Forward Operating Bases Power Plants in Afghanistan
Solicitation number
W912BU-10-R-0024
Issued by

About this file

Solicitation/Request for Proposal (RFP) for Forward Operating Bases Power Plants W912BU-10-R-0024 is now posted.

View the file

Other files

File Type Posted
W912BU-10-R-0024-0006.pdf PDF
FOB bid schedule.xls XLS spreadsheet
W912BU-10-R-0024-0005.pdf PDF
W912BU-10-R-0024-0004.pdf PDF
Amendment 0003 final.pdf PDF
W912BU-10-R-0024 Amend 0002.pdf PDF
W912BU-10-R-0024 Amendment 01.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 04:15 PM local t ime 16 Aug 2010

X

A X B X C

D

EX

X G F 54 - 66

67 - 76 X H 77 - 85

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 84

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912BU 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 30

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

31 - 42 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

44 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 45 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 46 - 48 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

49 - 52

PART II - CO NTRACT CLAUSES

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

16 Jul 2010

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912BU-10-R-0024

e5ctskdp Typewritten Text e5ctskdp Typewritten Text e5ctskdp Typewritten Text block 7 e5ctskdp Typewritten Text e5ctskdp Typewritten Text

W912BU-10-R-0024

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 100,000,000 Lump Sum Base

FFP

The contractor shall provide power plant installation and support in accordance with the attached schedule B, pricing schedule, and the specification in section C.

The period of performance is twelve (12) months.

FOB: Destination

NET AMT

0002 100,000,000 Lump Sum OPTION Option 1

FFP

The contractor shall provide power plant installation and support in accordance with the attached schedule B, pricing schedule, and the specification in section C.

0003 100,000,000 Lump Sum OPTION Option 2

FFP

The contractor shall provide power plant installation and support in accordance with the attached schedule B, pricing schedule, and the specification in section C.

0004 100,000,000 Lump Sum OPTION Option 3

FFP

The contractor shall provide power plant installation and support in accordance with the attached schedule B, pricing schedule, and the specification in section C.

0005 90,000,000 Lump Sum OPTION Option 4

FFP

The contractor shall provide power plant installation and support in accordance with the attached schedule B, pricing schedule, and the specification in section C.

PRICING SCHEDULE

Philadelphia District, USACE $490 million FOB Power Generation and Distribution IDIQ

INSPECTION AND ACCEPTANCE TERMS: Supplies and services will be accepted at Destination by the Government for all CLINs.

CONTRACT ADMINISTRATION: Cognizant contract administration authority will be delegated the contracting officer at the US ARMY Corps of Engineer Office, Philadelphia District.

DESIGNATION OF GOVERNMENT INSPECTOR: A Government representative will be designated as the Contracting Officer Representative (COR) and as Contracting Officer Technical Representative (COTR) for the purpose of technical surveillance and inspection of work being performed under this contract. This designation in no way authorizes anyone other than the contracting officer to commit the Government to changes in the terms of the contract.

LIMITS OF AUTHORITY CONTRACTING OFFICER: Only the contracting officer is authorized to make changes to the terms and conditions of the contract.

OPTION TO EXTEND SERVICES: The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 14 days of contract expiration.

OPTION TO EXTEND THE TERM OF THE CONTRACT: The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(a) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(b) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 60 months.

CONTRACT PARAMETERS: Total maximum quantity of services the Government may acquire under this IDIQ contract: $490,000,000.00 or 5 Years.

CLIN STRUCTURE: The purpose of this IDIQ contract is to provide flexibility to meet supporting U.S. Military prime power generation, transmission, and distribution for any Title 10 locations in Afghanistan. The immediate focus is on supporting FOB Dwyer, Afghanistan with a 10MW continuous power plant. The IDIQ format will also allow for expansion, take over, or establishment of prime power contract operations at any other US military installation in Afghanistan.

The CLIN structure is organized to mobilize a set MW capability or amount of transmission/distribution and then expand when and where needed. It is also established with the intention to combine CLINs if necessary. For example, if a FOB requires 14MW, CLINs 0006 and 0002 (with quantity of 2) would be combined to support the requirement.

The expansion CLIN will be used to support unforeseen expansion costs. Contractor will be required to submit a proposal, on a case by case basis, for review, negotiation and approval by the Contracting Officer on a case by case basis when installation expansions (additional mobilizations) exceed current capabilities and projected costs in “Mobilization Costs for Additional Power at Existing Job Sites” CLINS. In addition, the expansion CLIN may also be used to address unforeseen O&M costs associated with expansion of the distribution system such as additional feeders, transformers, panels, etc. The transformer CLINs can be used to procure one pad mount transformer or pole top can, or even be utilized to construct a substation if needed.

CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS:

Attachment 1: Performance Statement of Work entitled “Prime Power for U.S. Facilities in Afghanistan” dated 20 December 2009.

Attachment 2: QUALITY ASSURANCE SURVEILLANCE PLAN (QASP).

CLINs for INITIAL Mobilization and Continuous Prime Power at a new job site.

Total Mobilization Costs: $ 3,000,000.00 EST Total Labor Costs: $ 50,000,000.00 EST Total BOM Costs: $ 45,000,000.00 EST

ITEM

NO.

DESCRIPTION QTY UNIT UNIT

PRICE

MAX

AMOUNT

0001 Mobilization Costs for Initial Power at a New Job Site 1MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 1 MW.

0002 Mobilization Costs for Initial Power at a New Job Site 2MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 2 MW.

0003 Mobilization Costs for Initial Power at a New Job Site 3MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 3 MW.

0004 Mobilization Costs for Initial Power at a New Job Site 5MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 5 MW.

0005 Mobilization Costs for Initial Power at a New Job Site 7MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 7 MW.

0006 Mobilization Costs for Initial Power at a New Job Site 10MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 10 MW.

0007 Mobilization Costs for Initial Power at a New Job Site 15MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 15 MW.

0008 Mobilization Costs for Initial Power at a New Job Site 20MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 20 MW.

CLINs for ADDITIONAL Mobilization and Continuous Prime Power at an existing job site 0009 Mobilization Costs for Additional Power at Existing

Job Site 1MW Prime Continuous Power 1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 1 MW.

0010 Mobilization Costs for Additional Power at Existing Job Site 2MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 2 MW.

0011 Mobilization Costs for Additional Power at Existing Job Site3MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 3 MW.

0012 Mobilization Costs for Additional Power at Existing Job Site 5MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 5 MW.

0013 Mobilization Costs for Additional Power at Existing Job Site 7MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 7 MW.

0014 Mobilization Costs for Additional Power at Existing Job Site 10MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 10 MW.

0015 Mobilization Costs for Additional Power at Existing Job Site 15MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 15 MW.

0016 Mobilization Costs for Additional Power at Existing Job Site 20MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 20 MW.

CLINs for UNDERGROUND Transmission and Distribution Service 0017 1km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 1km of underground transmission and distribution.

0018 2km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 2km of underground transmission and distribution.

0019 3km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 3km of underground transmission and distribution.

0020 5km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 5km of underground transmission and distribution.

0021 7km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 10km of underground transmission and distribution.

0022 10km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 1km of underground transmission and distribution.

0023 15km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 15km of underground transmission and distribution.

0024 20km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 20km of underground transmission and distribution.

CLINs for OVERHEAD Transmission and Distribution Service 0025 1km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 1km of overhead transmission and distribution.

0026 2km Transmission and Distribution 1 Month

The contractor is responsible for providing all personnel, equipment and materials necessary to provide 2km of overhead

0027 3km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 3km of overhead transmission and distribution.

0028 5km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 5km of overhead transmission and distribution.

0029 7km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 7km of overhead transmission and distribution.

0030 10km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 10km of overhead transmission and distribution.

0031 15km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 15km of overhead transmission and distribution.

0032 20km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 20km of overhead transmission and distribution.

CLINs for Power Transformation 0033 2kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 2kVA of electrical transformation.

0034 5kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 5kVA of electrical transformation.

0035 10kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 10kVA of electrical transformation.

0036 15kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 15kVA of electrical transformation.

0037 25kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 25kVA of electrical transformation.

0038 50kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 50kVA of electrical transformation.

0039 100kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 100kVA of electrical transformation.

0040 200kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 200kVA of electrical transformation.

0041 500kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 500kVA of electrical transformation.

0042 2MVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 2MVA of electrical transformation.

0043 5MVA 1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to provide 5MVA of

0044 10MVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 10MkVA of electrical transformation.

CLINS for De-Mobilization and Removal of Equipment 0045 De-Mobilization and Removal, 1MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

0046 De-Mobilization and Removal, 2MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

0047 De-Mobilization and Removal, 3MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

0048 De-Mobilization and Removal, 5MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

0049 De-Mobilization and Removal, 7MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

0050 De-Mobilization and Removal, 10MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

0051 De-Mobilization and Removal, 15MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

0052 De-Mobilization and Removal, 20MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

CLINs Pertaining to Support of Operations and Personnel 0053 Contract Data Requirements List: 1 Ea The contractor is responsible for providing the following reports:

- CDRL A0001 - Operations Action Plan IAW Para 2 of the PWS

- CDRL A0002 – Mobilization Letter IAW Para 1.10 of PWS

- CDRL A0003 – Emergency Spill and Response Plan IAW Para 1.18 of PWS

0054 Insurance 1 Month The contractor is responsible for procuring the following insurance coverage:

-Workers Compensation.

0055 Expansion Costs 1 Month Variable Variable This CLIN is for covering unforeseen cost associated with this IDIQ.

0056 NTV with O&M Support 1 veh Month The contractor is responsible for providing all personnel and materials necessary to provide Prime Power personnel with

Non-Tactical Vehicles and the O&M support for maintaining the NTV(s).

0057 Living Facilities 1 pax ea The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

0058 Laundry, Shower/Latrine 1 ea The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

0059 Internet Service Provide ISP 1 Month The contractor is responsible for providing service and materials necessary to provide personnel with internet access.

0060 Mini-Grid System 1 Lot The contractor is responsible for providing all personnel and materials necessary to plan, install and perform O&M on a mini-grid system in accordance with the PWS.

0061 Scabbing Operations 1 Lot The contractor is responsible for providing all personnel and materials necessary to plan, install and perform operations on an existing generation and distribution system in accordance with the PWS.

CLINs for Option Year One Mobilization and Continuous Prime Power at a new job site.

Total Mobilization Costs: $ 3,000,000.00 EST Total Labor Costs: $ 50,000,000.00 EST Total BOM Costs: $ 45,000,000.00 EST

ITEM

NO.

DESCRIPTION QTY UNIT UNIT

PRICE

MAX

AMOUNT

1001 Mobilization Costs for Initial Power at a New Job Site 1MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 1 MW.

1002 Mobilization Costs for Initial Power at a New Job Site 2MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 2 MW.

1003 Mobilization Costs for Initial Power at a New Job Site 3MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 3 MW.

1004 Mobilization Costs for Initial Power at a New Job Site 5MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 5 MW.

1005 Mobilization Costs for Initial Power at a New Job Site 7MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 7 MW.

1006 Mobilization Costs for Initial Power at a New Job Site 10MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 10 MW.

1007 Mobilization Costs for Initial Power at a New Job Site 15MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 15 MW.

1008 Mobilization Costs for Initial Power at a New Job Site 20MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 20 MW.

CLINs for ADDITIONAL Mobilization and Continuous Prime Power at an existing job site 1009 Mobilization Costs for Additional Power at Existing

Job Site 1MW Prime Continuous Power 1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 1 MW.

1010 Mobilization Costs for Additional Power at Existing Job Site 2MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 2 MW.

1011 Mobilization Costs for Additional Power at Existing Job Site3MW Prime Continuous Power

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide

1012 Mobilization Costs for Additional Power at Existing

Job Site 5MW Prime Continuous Power 1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 5 MW.

1013 Mobilization Costs for Additional Power at Existing Job Site 7MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 7 MW.

1014 Mobilization Costs for Additional Power at Existing Job Site 10MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 10 MW.

1015 Mobilization Costs for Additional Power at Existing Job Site 15MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 15 MW.

1016 Mobilization Costs for Additional Power at Existing Job Site 20MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 20 MW.

CLINs for UNDERGROUND Transmission and Distribution Service 1017 1km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 1km of underground transmission and distribution.

1018 2km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 2km of underground transmission and distribution.

1019 3km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 3km of underground transmission and distribution.

1020 5km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 5km of underground transmission and distribution.

1021 7km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 10km of underground transmission and distribution.

1022 10km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 1km of underground transmission and distribution.

1023 15km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 15km of underground transmission and distribution.

1024 20km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 20km of underground transmission and distribution.

CLINs for OVERHEAD Transmission and Distribution Service 1025 1km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 1km of overhead transmission and distribution.

1026 2km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 2km of overhead

1027 3km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 3km of overhead transmission and distribution.

1028 5km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 5km of overhead transmission and distribution.

1029 7km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 7km of overhead transmission and distribution.

1030 10km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 10km of overhead transmission and distribution.

1031 15km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 15km of overhead transmission and distribution.

1032 20km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 20km of overhead transmission and distribution.

CLINs for Power Transformation 1033 2kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 2kVA of electrical transformation.

1034 5kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 5kVA of electrical transformation.

1035 10kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 10kVA of electrical transformation.

1036 15kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 15kVA of electrical transformation.

1037 25kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 25kVA of electrical transformation.

1038 50kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 50kVA of electrical transformation.

1039 100kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 100kVA of electrical transformation.

1040 200kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 200kVA of electrical transformation.

1041 500kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 500kVA of electrical transformation.

1042 2MVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 2MVA of electrical transformation.

1043 5MVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 5MVA of

1044 10MVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 10MkVA of electrical transformation.

CLINS for De-Mobilization and Removal of Equipment 1045 De-Mobilization and Removal, 1MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

1046 De-Mobilization and Removal, 2MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

1047 De-Mobilization and Removal, 3MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

1048 De-Mobilization and Removal, 5MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

1049 De-Mobilization and Removal, 7MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

1050 De-Mobilization and Removal, 10MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

1051 De-Mobilization and Removal, 15MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

1052 De-Mobilization and Removal, 20MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

CLINs Pertaining to Support of Operations and Personnel 1053 Contract Data Requirements List: 1 Ea The contractor is responsible for providing the following reports:

- CDRL A0001 - Operations Action Plan IAW Para 2 of the PWS

- CDRL A0002 – Mobilization Letter IAW Para 1.10 of PWS

- CDRL A0003 – Emergency Spill and Response Plan IAW Para 1.18 of PWS

1054 Insurance 1 Month The contractor is responsible for procuring the following insurance coverage:

-Workers Compensation.

1055 Expansion Costs 1 Month Variable Variable This CLIN is for covering unforeseen cost associated with this IDIQ.

1056 NTV with O&M Support 1 veh Month The contractor is responsible for providing all personnel and materials necessary to provide Prime Power personnel with

Non-Tactical Vehicles and the O&M support for maintaining the NTV(s).

1057 Living Facilities 1 pax ea The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

1058 Laundry, Shower/Latrine 1 ea The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

1059 Internet Service Provide ISP 1 Month The contractor is responsible for providing service and materials necessary to provide personnel with internet access.

1060 Mini-Grid System 1 Lot

The contractor is responsible for providing all personnel and materials necessary to plan, install and perform O&M on a mini-grid system in accordance with the PWS.

1061 Scabbing Operations 1 Lot The contractor is responsible for providing all personnel and materials necessary to plan, install and perform operations

CLINs for Option Year Two Mobilization and Continuous Prime Power at a new job site.

Total Mobilization Costs: $ 3,000,000.00 EST Total Labor Costs: $ 50,000,000.00 EST Total BOM Costs: $ 45,000,000.00 EST

ITEM

NO.

DESCRIPTION QTY UNIT UNIT

PRICE

MAX

AMOUNT

2001 Mobilization Costs for Initial Power at a New Job Site 1MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 1 MW.

2002 Mobilization Costs for Initial Power at a New Job Site 2MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 2 MW.

2003 Mobilization Costs for Initial Power at a New Job Site 3MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 3 MW.

2004 Mobilization Costs for Initial Power at a New Job Site 5MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 5 MW.

2005 Mobilization Costs for Initial Power at a New Job Site 7MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 7 MW.

2006 Mobilization Costs for Initial Power at a New Job Site 10MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 10 MW.

2007 Mobilization Costs for Initial Power at a New Job Site 15MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 15 MW.

2008 Mobilization Costs for Initial Power at a New Job Site 20MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 20 MW.

CLINs for ADDITIONAL Mobilization and Continuous Prime Power at an existing job site 2009 Mobilization Costs for Additional Power at Existing

Job Site 1MW Prime Continuous Power 1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 1 MW.

2010 Mobilization Costs for Additional Power at Existing Job Site 2MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 2 MW.

2011 Mobilization Costs for Additional Power at Existing Job Site3MW Prime Continuous Power

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide

2012 Mobilization Costs for Additional Power at Existing

Job Site 5MW Prime Continuous Power 1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 5 MW.

2013 Mobilization Costs for Additional Power at Existing Job Site 7MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 7 MW.

2014 Mobilization Costs for Additional Power at Existing Job Site 10MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 10 MW.

2015 Mobilization Costs for Additional Power at Existing Job Site 15MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 15 MW.

2016 Mobilization Costs for Additional Power at Existing Job Site 20MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 20 MW.

CLINs for UNDERGROUND Transmission and Distribution Service 2017 1km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 1km of underground transmission and distribution.

2018 2km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 2km of underground transmission and distribution.

2019 3km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 3km of underground transmission and distribution.

2020 5km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 5km of underground transmission and distribution.

2021 7km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 10km of underground transmission and distribution.

2022 10km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 1km of underground transmission and distribution.

2023 15km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 15km of underground transmission and distribution.

2024 20km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 20km of underground transmission and distribution.

CLINs for OVERHEAD Transmission and Distribution Service 2025 1km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 1km of overhead transmission and distribution.

2026 2km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 2km of overhead

2027 3km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 3km of overhead transmission and distribution.

2028 5km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 5km of overhead transmission and distribution.

2029 7km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 7km of overhead transmission and distribution.

2030 10km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 10km of overhead transmission and distribution.

2031 15km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 15km of overhead transmission and distribution.

2032 20km Transmission and Distribution 1 Month The contractor is responsible for providing all personnel, equipment and materials necessary to provide 20km of overhead transmission and distribution.

CLINs for Power Transformation 2033 2kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 2kVA of electrical transformation.

2034 5kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 5kVA of electrical transformation.

2035 10kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 10kVA of electrical transformation.

2036 15kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 15kVA of electrical transformation.

2037 25kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 25kVA of electrical transformation.

2038 50kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 50kVA of electrical transformation.

2039 100kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 100kVA of electrical transformation.

2040 200kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 200kVA of electrical transformation.

2041 500kVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 500kVA of electrical transformation.

2042 2MVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 2MVA of electrical transformation.

2043 5MVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 5MVA of

2044 10MVA 1 Lot The contractor is responsible for providing all personnel, equipment and materials necessary to provide 10MkVA of electrical transformation.

CLINS for De-Mobilization and Removal of Equipment 2045 De-Mobilization and Removal, 1MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

2046 De-Mobilization and Removal, 2MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

2047 De-Mobilization and Removal, 3MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

2048 De-Mobilization and Removal, 5MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

2049 De-Mobilization and Removal, 7MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

2050 De-Mobilization and Removal, 10MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

2051 De-Mobilization and Removal, 15MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

2052 De-Mobilization and Removal, 20MW 1 Lot The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

CLINs Pertaining to Support of Operations and Personnel 2053 Contract Data Requirements List: 1 Ea The contractor is responsible for providing the following reports:

- CDRL A0001 - Operations Action Plan IAW Para 2 of the PWS

- CDRL A0002 – Mobilization Letter IAW Para 1.10 of PWS

- CDRL A0003 – Emergency Spill and Response Plan IAW Para 1.18 of PWS

2054 Insurance 1 Month The contractor is responsible for procuring the following insurance coverage:

-Workers Compensation.

2055 Expansion Costs 1 Month Variable Variable This CLIN is for covering unforeseen cost associated with this IDIQ.

2056 NTV with O&M Support 1 veh Month The contractor is responsible for providing all personnel and materials necessary to provide Prime Power personnel with

Non-Tactical Vehicles and the O&M support for maintaining the NTV(s).

2057 Living Facilities 1 pax ea The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

2058 Laundry, Shower/Latrine 1 ea The contractor is responsible for providing all personnel and materials necessary to demobilize in compliance with the

PWS.

2059 Internet Service Provide ISP 1 Month The contractor is responsible for providing service and materials necessary to provide personnel with internet access.

2060 Mini-Grid System 1 Lot

The contractor is responsible for providing all personnel and materials necessary to plan, install and perform O&M on a

2061 Scabbing Operations 1 Lot The contractor is responsible for providing all personnel and materials necessary to plan, install and perform operations

CLINs for Option Year Three Mobilization and Continuous Prime Power at a new job site.

Total Mobilization Costs: $ 3,000,000.00 EST Total Labor Costs: $ 50,000,000.00 EST Total BOM Costs: $ 45,000,000.00 EST

ITEM

NO.

DESCRIPTION QTY UNIT UNIT

PRICE

MAX

AMOUNT

3001 Mobilization Costs for Initial Power at a New Job Site 1MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 1 MW.

3002 Mobilization Costs for Initial Power at a New Job Site 2MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 2 MW.

3003 Mobilization Costs for Initial Power at a New Job Site 3MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 3 MW.

3004 Mobilization Costs for Initial Power at a New Job Site 5MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 5 MW.

3005 Mobilization Costs for Initial Power at a New Job Site 7MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 7 MW.

3006 Mobilization Costs for Initial Power at a New Job Site 10MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 10 MW.

3007 Mobilization Costs for Initial Power at a New Job Site 15MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 15 MW.

3008 Mobilization Costs for Initial Power at a New Job Site 20MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 20 MW.

CLINs for ADDITIONAL Mobilization and Continuous Prime Power at an existing job site 3009 Mobilization Costs for Additional Power at Existing

Job Site 1MW Prime Continuous Power 1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 1 MW.

3010 Mobilization Costs for Additional Power at Existing Job Site 2MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 2 MW.

3011 Mobilization Costs for Additional Power at Existing Job Site3MW Prime Continuous Power

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide

3012 Mobilization Costs for Additional Power at Existing

Job Site 5MW Prime Continuous Power 1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 5 MW.

3013 Mobilization Costs for Additional Power at Existing Job Site 7MW Prime Continuous Power

1 Lot

The contractor is responsible for providing all personnel, equipment and materials necessary to mobilize to provide prime power continuous output of 7 MW.

3014 Mobilization Costs for Additional Power at Existing Job Site 10MW Prime Continuous Power

1 Lot

The contractor is…