This amendment addresses requests for information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912BU-16-R-0048_Amendment_0004.pdf | ||
| W912BU-16-R-0048_Amendment_0003.pdf | ||
| W912BU-_16-R-0048_Amend2.pdf | ||
| W912BU-_16-R-0048.pdf | ||
| pilot_house_052316_sld_-_Sheet1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W25PHS60696869
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to address requests for information.
Offerors must acknow ledge receipt of this amendment by the date specified in the solicitation by one of the follow ing methods: in the space provided in the SF33 or by signing block 15 below .
FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED IN THE SOLICIATION MAY RESULT IN REJECTION OF YOUR
PROPOSAL.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-16-R-0048
X 9B. DATED (SEE ITEM 11)
24-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Jun-2016
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
POC: AARON SANNUTTI
WANAMAKER BLDG
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BU-16-R-0048
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
RFI RESPONSES
Section 5(a): States that all aluminum in the hull shall be 5000 series aluminum material, and that no welded 6000 series aluminum shall be used. We assume this means the hull structure only.
Please clarify if this is intended to include any other areas of the vessel, such as the deckhouse, bulwarks, machinery foundations, fender channel etc.
The 5000 series requirement applies to all structure and structural shapes on the hull, decks, and machinery foundations.
Section 6: Specification states that “Vessel to be built in accordance with Subchapter T”. In the event that these specifications contradict Subchapter T, or are missing equipment that would be required by T, please indicate which will govern? Likewise, Section 24(b) states that the AC electrical system shall be in accordance with Subchapter J. Please clarify the intent with these statements on Subchapter T and J. Section 11: The specification calls for carbon monoxide detection. Can this be battery powered or hard wired? What level of detection (30 ppm or less)?
The Government knows of no conflicts between the requirements of the specification and the requirements of Subchapter T. The contractor shall build the boat in accordance with Subchapter T and the electrical system in accordance with Subchapter J. The contractor shall also provide anything additional in these areas that is required by the spec. Any area of the specification thought to conflict with either of these standards shall be specifically identified by the contractor and brought to the Government’s attention immediately.
The carbon monoxide detector(s) may be battery powered household type units.
Section 12b: The described bilge manifold system includes a seachest and duplex strainer. Is it the intent for the 5 HP bilge pump to also act as or be capable of acting as a fire pump?
No, there is no intent for the 5 HP bilge pump to act as a fire pump.
13(a): Can you provide additional details on the anti-fatigue matting for the deckhouse interior?
Is there a preferred manufacturer or style?
The Government has no preferred manufacturer or style.
Section 13(f): The specification calls for a second, removable, chair at the survey station. Shall this chair also be a Stidd model 500 V5 or equal?
No, this chair need not be a Stidd model 500 V5 or equal. The intent is for this chair to be smaller and easier to store than the survey station chair. It shall be of similar material and finish but need not be the same as the Stidd chair.
Section 14(a): the Lewmar V-5 Gypsy/Drum has a maximum pull of 3190 lb. The specification calls for 3500 lb. Will the Lewmar V-5 suffice or should we look at an alternative that can do 3500 lb., such as the Maxwell RC Series?
The Lewmar V-5 Gypsy/Drum has a maximum pull in excess of 3500 lb in a 24VDC configuration.
Section 19: Should the toilet flush system be fresh water off the fresh water tank or salt water via a separate sea intake? Please clarify the requested vacuum assisted toilet system.
The toilet flush system shall utilize fresh water only. The toilet shall be a vacuum assist flush macerating type.
Section 23: Floscan has commented that the TwinScan fuel flow system is ONLY for gas models, and is not available for diesel. Is there a preferred alternate?
The Government recognizes that the TwinScan monitoring system is only for gasoline applications. The contractor shall install one Flow Scan series 7500/7600 per engine.
Section 30: The Specification states “Propulsion Control Systems that are provided, warranted, and serviced by the engine manufacturer are preferred”. Is it the intent for the Propulsion & Steering control system to carry the same 5-year warranty period as the engines and gears?
It is not intended that the propulsion and steering control system carry the same 5 year warranty as the engines and gears.
Section 39: Can you provide additional details on the Government furnished Davit mechanism that will accompany the “Intelliwinch”?
The davit mechanism will come as a packaged part of the Intelliwinch in a specialized design that is still under consideration by the Government at this time. It is suggested that proposers contact Stema Systems and inquire about their packaged winch/crane units for a better understanding of what will be provided.
Section 40: Can you provide additional details or information on the Bar Check and Ball check described in this section?
The Bar Check and Ball Check shall be provided in accordance with section 40 of this specification and standard industry practices.
Section 42: The specification makes reference a government furnished satellite phone antenna.
Will the referenced “galley television and a handset to be located near the pilot’s station” also be Government furnished?
The handset will be provided by the government. The requirement for the connection near the galley television is deleted.
General: Is there a requirement for tonnage or documentation?
No, there is not.
General: Is there a preferred method for large electronic file transfer? Would a system such as WeTransfer (https://www.wetransfer.com/) be suitable for submitting the electronic bid package?
The U.S. Army Corps of Engineers does not have the means to accept large files electronically through unvetted websites. Large eletronic submissions may be sent via email in smaller pieces to aaron.w.sannutti@usace.army.mil or uploaded onto a CD or CDs and submitted with the hard copies. Please note that three (3) hard copy proposals are required in order for an offeror’s proposal to be found responsive.