15R0080_Solicitation.pdf

PDF 325 KB Posted

Attached to
Procurement of a New Wicket Lifter Winch and Relocation of Current Winch
Solicitation number
W912BU-15-R-0080
Issued by

About this file

Solicitation W912BU-15-R-0080.

View the file

Other files

File Type Posted
15R0080-0001_Final.pdf PDF
Drawings.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912BU-15-R-0080 09-Nov-2015

b. TELEPHONE NUMBER

215-656-6773

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 09 Dec 2015

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912BU9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

JUSTIN CHUNG

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: JUSTIN CHUNG

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 964907 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

US ARMY ENGINEER DISTRICT, LOUISVILLE

1153 WEST 3RD STREET

BROOKPORT IL 62910

TEL: FAX:

215-656-6780FAX:

TEL: 215-656-6773 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

500 employees

NAICS:

333923

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF71

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912BU-15-R-0080

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each Barge Hauling Winch and Foundation

FFP

The contractor shall provide the items and services described in the Statement of Work (SOW). The contractor shall provide and install a new barge hauling winch and foundation, relocate the existing winch, and incorporate modifications to the winch foundation.

FOB: Destination

NET AMT

Section C - Descriptions and Specifications

STATEMENT OF WORK

C000 GENERAL

C001 PROJECT DESCRIPTION

The U.S. Army Corps of Engineers (USACE) has issued this solicitation, for the procurement and installation of a new barge hauling winch and foundation, and relocation of the existing winch, and incorporate modifications to the winch foundation to include modifications to the winch foundations. The new winch will be used to position a wicket lifter barge across the face of a wicket dam servicing Lock and Dam 52 on the Ohio River system, in USACE Louisville District.

C002 PRE-PROPOSAL INSPECTION

Two pre-proposal inspections will be held to allow all prospective offerors an opportunity to inspect the barge.

While attendance at an inspection is not mandatory, it is strongly recommended that prospective offerors inspect the winch and barge during one of these two sessions.

The pre-proposal inspections will be held on Tuesday, November 17 and Wednesday, November 18, 2015 at 9:00 AM CDT in Brookport, Illinois. Representatives of prospective offerors wishing to attend should contact Brian Holcomb at (502) 315-6702 for the specifics of the exact location and the on-site point of contact.

During the pre-proposal inspection, offerors will be allowed unencumbered access to the barge. Representatives of the Government will be available, but only to the extent necessary to escort offerors and assist with access to the barge. Government Representatives will not discuss the scope of the work or make any technical clarifications or interpretations.

After the inspection, offerors shall submit all questions on items discovered via e-mail to the contract specialist listed as the primary point of contract in the solicitation. The Government will prepare answers to all questions received. These answers will be posted as an amendment to the solicitation to allow all offerors an opportunity to review the questions received and any associated revisions to the solicitation.

C003 DESIGN STANDARDS

The winch, winch foundations, controls, and associated equipment shall be designed and constructed in accordance with the latest edition and interpretations of the rules, regulations, requirements and standards of the Legislation, Regulatory Agencies and technical organizations listed below. The contractor is required to incorporate into the barge any revisions to the rules and regulations listed below as well as those stipulated in the respective specification clauses.

U.S. Army Corps of Engineers, Publication No. EM 385-1-1; “Safety and Health Requirements Manual.” May be viewed at internet web site: http://publications.usace.army.mil/publications/eng-manuals/EM_385-1-1_languages/EM_385-1-1_English_2008/toc.html

American Bureau of Shipping (ABS) "Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways."

ABS “Guide For Shipbuilding and Repair Quality Standard For Hull Structure During Construction”.

American Welding Society “Guide For Steel Hull Welding”, ANSI/AWS D3.5-85.

American Society of Mechanical Engineers (ASME) “Base-Mounted Drum Hoists”, ASME B30.7-2011

Institute of Electrical and Electronic Engineers Standards, Publication No. IEEE-45

"Recommended Practice for Electrical Installations on Shipboard"

National Electrical Code (NEC)

C006 SCOPE OF WORK

A. CONTRACTOR’S RESPONSIBILITY

The contractor assumes complete responsibility for the procurement, installation and testing of the new barge hauling winch and the relocation and testing of the existing winch according to the specification and the documents to meet the requirements of this contract. Should the contractor determine at any time that he is unable to fulfill those responsibilities, he shall notify the COR immediately of the problem experienced and his proposed manner of correction.

The contractor is not responsible for any design work or engineering to develop the new foundation details. The Government will provide a design for the foundation to include all structural and weld details (see Paragraph C456).

The contractor shall provide all crane services and support to unload the winch and other materials during delivery to the work site. The contractor is responsible for moving the winches into position inside the existing structure on the barge. Machining and tooling required to install (mechanically and electrically) the winches shall be provided by contractor.

B. DEFINITION OF LOCATION WHERE THE WORK SHALL BE PERFORMED

U.S. Army Corps of Engineers, Louisville District Wicket Lifter L&D #52 is located at Ohio River Lock & Dam #52, Ohio River Mile 939. The street address for Lock & Dam #52 is:

US Army Corps of Engineers

Lock and Dam #52 1153 West 3rd Street Brookport, IL 62910

The work required to be performed under this contract shall be physically performed onsite at Lock and Dam #52 in Brookport, IL or at a facility supplied by the offeror. Any facility provided by the offeror shall be within 60 river miles of Lock and Dam #52. Should the Offeror decide to perform the work at their facility, all costs associated with transportation of the wicket lifter barge to and from the facility shall be the contractor’s responsibility.

The offeror shall indicate in his proposal whether the work to be performed under this contract will be physically performed onsite at Lock and Dam #52 in Brookport, IL or if the wicket lifter barge will be towed to a work site provided by the contractor to perform the work required by this contract.

C010 DEFINITIONS

The following definitions are applicable to phrases and acronyms used throughout this contract:

COR - Contracting Officer’s Representative - a member of the contract management and quality assurance team authorized by the Contracting Officer to perform certain administrative and managerial duties. A copy of the COR’s authority letter is furnished to the contractor.

K.O. - Contracting Officer - A person with the authority to enter into, administer and/or terminate contracts and make related determinations and findings.

MDC – Acronym for the Marine Design Center.

QC - Quality Control - Quality Control is a function of the contractor. Quality Assurance (QA) is a function of the Government.

USACE – Acronym for United States Army Corps of Engineers.

C025 CONTRACTOR’S QUALITY STANDARDS

The contractor shall be responsible for the procurement and installation of a new winch and the relocation of an existing winch. The contractor shall utilize the specified components so as to meet specification requirements utilizing construction and testing methods to ensure that the completed barge conforms to the intended design.

Inspection by the Marine Design Center is for the purpose of verifying the proper function of the contractor’s quality control measures and is not to be used as a substitute for control of quality by the contractor.

A. STRUCTURAL MATERIALS

Unless otherwise specified or noted on the contract drawings, all structural hull material shall be in accordance with the following specifications:

American Bureau of Shipping (ABS), “Rules for Building and Classing Steel Vessels” and “Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways”.

Welding Materials - ABS “Approved Welding Electrodes, Wire-Flux and Wire Gas Combination.”

B. STANDARD PARTS & MATERIALS

All articles, fittings, equipment, machinery, supplies, and materials used in the construction and outfitting of the winch and foundations shall be the highest grade, free from defects and imperfections, unused and, be the standard product of reputable manufacturers, to the maximum extent practicable. Any material not specified shall be the best of their kind for the purpose intended.

Materials specified herein to meet the requirements of standard specifications published by national authorities shall conform to the respective editions, including amendments, specified. No salvage materials shall be used in the work.

C. WORKMANSHIP

All labor shall be especially skilled for each kind of work and under competent direction.

In engaging one kind of work with another, marring or damage of previously acceptable construction shall be cause for rejection. All parts of the barge intended to join or bear upon other parts shall have complete and solid contact and shall fit together without excessive cold work during erection. Shims or liners shall not be used for the purpose of overcoming a bad fit. Lightening holes may be punched or flame-cut and all edges shall have burrs removed.

Holes in members having sharp curvature shall be avoided

D. WELDERS

All welding under this contract shall be done only by welders who have successfully passed qualification tests accepted by the American Bureau of Shipping or other regulatory bodies acceptable to ABS.

The contractor shall bear the expense of conducting these tests and shall certify, by name to the Contracting Officer, welders who have successfully passed the prescribed tests and hold current, valid certifications.

The contractor shall require any welder to repeat these tests when in the opinion of the Contracting Officer, the work of the welder indicates a reasonable doubt of his proficiency. In such cases the welder shall be re-certified as above if he successfully passed the retest; otherwise, he shall be disqualified until he has successfully passed the retest.

The contractor shall maintain records of each welder’s certification during the course of the contract. The records are to be available for examination upon request of the Contracting Officer.

E. WELDING

All welding shall be in accordance with the current rules and Quality Standards of the American Bureau of Shipping and ANSI/AWS D3.5-85. All welding equipment used on the work shall be of a modern type subject to close control. The electrodes used throughout the work shall be suitable for use with the parent metal at each weld, and be approved by ABS.

Welding procedures, as to direction, length, numbers, and sequence of beads, shall be carefully planned to minimize lock-up stresses. Care shall be exercised to produce smooth even beads, especially on all exposed plating and fittings. Beads shall be chipped and ground where directed by the COR.

The contractor shall employ appropriate welding procedures and grounding connections.

F. INSTALLATION

Materials and equipment shall be installed in accordance with the approved recommendations of the manufacturer, and in compliance with the contract documents. The installation shall be accomplished by workmen skilled in this type of work.

G. CONSTRUCTION STANDARDS

All material, machinery and equipment shall be new, of current manufacture and suitable for the marine service intended. Spare parts and service shall be readily obtainable.

All material, unless otherwise specified in these specifications or in the drawings, shall be of commercial quality to ASTM, ANSI, or SAE specifications.

During installation and before completion, the contractor shall be responsible for protection of all material, equipment, etc., located on the barge.

All materials shall be free of imperfections due to manufacturing processes and from defects which adversely affect appearance or serviceability.

All sharp edges or projections which constitute a personnel hazard shall be removed or ground smooth. All notches shall have a radius to prevent stress concentrations.

C300 STRUCTURE

C330 FOUNDATIONS

A. REFERENCE DRAWINGS

788-F215-01 GENERAL ARRANGEMENT “REMOVALS”

788-F215-02 GENERAL ARRANGEMENT WINCH MODIFICATIONS

788-F330-01 WINCH FOUNDATION MODIFICATIONS

B. GENERAL

Suitable foundations for the new and existing winches shall be furnished and installed to distribute the loads to the structure, and to avoid undue stresses and vibrations in the hull. The contractor shall provide all labor, material, and equipment to remove the existing foundation for the existing winch. Additionally, the contractor shall furnish all labor, material, and equipment to install the new foundations.

The reference drawings in paragraph A above provide details for the existing foundation and also identify the general area for the installation of the new foundations.

The contractor is not responsible for developing the design of the foundations for the new and relocated winches.

Following contract award, and receipt of all technical documents from the contractor, the Government will develop a detailed foundation design and provide it to the contractor.

For bidding purposes, because the foundation design relies on the new winch procured and thus cannot be designed before the winch is selected, the contractor shall assume for bidding purposes, that the two new foundations will be of similar design to the current foundation for the existing winch. After completion of the design, any changes in scope will be handled through contract modification.

C. EXISTING FOUNDATION

The contractor shall be responsible for removing and scrapping the existing foundation for the current winch (Wintech Model DP25000-50).

D. NEW FOUNDATIONS

The contractor shall be responsible for fabricating and installing two (2) new steel foundations. The first foundation shall be installed at the existing foundation location for installation of the new winch. The second foundation shall be installed at a forward location of the barge specified by the Government, for relocation of the current winch (Wintech Model DP25000-50).

All equipment and machinery shall be leveled with chock-fast and bolted to foundations to facilitate ease of removal for repair. Winch gears shall be aligned in accordance with winch manufacturer’s specifications. Welding of equipment or machinery to foundations is not acceptable.

Foundation members shall be lightened and openings provided to permit access to all parts of the foundation for inspection, drainage, and maintenance. All corners shall be ground smooth.

Bolt holes in foundations shall be templated from the component. Foundation top flanges/plates shall be level.

Web plates of foundations shall be stiffened at holding-down bolts and other points of load concentration. All equipment and machinery bolted to foundations shall have mounting bolt holes accurately bored (not burned) and reamed to provide a no-slop fit.

C400 OUTFIT

C406 COATING SYSTEM

A. GENERAL

After installation of the new foundations for the new winch and the relocated existing winch, the contractor shall paint all areas of the barge that are affected by the performance of this work. This includes all new steel work, all modified areas (replaced or repaired), and all areas that are damaged by the contractor through performance of the work required under this contract. Painting of the deck surfaces shall provide a uniform finish.

B. SURFACE PREPARATION

Surface preparation for all new areas shall be in accordance with the manufacturer’s surface preparation requirements for new steel.

Surface preparation for all modified or damaged areas shall consist of cleaning to bare metal using power tool cleaning in accordance with Steel Structures Painting Council Standards SSPC-SP11.

C. PAINT REQUIREMENTS

Paint shall be delivered in sealed containers with labels to indicate manufacturer, contents, manufacturing date, and any special instructions. Paints and painting materials shall be stored under cover and protected from extreme temperatures.

Paints shall not be used if they have exceeded the closed shelf life or pot life recommended by the manufacturer.

Additionally, paints shall not be applied in weather, temperature, or humidity conditions not recommended by the manufacturer.

D. APPLICATION OF COATINGS

Surface preparation and paint application shall be in strict compliance with the coating manufacturer’s recommendations. The contractor shall take particular care to insure that coating system requirements are met in all areas, especially those difficult to coat, such as flange undersides.

E. COATING SYSTEM

The system shall be composed of the following coating types:

Self-priming epoxy coat Fade resistant urethane top coat

The coating system that the Contractor intends to use shall be submitted to the COR for review and approval.

The following coating systems from PPG Amercoat, International Paint, Sherwin-Williams and Carboline have been reviewed and are considered to meet the coating requirements of this clause. The contractor may select any of these systems at his discretion. However, selection of any other coating system will require the review of the proposed coating manufacturer’s data and concurrence of the Marine Design Center prior to any application of the system. Systems may not be “mixed” (i.e. mixing an “a” with a “b”, as identified below, is not acceptable). The specific coating designations to be used are as follows:

1. Self Priming Epoxy Base Coat (8 mils DFT Minimum)

a. Amercoat 240

b. International INTERTUF 262

c. Sherwin-Williams Sea Guard 5000HS

d. Carboline Carboguard 635

2. Fade Resistant Urethane Top Coat (4 mils DFT Minimum)

a. Amercoat 450 H

b. International INTERTHANE 990

c. Sherwin-Williams Acrolon 218HS

d. Carboline Carbothane 134HG

The number of coats is not specified above. The contractor is required to provide the number of coats necessary to attain the DFT thickness required in the schedule. Thickness applied per coat may not exceed the manufacturer’s recommended maximum thickness.

Color selection for all coatings shall be based on the existing coatings and shall be subject to approval by the COR prior to application.

All top coatings shall be thick enough to provide complete opaque color coverage. Thickness increased over the DFT minimums required above shall be provided if required for opaque color coverage.

All items of machinery and equipment shall be painted with the individual manufacturer’s standard colors. Painted surfaces damaged in handling and installing the equipment shall be repainted.

All unpainted machinery items having black cast or carbon steel surfaces shall be given a prime coat and finish coat of gray machinery enamel.

F. SAFETY & HEALTH STANDARDS

On 24-hours notice of any Government inspection, and before any representative of the U.S. Government boards the vessel for inspection, each enclosed or confined space to be inspected shall be labeled “Safe for Workers” in accordance with the OSHA regulations stated in 29 CFR 1915. The initial certificate shall be issued by a National Fire Protection Association (NFPA) certified Marine Chemist. A competent person may re-certify daily provided that the conditions have been maintained.

This means that in all spaces so designated:

The oxygen content of the atmosphere is at least 19.5 percent and below 22 percent by volume;

The concentration of flammable vapors is below 10 percent of the lower explosive limit (LEL);

Any toxic materials in the atmosphere are within permissible concentrations;

Any residues or materials associated with any work in the space will not produce uncontrolled release of toxic materials under existing atmospheric conditions while maintained as directed.

The contractor shall notify the Government when this certificate has been issued. The vessel will not be inspected and accepted by the Government without a NFPA Marine Chemist certificate for each compartment.

C456 DECK WINCHES

A. REFERENCE DRAWINGS

788-F215-01 GENERAL ARRANGEMENT “REMOVALS”

788-F215-02 GENERAL ARRANGEMENT WINCH MODIFICATIONS

788-F330-01 WINCH FOUNDATION MODIFICATIONS

B. SUPPORT

The offeror shall provide crane and rigging support to unload the winch during delivery and also to position the winch on to the barge should the work be performed at Lock and Dam 52. Alternatively should the offeror decide to perform the work at his facility (see Clause C006), all costs associated with transportation of the wicket lifter barge to and from the facility shall be the Contractor’s responsibility.

C. EXISTING WINCH

The existing winch is a Wintech Model DP25000-50 winch. The following information is provided to identify the specific winch:

Model No.: DP25000-50 Serial No.:12026 Rope Dia.: 7/8” Max Line Pull (1st Layer): 32,000lbs.

The contractor shall furnish all labor, material, and equipment to remove the existing winch from its current foundation and relocate the winch to the new foundation required by Clause C330. The existing winch shall remain property of Government.

D. NEW WINCH

The contractor shall furnish and install a new winch at the location of the current existing winch.

The winch shall be of the horizontal drum type with reversible capabilities, infinitely variable line-speed up to the rated line speed identified below. The winch shall be electric and gear driven, designed and manufactured in accordance with ASME B30.7-2011 safety standard. Exposed moving parts shall be guarded.

1. Operation Requirements:

Minimum 45,000 lbs rated line pull at 26 ft/min rated line speed on first layer 26,200 lbs minimum line pull on any layer

2. Bedplate:

The bedplate shall be of rugged construction, welded steel, fully stress relieved, with machined mounting pads to keep all pillow blocks, motor, and reducer in accurate alignment. The bedplate shall be designed to be bolted to the work barge. The bedplate shall have a catch pan underneath the gear reducer to contain the full amount of oil held in the reducer in case of failure. Lifting points with lifting eyes shall be supplied to facilitate installation.

3. Drum:

The drum shall be fabricated from welded structural steel. The drum shall have grooved lagging with a core diameter of 24 inches, sized to store 2200 feet of 6 x 37 class 1-1/4-inch IWRC EIPS wire rope. The drum shall be horizontally mounted on shaft and fitted with grease lubricated anti-friction bearings of the renewable type. All rotating parts shall be accurately machined, fitted, and balanced.

4. Gear Reduction:

Gear reduction shall be provided by a 4 stage helical spur gear arrangement. Gears and pinions shall be of steel or other materials if approved by the Contracting Officer or his Representative. Adequate means of lubrication shall be provided for the gears and bearings to satisfy all operating conditions for three-month intervals without external lubrication by the operator. The gearing shall be rated for a service factor of 1.6.

All gearing shall be hardened for durability and strength to meet the service requirements of the winch. All gear shafting shall be of high carbon or alloy steel. The gear case and gear case cover mating materials shall be machined to form an oil-tight seal without the use of a gasket other than a light coating of sealant at assembly. All gear case and gear case cover fabrication joints shall be continuous welded and oil-tight. All bearing blocks shall be faced and motor-mounting pads machined.

5. Electric Motor & Motor Brake:

All motors shall be NEMA or IEC type, suitable for marine application and sized and designed for continuous operation of the driven auxiliary at rated capacity. Motors shall be designed, constructed, and installed in accordance with ABS Rules; however, ABS certification is not required. All motors shall be equipped with anti-friction bearings. All motors using grease-lubricated bearings shall be provided with grease fittings and shall have positive means for preventing grease from being forced out upon the motor windings.

All motors shall have IP-56 protection. All motors shall have class “F” insulation with a class “B” temperature rise rating based on 50o C ambient temperature.

All motor circuits shall have motor feeder short-circuit and ground-fault protection, disconnect means, motor branch-circuit, short circuit, and ground fault protection, manual reset motor overload protection and integral start/stop push-button set.

The new winch motor shall be a Totally Enclosed Fan Cooled (TEFC) continuous inverter duty motor, 1000:1 constant torque, 1800 RPM, 480VAC, encoder, severe duty treatment, anti-fungal treatment, over temperature thermostat, space heater, and a spring set electrically released dust tight water proof brake rated at 150% full load torque of the motor.

6. Winch Wire Rope Drum Brake:

A winch drum brake shall be provided that acts directly on the winch wire rope drum. The drum shall have a spring set hydraulically released brake rated at 200% full load torque. The drum brake shall set upon loss of hydraulic pressure or when an emergency stop is pressed.

7. Hydraulic Power Unit:

The drum brake shall be connected to a suitably sized electrically driven hydraulic power pack provided by the winch manufacturer. The pump motor shall be capable of being started and stopped locally from the associated controller and remotely from a remote control station (see Clause C702). Hydraulic power unit shall produce less noise than the winch power unit, or it shall be placed in an enclosure to limit noise levels to the decibel rating of the winch.

8. Level Wind:

Winch shall have a level wind unit to keep wire rope evenly distributed across the drum. Level wind shall have a clutch that can be disengaged by winch operator to correct for timing issues between drum and wire rope. Level wind shall have a roller fairlead to prevent premature wear to wire rope.

9. Wire Rope:

The new winch shall be supplied with 2200 feet of 6 x 37 class 1-1/4 IWRC EIPS wire rope. The wire rope shall have a 3.5:1 safety factor when comparing the breaking strength of the wire rope to the line pull of the winch.

Winch rope shall be supplied with detachable floats for each 100’ of wire rope, or as recommended to keep the wire rope afloat. Floats shall be detachable by deck crew after the wire rope is drawn up onto the deck of the wicket lifter barge. Wire rope shall have a mechanically spliced Flemish eye in one end for placing over a pipe anchor.

The contractor shall provide the COR with a “Certificate of Examination and Test of Wire Rope Before Being Taken Into Use” (U.S. Department of Labor – Occupational Safety and Health Administration Form No. 5) for each continuous run of rope installed on the winches. The certification shall be performed to the requirements of 29 CFR, part 1919 and be in accordance with the requirements of 29 CFR 1918.

10. Documentation:

Operation and Maintenance manuals with installation instructions, top level drawings, troubleshooting guides, electrical schematics, component documentation, commercial warranties, and software program shall be supplied.

All documentation shall be supplied in an electronic format.

E. OPERATOR’S CONTROLS

1. New Winch

The contractor shall supply and install operator’s controls. The operator shall have a control stand consisting of winch system on/off, VFD speed selector, FWD and Reverse selector, and Emergency Stop (E-stop). Stand shall be located per direction of site personnel inside the control building. Stand shall also have a hard wired remote control with all of the above controls. The remote control shall be able to reach the stern of the barge.

Following safety features shall be incorporated into the winch control system:

E-stop system that applied both the main drum brake and aux motor brake.

System shall be setup so that brake application cannot sever the wire rope.

E-stop shall also trigger an audible alarm when pressed.

Over-speed detection for the winch.

2. Existing Winch

The current operator control stand shall be relocated and re-installed per direction of site personnel inside the control building.

C700 ELECTRICAL

The contractor shall be responsible for furnishing all labor, material, and equipment to connect the new winch and its components and the relocated existing winch to the existing electrical system.

C701 GENERAL REQUIREMENTS

Where not otherwise specified, all machinery, equipment, materials, and installation shall be in accordance with applicable ABS, IEEE, NEMA, ANSI, and NEC standards and codes. All electrical equipment furnished shall bear the approval of the Underwriters Laboratories or other recognized independent laboratory, where applicable.

All new electrical equipment shall be provided with at least the minimum degree of protection specified by Part 4, Chapter 8, Section 3, Table 2 of the ABS Rules.

All power consuming equipment shall operate satisfactorily with a voltage variation of –10% to +6% and AC equipment shall operate satisfactorily with a steady state frequency variation of + or – 5%.

Electric equipment and machinery shall have suitable barriers or screens wherever required to protect personnel from contacting energized, moving or rotating parts.

All controllers and equipment indicators shall be installed in weather tight enclosures, unless otherwise required in the specification.

Equipment shall be located and oriented as conveniently as practicable for operation and maintenance. All equipment shall be accessible for removal, servicing and adjustment without dismounting or removal of other equipment.

Equipment shall be treated to provide protection against corrosion, moisture, mold, and other destructive agents to which the equipment may be exposed.

The conductivity of connections shall not be less than the conductivity of the connected cable. All bolts, screws, nuts, and washers shall be made of corrosion-resistant metal of adequate size for their functions. Lock washers or equivalent shall be used to prevent loosening of bolted connections throughout the electrical system.

C725 ELECTRICAL CABLES

A. GENERAL

The contractor shall provide and install new cables for the new winch and VFD and remove and scrap the existing cable and provide and install new cable for the relocated winch.

Voltage drop shall not exceed 5% from the panel board to the load for all new and modified circuits.

Cables shall be constructed in accordance with IEEE-45, bronze armored. Insulation shall be rated at 90 degrees C (85 degrees C – ABS).

B. CABLE REQUIREMENTS

Cables shall be similar to SEACOAST, TXTB Series, 90 degree C rated, armored, USCG and ABS approved.

Armored cables used shall be basket weave armor (bronze jacket) in accordance with IEEE-45 or equivalent (as classified by UL as IEEE-45 equivalent). The cable armor (bronze jacket) shall be grounded at both ends.

All cables for control circuits shall be 14 AWG or larger. Cabling for alarm and monitoring systems shall be 16 AWG or larger. Communication cables and those used for Internal control cabinets such as circuits used to integrated terminal blocks with PLC I/O cards may be 18 AWG or less than or equal as applicable.

Solderless crimp type or compression lugs shall be used for all cable terminations. Soldered lugs are not acceptable.

All cable entrances to watertight enclosures or the protected area of drip proof enclosures shall be made using watertight brass terminal tubes. Cable entrances to non-watertight enclosures shall be made using cable connectors with clamps as appropriate for armored cable. Where top entry to non-watertight enclosures is made the cable connector shall also be sealed to prevent entrance of debris into the enclosure. All cable penetrations through watertight bulkheads or decks shall employ the NELSON MCT/Multi-Plug and/or the Uni-Plug system or similar.

10% spare capacity shall be incorporated in each unit for the addition of cables.

The contractor shall develop a classification system and cable separation procedure that shall ensure that all refit installed equipment will operate satisfactorily and will not interfere with any other shipboard system.

All new cables shall be identified at both ends with tags fabricated from strip aluminum with raised lettering, securely fastened to the cable by banding.

C. CABLE SUPPORTS

All new cable installations shall be supported on galvanized steel brackets, and shall comply with all applicable provisions of IEEE-45. Cable supports shall be heavy enough to bear the weight of cables without bending, and all supports shall have rough or sharp edges removed so that cable armor will not be damaged. Horizontal runs of cable shall be supported by brackets spaced every 2 feet. Vertical runs of cables shall be supported every 2 feet with individual cable straps and bar hangers or brackets.

C750 VARIABLE FREQUENCY DRIVE FOR THE WINCH

A. CONTROLS

The winch shall be controlled by a PLC and Variable Frequency Drive with a joystick, indicator lights, and selector knobs as required. The speed shall be infinitely adjustable from 0-100% at the operator station. Over speed detection and travel limits shall be provided. Overspeed detection shall apply both brakes and reset drive. Motor starter panel and control panel enclosures shall be NEMA 4.

B. VFD

A variable speed, reversible electric drive shall be provided for the new winch. Power supply for the drive shall be 480-VAC, 3-phase, 60-Hz. It shall be able to continuously deliver required rated power to the new winch motor and shall be rated at no less 150% of the full horsepower of the winch motor. The output of the drive shall be fully adjustable over the entire operating range of the winch motor being controlled. The drive shall be independent and separate from all other drives, and any fault in the drive shall not affect operational capabilities of any other drives.

The drive shall be provided with all necessary control, detection, protection, instrumentation, input/output, diagnostics and any other functions required by the system. The drive shall also control operation of any ventilation blower associated with the winch motor, if required. A limitation of the size of the AC adjustable drive cabinets has not been established.

The drive shall be of a 12-pulse or IGBT type and provided with class A net filters. The drive shall be microprocessor controlled and provided with digital control panel. The drive shall have IP 23 protection, be self-ventilating and not require an external ventilation duct or separate power source for any internal blowers. Control power for the drive operation shall be provided from the drive’s own power supply. The drive shall be ABS type approved and rated for 50 degree C ambient, including the drive controller.

The new winch drive shall include provisions for the following remote indications and alarms:

Drive Power Available Motor Current Motor Failure Motor Alarm Drive Failure

C800 TESTING

A. GENERAL

The contractor shall perform testing on all equipment, machinery, and systems installed or modified as part of this contract. The tests shall demonstrate satisfactory compliance with the specification requirement. The contractor shall furnish all labor, material, tools, and test equipment to perform the testing. Within 30 days after notice to proceed, the contractor shall submit a comprehensive test plan for all equipment, machinery, and systems to demonstrate proper operation and to verify that the components were installed correctly. Additional specific requirements are included below.

B. FACTORY ACCEPTANCE TESTING

The contractor shall perform factory acceptance testing at the manufacturer’s facility. Manufacturer shall create test system to include no load test, perform test to demonstrate rated capacity and line speed, and a brake test to demonstrate operation of the winch drum and motor brake systems. The Contracting Officer shall have the option of witnessing the testing. The Contracting Officer or his representative shall be notified at least 10 working days prior to the scheduled test date.

C. ACCEPTANCE TESTING:

Upon completion of the installation the wicket lifting winch system shall be thoroughly tested and operated in the presence of the Contracting Officer’s Representative, to such extent as necessary to demonstrate satisfactory operation as designed and specified. The contractor shall make all arrangements with the winch and electrical (drives and controls) equipment manufacturers to provide a qualified factory representative(s) on site for the acceptance testing. All winch system tests shall be performed in accordance with the manufacturer’s recommended test procedure for the equipment.

1. Electric Cabling

Insulation resistance readings of all installed power and lighting cable shall be taken using a 500 volt meter, and shall be in accordance with IEEE Standard 45, Section 46. The measured cable insulation resistance must meet or exceed the minimum values outlined in the referenced IEEE publication.

2. New Winch

Demonstrate the free running operation of the new winch in forward, reverse and stop. Perform pull tests to demonstrate rated load capability for the winch. Demonstrate that the winch will operated at the rated speed.

Demonstrate the operation of the selector switch and operation from the control panel and locally at each winch.

Demonstrate the free movement of the wire rope through the fairlead.

3. Brakes

Demonstrate the operation of the motor brake and drum brake. Perform pull tests to demonstrate rated load capability for the brakes. Demonstrate that the brakes will operate at their rated loads. Demonstrate the operation of the brake switches and operation from the control panel and locally at the winch.

4. Hydraulic Power Unit

All piping/hoses for the hydraulic power unit connection to the winch drum brake shall be hydrostatically tested for leaks at 1-1/2 times working pressure for a duration of no less than 10 minutes. The system shall be inspected for leaks at the welds, fittings, hoses, etc.

Upon completion of the hydrostatic testing, the systems piping and fittings shall be flushed with hydraulic fluid.

Jumpers shall be provided as necessary. Flushing shall be accomplished using a contractor furnished pump to circulate the hydraulic fluid, and the contractor furnished filters to collect all contaminants.

Demonstrate the operation of the hydraulic power unit and associated controls and test in accordance with the manufacturer’s test procedures.

5. Relocated Winch

Demonstrate the free running and loaded operation of the relocated winch in forward, reverse and stop. Diagnose and correct overcurrent drive tripping with current VFD.

C900 SPARE PARTS

The contractor shall provide a recommended list of spare parts. The Government may purchase spaces from this list by issuing a contract modification.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government

CLAUSES INCORPORATED BY REFERENCE

252.246-7000 Material Inspection And Receiving Report MAR 2008

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 240 dys. ADC 1 US ARMY ENGINEER DISTRICT, LOUISVILLE

1153 WEST 3RD STREET

BROOKPORT IL 62910

FOB: Destination

964907

52.211-17 Delivery of Excess Quantities SEP 1989 52.242-15 Stop-Work Order AUG 1989 52.247-34 F.O.B. Destination NOV 1991

Section G - Contract Administration Data

BILLING INSTRUCTIONS

Correspondence and Invoices shall be forwarded to:

U.S. Army Corps of Engineers Attn: CEMDC (Edward Vollberg, COR) Wanamaker Building, Room 630 South 100 Penn Square East Philadelphia, Pennsylvania 19107-3391

Telephone: (215) 656 - 6850

252.204-7006 Billing Instructions OCT 2005

Section I - Contract Clauses

52.203-3 Gratuities APR 1984 52.203-6 Alt I Restrictions On Subcontractor Sales To The Government

(Sep 2006) -- Alternate I

OCT 1995

52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights

APR 2014

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-7 System for Award Management JUL 2013 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2015

52.204-13 System for Award Management Maintenance JUL 2013 52.204-16 Commercial and Government Entity Code Reporting JUL 2015 52.204-18 Commercial and Government Entity Code Maintenance JUL 2015 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

JUL 2013

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

DEC 2014

52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns OCT 2014 52.219-14 Limitations On Subcontracting NOV 2011 52.222-3 Convict Labor JUN 2003 52.222-19 Child Labor -- Cooperation with Authorities and Remedies JAN 2014 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment

Exceeding $15,000

MAY 2014

52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity APR 2015 52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans OCT 2015 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons MAR 2015 52.222-54 Employment Eligibility Verification OCT 2015 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.229-3 Federal, State And Local Taxes FEB 2013 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.233-3 Protest After Award AUG 1996

52.242-13 Bankruptcy JUL 1995 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

AUG 2015

252.204-7012 (Dev) Safeguarding Covered Defense Information and Cyber Incident Reporting

OCT 2015

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism

OCT 2015

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7001 Buy American And Balance Of Payments Program-- Basic

(Nov 2014)

NOV 2014

252.225-7002 Qualifying Country Sources As Subcontractors DEC 2012 252.225-7012 Preference For Certain Domestic Commodities FEB 2013 252.225-7016 Restriction On Acquisition Of Ball and Roller Bearings JUN 2011 252.225-7048 Export-Controlled Items JUN 2013 252.226-7001 Utilization of Indian Organizations and Indian-Owned

Economic Enterprises, and Native Hawaiian Small Business Concerns

SEP 2004

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006 252.236-7002 Obstruction of Navigable Waterways DEC 1991 252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JUN 2013

252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea APR 2014 252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000

CLAUSES INCORPORATED BY FULL TEXT

52.204-17 OWNERSHIP OF CONTROL OF OFFEROR (NOV 2014)

(a) Definitions. As used in this provision--

Commercial and Government Entity (CAGE) code means—

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Contractor and Government Entity (CAGE) Branch to identify a commercial or government entity, or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Contractor and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as an NCAGE code.

Highest-level owner means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

Immediate owner means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.

(b) The Offeror represents that it [ ___ ] has or [ ___ ] does not have an immediate owner. If the Offeror has more than one immediate owner (such as a joint venture), then the Offeror shall respond to paragraph (c) and if applicable, paragraph (d) of this provision for each participant in the joint venture.

(c) If the Offeror indicates ``has'' in paragraph (b) of this provision, enter the following information:

Immediate owner CAGE code:

Immediate owner legal name: ___

(Do not use a ``doing business as'' name)

Is the immediate owner owned or controlled by another entity?:

[ ___ ] Yes or [ ___ ] No.

(d) If the Offeror indicates ``yes'' in paragraph (c) of this provision, indicating that the immediate owner is owned or controlled by another entity, then enter the following information:

Highest-level owner CAGE code:

Highest-level owner legal name:

(Do not use a ``doing business as'' name)

(End of provision)

52.212-4 CONTRACT TERMS AND CONDITIONS-- COMMERCIAL ITEMS (MAY 2015)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract.