AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

00 3

3. EFFECTIVE DATE

10/11/2016

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE W912BU 7. ADMINISTERED BY (If other than Item 6) CODE E5CTCSGF

US ARMY ENGINEER DISTRICT, PHILADELPHIA

WANAMAKER BUILDING, 100 PENN SQUARE EAST

PHILADELPHIA, PENNSYLVANIA 19107-3390

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: SANDI FLETCHER

WANAMAKER BUILDING, 100 PENN SQUARE EAST

PHILADELPHIA, PENNSYLVANIA 19107-3390

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION

NO.

W912BU-16-B-00

9B. DATED (SEE ITEM 11)

0 /31/2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

THIS AMENDMENT HEREBY EXTENDS THE BID OPENING DATE TO 21 O AT 11:00 A.M.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

X

Continued:

This page was intentionally left blank for duplex printing.

Amendment No. 0003

IFB W912BU-16-B-0005

14. DESCRIPTION OF AMENDMENT (continued)

a. REQUESTS FOR INFORMATION (RFI) WITH RESPONSES: RFI’s with responses, annotated Amendment No. 0003, are attached to this amendment.

b. BIDDING SCHEDULE: Please delete page 00 10 00-5 in its entirety and substitute the revised page 00 10 00-5, annotated Amendment No. 0003, attached hereto.

c. SECTION 00 70 00 - CONDITIONS OF CONTRACT: Please delete page 00 70 00-20 in its entirety and substitute the revised page 00 70 00-20, annotated Amendment No. 0003, attached hereto.

d. SECTION 00 73 15 - WAGE RATES: Please delete pages 00 73 15-10 through 00 73 15-16 in their entirety and substitute revised pages 00 73 15-10 through 00 73 15-16, annotated Amendment No. 0003, attached hereto.

e. TECHNICAL SPECIFICATIONS:

(1) Section 32 15 00 – DUNE CROSSOVERS: Please delete pages 32 15 00-7 through 32 15 00-12 in their entirety and insert revised pages 32 15 00-7 through 32 15 00-13, annotated Amendment No. 0003, attached hereto.

f. CONTRACT DRAWINGS: Please delete the following drawings in their entirety and substitute the revised drawings of the same numbers, with the latest revision date of 5 October 2016, attached hereto:

C-303 C-501 C-503

g. Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0003. Failure to acknowledge all amendments may be cause for rejection of the bid.

RFI

Dwg Sheet/ Spec Section Request for Information Response

We request an extension of the bid opening to review the changes in Amendment No. 1 See Amendment No. 0002.

290 Calendar days is not enough time to complete all of the Outfall extensions. We request a time extension for the contract of an additional 100 calendar days See Amendment No. 0003.

RFI #9 response from Amendment 0001 does not include the number of locations where the timber bulkhead will be constructed. Is the contractor to assume that every crossover in Ventnor is to receive a timber bulkhead?

Approximately 41 locations? If not, which locations are to receive a bulkhead.

Yes, the timber bulkheads are to be constructed at all new Standard Pedestrian Crossovers in Ventnor City (there are 12 locations, see response to RFI #4, below).

The bid quantity for construct pedestrian crossovers in Ventnor is enough for approximately 12 locations. Which 12 are being constructed? C-108 to C-111 only show 2 locations for “Construct Standard Pedestrian Crossover”

There are 12 Pedestrian Crossovers in Ventnor City that are shown in a darker lineweight that are labeled "Construct Standard Pedestrian Crossover (TYP)".

Hence, "TYP" means any crossovers that look like this (darker lines) are new. See sheets C-110 and C-111. Bid per plans and specifications.

Ventnor City is approximately 9000 LF. Between which stations is the 4,350 LF of sand fence to be installed?

Locations of the dune requiring reconstruction or initial construction are shown in a darker lineweight, hence these are the locations requiring new sand fence.

Also along the crossovers as shown in the details. Bid per plans and specifications.

Do the stabilization mats installed on the pedestrian crossovers in Longport get installed in the viewing area? Yes. See Amendment No. 0003.

Sheet C-111, C-113, Note 9

Is the additional I-5 material required by this note measured for payment as part of the crossover installation?

Yes. Section 32 15 00 has been revised. See Amendment No. 0003.

Drawing C-503 Detail 1 and Detail 2- 48” Support Systems

The detail shows the bottom timber crib with a thickness of 8” and the top timber crib with a thickness of 6”?

Typically the top and bottom cribbing are the same thickness so that the vertical side crib can be attached.

Should the top cribbing thickness be 8” instead of the 6” noted on the plans?

The pertinent details have been revised on Sheet C-503. See Amendment No. 0003.

There is a slight discrepancy in the sand fence wire between the specs and the detail on the plans. In paragraph 2.1 of spec section 329200, a 14-gauge wire is noted for binding the sand fence. On Detail 1 of Sheet C- 501 a 12.5-gauge wire is noted for binding the sand fence.

Can the desired gauge be clarified?

Detail 1 of Sheet C-501 has been revised.

See Amendment No. 0003.

Sheet C-103

Sheet C-103 shows contractor access over the boardwalk at New Hampshire Avenue in Atlantic City. It is our understanding that the boardwalk ramp at this location is only rated for 80,000lbs. The construction equipment needed for the outfalls will weigh between 100,000 and 120,000 lbs. In addition, the vehicle ramp at Victoria Avenue(used on all the previous beachfill projects), is no longer in place. The boardwalk between Rhode Island Avenue and Oriental Avenue is currently being reconstructed by the City of Atlantic City. How do we access the beach if this ramp is only rated for 80,000lbs? Can this be clarified?

The weight limit is 80,000 lbs for the New Hampshire ramp. The Contractor will be required to obtain a boardwalk crossing permit from the City. For equipment over 80,000 lbs the Contractor will have to dismantle and bring across in smaller sections.

Sheet C-502

After reviewing Amendment #1 we have a question.

It is still unclear on how payment will be made on the timber retaining walls shown on Sheet C-502. It is also unclear how many crossovers in Ventnor will require this timber retaining wall. It appears the response in Amend #1 has confused this permanent structure with temporary construction access.

To eliminate any confusion, can a separate bid item, with associated desired bid count, be created for the Ventnor Timber Retaining Wall shown on Sheet C-502?

The timber bulkheads are to be constructed at all new Standard Pedestrian Crossovers in Ventnor City (there are 12 locations, see response to RFI#4, above). Section 06 13 33 has been revised. See Amendment No. 0003.

It is evident that a number of the outfalls under this bid will require a cofferdam to complete the work noted on he plans. However, we do not see reference in Spec Section 06133 nor 334000 on how payment for this sheeting and shoring will be made.

Due to the magnitude of the costs associated with sheeting/shoring or cofferdam, can a cofferdam bid item be created at each outfall location?

See Section 06 13 33 OUTFALL PIPE SUPPORTS, Part 3, 1st paragraph. Bid per the plans and specifications.

REQUESTS FOR INFORMATION with RESPONSES Solicitation No. W912BU-16-B-0005

Amendment No. 0003

Amendment No. 0003

Request For Information Page 1

00 10 00-5

46. Construct Standard Pedestrian Crossover 57,730 SF $______ $____________

47. Construct Vehicle Crossover 13,145 SF $______ $____________

48. Construct ADA Accessible Crossover 9,264 SF $______ $____________

49. Stabilization Mat 3,191 SF $______ $____________

50. Sand Fence 20,317 LF $______ $____________

51. Split Rail Fence 9,438 LF $______ $____________

52. Post and Rail Fence 1,480 LF $______ $____________

53. Dune Grass Planting 18” O.C. 35,611 SY $______ $____________

54. Dune Grass Planting 24” O.C. 44,878 SY $______ $____________

55. Name the State of New Jersey and the City of Margate as “Additional Insured” under General Liability Insurance 1 JOB LS $____________

Stormwater Outfall Pipe Extension: Station 350+64

56. 12-Inch Ductile Iron Pipe 432 LF $______ $____________

57. Type “A” Pipe Support Unit 45 EA $______ $____________

58. Type “B” Pipe Support Unit 3 EA $______ $____________

LONGPORT BOROUGH

59. Structures Monitoring 1 JOB LS $____________

60. Beachfill 1,150,000 CY $______ $____________

61. Construct Standard Pedestrian Crossover(Longport) 27,273 SF $______ $____________

62. Construct Vehicle Crossover 11,167 SF $______ $____________

63. Construct ADA Accessible Crossover 6,025 SF $______ $____________

64. Stabilization Mat 2,448 SF $______ $____________

65. Sand Fence 17,534 LF $______ $____________

66. Split Rail Fence 7,144 LF $______ $____________

67. Post and Rail Fence 948 LF $______ $____________

68. Dune Grass Planting 18” O.C. 34,361 SY $______ $____________

69. Dune Grass Planting 24” O.C. 27,944 SY $______ $____________

70. Name the State of New Jersey and the Borough of Longport as “Additional Insured” under General Liability Insurance 1 JOB LS $____________

00 10 00-6

Stormwater Outfall Pipe Extension: Station 362+51

71. Remove and Dispose of Damaged Pipe and Pile Pipe Supports 1 JOB LS $____________

72. 10-Inch Ductile Iron Pipe 216 LF $______ $____________

73. Type “A” Pipe Support Unit 21 EA $______ $____________

74. Type “B” Pipe Support Unit 3 EA $______ $____________

Stormwater Outfall Pipe Extension: Station 374+99

75. 16-Inch Ductile Iron Pipe 252 LF $______ $____________

76. Type “A” Pipe Support Unit 25 EA $______ $____________

77. Type “B” Pipe Support Unit 3 EA $______ $____________

TOTAL ESTIMATED BASE BID AMOUNT $__________________

OPTIONS

ATLANTIC CITY:

78. Option 1 - Beachfill 25,000 CY $________ $____________

79. Option 2 - Beachfill 50,000 CY $________ $____________

80. Option 3 - Beachfill 75,000 CY $________ $____________

81. Option 4 - Beachfill 125,000 CY $________ $____________

82. Option 5 - Beachfill 125,000 CY $________ $____________

83. Option 6 - Beachfill 300,000 CY $________ $____________

84. Option 7 - Beachfill 500,000 CY $________ $____________

VENTNOR CITY

85. Option 8 - Beachfill 10,000 CY $________ $____________

86. Option 9 - Beachfill 25,000 CY $________ $____________

87. Option 10 - Beachfill 50,000 CY $________ $____________

88. Option 11 - Beachfill 65,000 CY $________ $____________

89. Option 12 - Beachfill 100,000 CY $________ $____________

90. Option 13 - Beachfill 150,000 CY $________ $____________

MARGATE CITY:

91. Option 14 - Beachfill 25,000 CY $________ $____________

92. Option 15 - Beachfill 50,000 CY $________ $____________

W912BU-16-B-0005 00 70 00 - 19

7 calendar days remove the posting from FAPIIS and resolve the issue in accordance with agency Freedom of Information procedures, prior to reposting the releasable information. The contractor must cite 52.209-9 and request removal within 7 calendar days of the posting to FAPIIS.

(2) The Contractor will also have an opportunity to post comments regarding information that has been posted by the Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the Contractor revises them.

(3) As required by section 3010 of Pub. L. 111-212, all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available.

(d) Public requests for system information posted prior to April 15, 2011, will be handled under Freedom of Information Act procedures, including, where appropriate, procedures promulgated under E.O. 12600.

(End of clause)

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (NOV 2015)

(a) Definitions. As used in this clause--

Inverted domestic corporation means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).

Subsidiary means an entity in which more than 50 percent of the entity is owned--

(1) Directly by a parent corporation; or

(2) Through another subsidiary of a parent corporation.

(b) If the contractor reorganizes as an inverted domestic corporation or becomes a subsidiary of an inverted domestic corporation at any time during the period of performance of this contract, the Government may be prohibited from paying for Contractor activities performed after the date when it becomes an inverted domestic corporation or subsidiary. The Government may seek any available remedies in the event the Contractor fails to perform in accordance with the terms and conditions of the contract as a result of Government action under this clause.

(c) Exceptions to this prohibition are located at 9.108-2.

(d) In the event the Contractor becomes either an inverted domestic corporation, or a subsidiary of an inverted domestic corporation during contract performance, the Contractor shall give written notice to the Contracting Officer within five business days from the date of the inversion event.

(End of clause)

52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A

FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)

(a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--

(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or

W912BU-16-B-0005 00 70 00 - 20

IFB No. W912BU‐16‐B‐0005

Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.

The Offeror represents that--

It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and

It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.

(End of provision)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, and complete the Base Bid work (except Dune Grass Planting and Fertilization), ready for use within 310 calendar days after the date of receipt of notice to proceed. Dune Grass Planting and Fertilization shall be completed no later than 1 August 2018. If any or all of the Options are awarded, contract performance time will be extended by the amount of days listed for each awarded Option as follows: Option 1 – 2 days; Option 2 – 3 days; Option 3 – 5 d a y s ;

Option 4 – 8 d a y s ; Option 5 – 8 d a y s ; Option 6 –20 days; Option 7 – 3 0 d a y s ; Option 8 – 1 day; Option 9 – 2 d a y s ;

Option 10 – 3 days; Option 11 – 4 days;Option 12 – 7 days; Option 13 – 10 days; Option 14 – 2 days; Option 15 – 3 days;

Option 16 – 5 days; Option 17 – 17 days; Option 18 – 2 days; Option 19 – 3 days; Option 20 – 5 days; and Option 21 – 1 7 d a y s .

The Contracting Officer has the right to exercise any or all of the options within 14 calendar days after the approval by the Government of the Pre-Condition Surveys for each individual section of the beachfill as defined on the bidding schedule for Atlantic City, Ventnor City, Margate City and Longport Borough, respectively.

The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $5,100.00 for each calendar day of delay until the work is completed or accepted.

If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.211-13 TIME EXTENSIONS (SEP 2000)

Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.

(End of clause)

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Section 00 73 15 Page 9

General Decision Number: NJ160046 09/09/2016 NJ46

Superseded General Decision Number: NJ20150046

State: New Jersey

Construction Type: Heavy

County: Atlantic County in New Jersey.

HEAVY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 02/19/2016 2 02/26/2016 3 03/18/2016 4 05/06/2016 5 05/13/2016 6 06/03/2016 7 08/05/2016 8 09/09/2016

CARP0006-013 05/01/2016

Rates Fringes

CARPENTER (Including Form Work)............................$ 45.94 57%

The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

CARP0454-009 05/01/2016

Rates Fringes

PILEDRIVERMAN....................$ 43.95 31.32

PAID HOLIDAYS:

New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day; provided that the worker works any of the three days in the five-day work week preceding the holiday and the first work day after the holiday.

CARP0715-007 05/01/2016

Rates Fringes

Amendment No. 0003

Section 00 73 15 Page 10

Millwright.....................$ 46.05 56%

Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

ELEC0351-011 09/29/2014

Rates Fringes

Electricians:

Cable splicer on lead cable.$ 46.51 72.54% + .65 Electrician and cable splicer.....................$ 44.51 75.35% + .65

ENGI0825-019 01/01/2016

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 47.70 29.80

GROUP 2.....................$ 46.05 29.80

GROUP 3.....................$ 43.91 29.80

GROUP 4.....................$ 42.41 29.80

GROUP 5.....................$ 40.69 29.80

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.

PAID HOLIDAYS:

New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided

1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.

DEFINITION OF GROUPS:

GROUP 1:

Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);

Elevating Grader; Excavator; Front End Loader (5 cu. yd.

and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable)

GROUP 2:

Concrete Pumper; Grader/Blade (Finish); Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom

Amendment No. 0003

Section 00 73 15 Page 11

GROUP 3:

Asphalt Spreader; Bulldozer; Compressor(2 or 3) (in Battery) (within 100 ft.); Crusher; Forklift; Front End Loader (1

cu. yd. and over but less than 2 cu. yd.); Lull; Mechanic;

Paver, Asphalt; Roller, Blacktop; Tractor;

GROUP 4:

Broom; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Roller, Grade; Pump

GROUP 5:

Oiler

IRON0350-006 07/01/2015

Rates Fringes

Ironworkers:

Reinforcing.................$ 45.77 28.75 Structural and Ornamental...$ 46.77 28.75

LABO0172-007 09/01/2012

Rates Fringes

Laborers:

Landsacpe Laborer, Power Tool Operator...............$ 33.20 22.40 Pipelayer...................$ 33.90 22.40

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is required to wear Level A, B or C personal protection: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, where the worker is not required to wear Level A, B, or C personal protection: $1.00 per hour additional.

PAID HOLIDAYS:

New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided that the worker works three days for the same employer within a period of ten working days consisting of five working days before and five working days after the day upon which the holiday falls or is observed.

LABO0222-013 07/01/2012

Rates Fringes

LABORER

MASON TENDER:

Cement/Concrete.............$ 29.35 23.07

* PAIN0711-023 05/01/2016

Rates Fringes

Painters:

Amendment No. 0003

Section 00 73 15 Page 12

Work on bridges (Major Bridges Designed for Commercial Navigation)......$ 52.38 26.05

* PAIN0711-024 05/01/2016

Rates Fringes

Painters:

New Construction Brush and roller...........$ 38.42 22.09 Repaint work, on projects on which no major alterations occur.

Brush and roller...........$ 28.74 18.47

PLAS0592-036 05/01/2016

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 40.02 31.77

PLUM0322-010 05/01/2016

Rates Fringes

PIPEFITTER.......................$ 44.42 36.34

TEAM0331-003 05/01/2015

Rates Fringes

Truck drivers:

Dump Truck, Pickup Truck....$ 33.41 18.555 Off the Road Truck, Flatbed Truck...............$ 33.76 18.555

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour additional.

PAID HOLIDAYS:

New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day.

BEREAVEMENT LEAVE:

Any worker having a death in his or her immediate family (parent, spouse, child, brother or sister, mother-in-law or father-in-law) shall be given three days time off with pay at the time of death upon furnishing proof of said death.

This provision shall also apply to grandparents, when living with the worker.

SUNJ2004-022 01/02/2009

Amendment No. 0003

Section 00 73 15 Page 13

Rates Fringes

LABORER: Common or General......$ 25.30 11.92

OPERATOR: Backhoe Loader Combo............................$ 31.28 20.79

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which

Amendment No. 0003

Section 00 73 15 Page 14 these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor

Amendment No. 0003

Section 00 73 15 Page 15

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Amendment No. 0003

Section 00 73 15 Page 16

2.8 BULKHEAD

2.8.1 Timber Piles

Timber piles shall be as specified in Section 06 13 33 OUTFALL PIPE

SUPPORTS.

2.8.2 Timber Sheeting

Timber sheeting shall be as specified for timber cribbing in Section 06 13

33 OUTFALL PIPE SUPPORTS.

2.8.3 Hardware

Hardware shall be as specified in Section 06 13 33 OUTFALL PIPE SUPPORTS.

PART 3 EXECUTION

3.1 CLEARING, GRUBBING, DEMOLITION AND EXCAVATION

Crossovers shall be constructed as indicated on the contract drawings and in accordance with the approved work plans and shop drawings.

Crossover construction and repair will require excavation of portions of the dune, clearing and grubbing of dune vegetation and dune grass, and the removal of sand fence and posts. Clearing and grubbing shall be done only to the extent necessary for the installation of crossovers. Any sand fence removed shall be salvaged for replacement upon completion of repair or installation.

3.1.1 Clearing

Clearing shall consist of the satisfactory removal and disposal of vegetation, including snags, brush, and rubbish occurring within the areas to be cleared as necessary for the of crossover repair. Stumps, roots, brush, and other vegetation in areas to be cleared shall be removed in their entirety. Cleared material shall be disposed of off-site.

3.1.2 Grubbing

Grubbing shall consist of the removal and disposal of stumps, roots larger than 3 inches in diameter, and matted roots. Material to be grubbed, shall be removed to a depth of not less than 18 inches below the original surface level of the ground. Depressions made by grubbing shall be filled with suitable material and compacted to make the surface conform with the original adjacent surface of the ground. Grubbed material shall be disposed of off-site.

3.1.3 Demolition

Existing crossovers shall be removed to the extent and limit of the repairs, as directed by the Contracting Officer and as shown on the drawings.

3.1.4 Excavation

Excavation of existing dunes shall be held to the minimum required to

Section 32 15 00 Page 7 complete construction of crossover repairs. Any unsatisfactory material uncovered shall be disposed of off-site. The remainder of material shall be stockpiled and used to restore dune to preconstruction configuration to the maximum extent possible.

3.2 RESTRICTIONS ON CROSSOVER CONSTRUCTION

Do not construct two adjacent pedestrian crossovers concurrently. Complete the fencing associated with each pedestrian crossover concurrently with the construction of each pedestrian crossover.

3.3 RECONSTRUCTION/REPAIR OF CROSSOVERS

The reconstruction/repair of crossovers shall be as specified herein for the construction of crossovers.

3.4 CONSTRUCTION OF CROSSOVERS

3.4.1 General

Construct crossovers including observation areas at the locations and in the manner indicated on the drawings and in accordance with the approved work plan. Clearing, grubbing, demolition, excavation and fill shall be performed as minimally as necessary to construct the crossovers. Construct crossovers utilizing a soil aggregate, consisting of I-5 material, as shown on the Contract Drawings, for all crossovers, except Standard Pedestrian Crossovers(Longport). Standard Pedestrian Crossovers(Longport) shall have sand material utilized for the pedestrian crossovers and shall be as specified in Paragraph "SAND MATERIAL". Standard Pedestrian Crossovers(Longport) include stabilization mats, as indicated.

3.4.2 Placement of I-5 Material

Prior to placement of I-5 material, place geotextile in accordance with Section 31 05 19 GEOTEXTILE. Place I-5 material in maximum 12 inch lifts and compact to at least 90 percent laboratory maximum dry density as determined by the Modified Proctor test procedure as specified in ASTM D1557.

Remove, replace or dry materials that are too wet to facilitate proper compaction, by any method approved by the Contracting Officer. Place materials to the lines and grades shown and compact by the controlled use of the hauling and spreading equipment. Movement of the equipment shall be distributed as much as practicable over the surface to provide uniform compaction and complete coverage of the fill.

3.4.3 Testing

Furnish materials meeting the requirements specified herein, for placing the materials within the limits of moisture suitable for proper compaction, and for compacting the materials in accordance with the requirements of this section. Perform laboratory tests as required to control the work and demonstrate compliance with material specifications. Testing shall be as specified in Section 01 45 00 CONTRACTOR QUALITY CONTROL(CQC). Determine field in-place moisture/density in accordance with ASTM D6938. All nuclear gauges proposed for use on site shall have been laboratory calibrated within 9 months of their actual use on site. When test results indicate, as determined by the Contracting Officer, that compaction is not as specified, remove, replace and recompact the material to meet specification requirements. Perform tests on recompacted areas to determine conformance with specification requirements. The following number of tests, if

Section 32 15 00 Page 8 performed at the appropriate time, will be the minimum acceptable for each type operation.

a. Perform not less than one gradation test on material placed in each vehicular and ADA accessible crossover and not less than one test for every fifth pedestrian crossover unless otherwise directed or approved by the Contracting Officer. The Contracting Officer may require additional tests, whenever materials are questionable, at no additional cost to the Government. During the course of construction, if the source or appearance or performance of the crossover materials noticeably changes, in the opinion of the Contracting Officer, repeat the appropriate index testing as described herein, of the materials to ensure compliance and reestablish moisture/density relationships for compaction, at no additional cost to the Government.

b. Generate a compaction curve from a modified Proctor test in accordance with ASTM D1557 for each type of material used and for any change in appearance or composition of each material source as determined by the Contracting Officer. Perform tests, in accordance with ASTM D1557, to determine the respective material's optimum moisture and laboratory maximum density value at the following frequency: one preconstruction test for this project; one test in each beachfill town during production at the beginning; and one test at the midpoint in each beachfill town.

c. Perform three in-place nuclear density tests per lift of material placed at each crossover.

d. Check in-place densities using ASTM D1556 once for every 5 vehicular or pedestrian crossovers constructed or reconstructed and once for each ADA accessible crossover constructed. Additional checks shall be performed as requested by the Contracting Officer, at no additional cost to the Government.

3.4.3.1 Action Required for Non-Compliance

Whenever test results indicate material non-compliance, remove such material, at no additional cost to the Government. Perform additional tests as directed by the Contracting Officer, to identify the limits of unsuitable material, at no additional cost to the Government.

3.5 BULKHEAD CONSTRUCTION

Construct bulkheads as indicated on the drawings. Accurately place piles at the locations and alignments both laterally and vertically to ensure that the piles are located within stair stringers as shown. Remove debris encountered during excavation. Piles shall not be cut to permit fitting of sheeting. Shimming is not allowed, unless otherwise shown. Drill bolt holes not more than 1/16 inch larger than diameter of bolt shank. Attach sheeting to piles using thru bolts, washers, and nuts as shown.

Preservative treat lumber immediately after cutting, notching and drilling treated lumber, as specified in AWPA M4.

Note: In lieu of using beveled washers, a flat-bottomed, recessed shoulder may be counterbored for use with a flat washer. Depth of recessed shoulder shall not exceed 1/4 inch deeper than that depth required for uniform washer contact, perpendicular to bolt alignment. Diameter of recess shall be no greater than that clearance required for socket tool access for

Section 32 15 00 Page 9 tightening.

3.6 STABILIZATION MAT INSTALLATION

a. Prepare the surface where the stabilization mats will be placed by raking the beach. Remove debris and foreign objects from the area. The surface should be as smooth and flat as possible to ensure optimal wheelchair accessibility.

b. Unroll the stabilization mat fully. Install the mat with the walking surface facing up.

c. Where the stabilization mat meets permanent crossover structures, the mat end shall be placed with no gap. Set the mat flush or just below the permanent path to eliminate a tripping hazard. Dig a one to two inch trench and tuck the end of the mat into this trench and cover end of mat with beach sand.

d. Anchor the mat end using U-shaped pin anchors across the connector strip. Install the pins in the predefined holes in the mat connector strip, which shall be integral to each end of the stabilization mat.

e. Anchor the beach end of the mat by digging a three inch trench. Fold the end of the mat into the trench firmly securing this end with four anchor pins inserted through the predefined holes in the mat connector strip.

f. Rake sand over the trench covering the end of the mat to prevent a tripping hazard.

3.6.1 Connecting Stabilization Mats

a. Install the successive mats by overlapping the connector strips, ensuring that the anchoring holes are lined up so that the anchor pins anchor both mats securely together.

b. Secure the mats with four U-shaped pins at each seam or as recommended by the mat manufacturer.

c. Continue connecting mat sections for the length of the access route.

Complete the installation by securing the end of the final stabilization mat section as specified above or per manufacturer's instructions.

3.7 INSTALLATION OF POST AND RAIL, AND SPLIT RAIL FENCING

Construct fencing as indicated on the drawings. Excavate to the depths indicated for posts. Remove debris encountered during excavation. Set posts plumb and in proper alignment. Backfill shall be compacted with hand tampers or other approved method. Pre-drill holes for screws to prevent splitting. Replace items that split at no additional cost to the Government. Preservative treat lumber immediately after cutting, notching and drilling treated lumber, as specified in AWPA M4.

3.7.1 Handrail Installation

Install handrails on post and rail fence for ADA accessible crossovers.

Fit handrail sections together to form tight joints, except as necessary for expansion. Handrail shall be constructed as indicated and installed such that handrails maintain uniform height above grade and are installed

Section 32 15 00 Page 10 at the same slope of the ramp, as shown on the drawings. Unless otherwise shown on the drawings, install handrails not less than 34 inches nor more than 38 inches above grade.

3.8 SAND FENCE

The sand fence shall be constructed as indicated on the contract drawings and in the manner specified in Section 32 92 00 SAND FENCE AND DUNE GRASS.

3.9 MEASUREMENT AND PAYMENT

3.9.1 Pedestrian Crossovers

3.9.1.1 Standard Pedestrian Crossover Construction

The work specified in this section for the construction of I-5 material standard pedestrian crossovers for all areas, except Longport Borough, will be measured for payment by the square footage (measured along the centerline of the crossover) of I-5 material standard pedestrian crossovers satisfactorily constructed and accepted. Payment will be made at the contract price per unit for the respective Bid Items titled "Construct Standard Pedestrian Crossover", and shall include all costs associated with constructing the I-5 material surface, including demolition, excavation, geotextile, and additional beachfill material, which are incidental to this item.

3.9.1.2 Bulkheads

The work specified in this section for the construction of bulkheads will not be measured separately for payment. All costs associated with constructing the bulkheads shall be included in the unit price for the associated Bid Items titled "Construct Standard Pedestrian Crossover".

3.9.1.3 Standard Pedestrian Crossover (Longport) Construction

The work specified in this section for construction of sand material Standard Pedestrian Crossovers in Longport Borough will be measured for payment by the square footage of stabilization mats satisfactorily installed and accepted as specified herein. Payment will be made for the construction of Standard Pedestrian Crossovers(Longport) and stabilization mat walkways at the contract price per unit for the respective Bid Items titled "Construct Standard Pedestrian Crossover(Longport)", and shall include all costs associated with constructing the stabilization mat surface, including demolition, excavation, and additional beachfill material, which are considered incidental to this item.

3.9.1.4 Standard Pedestrian Crossover Reconstruction/Repair

The work specified in this section for the reconstruction/repair of I-5 material standard pedestrian crossovers will be measured for payment by the square footage (measured along the centerline of the crossover) of standard pedestrian crossovers satisfactorily reconstructed and accepted. Payment will be made at the contract unit price for the Bid Items titled "Reconstruct Standard Pedestrian Crossover", and shall include all costs associated with constructing the I-5 material surface, including demolition, excavation, geotextile, and additional beachfill material, which are incidental to this item.

Section 32 15 00 Page 11

3.9.2 Vehicle Crossovers

3.9.2.1 Vehicle Crossover Construction

The work specified in this section for construction of I-5 material vehicle crossovers and driving surfaces will be measured for payment by the square footage (measured along the centerline of the crossover and driving surface) of vehicle crossovers satisfactorily constructed and accepted. Payment will be made at the contract unit price for the Bid Items titled "Construct Vehicle Crossover", and shall include all costs associated with constructing the I-5 material surface, including demolition, excavation, geotextile, and additional beachfill material, which are incidental to this item.

3.9.2.2 Vehicle Crossover Reconstruction

The work specified in this section for the reconstruction/repair of vehicle crossovers will be measured for payment by the square footage (measured along the centerline of the crossover) of vehicle crossovers satisfactorily constructed and accepted. Payment will be made at the contract unit price for the Bid Items titled "Reconstruct Vehicle Crossover", and shall include all costs associated with constructing the I-5 material surface, including demolition, excavation, geotextile, and additional beachfill material, which are incidental to this item.

3.9.3 ADA Accessible Crossover Construction

The work specified in this section for the construction of I-5 material ADA accessible crossovers and walkways will be measured for payment by by the square footage (measured along the centerline of the crossover and walkway) of ADA accessible crossovers satisfactorily constructed and accepted.

Payment will be made at the contract unit price for the Bid Items titled "Construct ADA Accessible Crossover", and shall include all costs associated with…