Amendment 1.pdf

PDF 33 KB Posted

Attached to
Drydock and Repair New York District Drift Collection Vessel DRIFTMASTER
Solicitation number
W912BU-12-B-0008
Issued by

About this file

Amendment 1 Contents 1. Corrections to TP 1.27 and TP 2.14. 2. Added to section B The CLINs below shall be accomplished in accordance with the specified TP contract sections as well as all SW and SC sections. All costs associated with SW and SC contract sections shall be included in the pricing of all CLINs. 3. Explanation Each CLIN includes the Period of Performance statement of 45 days from NTP. This is the for the entire Delivery Order. The Shipyard will have 45 days from the Notice to Proceed.

View the file

Other files

File Type Posted
Abstract 12-B-0008.pdf PDF
Amendment 3.pdf PDF
Amendment 2 .pdf PDF
Solicitation 12-B-0008.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W25PHS20251170A

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. Corrections to TP 1.27 and TP 2.14.

2. Added to section B,"The CLINs below shall be accomplished in accordance w ith the specified TP contract sections as w ell as all SW and SC sections. All costs associated w ith SW and SC contract sections shall be included in the pricing of all CLINs."

3. Explanation: Each CLIN includes the Period of Performance statement of "45 days from NTP." This is the for the entire Delivery Order.

The Shipyard w ill have 45 days from the Notice to Proceed to complete the Delivery Order. All Definite and Indefinite Items of the Delivery Order w ill be completed w ithin that time period.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 24

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Feb-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-12-B-0008

X 9B. DATED (SEE ITEM 11)

31-Jan-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Feb-2012

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

E5CTSRWH

Typewritten Text

E5CTSRWH

Typewritten Text X

E5CTSRWH

Typewritten Text

W912BU-12-B-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES (Changes are shown in red)

SECTION B – SUPPLIES OR SERVICES AND PRICES

“The CLINs below shall be accomplished in accordance with the specified TP contract sections as well as all SW and SC sections. All costs associated with SW and SC contract sections shall be included in the pricing of all CLINs.”

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

TP 1.27 Fresh Water Tank Cleaning and Painting

The fresh water tanks on the vessel are currently coated with a cement wash approved for use in fresh water tanks.

The Contractor shall completely remove the existing cement wash, pressure wash all inside surfaces of the tanks and access covers after complete removal of the cement wash, remove all debris and cleaning residues, and shall apply two (2) coats of an epoxy tank coating, approved for potable water use, that has been approved beforehand by the COR to all cleaned surfaces. The access covers shall be reinstalled using new gaskets.

TP 2.14 Propellers, Propeller Shafts, and Bearings

If directed by the KO, the Contractor shall change the port and starboard propellers and propeller shafts as follows:

a. Remove the port and starboard rudders. The rudders are each held by eight (8) 1-1/2” X 5-1/2” fitted bolts.

b. Remove the port and starboard propellers. (Note – Propeller removal and reinstallation is already covered under

TP 2.06.) The propellers are each 3 blade 52”D X 44”P.

c. Remove the port and starboard propeller shafts. Propeller shafts are each 15’-6-1/2” long, 4-1/2” diameter with

5-1/2” sleeves.

d. Install two (2) Government furnished propeller shafts to an 80% fit into the propeller shaft couplings. Propeller shafts are each 4-1/2” OD (5-1/2” at the sleeves) and are approximately 15’-6-1/2” long with tapers at both ends.

e. Bore two (2) one inch (1”) diameter holes diametrically opposite into the hub of each of the two (2) new propellers to act as jacking screw holes for future propeller removal.

f. Install two (2) new, reconditioned propellers on the shafts to an 80% fit and to ABS approval. Propellers are each 3 blade, 52”D X 44” P. See Contract Clause TP 2.06 for details on propeller reconditioning.

g. Replace stern tube packing with ¾” flax, waxed square packing in five (5) rows.

h. Reinstall the rudders.

i. The Contractor shall ensure the snugness of all shaft, propeller and rudder nuts by checking their tightness with hand-held wrenches after initial installation.

All work required for shaft alignment after installation shall be paid out under TP 2.16 “Propulsion System Alignment”.

(End of Summary of Changes)