Amendment 0002. Offeror must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended) by signing block 15 by acknowledging receipt of this amendment on each copy of the offer submitted or by separate letter which includes a reference to the solicitation and amendment numbers. FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTIONS OF YOUR QUOTE.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF_1409_signed.pdf | ||
| 827-B406-01_MDC_STANDARD_FLOATING_PLANT_PAINT_SCHEDULE.PDF | ||
| 16B0021-0001_Amendment.pdf | ||
| 827-B311-01 | — | |
| 827-B332-02 MISC STRUCTURE | — | |
| 827-B425-01 | — | |
| 827-B215-01 | — | |
| 16B0021_Solicitation.pdf | ||
| 827-B000-01 | — | |
| 827-B332-03 MISC STRUCTURE | — | |
| 827-B309-01 | — | |
| 827-B307-02 | — | |
| 827-B332-01 MISC STRUCTURE | — | |
| 827-B205-01 | — | |
| 827-B307-01 | — |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment hereby answ ers questions presented to the Government.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-16-B-0021
X 9B. DATED (SEE ITEM 11)
29-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Aug-2016
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
POC: JUSTIN CHUNG
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BU-16-B-0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
The purpose of this amendment is to answer questions presented to the Government.
The Government has received questions concerning the solicitation and hereby provides answers to these questions.
Questions that may be of general interest of all Offerors/Government and that are not readily answered by the preceding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or clarify and simplify the question(s). Questions and answers are issued to the Offerors for information purposes only.
All other terms and conditions remain the same.
Offeror must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended) by signing block 15, by acknowledging receipt of this amendment on each copy of the offer submitted or by separate letter which includes a reference to the solicitation and amendment numbers. FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTIONS OF YOUR QUOTE.
Answers to Questions Question #1: Can the Government please confirm that at award it is their intent to provide a complete set of drawings in AutoCAD.dwg format to the Contractor?
Answer #1: All applicable drawings have been posted as part of this announcement. The set can be re transmitted after contract award.
Question #2: Could the Government confirm that the Contractor will be responsible to re-submit the entire drawing packages for ABS technical review/approval?
Answer #2: The contractor is required to submit the detailed construction drawings they generate to ABS for review and approval.
Question #3: The Government notes that this barge design and drawings were developed on previously classed barges based on MDC Project 2867-CELRN STOP LOG (Hull 777), ABS Vessel ID YY223583.
Could the Government please confirm this to mean Hull 777 is an exact “sistership” to the referenced hull?
Also, please identify any modifications from the “sistership” if applicable.
Answer #4: The 777 barge is not an exact “sistership” to these vessels. A major difference: the longitudinal member in 777 was cut in way of the transverse beams, whereas the transverse beams are intercostal in this design.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .