W912BU-15-R-0021-0002.pdf

PDF 29 KB Posted

Attached to
One (1) self propelled aluminum hydrographic surveyboat (2987)
Solicitation number
W912BU-15-R-0021
Issued by

About this file

Amendment 02

View the file

Other files

File Type Posted
W912BU-15-R-0021-0003.pdf PDF
W912BU-15-R-0021-0001.pdf PDF
W912BU-15-R-0021.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: ADRIANA A. DUNAWAY

100 PENN SQUARE EAST

CENAP-CT

PHILADELPHIA PA 19107-3390

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

MDC 2987 – One (1) Self Propelled Aluminum Hydrographic Surveyboat

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-May-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-15-R-0021

X 9B. DATED (SEE ITEM 11)

16-Apr-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-May-2015

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912BU

FACILITY CODECODE

EMAIL:TEL:

W912BU-15-R-0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 02

The purpose of this amendment is to:

1. Include FAR Clause 52.245-1 that was inadvertently left out of the solicitation.

2. Replace Section C42. Shipboard Survey Equipment and Installation in its entirety.

All other terms and conditions remains the same.

Oferors must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended).

FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN

REJECTION OF YOUR PROPOSAL

SECTION C

42. Shipboard Survey Equipment and Installation

a. Equipment

The builder shall provide and install the following survey equipment components (or equal), and associated wiring:

Reson SeaBat 7125 SV2 Ultra high resolution dual frequency (200-400 kHz) multibeam echosounder with latest firmware loaded.

Equal system shall meet the following criteria:

50MHz ping rate or greater IHO SP44Ed5 Compliant Max Along Track transmit Beamwidth - 2 degrees at 200kHz and 1 degree at 400kHz Max Cross Track receive Beamwidth – 1 degrees at 200kHz and 0.5 degree at 400kHz Minimum swath 140 Equal Distant / 160 degrees equal angular

Reson SVP70 sound velocity probe.

Equal system shall meet the following criteria:

Compatible with proposed system Minimum 1300m/s range Resolution .01 m/s or greater Sampling rate 20Hz or better

Applanix POS MV 320 Positioning and Orientation system.

Equal system shall meet the following criteria:

Roll/Pitch Accuracy of 0.02 degrees (GPS/DGPS), 0.01 degrees (RTK) Heave Accuracy 5cm/5% (whichever greater) fo 20 seconds or less Heading Accuracy of 0.02/0.01 w 2m/4m baseline Position Accuracy of .05-2m (1 sigma)/0.02-0.10m (RTK)

Odom CV 300 Rack Mounted Single Beam Echosounder with 200/28kHz transducers.

Equal system shall meet the following criteria:

200/28kHz transducers Resolution 0.1ft or better Sound Velocity 1370m/s w 1m/s resolution or better Multi frequency (high/low selectable)

YSI Castaway temperature, and depth instrument for hydrologic profiling (CTD).

Equal system shall meet the following criteria:

Hand Deployable Deployable to 100m depth Minimum 5Hz sampling rate Temperature response 200ms Maximum Conductivity accuracy 1us/cm Pressure accuracy .01dbar

Provide deck to desktop height rack mount near both survey work stations with sufficient room to mount all of the survey equipment.

In addition, the contractor shall install three (3) government furnished computers with 3 monitors per computer.

b. Installation

The contractor shall install each of these components ready to operate.

The wiring for these components shall be installed in single runs with no splices.

The wiring runs shall extend from the components to the survey station in the pilot house. Each of the wiring runs shall include ten feet of extra wire, for final connection to the survey station. All wiring runs shall be in the survey wireways, and isolated from all other wiring on the vessel.

The contractor shall provide all equipment, materials and services required for the proper installation of the survey equipment, to include operational testing. The survey systems as installed must be fully functional.

The contractor shall retain the services of the survey equipment manufacturers to support the system installation, and to witness on board the operational survey testing.

The contractor shall provide written confirmation from the survey equipment manufacturers that the systems are installed in accordance with manufacturer’s requirements, and that the equipment is functioning properly.

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

52.245-1 Government Property APR 2012

(End of Summary of Changes)

File details come from the government source that posted it. Updated .