W912BU-12-R-0037_A004-Specs.pdf
PDF 99 KB Posted
- Solicitation number
- W912BU-12-R-0037
About this file
Amendment No. 0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912BU-12-R-0037_A003-Specs.pdf | ||
| W912BU-12-R-0037_A002-Dwgs.pdf | ||
| W912BU-12-R-0037_A002-Specs.pdf | ||
| W912BU-12-R-0037_A001-Specs.PDF | ||
| site visit list.pdf | ||
| W912BU12R0037_SpecsVol2.pdf | ||
| W912BU12R0037_Dwgs.pdf | ||
| W912BU12R0037_specsVol1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US ARMY ENGINEER DISTRICT, PHILADELPHIA
POC:MICHELLE L. JOHNSON
WANAMAKER BLDG
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
THIS AMENDMENT DOES NOT EXTEND THE PROPOSAL RECEIPT DATE OF 23 AUGUST 2012 AT 2:00 P.M.
No Further RFIs will be answered.
1. CONTRACT ID CODE PAGE OF PAGES
J 1
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-12-R-0037
X 9B. DATED (SEE ITEM 11)
20-Jul-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required) Demolition of the Walson Hospital Complex, located at Joint Base McGuire-Dix-Lakehurst (JB MDL), New Jersey
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Aug-2012
CODE
CONTR DIV-CONTRACTS BR
USAED, PHILA DISTRICT
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912BU
FACILITY CODE CODE
EMAIL: TEL:
Amendment No. 0004
RFP W912BU-12-R-0037
14. DESCRIPTION OF AMENDMENT (continued)
a. RFI’s with RESPONSES: RFI’s with responses, annotated Amendment No.
0004 are attached to this amendment.
b. TECHNICAL SPECIFICATIONS:
(1) SECTION 02 82 14 – ASBESTOS HAZARD CONTROL ACTIVITIES: Please delete pages 02 82 14-13, 29, and 39, in their entirety and substitute revised pages 02 82 14-13, 29, and 39, annotated Amendment No. 0004, attached hereto.
c. Please indicate receipt of this amendment on Standard Form 1442(SOLICITATION, OFFER, AND AWARD) as Amendment No. 0004. Failure to acknowledge all amendments may be cause for rejection of the bid.
FOR INFORMATION ONLY
REQUESTS FOR INFORMATION WITH
RESPONSES
RFP W912BU-12-R-0037
16-Aug-2012
RFI # Discipline Dwg Sheet/Spec Section
Comment Response
1 Asbestos 02 82 14 page 29
Revised Asbestos Individual Work Task Data Element on Sheet 03 of 16 "Fire Stop Material Between Floors"
- Element #5 "OSHA ASBESTOS CLASS
DESIGNATION FOR WORK TASK___II___"
appears to be in error - As the revised data sheet declares the fireproofing to be FRIABLE in revised and bolded Element #6 is should not be a Class II OSHA material and should be corrected to be Class I OSH Material. Please identify what is the proper OSHA asbestos class designation for this material.
Revised Asbestos Individual Work Task Data Element, Sheet 03 of 16 "Fire Stop Material Between Floors" - Element
#5 "OSHA ASBESTOS CLASS
DESIGNATION FOR WORK
TASK_II_". See Amendment No. 0004
2 Asbestos 02 82 14 page 30
1. Revised Asbestos Individual Work Task Data Element on Sheet 04 of 16 - Rubber Waterproofing Layer (Outer Layer) Behind Brick Wall - Where and what is this Asbestos Containing material - Is it below the black material on the walls that go below grade that was discussed at the walk-thu by the environmental consultant? Where else might it be? Bid as shown.
3 Asbestos 02 82 14 page 31
1. Revised Asbestos Individual Work Task Data Element on Sheet 05 of 16 - "(Exterior) Wing Plastic Inner Waterproofing Layer" - Where and what is this Asbestos Containing material - Is it below the black material on the walls that go below grade that was discussed at the walk-thu by the environmental consultant? Where else might it be? Bid as shown.
4 Asbestos 02 82 14 page 31
1. Revised Asbestos Individual Work Task Data Element on Sheet 05 of 16 - "(Exterior) Wing Plastic Inner Waterproofing Layer" - Is there waterproofing around the window opening where water would have been most impervious to enter; or under the sill was it installed prior to installation of the window.
Thus is the material both on the interior and the exterior? Bid as shown.
5 Asbestos 02 82 14 page 32
1. Revised Asbestos Individual Work Task Data Element on Sheet 06 of 16 - "(Exterior) Wing Black Mastic" - It states in Element #4. ABATEMENT TECHNIQUE TO BE USED: Removed_as part of building demolition debris - will this material be Construction Debris or be required to be disposed as ACM Non-Friable and be required to be manifested? Bid as shown.
6 Asbestos 02 82 14 page 32
Revised Asbestos Individual Work Task Data Element on Sheet 06 of 16 - "(Exterior) Wing Black Mastic" - Where and what is this Asbestos Containing material - Is it throughout the building on the "Exterior"? on the upper floors? Bid as shown.
Requests for Information Page 1
7 Asbestos 02 82 14 page 39
Revised Asbestos Individual Work Task Data Element on Sheet 13 of 16 - "Black mastic Waterproofing on Exterior Masonry Walls/Pipe Chases Throughout Hospital" - Are we to assume that this is not on the concrete beams or on concrete columns or should the description be changed to include over-sprayed asbestos waterproofing where ever it may be on the curtain wall?
See Revised Asbestos Individual Work Task Data Element, Sheet 13 of 16, in Amendment No. 0004
8 Asbestos
Will the Government perform air monitoring for asbestos? Will the Government perform OSHA sampling? Will the Government perform final air monitoring?
Air monitoring is the responsibility of the Contractor, see Section 01 57 20 Paragraph 1.12
9 Earthwork It the intent for overall fill on the site to be re-balanced or to have exported soils?
The intent for the overall fill on the site is to be a rebalance, however it must comply with Section 31 00 00.
10 Asbestos Roofing - is the concrete or steel decks contaminated with asbestos
There was no report of any contaminated concrete or steel decking on the roof. Bid as shown.
11 General With the revised information on the asbestos and hazardous material we request another scheduled walk through and an extended bid date of two weeks.
No extension or additional walk throughs are proposed.
12 Asbestos RFI Amend 3
In regards to RFIs in Amendment No. 0003, Question 6, The question is going to cause problems, NJAC 5:23- 8 is for occupied buildings or buildings that will be re-occupied. This should not be used for demolition projects. The proper regulatory authority should be neshap part 61 and njac 12:120.
See Revised Section 02 82 14, page 13 in Amendment No. 0004
Requests for Information Page 2
1.13.1 Notifications
The required 10-day notifications shall be submitted to the following offices:
United States Environmental Protection Agency- Region 2 Division of Enforcement and Compliance Assistance-Air Compliance Branch
(DECA-ACB)
290 Broadway -21st Floor New York, NY 10007-1866 Fax Number (212) 637-3998
Pursuant to DOL' s regulation N.J.A.C. 12:120-7.2, a 10-day notification for any project over 3 linear feet or 3 square feet involving friable and non-friable ACM shall be submitted to the DOL at the following address:
Department of Labor Division of Public Safety & Occupational Safety & Health Asbestos Control & Licensing Section P.O. Box 949 Trenton, NJ 08625-0949 Fax Number (609) 633-0664
Pursuant to DHSS's regulation N.J.A.C. 8:60-7.2, a 10-day notification for asbestos abatement shall be submitted to the DHSS at the following address:
New Jersey Department of Health and Senior Services Indoor Environments Program Consumer and Environmental Health Services P. O. Box 369 3635 Quakerbridge Road Trenton, NJ 08625-0369 Fax Number (609) 588-7618
1.14 PERSONAL PROTECTIVE EQUIPMENT
Three complete sets of personal protective equipment shall be made available to the CO and authorized visitors for entry to the regulated area. The CO and authorized visitors shall be provided with training equivalent to that provided to Contractor employees in the selection, fitting, and use of personal protective equipment and the site safety and health requirements. Contractor workers shall be provided with personal protective clothing and equipment and the Contractor shall ensure that it is worn properly. The Contractor's Designated IH and Designated Competent Person shall select and approve all the required personal protective clothing and equipment.
Section 02 82 14 Page 13
1.14.1 Respirators
Respirators shall be in accordance with paragraph RESPIRATORY PROTECTION
PROGRAM.
1.14.2 Whole Body Protection
Personnel exposed to or having the potential to be exposed to airborne concentrations of asbestos that exceed the PELs, or for all OSHA Classes of work for which a required negative exposure assessment is not produced, shall be provided with whole body protection and such protection shall be worn properly. Disposable whole body protection shall be disposed of as asbestos contaminated waste upon exiting from the regulated area. Reusable whole body protection worn shall be either disposed of as asbestos contaminated waste upon exiting from the regulated area or be properly laundered in accordance with 29 CFR 1926.1101. The Contractor's Designated Competent Person, in consultation with the Designated IH, has the authority to take immediate action to upgrade or downgrade whole body protection when there is an immediate danger to the health and safety of the wearer.
1.14.2.1 Coveralls
Disposable-impermeable coveralls with a zipper front shall be provided.
Sleeves shall be secured at the wrists, and foot coverings secured at the ankles. See DETAIL SHEET 13.
1.14.2.2 Gloves
Gloves shall be provided to protect the hands where there is the potential for hand injuries (i.e., scrapes, punctures, cuts, etc.).
1.14.2.3 Foot Coverings
Cloth socks shall be provided and worn next to the skin. Footwear, as required by OSHA and EM 385-1-1, that is appropriate for safety and health hazards in the area shall be worn. Reusable footwear removed from the regulated area shall be thoroughly decontaminated or disposed of as ACM waste.
1.14.2.4 Head Covering
Hood type disposable head covering shall be provided. In addition, protective head gear (hard hats) shall be provided as required. Hard hats shall only be removed from the regulated area after being thoroughly decontaminated.
1.14.2.5 Protective Eye Wear
Eye protection shall be provided, when operations present a potential eye injury hazard, and shall meet the requirements of ANSI/ISEA Z87.1.
1.15 HYGIENE FACILITIES AND PRACTICES
The Contractor shall establish a decontamination area for the decontamination of employees, material and equipment. The Contractor shall ensure that employees enter and exit the regulated area through the decontamination area.
Section 02 82 14 Page 14
TABLE 1
INDIVIDUAL WORK TASK DATA ELEMENTS
Sheet__3__ of __16__ There is a separate data sheet for each individual work task.
1. WORK TASK DESIGNATION NUMBER _WH_
2. LOCATION OF WORK TASK__Walson Hospital Fire Stop all Floor Penetrations_
3. BRIEF DESCRIPTION OF MATERIAL TO BE ABATED:_Fire Stop Material Between Floors__________________________________________________
a. Type of Asbestos _ TBD by Contractor_
b. Percent asbestos content _ TBD by Contractor_%
4. ABATEMENT TECHNIQUE TO BE USED___Removal_______________________
5. OSHA ASBESTOS CLASS DESIGNATION FOR WORK TASK___I_____________
6. EPA NESHAP FRIABILITY DESIGNATION FOR WORK TASK
Friable _ X___ Non-friable Category I _____ Non-friable Category II____
7. FORM _____ and CONDITION OF ACM: GOOD__ X___ FAIR_____ POOR_____
8. QUANTITY: _____________
8a. QUANTITY: LINEAR FT.______________, SQUARE FT._________
9. RESPONSE ACTION DETAIL SHEET NUMBER FOR WORK TASK__ 45_____
10. SET-UP DETAIL SHEET NUMBERS
FOR WORK TASK __________, __________, __________, __________,
NOTES:
(1) Numeric sequence of individual work tasks (1,2,3,4, etc.) for each regulated area. Each category of EPA friability/OSHA class has a separate task.
(2) Specific location of work (building, floor, area, e.g., Building 1421, 2nd Floor, Rm 201)
(3) A description of material to be abated (example: horizontal pipe, cement wall panels, tile, stucco, etc.) type of asbestos (chrysotile, amosite, crocidolite, etc.); and % asbestos content.
(4) Technique to be used: Removal = REM; Encapsulation = ENCAP;
Encasement = ENCAS; Enclosure = ENCL; Repair = REP.
(5) Class designation: Class I, II, III, or IV (OSHA designation).
(6) Friability of materials: Check the applicable EPA NESHAP friability designation.
(7) Form: Interior or Exterior Architectural = IA or EA;
Mechanical/Electrical = ME.
Condition: Good = G; Fair = F; Poor = P.
(8) Quantity of ACM for each work task in meters or square meters.
(8a) Quantity of ACM for each work task in linear feet or square feet.
(9) Response Action Detail Sheet specifies the material to be abated and the methods to be used. There is only one Response Action Detail Sheet for each abatement task.
(10) Set-up Detail Sheets indicate containment and control methods used in support of the response action (referenced in the selected Response Action Detail Sheet).
Section 02 82 14 Page 29
Amendment No. 0003
TABLE 1
INDIVIDUAL WORK TASK DATA ELEMENTS
Sheet__4__ of __16__
There is a separate data sheet for each individual work task.
1. WORK TASK DESIGNATION NUMBER _WH-Wing 1_
2. LOCATION OF WORK TASK__ Walson Hospital Building, 5250 Wing ___
3. BRIEF DESCRIPTION OF MATERIAL TO BE ABATED:__Rubber Waterproofing Layer (Outer Layer)_Behind Brick Wall
a. Type of Asbestos _ CHRYSOTILE
b. Percent asbestos content _ 2.7%
4. ABATEMENT TECHNIQUE TO BE USED___Removal_______________________
5. OSHA ASBESTOS CLASS DESIGNATION FOR WORK TASK___II_____________
6. EPA NESHAP FRIABILITY DESIGNATION FOR WORK TASK
Friable _____ Non-friable Category I _X_____ Non-friable Category II___
7. FORM _____ and CONDITION OF ACM: GOOD_ X____ FAIR_____ POOR_____
8. QUANTITY: _____________
8a. QUANTITY: LINEAR FT.______________, SQUARE FT._________
9. RESPONSE ACTION DETAIL SHEET NUMBER FOR WORK TASK_45_
10. SET-UP DETAIL SHEET NUMBERS
FOR WORK TASK __________, __________, __________, __________,
NOTES:
(1) Numeric sequence of individual work tasks (1,2,3,4, etc.) for each regulated area. Each category of EPA friability/OSHA class has a separate task.
(2) Specific location of work (building, floor, area, e.g., Building 1421, 2nd Floor, Rm 201)
(3) A description of material to be abated (example: horizontal pipe, cement wall panels, tile, stucco, etc.) type of asbestos (chrysotile, amosite, crocidolite, etc.); and % asbestos content.
(4) Technique to be used: Removal = REM; Encapsulation = ENCAP;
Encasement = ENCAS; Enclosure = ENCL; Repair = REP.
(5) Class designation: Class I, II, III, or IV (OSHA designation).
(6) Friability of materials: Check the applicable EPA NESHAP friability designation.
(7) Form: Interior or Exterior Architectural = IA or EA;
Mechanical/Electrical = ME.
Condition: Good = G; Fair = F; Poor = P.
(8) Quantity of ACM for each work task in meters or square meters.
(8a) Quantity of ACM for each work task in linear feet or square feet.
(9) Response Action Detail Sheet specifies the material to be abated and the methods to be used. There is only one Response Action Detail Sheet for each abatement task.
(10) Set-up Detail Sheets indicate containment and control methods used in support of the response action (referenced in the selected
Section 02 82 14 Page 30
TABLE 1
INDIVIDUAL WORK TASK DATA ELEMENTS
Sheet__13__ of __16_ There is a separate data sheet for each individual work task.
1. WORK TASK DESIGNATION NUMBER __
2. LOCATION OF WORK TASK__Walson Hospital 5250____________________
3. BRIEF DESCRIPTION OF MATERIAL TO BE ABATED:_Blackmastic Waterproofing on Exterior Masonry Walls/Pipe Chases/including surfaces oversprayed with waterproofing mastic throughout Hospital._____
a. Type of Asbestos _______________________________________________
b. Percent asbestos content ______________________________________%
4. ABATEMENT TECHNIQUE TO BE USED_Remove as Demolition Debris_____
5. OSHA ASBESTOS CLASS DESIGNATION FOR WORK TASK___II___________
6. EPA NESHAP FRIABILITY DESIGNATION FOR WORK TASK
Friable _____ Non-friable Category I __X___ Non-friable Category II____
7. FORM _____ and CONDITION OF ACM: GOOD__X__ FAIR_____ POOR_____
8. QUANTITY: _____________
8a. QUANTITY: LINEAR FT.______________, SQUARE FT._______________
9. RESPONSE ACTION DETAIL SHEET NUMBER FOR WORK TASK_______
10. SET-UP DETAIL SHEET NUMBERS
FOR WORK TASK __________, __________, __________, __________,
NOTES:
(1) Numeric sequence of individual work tasks (1,2,3,4, etc.) for each regulated area. Each category of EPA friability/OSHA class has a separate task.
(2) Specific location of work (building, floor, area, e.g., Building 1421, 2nd Floor, Rm 201)
(3) A description of material to be abated (example: horizontal pipe, cement wall panels, tile, stucco, etc.) type of asbestos (chrysotile, amosite, crocidolite, etc.); and % asbestos content.
(4) Technique to be used: Removal = REM; Encapsulation = ENCAP;
Encasement = ENCAS; Enclosure = ENCL; Repair = REP.
(5) Class designation: Class I, II, III, or IV (OSHA designation).
(6) Friability of materials: Check the applicable EPA NESHAP friability designation.
(7) Form: Interior or Exterior Architectural = IA or EA;
Mechanical/Electrical = ME.
Condition: Good = G; Fair = F; Poor = P.
(8) Quantity of ACM for each work task in meters or square meters.
(8a) Quantity of ACM for each work task in linear feet or square feet.
(9) Response Action Detail Sheet specifies the material to be abated and the methods to be used. There is only one Response Action Detail Sheet for each abatement task.
(10) Set-up Detail Sheets indicate containment and control methods used in support of the response action (referenced in the selected
Section 02 82 14 Page 39
Amendment No. 0003
TABLE 1
INDIVIDUAL WORK TASK DATA ELEMENTS
Sheet__14__ of __16__ There is a separate data sheet for each individual work task.
1. WORK TASK DESIGNATION NUMBER __
2. LOCATION OF WORK TASK__Walson Hospital 5250___________________
3. BRIEF DESCRIPTION OF MATERIAL TO BE ABATED:__Door Caulking Around Frames
a. Type of Asbestos _TBD by Contractor________________________
b. Percent asbestos content _TBD by Contractor________________
4. ABATEMENT TECHNIQUE TO BE USED___Removal_______________________
5. OSHA ASBESTOS CLASS DESIGNATION FOR WORK TASK___II_____________
6. EPA NESHAP FRIABILITY DESIGNATION FOR WORK TASK
Friable _____ Non-friable Category I __X___ Non-friable Category II____
7. FORM _____ and CONDITION OF ACM: GOOD__X__ FAIR_____ POOR_____
8. QUANTITY: _____________
8a. QUANTITY: LINEAR FT.__26,000______, SQUARE FT._____________
9. RESPONSE ACTION DETAIL SHEET NUMBER FOR WORK TASK___45____
10. SET-UP DETAIL SHEET NUMBERS
FOR WORK TASK __________, __________, __________, __________,
NOTES:
(1) Numeric sequence of individual work tasks (1,2,3,4, etc.) for each regulated area. Each category of EPA friability/OSHA class has a separate task.
(2) Specific location of work (building, floor, area, e.g., Building 1421, 2nd Floor, Rm 201)
(3) A description of material to be abated (example: horizontal pipe, cement wall panels, tile, stucco, etc.) type of asbestos (chrysotile, amosite, crocidolite, etc.); and % asbestos content.
(4) Technique to be used: Removal = REM; Encapsulation = ENCAP;
Encasement = ENCAS; Enclosure = ENCL; Repair = REP.
(5) Class designation: Class I, II, III, or IV (OSHA designation).
(6) Friability of materials: Check the applicable EPA NESHAP friability designation.
(7) Form: Interior or Exterior Architectural = IA or EA;
Mechanical/Electrical = ME.
Condition: Good = G; Fair = F; Poor = P.
(8) Quantity of ACM for each work task in meters or square meters.
(8a) Quantity of ACM for each work task in linear feet or square feet.
(9) Response Action Detail Sheet specifies the material to be abated and the methods to be used. There is only one Response Action Detail Sheet for each abatement task.
(10) Set-up Detail Sheets indicate containment and control methods used in support of the response action (referenced in the selected
Section 02 82 14 Page 40
| SF30 |
| AmndDesc0004 |
| Amend 4 RFIs |
| Page13 from 02 82 14 |
| Page 14 from 02 82 14 |
| Page29 from 02 82 14 |
| Page30 from 02 82 14 |
| Page39 from 02 82 14 |
| Page40 from 02 82 14 |
File details come from the government source that posted it. Updated .