Amendment 0001. Offeror must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended) by signing block 15 by acknowledging receipt of this amendment on each copy of the offer submitted or by separate letter which includes a reference to the solicitation and amendment numbers. FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTIONS OF YOUR QUOTE.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF_1409_signed.pdf | ||
| 16B0021-0002_Amendment.pdf | ||
| 827-B406-01_MDC_STANDARD_FLOATING_PLANT_PAINT_SCHEDULE.PDF | ||
| 827-B307-02 | — | |
| 827-B332-01 MISC STRUCTURE | — | |
| 827-B205-01 | — | |
| 827-B307-01 | — | |
| 827-B425-01 | — | |
| 827-B215-01 | — | |
| 16B0021_Solicitation.pdf | ||
| 827-B000-01 | — | |
| 827-B311-01 | — | |
| 827-B332-02 MISC STRUCTURE | — | |
| 827-B332-03 MISC STRUCTURE | — | |
| 827-B309-01 | — |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment hereby answ ers questions presented to the Government and provides offerors w ith draw ing 827-B406-01.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-16-B-0021
X 9B. DATED (SEE ITEM 11)
29-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Aug-2016
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
POC: JUSTIN CHUNG
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BU-16-B-0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
The purpose of this amendment is to answer questions presented to the Government and provide offerors with drawing 827-B406-01. Drawing 827-B406-01 will be provided via Federal Business Opportunities (FBO) posting.
The Government has received questions concerning the solicitation and hereby provides answers to these questions. Questions that may be of general interest of all Offerors/Government and that are not readily answered by the preceding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or clarify and simplify the question(s). Questions and answers are issued to the Offerors for information purposes only.
All other terms and conditions remain the same.
Offeror must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended) by signing block 15, by acknowledging receipt of this amendment on each copy of the offer submitted or by separate letter which includes a reference to the solicitation and amendment numbers. FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTIONS OF YOUR QUOTE.
Answers to Questions Question 1: Section C406 COATING SYSTEM subsection G NUMBER OF COATS & PAINT SCHEDULE states “The number of coats is not specified. The contractor is required to provide the number of coats necessary to attain the DFT thicknesses in accordance with the contract drawing”. The required information does not appear to be present in the provided drawings. Can you please clarify?
Answer 1: The paint schedule for the contract was not posted with the original announcement. Please refer to drawing “827-B406-01 MDC STANDARD FLOATING PLANT PAINT SCHEDULE”.
Question 2: Although the drawings are to be “assumed to be ABS approved” will the ACOE provide drawings to ABS for review prior to contract award? If so how long will that take and can the due date be extended for such a review?
Answer 2: The contractor is required to submit the drawings to ABS for review and approval. The intent behind the statement "assumed to be ABS approved" is to allow the potential bidders to prepare their bid per the drawings as shown. In addition, the Government is responsible for the design, therefore if the ABS reviews results in technical comments that require a revision(s) to the design, the Government will coordinate with the contractor on the necessary contract modification(s).
Question 3: Please clarify if the government will require anti-fouling coating below the waterline and number of coats if applicable.
Answer 3: The paint schedule for the contract was not posted with the original announcement. Please refer to drawing “827-B406-01 MDC STANDARD FLOATING PLANT PAINT SCHEDULE”.
W912BU-16-B-0021
(End of Summary of Changes)