract.

6. The bidder (contractor) agrees that he will maintain at least the following types of records to document compliance with this subcontracting plan:

(a) Small, service-disabled veteran-owned small, HUBZone Small, Small Disadvantaged, women-owned small, and veteran-owned small business concerns source lists, guides and other data identifying SB/HZSB/SDB/WO/VO vendors.

(b) Organizations contacted for small, service-disabled veteran-owned small, HUBZone small, small disadvantaged, women-owned small, and veteran-owned small business sources.

(c) On a contract-by-contract basis, records on all subcontract solicitations over $100,000, indicating on each solicitation

(1) whether small business concerns were solicited, and if not, why not; (2) whether service-disabled veteran-owned small business concerns were solicited, and if not, why not; (3) whether HUBZone small business concerns were solicited, and if not, why not; (4) whether small disadvantaged business concerns were solicited, and if not, why not; (5) whether women- owned business concerns were solicited and if not, why not; (6) whether veteran-owned business concerns were solicited and if not, why not; and (7) reasons for the failure of solicited small, service-disabled veteran-owned small, HUBZone small, small disadvantaged, women-owned, or veteran-owned small business concerns to receive the subcontract award.

(d) Records to support other outreach efforts: Contacts with Minority and Small Business Trade Associations, etc.

Attendance at small and minority business procurement conferences and trade fairs.

(e) Records to support internal activities to guide and encourage buyers: Workshops, seminars, training programs, etc.

Monitoring activities to evaluate compliance.

(f) On a contract-by-contract basis, records to support subcontract award data to include name and address or subcontractor .

(g) Records to be maintained in addition to the above are as follows:

Signed:

Date:

00 45 00 - 6

NOTE TO CONTRACTING OFFICER: Upon incorporation of a plan into the contract, indicate herein the estimated dollar value of the contract:

PLAN ACCEPTED:

Contracting Officer

Date:

PLAN APPROVED: ______________________________________________

CHERYL W. CHANDLER

Small Business Specialist

Date: ___________________________________________________________

Amendment No. 0002

Section 00 73 15 Page 23

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Section 00 73 15 Page 24

General Decision Number: NJ170035 06/02/2017 NJ35

Superseded General Decision Number: NJ20160035

State: New Jersey

Construction Type: Building

County: Mercer County in New Jersey.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 02/10/2017 2 04/21/2017 3 05/19/2017 4 05/26/2017 5 06/02/2017

ASBE0089-004 07/01/2016

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR ((includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead

Section 00 73 15 Page 25 abatement))......................$ 42.02 31.83

PAID HOLIDAYS:

The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay.

BRNJ0002-013 11/01/2016

Rates Fringes

Bricklayer.....................$ 40.00 29.29

Work on high stacks: 22% per hour additional.

BRNJ0007-015 06/06/2016

MERCER COUNTY (north of Route 33)

Rates Fringes

Tile finisher..................$ 40.17 25.88 Tile setter....................$ 46.50 31.38

Tile finisher:

Work grouting all epoxy: $10.00 additional per day.

BRNJ0007-018 06/06/2016

MERCER COUNTY (south of Route 33)

Rates Fringes

Tile finisher..................$ 40.17 25.88 Tile setter....................$ 46.50 31.38

Tile finisher:

Work grouting all epoxy: $10.00 additional per day.

CARP0006-009 05/01/2017

Rates Fringes

CARPENTER (Scaffold Builder).....$ 47.28 57%

The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

CARP0006-011 05/01/2017

Section 00 73 15 Page 26

Rates Fringes

CARPENTER

Including Acoustical Ceiling Installation, Drywall Hanging and Formwork....................$ 47.28 57%

CARP0715-007 11/01/2016

Rates Fringes

Millwright.....................$ 46.55 56%

Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

ELEC0269-016 05/01/2016

Rates Fringes

Electrician and cable splicer (Includes Low Voltage Wiring)....$ 49.18 61.48%

ELEV0005-004 01/01/2016

Rates Fringes

Elevator mechanic..............$ 52.79 29.985

PAID HOLIDAYS:

New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas Day.

PAID VACATION:

Employer contributes 2% of basic hourly rate as vacation pay credit for 6 months to 5 years of service, and 4% for 5 years or more of service.

ENGI0825-020 01/01/2016

Section 00 73 15 Page 27

Power equipment operators:

GROUP 1.....................$ 47.70 29.80

GROUP 2.....................$ 46.05 29.80

GROUP 3.....................$ 43.91 29.80

GROUP 4.....................$ 42.41 29.80

GROUP 5.....................$ 40.69 29.80

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.

PAID HOLIDAYS:

New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided

1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.

DEFINITION OF GROUPS:

GROUP 1:

Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);

Elevating Grader; Excavator; Front End Loader (5 cu. yd.

and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable); Trencher

GROUP 2:

Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);

Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom

GROUP 3:

Asphalt Spreader; Bulldozer;Compressor(2 or 3) (in Battery) (within 100 ft.); Forklift; Front End Loader (1 cu. yd.

and over but less than 2 cu. yd.); Lull; Mechanic; Paver, Asphalt; Roller, Blacktop; Tractor;

GROUP 4:

Bobcat/Skid Loader; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Hydroseeder; Roller, Grade;

Section 00 73 15 Page 28

Pump, Hydraulic

GROUP 5:

Oiler

IRON0068-013 07/01/2016

Rates Fringes

IRONWORKER

Reinforcing.................$ 44.55 20.88 Structural, Ornamental, Rigger......................$ 46.54 20.88

LABO0008-001 05/01/2011

Rates Fringes

Asbestos Removal Laborer.........$ 28.37 21.62

The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)

LABO0222-006 07/01/2012

Rates Fringes

LABORER

MASON TENDER:

Brick/Cement/Concrete.......$ 29.85 23.07

LABO0222-009 07/01/2012

Section 00 73 15 Page 29

Laborers:

Asphalt Shoveler, Asphalt Spreader, Common or General Laborer, Landscape Laborer, Pipelayer, Power Tool Operator and Screedman...................$ 29.35 23.07

PAIN0711-017 05/01/2016

Rates Fringes

Glazier........................$ 43.39 22.43

Work welding or using a cutting torch: $1.00 per hour additional.

Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet:

$1.00 per hour additional.

PAIN0711-018 05/01/2016

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 38.75 22.55

PAIN0711-020 05/01/2015

Rates Fringes

PAINTER (Brush & Roller).........$ 37.76 21.50 PAINTER (Paperhanger)............$ 38.65 21.61 PAINTER (Spray)..................$ 40.28 19.98

PLAS0008-007 05/01/2015

Rates Fringes

Plasterer......................$ 36.87 26.33

PLAS0592-036 05/01/2016

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 40.02 31.77

* PLUM0009-016 03/01/2017

Section 00 73 15 Page 30

MERCER COUNTY (south of a line drawn from the point at which Rt. 602 (also known as Hopewell - Wertsville Rd.) meets the Hunterdon/Mercer County line; then, south along Rt. 602 (also known as Hopewell - Wertsville Rd.) to the Borough of Hopewell, includes the Borough of Hopewell; then, east along the Reading Railroad to the Mercer/Somerset County line (Province Line Rd.))

PIPEFITTER (Including HVAC Pipe Installation)...............$ 47.47 35.51 Service and Repair..........$ 37.48 21.08 PLUMBER (Excluding HVAC Pipe Installation)....................$ 47.47 35.51 Service and Repair..........$ 37.48 21.08

* PLUM0024-009 05/01/2017

MERCER COUNTY (north of a line drawn from the point at which Rt. 602 (also known as Hopewell - Wertsville Rd.) meets the Hunterdon/Mercer County line; then, south along Rt. 602 (also known as Hopewell - Wertsville Rd.) to the Borough of Hopewell, includes the Borough of Hopewell; then, east along the Reading Railroad to the Mercer/Somerset County line (Province Line Rd.)):

PLUMBER, Excludes HVAC Pipe Installation.....................$ 52.66 33.54

PLUM0475-010 05/01/2017

MERCER COUNTY (north of a line drawn from point at which Rt.

602 (also known as Hopewell - Wertsville Rd.) meets the Hunterdon/Mercer County line; then, south along Rt. 602 (also known as Hopewell - Wertsville Rd.) to the Borough of Hopewell, includes the Borough of Hopewell; then, east along the Reading

PIPEFITTER, Includes HVAC Pipe Installation................$ 48.51 32.50

ROOF0030-027 05/01/2016

Section 00 73 15 Page 31

Roofer

SHINGLES....................$ 35.15 28.69

SLATE AND TILE..............$ 35.15 28.69

ALL OTHER WORK..............$ 35.15 28.69

Mopper, and operator of felt-laying machine: $.50 per hour additional.

Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour additional.

PAID HOLIDAY:

The last working day before Christmas, to be paid at the rate of four hours pay.

SFNJ0669-003 04/01/2017

MERCER COUNTY (does not include the town of Trenton)

Rates Fringes

Sprinkler fitter (Fire Sprinklers)......................$ 49.15 23.08

SFNJ0692-002 05/01/2013

Within 15 miles beyond the city limits of Philadelphia.

Rates Fringes

Sprinkler fitter (Fire Sprinklers)......................$ 48.65 21.57

SHEE0027-009 06/01/2012

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 43.08 32.52

TEAM0469-004 11/01/2016

Rates Fringes

Truck drivers:

Dump Truck..................$ 38.75 30.085 Off the Road Truck..........$ 38.90 30.085

Section 00 73 15 Page 32

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour additional.

New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day.

VACATION PAY CREDIT:

Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours).

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information

Section 00 73 15 Page 33 on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates

Section 00 73 15 Page 34 the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Section 00 73 15 Page 35

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

Section 00 73 15 Page 36

General Decision Number: NJ170056 06/02/2017 NJ56

Superseded General Decision Number: NJ20160056

State: New Jersey

Construction Type: Heavy

County: Mercer County in New Jersey.

HEAVY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 02/10/2017 2 03/03/2017 3 04/21/2017 4 05/19/2017 5 05/26/2017 6 06/02/2017

BRNJ0004-001 11/01/2016

Rates Fringes

CEMENT MASON.....................$ 40.00 29.29

CARP0006-014 05/01/2017

Rates Fringes

CARPENTER........................$ 47.28 57%

The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

Section 00 73 15 Page 37

CARP0715-007 11/01/2016

Rates Fringes

Millwright.....................$ 46.55 56%

Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

CARP1556-004…