Amendment P0005.pdf

PDF 33 KB Posted

Attached to
CRANE BARGE
Solicitation number
W912BU-11-B-0021
Issued by

About this file

Amendment P0005

View the file

Other files

File Type Posted
AbstractOfOfferors.pdf PDF
Amendment 6.pdf PDF
Solicitation W912BU-11-B-0021 Crane Barge page 2.pdf PDF
amendment 4.pdf PDF
Amendment 3.pdf PDF
Amenment 2 —
amend 2.pdf PDF
Amend 1.pdf PDF
Corrected Drawings Package.pdf PDF
Solicitation W912BU-11-B-0021 Crane Barge.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC ROBERT R. HILTON

E5CTSRH9

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W25PHS11875233

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912BU-11-B-0021Crane Barge P0005

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Aug-2011

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-11-B-0021

X 9B. DATED (SEE ITEM 11)

29-Jul-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Aug-2011

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912BU

FACILITY CODECODE

EMAIL:TEL:

W912BU-11-B-0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. The reason for this amendment is to add a revised clean Bid Schedule to reflect the changes that we have made to date. See attached Section B Page 2

2. Make the changes listed in the attached word document "2733 solicitation changes in Section C, and Section E. (See Below)

3. Section F01 Performance, Required Delivery Schedule:

4. Change 0001AB from "365 calendar days" TO "455 calendar days"

5. Section H01 Contract Organization, Contract Sequencing Chart:

6. Change Phase II "365" Calendar Days TO "455" Calendar Days.

7. Delete, Item 1 Question and Answer on Amendment 3. The construction phase is being extended an additional 90 days as described above to address the issue.

ADD TO:

(SECTION C) C456 WINCHES,

E. CAPSTAN

The Contractor shall supply and install one capstan equal to a Schoellhorn Albrecht, Model 22300, 10hp, 14” through deck double barrel type, starting pull 22,000, running pull 8,000 and 34 FPM. The location shown on the contract drawing is generally correct however the capstan shall be located to the starboard of centerline to allow the centerline structure to remain continuous.

(SECTION C) C630 FUEL OIL SYSTEM, A. GENERAL REQUIREMENTS

From:

For fueling requirements see contract section E05, E. 7.

To:

For fueling requirements see contract section E05, E. 15.

(SECTION C) C635 LUBE OIL, B. TANK GAUGING & ALARM

For fill requirements see contract section E05, E. 15.

For fill requirements see contract section E05, E. 16.

(SECTION C) C655 HYDRAULIC OIL, B. TANK GAUGING & ALARM

For fill requirements see contract section E05, E. 15.

For fill requirements see contract section E05, E. 18.

(SECTION C) C662 OILY BILGE SYSTEM, B. TANK GAUGING & ALARM

Delete the sentence. (For fill requirements see contract Clause E05, E. 150.)

(SECTION E) E05, E., 15. Fuel Oil System.

The Contractor is responsible for maintaining the fuel tank and for delivering the vessel with (10,000) gallons of fuel in the fuel oil tank.

To:

The Contractor is responsible for maintaining the fuel tank and for delivering the vessel with (18,000) gallons of fuel in the fuel oil tank.

(SECTION E) E05, E., 26. HVAC.

Delete the sentence. (Demonstrate the operation of the ventilation fan in the toilets.)

(SECTION E) E05, E., 31. Miscellaneous Equipment.

Delete the bulleted item. (The incinerating toilet)

(SECTION E) E08 FINAL ACCEPTANCE

Delete the following lines:

(Fuel oil main storage tanks 8,000 gallons.)

(Lube oil storage tank 500 Gallons) (Hydraulic oil storage tank FULL)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .