Dry Docking/Tailshaft repair Dredge McFarland
Solicitation number
W912BU-09-R-0003
Issued by

About this file

Solicitation Amendment 0001

View the file

Other files

File Type Posted
W912BU-09-R-0003 P0004 MCFARLAND DD.pdf PDF
W912BU-09-R-0003 P0003 MCFARLAND DD.pdf PDF
MF-H4-012-1.TIF TIF image
MF-H2-033.TIF TIF image
MF-H2-040.TIF TIF image
MF-H2-061.TIF TIF image
MF-H4-012-3.TIF TIF image
MF-H2-126-03 —
MF-M7-008.TIF TIF image
MF-H2-124.TIF TIF image
MF-H2-077-1.TIF TIF image
MF-H2-185.TIF TIF image
MF-H2-091-2.TIF TIF image
MF-M9-036.TIF TIF image
MF-H2-102.TIF TIF image
MF-H4-012-2.TIF TIF image
MF-H4-013.TIF TIF image
MF-H2-126-01 —
MF-H2-138.TIF TIF image
MF-H2-014.TIF TIF image
MF-H2-015.TIF TIF image
MF-H4-014.TIF TIF image
MF-H2-126-02 —
MF-H4-012.TIF TIF image
MF-H2-074.TIF TIF image
MF-H2-067.TIF TIF image
MF-H4-011.TIF TIF image
MF-H2-094.TIF TIF image
MF-M7-020.tif TIF image
MF-H2-091.TIF TIF image
MF-M7-014.TIF TIF image
MF-H2-125.TIF TIF image
MF-H2-034.TIF TIF image
MF-H2-115.TIF TIF image
MF-H5-101.TIF TIF image
MF-H4-016.TIF TIF image
MF-H2-091-1.TIF TIF image
MF-H2-107.TIF TIF image
MF-H2-077.TIF TIF image
MF-H1-001.TIF TIF image
MF-H2-111.TIF TIF image
W912BU-09-R-0003 MCFARLAND DD.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: EDWARD A. BODDIE

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W25PHS82815477A

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

Add Line item 0001BN "M-921 Air Receiver Recertification" & 0001BO "M-904 Replace Piping Expansion Joints" Add/Changes Specifications: H-214, M-701, M-702, M-703, M-921, and other sections Attach Draw ings Change Submission Date to 20NOV08

1. CONTRACT ID CODE PAGE OF PAGES

J

FAR (48 CFR) 53.243

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-09-R-0003

X 9B. DATED (SEE ITEM 11)

04-Nov-2008

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

P0001

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Nov-2008

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE E5CTSEAB

FACILITY CODECODE

EMAIL:TEL:

E5CTSEAB

Typewritten Text

E5CTSEAB

Typewritten Text

W912BU-09-R-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 17-Nov-2008 11:59 AM to 20-Nov-2008 11:59 AM.

The following have been added by reference:

52.212-5 Alt I Contract Terms and Conditions Required to Implement

Statutes or Executive Orders--Commercial Items (Sep 2008) Alternate I

FEB 2000

52.214-3 Amendments To Invitations For Bids DEC 1989 252.201-7000 Contracting Officer's Representative DEC 1991 252.217-7012 Liability and Insurance AUG 2003 252.246-7000 Material Inspection And Receiving Report MAR 2008

The following have been added by full text:

52.211-8 TIME OF DELIVERY (JUN 1997)

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

(Contracting Officer insert specific details)

W/IN DAYS AFTER

ITEM # DESCRIPTION QTY NOTICE TO PROCEED

0001AA Drydocking & Repiars 1JB Twenty-One (21) Calander Days 0001AB Laydays 5DY Five (5) Calendar Days

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE

Within Days

After Date

Item No. Quantity of Contract

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of clause)

52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS (JAN 1997)

(a) The Contractor shall--

(1) Certify any proposal to establish or modify final indirect cost rates;

(2) Use the format in paragraph (c) of this clause to certify; and

(3) Have the certificate signed by an individual of the Contractor's organization at a level no lower than a vice president or chief financial officer of the business segment of the Contractor that submits the proposal.

(b) ) Failure by the Contractor to submit a signed certificate, as described in this clause, may result in final indirect costs at rates unilaterally established by the Contracting Officer.

(c) The certificate of final indirect costs shall read as follows:

CERTIFICATE OF FINAL INDIRECT COSTS

This is to certify that I have reviewed this proposal to establish final indirect cost rates and to the best of my knowledge and belief: 1. All costs included in this proposal (identify proposal and date) to establish final indirect cost rates for (identify period covered by rate) are allowable in accordance with the cost principles of the Federal Acquisition Regulation (FAR) and its supplements applicable to the contracts to which the final indirect cost rates will apply; and 2. This proposal does not include any costs which are expressly unallowable under applicable cost principles of the FAR or its supplements.

Firm:------------------------------------------------------------------

Signature:-------------------------------------------------------------

Name of Certifying Official:-------------------------------------------

Title:-----------------------------------------------------------------

Date of Execution:-----------------------------------------------------

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/ http://www.arnet.gov/far/

(End of provision

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/

252.217-7011 ACCESS TO VESSEL (DEC 1991)

(a) Upon the request of the Contracting Officer, the Contractor shall grant admission to the Contractor's facilities and access to vessel, on a non-interference basis, as necessary to perform their respective responsibilities, to a reasonable number of:

(1) Government and other Government contractor employees (in addition to those Government employees attached to the vessel); and

(2) Representatives of offerors on other contemplated Government work.

(b) All personnel granted access shall comply with Contractor rules governing personnel at its shipyard.

http://farsite.hill.af.mil/ http://farsite.hill.af.mil/

The following have been modified:

LINE ITEMS

Following Line items added:

ITEM NO SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT

0001BM M-903 Generator Room Piping Replacement 1 JB $XXX.XX

0001BN M-921 Air Receiver Recertification 1 JB $XXX.XX

0001BO M-904 Replace Piping Expansion Joints 1 JB $XXX.XX

0001BP H-203 Audiogaging – (If Directed) 1 Test $XXX.XX

0001BQ H232 Repair Sea Chest 1 JB $XXX.XX

0001BR H-220 Replace Aft Peak Steel Tank 1 JB $XXX.XX

TOTAL ITEM 0001 1 VSL

SECTION C

Following changes are made:

H-10 SERVICES TO BE FURNISHED BY CONTRACTOR.

Next to last paragraph of this section has been changed to . . . “Furnish and maintain 24-hour independent unrestricted high-speed Internet access to each private office in the Port Engineer’s office for the entire duration of the repair period using either DSL, T-1 or cable service. Four wholly independent Internet connections shall be furnished and maintained by the Contractor for the duration of the repair period, with one office having 2 separate connections”. . .

PART 2 - SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

H-101 DRYDOCKING OF McFARLAND

Following text deleted[after first checkpoint] - “Remove all sea chest strainer plates for inspection of sea chest and sea valves by the COR. Remove debris and marine growth from both sides of the plates and the inside of sea strainer recess from the shell up to the valve by high-pressure fresh water wash as per the above. Provide manlift services and operator to inspect each sea chest. Rebolt upon completion of inspection by USCG and Government personnel, using new contractor-furnished stainless steel cotter keys.”

The following specifications have been added for new item

H-203 AUDIOGAGING (IF-DIRECTED)

1. Intent

The intent of this Clause is to perform ultrasonic thickness testing aboard the vessel when required by the Government Technical Representative.

2. Reference Drawings

Reference drawings will be furnished to the contractor for the areas to be audiogaged. These drawings will be used as basis for % wastage.

3. Description of Work

Provide the services of National Marine Services of Stafford, Texas or another ABS-approved ultrasonic thickness testing laboratory (subject to the approval of the Government Technical Representative) to perform ultrasonic thickness testing aboard the vessel as directed by the Government Technical Representative.

NOTE: A copy of the testing certification and equipment calibration and documentation showing ABS approval shall be provided to the Government Technical Representative prior to start of work.

Grind to a smooth clean surface and prepare test spots to determine thickness of piping, hull shell plate, bulkhead, hopper plating, etc., where directed by the Government Technical Representative.

NOTE: Cost of staging areas not currently staged will be handled separately from this Clause.

Measure the plate or pipe thickness at these spots.

Record the thickness found at each spot, compare to original plate thickness and record percentage of deterioration.

Furnish to the Government Technical Representative two copies of a detailed report of the ultrasonic thickness reading, the original thickness, the percentage wastage and drawings indicating spot locations. Highlight all areas in excess of 25% wastage in red and 15-25% wastage in orange.

Estimate on 1,000 test spots. Price per spot. Payment will be made on the total number of spots recorded.

H-205 RENEWAL OF DEFECTIVE STEEL (IF DIRECTED)

Item “A. Shapes “ has been changed to “Estimate on 4,000 pounds. . .”

H-214 CLEAN AND GAS-FREE SPACES AND BALLAST TANKS (If-Directed)

Material Changes –Clause H-214 now reads:

It is the intent of this Clause to have the following spaces cleaned and gas-freed for inspection as part of the renewal of the ABS Load Line Certificate and USCG Certificate of Inspection, If-Directed by the COR.

2. Reference Drawings

MF-H2-25, “Bulkhead Fore Peak # 10 & Chain Locker Bulkheads” MF-H2-26, “Bulkhead # 21 Transverse Watertight” MF-H2-27, “Bulkhead Potable Water & Fuel Oil Tank & Flat, Frames 21-32” MF-H2-28, “Bulkhead # 32 Transverse Watertight” MF-H2-29, “Bulkhead Transverse Watertight 48 & 88” MF-H2-30, “Bulkhead Transverse Watertight Frame 68”

MF-H2-35, “Bulkheads Frame 111-115 & Generator Room Flat” MF-H2-65, “Frames, Web 36-40-43-44-45-46-47” MF-H2-66, “Frames, Web 52-55-58-61-64-72-82-84 & 85” MF-H2-67, “Frames, Web 92-96-100-108-111-120-130” MF-H2-107, “Shell Expansion, Midship Frames 48-88” MH-H2-185, “Transverse Section through Hoppers”

3. Description of Work

The contractor shall provide all necessary labor, material, services and equipment to open, clean, gas-free, test and monitor the following spaces in accordance with the Technical Provisions. All spaces shall be made safe for entry and safe for hot work for the duration of the repair period, and maintained as such throughout the repair period.

• The Pump Room ballast tanks, located between Frames 32 and 48 under the Pump Room tanktop, between the shell and centerline.

• The Pump Room, located between Frames 32 and 48, from shell to shell and bulkhead to bulkhead.

• The draghead penetration void spaces located in the aft lower hopper voids, port and starboard, between Frames 68 and 88, along the shell of the vessel.

• The forward cofferdams located between Frames 30 and 32 in the Forward Potable Water Tank void space. Two of the cofferdams are adjacent to the shell and run from the tank top to the overhead, port and starboard. The other two cofferdams are below the tank top, port and starboard. There are a total of four cofferdams to be opened, cleaned, tested and monitored.

• The aft cofferdams located between Frames 124 and 125 in the Auxiliary Machinery Space. The cofferdams are below the tank top, port and starboard. There are a total of two cofferdams to be opened, cleaned, tested and monitored.

• The Fore Peak Tank, located between the bow and Frame 10.

NOTE: These spaces do not carry any fuels or lubricants and are expected to have minimal quantities of water, dirt and rust inside.

CHECKPOINT: Inform the Government Technical Representative, USGC and ABS that spaces are ready for internal inspection.

If the draghead penetration void spaces and/or cofferdams are activated, the contractor shall, upon completion of the ABS and USCG inspection, close the access hatches and secure with new contractor-furnished gaskets and stainless-steel hardware.

4. Bid Quantity

A. Estimate on cleaning and gas-freeing both the port and starboard Pump Room ballast tanks in accordance with the aforementioned specifications. Price per job.

B. Estimate on cleaning and gas-freeing the Pump Room in accordance with the aforementioned specifications. Price per job.

C. Estimate on cleaning and gas-freeing both the port and starboard draghead penetration spaces in accordance with the aforementioned specifications. Price per job.

D. Estimate on cleaning and gas-freeing all four forward cofferdam spaces in accordance with the aforementioned specifications. Price per job.

E. Estimate on cleaning and gas-freeing both the port and starboard aft cofferdam spaces in accordance with the aforementioned specifications. Price per job.

F. Estimate on cleaning and gas-freeing the Fore Peak Tank in accordance with the aforementioned specifications. Price per job.

The following specifications have been added for new item

H-220 REPLACEMENT OF AFT PEAK TANK STEEL

1. Intent

It is the intent of this clause to replacement all deteriorated steel inside the Aft Peak Tank.

2. Reference Drawings

MF-H2-33, “Aft Peak BHD 135” MF-H2-34, “Bulkheads Frame 125-133, Potable Water Tank” MF-H2-40, “Misc. Bulkheads on Main Deck Aft Frame 88” MF-H2-61, “Floors Frames 116-134” MF-H2-74, “Frame 115-135 P/S Shell Stringers” MF-H2-77, “Girder Center & Side Girders Aft Frame 88” MF-H2-91, “Plating Main Deck Aft Frame 88” MF-H2-94, “Plating Upper Deck Aft Frame 88” MF-H2-102, “Plate Edge Details for Standard Buttwelds” MF-H2-115, “Shell Expansion Aft Frame 88” MF-M7-8, “Struts, Propeller” MF-M7-14, “Skegs & Stern Tubes”

3. Temporary Supports

The structure being replaced is support structure for the two decks above and all machinery, equipment and components on these decks, as well as the decks themselves. The contractor shall take this into consideration when removing and reinstalling the internal structure, and provide temporary support structure as necessary during the removal and reinstallation process.

4. Scope of Work

The contractor shall provide all necessary labor, materials, equipment and support to perform and complete the work listed herein. Coordinate with all work listed under Clauses H-910 and all work being performed on the CPP system.

The Aft Peak Tank is located on the stern of the vessel, directly below the Steering Gear Room. It is accessed via two watertight hatches in this same space. Access to the Steering Gear Room is gained via a watertight door on the stern of the vessel, and via a flush-mounted bolted deck hatch on the port stern.

Access into the Aft Peak Tank for removal of existing steel, and for installation of new steel, can be made either through the shell or through the Steering Gear Room (Main Deck) plating on the port side outboard of the steering gear. The contractor is responsible for making any and all accesses necessary to perform and complete the work listed herein, and for reinstalling accesses upon completion of the work listed herein. All accesses into the tank shall be made in accordance with the Technical Provisions, and the cost of their removal and reinstallation shall be included herein.

The vessel will arrive at the contractor’s facility with material in the Aft Peak Tank. The contents of the Aft Peak Tank will be pumped out and disposed under Clause H-213.

After removal of the contents, the contractor shall fabricate and install blanks on the lines in the Auxiliary Machinery Room leading into the Aft Peak Tank. These blanks shall remain in place until all steel work is completed and the repairs have been final inspected by the COR, USCG and the ABS.

After the blanks are installed, and in coordination with Clause H-213, the contractor shall clean the Aft Peak Tank and make it safe for entry and safe for full unlimited hot work in accordance with the Technical Provisions. This shall remain in place for the duration of the repair period until the tank has been final inspected by the USCG and the ABS. Provide and maintain Competent Person watches on the Tank during all phases of the work, and post the Hot Work Certificate and the Competent Persons’ Log at the entrance to the Aft Peak Tank.

CHECKPOINT - After the tank has been certified by a Marine Chemist to be safe for entry, notify the COR and ABS representative that the tank is ready for inspection prior to the removal of the existing steel.

A firewatch shall be maintained in the Steering Gear room during all hot work operations in the Aft Peak Tank, and for one hour after the completion of hot work operations. This firewatch shall not perform any other work during this time.

Remove all internal transverse and longitudinal horizontal and vertical steel from the inside of the Aft Peak Tank. Rig off ship and dispose of steel. Removed steel is the property of the contractor and shall be disposed of in accordance with all Federal, State and Local requirements.

NOTE: Removed steel shall include, at a minimum, the full width, height and thickness of the 1st, 2nd, 3rd, 4th, 5th, 6th, and 7th swash bulkheads on both the port and starboard sides of centerline, and all structural steel inside the Aft Peak Tank between Bulkhead 134 and the stern, the port and starboard shell plate, and from the Steering Gear Tank top to the bottom of the tank.

Grind all remaining steel and weld material flush to the existing bulkhead and shell plate.

CHECKPOINT – Inform COR/GTR, USCG and ABS that tank is ready for post-removal/pre-installation inspection.

Prepare the interior shell plate surface and the forward bulkhead of the tank to Commercial Blast standards, in accordance with Steel Structures Painting Council Specification SSPC-SP-12, either by mechanical means or ultra-high pressure waterjetting standards to accept a two part paint coating system, consisting of one full-coat of Ameron 235 and two full coats of Ameron 351. The new steel being furnished and installed by the contractor shall also be coated with this same paint system.

NOTE: The USCG and ABS may elect to inspect the steel replacement while it is being performed. Coordinate and perform all in-process inspections with the COR, USCG and ABS.

Furnish and install all new longitudinal and transverse steel inside the Aft Peak Tank. All steel shall be installed as per the reference drawing, complete with swash plates, lightening holes and baffling as per the original installation. All steel shall be of the same thickness and mechanical and chemical properties as per the existing steel.

NOTE: The contractor shall properly sequence their welds so that minimum heat is transferred to the deck above and to the shell plate in order to minimize distortion of the deck and to minimize heat transfer to any of the equipment in the area.

CHECKPOINT – Inform COR/GTR, USCG and ABS that tank is ready for post-installation inspection.

Upon successful completion of this inspection, reinstall the plating and/or structural members used to gain access to the plating, and prove all accesses watertight in the presence of the COR, the ABS and USCG.

CHECKPOINT – Test integrity of tank in presence of and to satisfaction of resident USCG Inspector and ABS Surveyor.

Satisfactory completion of all tests and performance, completion and acceptance of final air test of Aft Peak Tank space constitute Final Acceptance of the work listed herein.

The following specifications have been added for new item

H-232 REPAIR SEA CHESTS

It is the intent of the Government to have the seven sea chests listed below opened, cleaned, inspected and closed as part of the USCG Drydock Examination.

MF-H2-111, “Sea chests, Raw Water System, 20” at FR 33 P&S” MF-H2-124, “Sea chests, Collecting System, FR 87-1/2 P&S” MF-H2-125, “Sea chests, Jetting & Firemain, FR 55 P&S” MF-H2-126, “Sea chest, Firemain, FR 90 P” MF-H2-67, “Web FRS. 92-96-100-108-111-120-130”

3. Scope of Work

The contractor shall provide all necessary labor, material, services and equipment to perform and complete the work listed herein to the following sea chests:

• Jetting And Fire System - Frame 55 P and S, strainer plate size approximately 3’ by 3’, 9/16”-thick stainless steel, held in place with eight fasteners.Collection System - Frame 87-1/2 P and S, strainer plate size approximately 7’-5” by 2’-6”; 1” diameter bars held in place with ten fasteners.

• Fire System - Frame 90 P, 12” diameter, 9/16”-thick stainless steel strainer plate, held in place with three fasteners.

• Raw Water/Main Injection System - Frame 33 P and S, strainer plate size is approximately 3’-3” by 5’- 1”, 9/16”-thick stainless steel, held in place with ten fasteners.

Remove the existing strainer plates from all sea chests. All plates are held in place with ¾” stainless steel fasteners and cotter keys.

NOTE: Padeyes may be welded to all of the above strainer plates to facilitate handling; however, their size shall be kept to a minimum so as to block as few holes as possible. All padeyes shall be removed upon reinstallation of the strainer plates.

Thoroughly clean strainer plates, interior of sea chests, and piping up to the sea valves by Ultra High Pressure Water Jetting blast in coordination with similar work being performed under Clause H-101. Ensure that all holes are unblocked by marine growth.

CHECKPOINT – Inform Government Technical Representative that sea chests are ready for inspection. Provide manlift services to inspect each sea chest. For the Collection System sea chests, provide and secure a ladder into each sea chest. Coordinate inspections with inspections of mating sea valves being performed under Clause H-231.

Upon completion of the final inspection, reinstall each strainer plate, replacing all fastenings, washers, and cotter keys with contractor-furnished AISI 316 stainless steel hardware.

Successful completion of the final inspection by the Government Technical Representative and USCG and subsequent closure of the sea chests constitutes Final Acceptance of the work listed herein.

The following specifications have been added for existing item:

M-701 REPAIR AND INSPECT CONTROLLABLE PITCH PROPULSION SYSTEM

It is the intent of this Clause to perform and complete repairs to the controllable pitch propulsion (CPP) system.

This will consisting of removing the port and starboard controllable pitch propeller blades, hubs and tailshafts;

installing rebuilt GFM tailshafts, reinstalling the existing existing hubs and blades, and testing the system in the presence of the Rolls Royce Naval Marine service representative and the COR.

MF-M7-20, ‘Conversion to Water Lubricated Bearings - Stern Tube Arrangement & Details’ *Rolls Royce Naval Marine Drawing No. E102SK01001, ‘Propeller Blade’ *Rolls Royce Naval Marine Drawing No. D102SK03301, ‘Tail Shaft’ *Rolls Royce Naval Marine Drawing No. D102SA01101, ‘Shaft Installations’ *Rolls Royce Naval Marine Drawing No. D102LA02000, ‘Hub Assembly (L.H.)’ *Rolls Royce Naval Marine Drawing No. D102RA02000, ‘Hub Assembly (R.H.)’

NOTE: * - These drawings contain information proprietary to Rolls Royce Naval Marine and must be provided by Rolls Royce Naval Marine. Refer to the latest revision of drawings.

3. Safety Requirements

There are padeyes welded to the hull above the rudders that have been used for rigging the rudders on and off the vessel. It is the responsibility of the contractor to ensure the integrity and suitability of the padeyes for the loads being lifted if the existing padeyes are used.

The cost for fabricating, installing and removing any extra padeyes required to complete the work in this Clause shall be included in this Clause. This includes cleaning, gas-freeing, certifying and maintaining any spaces not already gas-freed for other work items.

4. General Requirements

Provide a Rolls Royce Naval Marine representative or representatives for the duration of the repairs to direct and oversee all work associated with the removal, reinstallation and testing of all controllable pitch propulsion system equipment listed in this Clause. These representatives shall be capable of overseeing any other work to the controllable pitch propulsion system that is being performed while present at the contractor’s facility. The Rolls Royce Naval Marine service representative(s) shall be present during the Dock and Sea Trial periods to test and adjust the controllable pitch propulsion system components repaired during the shipyard period.

Coordinate all work being performed under this Clause with any other work being performed on the CPP and Bow Thruster systems.

The contractor shall provide, erect and maintain scaffolding to support the inspection, removal and reinstallation of the port and starboard blades, hubs, tailshafts and forward and aft cutlass bearings, and sufficient lighting to perform work at night

The contractor shall provide all tools necessary to remove and reinstall the blades, hubs and shafts. This includes furnishing a calibrated hydraulic torque machine to torque the bolts to Rolls Royce Naval Marine requirements.

Prior to any work starting, the Auxiliary Machinery Room (AMR) shall be cleaned, gas-freed and certified safe for hot work in accordance the requirements listed in the Technical Provisions. The cost of cleaning, gas-freeing, certifying and monitoring the AMR shall be included in this Clause. This gas-free, safe for hot work, certification shall remain valid until all work in the AMR has been completed, and shall be good for any hot work performed in the AMR.

5. Description of Work

The contractor shall provide all labor, services, material and equipment to perform, coordinate, test and complete the work on both the port and starboard controllable pitch propulsion systems listed herein. The contractor is responsible for properly coordinating the removal and reinstallation of the tailshafts, hubs, blades, stuffing boxes and packing glands and all other components removed as part of this Clause, as well as work being performed under Clauses M-702 and M-703 and the rudder repairs being performed under Clause H-910.

Secure hydraulics in the AMR, and drain hydraulic fluid from the CPP system to perform work listed herein.

Dispose of all old hydraulic fluid in accordance with the Technical Provisions and all applicable Federal, State and Local regulations, and include cost herein.

Remove the blades from the propeller hub and lift clear of the vessel.

Disconnect the tailshaft at the muff coupling forward of the tailshaft stuffing box in the AMR.

Disconnect the control rod at the oil distribution box for the controllable pitch propeller hub in the AMR.

Any and all disassembly of the OD boxes necessary to perform and complete the work listed herein, including the replacement of any gaskets and seals compromised by the disassembly, is the responsibility of the contractor.

Furnish and install any new O-rings, seals and gaskets to replace those compromised by the opening of the OD boxes under this Clause, and include the cost herein.

Rig and remove the port and starboard tailshafts and hubs from the vessel. Rig and transport to machine shop for separation of the hubs from the tailshafts. After separation from hubs, rig, transport and load removed shafts into shipping crates once the rebuilt shafts have been removed.

Separate hubs, sheath and sheath rings from existing shafts and make ready for installation to the rebuilt tailshafts. Protect removed hubs, sheath and sheath rings from damage and contamination during the removal and reinstallation procedure.

NOTE: The removed shafts shall be loaded into the shipping crates and secured as per the new shafts. Wrap the flanges with plastic sheeting, furnish and install a light coat of preservative to the bores of the shafts, and furnish and install wooden plugs on the bores on both ends of the shafts. Install lid on shipping crates and secure with new contractor-furnished stainless steel hardware. Transport to storage area and provide all necessary rigging and crane services to load on trucks for shipment back to Government storage facility. Include cost herein.

Remove the stuffing box and packing gland from the AMR and transport to machine shop for inspection by COR. Inform COR that these items are ready for inspection.

CHECKPOINT – Inform COR that stuffing box and packing gland are ready for inspection.

Replace the stuffing box air seals, air valves and grease fittings with GFM. Reassemble stuffing box and bolt around GFM cylinder. Inflate air seals to 80 psi.

CHECKPOINT – Inform COR and Chief Engineer to witness installation of new seals, valves and fittings and to witness stuffing box air seals holding air at 80 psi for 24 hours. Allow access to test area at all times during this 24 hour period.

Upon successful completion of test, disassemble stuffing box from around cylinder and hold for reinstallation on vessel. Furnish and install new stainless steel hardware and gaskets to mount stuffing box to stern tube assembly.

Remove upper half of stern tube bearing access cover to allow for inspection of the forward end of the strut bearing. The bearing covers are held in place by flat bar welded to the stern tube at each end and the middle of the cover on the inboard and outboard sides, and by pull penetration weld on each end around the circumference of the covers. Furnish and install new flat bars upon completion of repairs prior to undocking.

NOTE: The contractor may elect to drop the lower half of the access covers on both sides to assist in rigging the shafts on and off the vessel. Removal of the lower halves, and subsequent reinstallation, is the responsibility of the contractor and the contractor shall bear all costs associated with this removal and the subsequent reinstallation.

NOTE: The starboard aft cutlass bearing is mounted in Chockfast. A ring was fabricated and installed around the aft end of the aft bearing once the bearing was aligned. The contractor shall remove this ring, and prepare it for reuse, and install upon completion of the installation of the new bearing, if replacement is directed by the COR.

Utmost care shall be exercised while removing this ring, to avoid damaging the Chockfast. Replacement of the aft cutlass bearings, and the aforementioned Chockfast, if required, will be handled under Clause M-702.

Inspect the stern tube and strut for damage and excessive wear. Inform COR when areas are ready for inspection. Provide Condition Report to COR.

CHECKPOINT – Inform COR that stern tube and strut areas and forward and aft bearings are ready for in-place inspection. Replacement of the bearings, if necessary, will be performed under Clause M-702.

The contractor shall furnish and install new static and dynamic blade seal base O-rings, body bolt O-rings, blade bolt O-ring, hub and sheath O-rings under the direction of the Rolls Royce Naval Marine representative and in coordination with all other work on the CPP system. Furnish and install new blade seal base ring springs. The existing CPP blades and bronze blade seal base rings shall be reused.

NDT all existing blade bolts and body bolts in the presence of the COR, USCG and the Rolls Royce Naval Marine service representative. Provide Condition Report to COR. New blade and/or body bolts, if required, will be

GFM.

CHECKPOINT – Inform COR, USCG and the Rolls Royce Naval Marine service representative to witness NDT of blade and body bolts.

Mate existing hubs to the rebuilt Government-furnished port and starboard tailshafts in a machine shop environment, transport to vessel, rig into place and connect to muff coupling. Reconnect control rod. Furnish and install new safety/relief valves in the flange on the tailshaft, with removed valves to be given to COR. Reinstall existing CPP blades.

CHECKPOINT – Inform COR and Chief Engineer that safety/relief valves are being reinstalled. Allow COR and Chief Engineer access to witness reinstallation.

Reinstall existing stuffing box assemblies and packing glands with new contractor-furnished Duramax Ultra-X packing and gaskets.

‘Bump’ shaft using portable hydraulic power to ensure that hub does not contact rope guard once engaged.

If contact occurs, remove rope guard and reinstall further forward on strut to compensate for movement of hub.

Rope guard clearance to hub shall be ¼”.

Take final clearance readings between tailshaft and forward and aft cutlass bearings at 0º, 90º, 180º and

270º prior to movement of shaft. Readings on aft cutlass bearing to be taken on both forward and aft ends of bearing.

Provide Condition Report to COR listing readings and location in respect to shaft liner.

CHECKPOINT – Inform COR bearing area is ready for inspection prior to reinstalling stern tube bearing access and rope guard.

Test blade seal integrity by pressuring the controllable pitch propulsion system and pitching blades full ahead and astern and check for leaks. Wash out blade seal area with water before test and wet area during test.

Check for leaks in system and tighten all connections.

CHECKPOINT – COR to witness blade seal integrity test.

Restore all other removals, and remove all staging and equipment from the drydock, and make system ready for operation once vessel is undocked.

6. Final Acceptance

Leak-free operation without binding from full astern to full ahead performed while underway during the Dredging Sea Trial in the presence of the COR, Chief Engineer and the Rolls Royce Naval Marine representative constitutes Final Acceptance.

The following specifications have been added for an existing item:

M-702 REPLACE CUTLASS BEARINGS AND CHOCKFAST (IF-DIRECTED)

It is the intent of this Clause to replace the port and/or starboard forward and/or aft cutlass bearings of the controllable pitch propulsion (CPP) system.

2. Aft Cutlass Bearing Replacement

If-Directed by the COR, Provide all necessary labor, material, services and equipment to perform and complete the work listed herein on the port and/or starboard controllable pitch propulsion (CPP) system.

In coordination with all controllable pitch propulsion system repairs being performed in Clause M-701, the contractor shall remove the existing port and/or starboard forward and/or aft cutlass bearings and machine OD of new bearings in accordance with requirements listed herein.

CHECKPOINT – Inform COR and Chief Engineer that the new bearings are machined and ready for inspection prior to installation. Provide OD measurements on Condition Report, with measurements to be taken at the forward, aft and middle of bearings

NOTE: The Starboard aft (strut) cutlass bearing is partially mounted in Chockfast Orange. The contractor shall extreme care shall be taken to ensure the existing Chockfast is not damaged when removing the bearing. If it is determined that this bearing is in need of replacement, before the bearing is removed, the contractor shall find establish the centerline of the forward and aft bearings measuring from the I.D. of the bearing shell, top to bottom and side to side. Furnish and install mounts for piano wire on the aft end of the strut and the forward end of the stern tube bearing. The mounting points for the piano wire on these fixtures shall be the centerline of the bearings as defined above. Install piano wire after existing bearings are removed.

CHECKPOINT – Inform COR and Chief Engineer that piano wire mount is installed and ready for inspection prior to removal of bearings.

If-Directed by the COR, remove existing Chockfast Orange, remove and retain existing backing ring and prepare for reuse, prepare area for acceptance of new Chockfast Orange and furnish and install new starboard aft bearing in Chockfast Orange. The Government will furnish 12 gallons of Chockfast Orange for this installation; the contractor shall furnish a factory Chockfast Orange rep to oversee installation of Chockfast. Fabricate and install new backing ring as per existing. Also furnish and install a 1-1/2” standpipe to the backing ring, to extend 3” above the split line of the bearing, for use in installing new Chockfast.

NOTE: The final alignment, and location, of the new starboard aft bearing shall be determined using the installed piano referenced above.

If-Directed by the COR, remove existing port aft cutlass bearing and replace with new GFM bearing.

If-Directed by the COR, remove existing port and/or starboard forward cutlass bearings and replace with new GFM bearings.

The new forward cutlass bearings shall be machined prior to installation. Machine each new GFM forward cutlass bearings along entire length of the O.D. In each bearing, drill 16 bolt holes to match existing bolt hole pattern and 4 jacking bolt holes (2 per halve) in each bearing to facilitate installation. Use removed bearings as a template, with final measurements shall be taken from the vessel. Package removed bearings in the crates the new bearings were provided in, and store for shipment back to the Fort Mifflin Distribution Center. Include cost of this work herein.

NOTE: Some of the bolt holes on the bottom half of the starboard aft cutlass bearing can not be utilized. The contractor shall not drill these holes in the new bearing flange.

Restore all other removals in coordination with Clauses M-701 and M-703.

3. Bid Quantity

A. Estimate on replacing port forward cutlass bearing. Price per job.

B. Estimate on replacing starboard forward cutlass bearing. Price per job.

C. Estimate on replacing port aft cutlass bearing. Price per job.

D. Estimate on replacing starboard aft cutlass bearing. Price per job..

E. Estimate on replacing Chockfast in way of starboard aft cutlass bearing. Price per job.

The following specifications have been added for an existing item:

M-703 FLUSH CPP HYDRAULIC SYSTEM (IF-DIRECTED)

1. Intent

The intent of this Clause is to provide for flushing of the port and/or starboard controllable pitch propulsion hydraulic systems, if-directed by the COR.

2. System Flush

Provide all necessary labor, material, services and equipment to perform and complete the work listed herein on the port and/or starboard controllable pitch propulsion (CPP) hydraulic systems.

In coordination with all controllable pitch propulsion system repairs being performed in Clause M-701, the contractor shall perform a hot flush of the port and/or starboard CPP systems.

Prior to performing the system flush, drain, open and clean the head and sump tanks on the port and starboard CPP systems and clean with contractor-furnished lint-free rags. Upon completion of inspection, fill with new contractor-furnished oil. The contractor shall dispose of the used oil in accordance with the Technical Provisions and all applicable Federal, State and local requirements, and include the cost of the disposal herein.

CHECKPOINT – Inform COR and Chief Engineer that head and sump tanks are open and ready for inspection prior to refilling with new oil.

The port and starboard CPP systems shall be flushed with new contractor-furnished normal system oil heated to and maintained at 160°F. The flush shall continue until the oil meets NAS 1638 Class 10 requirements. The contractor shall furnish all necessary pumps, filters strainers and heaters to perform and complete the flush, and two complete flushing systems shall be provided if both systems are to be flushed, so that both systems can be flushed at the same time.

For estimating purposes, estimate on 24 hours per side to meet the aforementioned cleanliness standards.

Additional time to meet these standards, if necessary, will be handled under Clause M-901 or by Modification of Contract.

The flush shall be overseen by the Rolls Royce Naval Marine service representative.

Once completed, the flushed oil shall remain in the system.

Dispose of any waste generated by the flush, including, but not limited to, filters and excess oil in accordance with the Technical Provisions and all applicable Federal, State and local requirements, and include the cost of the disposal herein.

3. Bid Quantity

A. Estimate on flushing the port CPP hydraulic system. Price per side.

B. Estimate on flushing the starboard CPP hydraulic system. Price per side.

The following specifications have been added for new item:

M-903 GENERATOR ROOM PIPING REPLACEMENT

The intent of this clause is have a pipe section located in the starboard space outboard of the Generator

Room, removed and a new section templated, targeted, fabricated and installed by the Contractor in accordance with the following specifications and requirements.

2. Description of Work

The contractor shall furnish all labor, material, services and equipment to perform and complete the following piping replacement.

The existing pipe section is fabricated from steel and 90-10 Copper-Nickel, and consists of 6” and 5” pipe, 6” and 5” flanges, one 5” valve, one 6” 90 degree elbow, two 5” 90 degree elbows, one 4” 90 degree elbow and one 4” flange. A 6” duplex strainer is located in this section; it shall be removed, cleaned and reused. All existing pipe shall be unbolted, rigged out of the space, lifted clear of the vessel and transported to the pipe shop for use in fabrication of the new section.

All existing pipe, flanges and fittings, with the exception of the strainer, are to be considered scrap, and disposed of by the contractor in accordance with the Technical Provisions and all applicable Federal, State and Local regulations, and the cost included herein.

The new pipe section shall be templated and targeted from the existing pipe section, and installed by the contractor in the same location and orientation as the original section. The contractor may elect to install additional flanges above what is listed to ease in installation, as no hot work may be performed in this space. The cost of providing and installing these additional flanges shall be the responsibility of the contractor.

The new pipe section will eliminate the 5” pipe, flanges and valve. The contractor shall provide the following Class 200, 90-10 Copper Nickel pipe, elbows, flanges and valves to fabricate the new replacement pipe section:

• 12’ of 6” piping.

• Five 6” 8-bolt flanges.

• One 4” 8-bolt flange.

• One 6” to 4” Reducing 90 degree elbow.

• Two 6” 90 degree elbows.

• One 8-bolt flanged bronze butterfly valve.

• One 4” 45 degree elbow

• 1’ of 4” piping

Template, target and fabricate the new pipe section as per the original layout.

Upon completion of the fabrication, pressure test the new piping to 80 PSI in the presence of the COR and the Chief Engineer. Furnish and install blanks in way of the strainer during this test.

CHECKPOINT – Inform COR and Chief Engineer that new pipe sections are ready for testing.

Upon completion of testing, transport to ship, rig onboard and install in place of original pipe section.

Furnish and install new stainless steel bolts, nuts and washers during installation on vessel.

Restore any removals made necessary to gain access to area and to remove original section of piping.

Leak free operation of this piping section during Dock Trials constitutes Final Acceptance of the work listed herein.

M-904 REPLACE PIPING EXPANSION JOINTS

1. Intent

The intent of this specification is to remove the aforementioned main injection system piping system expansion joints and replace with GFM joints.

2 Reference Drawing

MF-M9-36, “Raw Water System”

3. Scope of Work

The Contractor shall provide all labor and material to replace the following rubber expansion joints in the raw water/main injection piping system. The new expansion joints will be Government furnished.

The expansion joints to be replaced are as follows:

• Frame 67, Port Forward Lower Void, Main Injection System, 18”, 8” F-F

• Frame 67, Stbd Fwd Lower Void, Main Injection System, 18”, 8” F-F

• Frame 87, Port Aft Lower Void, Main Injection System, 18”, 9.5” F-F

• Frame 87, Stbd Aft Lower Void, Main Injection System, 18”, 8.5” F-F

• Frame 90, Centerline, Main Engine Room, Crossover Pipe, 18”, 8” F-F

• Frame 104, Port, Main Engine Room, Main Injection System, 18”, 8” F-F

• Frame 104, Stbd, Main Engine Room, Main Injection System, 18”, 8” F-F

The contractor shall remove the existing expansion joints in these locations, tag, rig and lift clear of the vessel. Lay out in an area for inspection by the Chief Engineer and the COR.

Clean the mating flanges of the main injection system piping to remove any sharp edges, marine growth or corrosion that would inhibit proper installation of the joints.

CHECKPOINT – Inform COR and Chief Engineer that existing expansion joints are ready for inspection, and that the mating flanges of the main injection system piping are ready for inspection.

The GFM expansion joints are Unaflex Style 1000, complete with retaining rings and Certificates of Compliance, and are sized to match the originals. The existing expansion joints are Style 1100.

The contractor shall rig them onto the vessel and install in place of the originals. Lubricate the mating flanges and the flanges of the joint to ease in installation and prevent damage to the new expansion joints.

Furnish and install new 316 stainless steel bolts, nuts, washers and lock washers on all bolt holes of all the new expansion joints. Discard original hardware.

NOTE: The hardware shall be installed with the heads of the bolts being on the expansion joint side of the mating flanges, with the respective nuts to be tightened against the steel flanges of the main injection system piping.

CHECKPOINT – Inform COR and Chief Engineer that installed expansion joints are ready for installation.

Annotate manufacturer data (serial numbers and dates) from the new joints, and their location, on a Condition Report and provide to the COR.

Restore all other removals, and remove and clean any debris left in area.

4. Acceptance

Leak free installation of the new expansion joints…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .