US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
UNDER DPAS (15 CFR 700)
11. DELIVERY FOR FOB
RFQ
SEE SCHEDULE
14. METHOD OF SOLICITATION
IFB RFP
CODE
SEE ADDENDUM
BLOCK IS MARKED
DESTINATION UNLESS
12. DISCOUNT TERMS
(No Collect Calls)
13b. RATING
13a. THIS CONTRACT IS A RATED ORDER
CODE
W912BU-09-R-0003 04-Nov-2008
b. TELEPHONE NUMBER
215-656-6786
8. OFFER DUE DATE/LOCAL TIME
11:59 AM 17 Nov 2008
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV 3/2005)
Prescribed by GSA
FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY
CODE 10. THIS ACQUISITION IS
UNRESTRICTED
FAX: NAICS:
TEL:
CODE 18a. PAYMENT WILL BE MADE BYOFFEROR
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TEL.
W912BU
SIZE STD:
9. ISSUED BY
FACILITY
CODE
17a.CONTRACTOR/
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
15. DELIVER TO CODE E570000 16. ADMINISTERED BY
LOGISTICS MGMT OFFICE
USAED, PHILA DISTRICT WANAMAKER BUILDING
PHILADELPHIA PA 19107-3390
TEL: FAX:
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
EDWARD A BODDIE
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES
SEE SCHEDULE
TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS
SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
SB
HUBZONE SB
SET ASIDE: % FOR
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W25PHS82815477A
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
TEL: EMAIL:
2 COPIES
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
.OFFER DATED YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
X
8(A)
SVC-DISABLED VET-OWNED SB
EMERGING SB
X
E5CTSEAB
Typewritten Text
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
SEE SCHEDULE
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT
PAGE 2 OF
23. UNIT PRICE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV 3/2005) BACK
Prescribed by GSA
FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
W912BU-09-R-0003
Section SF 1449 - CONTINUATION SHEET
INSTRUCTIONS:
The following items are required before an award can be made:
CENTRAL CONTRACTOR’S REGISTRATION: All contractors are required to register in the Central Contractor’s Registration (CCR) Database before an award can be made. Contractor’s can obtain information on registration and annual confirmation requirements by calling 1-888-227-2423 or via the Internet at www.ccr.gov. See DFARS Clause 52.204-7004 “Required Central Contractor Registration” in the solicitation document.
VETS 100 REPORT – You must be in compliance with the VETS 100 reporting requirement to receive a Federal contract of $25,000.00 or more. The Department of Labor has made available several reporting options as follows:
1. Direct entry of information on VETS 100 website at:
http://vets.dol.gov/vets100
2. Submission of an electronic file on a diskette; and
3. Submission of the VETS 100 Report in hard copy form U.S. Department of Labor Veterans Employment and Training Service VETS 100 Report Office 6101 Stevenson Avenue Alexandria, VA 22304-3540
U.S. ARMY CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS MANUAL,
EM 385-1-1
This clause applies to contracts and purchase orders that include the Accident Prevention clause at FAR 52.236-13 and/or other safety provisions. EM 385-1-1 and its changes are available at http://www.hq.usace.army.mil (at the HQ homepage, select Safety and Occupational Health). The Contractor shall be responsible for complying with the current edition and changes posted on the web as of the effective date of this solicitation.
LOCATION OF WORK:
Shipyard TBD
COMMENCEMENT:
Contractor may start work upon Notice To Proceed. The project manager on-site is Mr. Mark Saylor,
(215) 964-4202.
http://www.ccr.gov/ http://vets.dol.gov/vets100 http://www.hq.usace.army.mil/
LINE ITEMS
Drydrock and perform repairs to Dredge McFarland of USACE PHILADLEPHIA DISTRICT according to the attached plans and specifications.
ITEM NO SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
0001 REPAIRS TO DREDGE MCFARLAND:
Contractor shall provide all Facilities, Services, Labor and Materials to overhaul the Dredge McFarland in accordance with the following line items, plans and specification stated herein.
1 JB
$XXX.XX
0001AA H-101 Drydocking of McFarland All lay days, demurrage and other dock costs necessary to perform the repair work listed in this contract shall be included in the cost of this Line Item
0001AB H-102 LAY DAYS 5 Days $XXX.XX (If Directed Item)
0001AC H-103 Utilities & Services 21 Days $XXX.XX
0001AD H-205 Miscellaneous Steel A Shapes 2,500 Pound $XXX.XX
0001AE H-205 Miscellaneous Steel B(1) 1/4" PLATE 250 Square
Foot $XXX.XX
0001AF H-205 Miscellaneous Steel B(2) 5/16" PLATE 250 Square
0001AG H-205 Miscellaneous Steel B(3) 3/8" Plate 250 Square
0001AH H-205 Miscellaneous Steel B(4) 7/16" PLATE 250 Square
0001AJ H-205 Miscellaneous Steel B(5) 1/2" PLATE 250 Square
0001AK H-205 Miscellaneous Steel B(6) 9/16" PLATE 250 Square
0001AL H-205 Miscellaneous Steel B(7) 1/2" AR PLATE 250 Square
0001AM H-205 Miscellaneous Steel B(8) 3/4" AR PLATE 250 Square
0001AN H-205 Miscellaneous Steel B(9) 1/2" SS PALTE 250 Square
0001AP H-205 Miscellaneous Steel B(10) 5/8" PLATE 100 Square
0001AQ H-205 Miscellaneous Steel B(11) 5/8" SHELL
PLATE
100 Square
0001AR H-205 Miscellaneous Steel B(12) 1" SHELL
PLATE
100 Square
0001AS H-213 Pump Out After Peak Tank A Removal and Disposal 20,00
Gallon
0001AT H-214 Clean & Gas Free Spaces/Ballast A. Pump
Room Balssat Tanks
0001AU H-214 Clean & Gas Free Spaces/Ballast B. Pump
Room Ballast Tanks
0001AV H-214 Clean & Gas Free Spaces/Ballast C.
Draghead Penetration Spaces
0001AW H-214 Clean & Gas Free Spaces/Ballast D. FWD
Cofferdams
0001AX H-214 Clean & Gas Free Spaces/Ballast E. Aft
Cofferdams
0001AY H-214 Clean & Gas Free Spaces/Ballast F. Fore
Peak Tank
0001AZ H-401 Hopper Doors & Operating Mechnsms 1 JB $XXX.XX
0001BA H-402 Replace Hopper Door Frame 1 JB $XXX.XX
0001BB H-522 Repair 26" Dredging Valve 1 JB $XXX.XX
0001BC H-910 Inspect Port & Stbd Rudder Bearing 1 JB $XXX.XX
0001BD M-701 Controllable Pitch Propulsion (CPP)
Repairs
0001BE M-702 Replace Cutlass Brngs & Chockfast Both
Port and Stbd fwd bearings
0001BF M-702 Replace Cutlass Brngs & Chockfast Both
Port and Stbd aft bearings
0001BG M-702 Replace Cutlass Brngs & Chockfast
Replace Chockfast
0001BH M-703 CPP Hydraulic System Flush Port & Stbd sides
0001BJ M-901 Miscellaneous Maintenance 1,000 Hours $XXX.XX LABOR - (If Directed)
0001BK M-901 Miscellaneous Maintenance 1 JB $XXX.XX Material - (If Directed)
0001BL M-901 Miscellaneous Maintenance 1 JB $XXX.XX Burden Charges - insert percentage rate:_________Material and enter a total value
0001BM M-903 Generator Room Piping Replacement 1 JB $XXX.XX
TOTAL ITEM 0001 1 VSL
INSERT THE LOCATION OF THE SHIPYARD WHERE THE WORK WILL BE
PERFORMED:
The Government may reject am offer as non-responsive if it is materially unbalanced when it is based on prices significantly overstated for other work. (52.217-5)
SECTION C
SECTION C
PART 1 – TECHNICAL PROVISIONS
TP-1 SCOPE OF WORK
In accordance with the Master Ship Repair Agreement, for Repair and Alteration of Vessels (MSRA), the Contractor shall furnish all management, supervision, labor, subcontracting services of manufacturer's representatives and all facilities, utilities, equipment, tools, lubricants, fuels, materials and articles (excluding Government furnished property) necessary to fully execute the work items specified herein.
The contractor shall furnish all engineering, design, labor, services, equipment, parts and materials and perform the drydocking and repairs to the Dredge McFARLAND listed in this contract.
Drawings, equipment or materials to be furnished by the Government will be specifically listed in the appropriate contract clause. Unless specifically listed, the contractor shall assume no drawings, equipment or materials will be furnished by the Government and shall bid accordingly.
TP-2 PRINCIPAL FEATURES
VESSEL DATA. (Information). The dredge McFARLAND is an all-steel, sea-going hopper dredge. The dimensions of the hull are:
Length without Boom Overhang 300 feet - 0 inches Length with Boom Overhang 319 feet - 8 inches Length Between Perpendiculars 284 feet - 0 inches Beam Molded (without wings) 72 feet - 0 inches Depth Amidships, molded 33 feet - 0 inches Normal Draft Aft 16 feet - 6 inches Normal Draft Forward 15 feet - 3 inches Registered Gross Tonnage 9,720 long tons Lightship Displacement 6,152 long tons Ballast, Fuel and Water 400 long tons (approx.)
• Normal being light on fuel and ballast. Actual draft must be taken prior to drydocking, and weight calculated.
TP-3 DEFINITIONS
The following definitions are applicable to phrases and acronyms used throughout this contract:
• Contracting Officer (KO) - a person with authority to enter into, administer, and/or terminate contracts and make related determinations and findings.
• Contracting Officer's Representative (COR) - a member of the Philadelphia District contract management and quality assurance team authorized by the Contracting Officer to perform administrative and managerial duties. A copy of the COR's authority letter is furnished to the Contractor upon award of the contract.
• Government Technical Representative (GTR) – Same duties as COR.
• Government Furnished Equipment (GFE) - Equipment, materials, parts, supplies or components furnished by the Government for installation on the vessel.
• USACE - Acronym for the U.S. Army Corps of Engineers.
• PSBr - Acronym for the Physical Support Branch of the Philadelphia District Corps of Engineers.
• QC - Quality Control. Quality Control is a function of the contractor. See clause E-3.
• QA - Quality Assurance. Quality Assurance is a function of the Government.
• ABS - Acronym for the American Bureau of Shipping.
• USCG - Acronym for the U.S. Coast Guard.
• USN - Acronym for the U.S. Navy.
• CFR - Acronym for the Code of Federal Regulations.
• ANSI - Acronym for the American National Standards Institute.
• OSHA - Acronym for the Occupational Safety and Health Administration.
• NFPA - Acronym for the National Fire Protection Association.
• NIOSH - Acronym for the National Institute of Occupational Safety and Health.
• EPA - Acronym for the Environmental Protection Agency.
• AHA – Activity Hazard Analysis.
TP-4 STANDARDS
All design, engineering, modifications and repairs to the vessel shall be performed in accordance with the criteria set forth in the latest issues of the following standards or regulations:
• U.S. Army Corps of Engineers, Publication No. EM 385-1-1, “Safety and Health Requirements Manual”.
Online at: http://www.usace.army.mil/publications/eng-manuals/em385-1-1/toc.htm
• USCG, Navigation Rules - Inland/International.
• Code of Federal Regulations, Title 29, Part 1900, Occupational Safety and Health Administration.
Code of Federal Regulations, Title 29, Part 1900, Subpart 1915, Occupational Safety and Health Administration, “Shipyard Industry”, OSHA Publication 2268.
Code of Federal Regulations, Title 33, Navigation and Navigable Waters.
Code of Federal Regulations, Title 46, Shipping.
Parts 41-69 (Subchapters E-G) Parts 90-105 (Subchapter I) Parts 110-113 (Subchapter J) Parts 159-165 (Subchapter P)
Parts 170-174 (Subchapter S)
American Bureau of Shipping, “ABS Rules for Building and Classing Steel Vessels”
Institute of Electrical and Electronic Engineers Standards, Publication No. IEEE-45 – “Recommended Practice for Electrical Installation on Shipboard”
Illuminating Engineering Society, “Recommended Practice for Marine Lighting”
National Electric Code (NEC).
National Electrical Manufacturer Association (NEMA).
National Fire Protection Association (NFPA).
Note that these standards apply only to the engineering, design and workmanship performed by the contractor as part of this contract including removals, accesses and other work performed by the contractor incidental to the work required by the contract.
All other standards not listed above but that are incorporated by reference under the aforementioned standards shall also apply to the work being performed under this contract.
TP-5 CERTIFICATION AND CLASSIFICATION
The vessel has an USCG Certificate of Inspection, Official No. 7739856, which expires on 22 March 2011. USCG inspections will be performed at this time. It is the intention of the Government to complete all requirements of the USCG Drydock Examination, Internal Structural Review and the annual inspection for renewal of the COI. A tailshaft credit will also be performed during this availability.
The vessel has an ABS Load Line Certificate, No. 6703228-11, which expires on 05 December 2008.
McFARLAND is not a classed vessel. The remaining structural steel replacement requirements necessary to renew this certificate will be addressed during this availability.
The Government will contract with the ABS to perform all required ABS inspections. The Government will coordinate with USCG to perform all required USCG inspections. The contractor shall coordinate with both the ABS and USCG on all repair Clause work items that require their oversight or inspection.
When such inspections are performed, the crew will perform them in the presence of the USCG Inspector or ABS Surveyor, unless otherwise specified in a contract Clause. The Government will coordinate all inspections with the contractor. The contractor shall plan his work to allow for government coordinated ABS and USCG inspections.
The USCG may issue CG835 violations that require correction prior to the departure of the vessel from the contractor’s facility. Correction of these may require the contractor to perform repairs on an expedited basis to avoid delays to both the contractor’s and the Government’s work schedules. Payment for such corrections, and any additional time at the pier necessary to address these corrections, will be handled under a Modification of Contract or via a Miscellaneous Maintenance Clause.
The contractor is responsible for coordinating all ABS and USCG inspections on their work as specified, and shall provide the services of a QA representative to accompany the ABS and/or USCG whenever they are present on the vessel for inspection of contractor-performed repairs and tests.
The cost of the ABS Surveyor to witness additional inspections of contractor-performed work items that previously failed, or were not properly scheduled, shall be borne by the contractor and reimbursed to the Government via 2- Way Memorandum.
TP-6 INSPECTIONS, TESTING AND TRIALS
A. GENERAL
The contractor shall provide and maintain inspection systems covering the work specified in this contract in accordance with the requirements.
The work will be conducted under the general direction of the Physical Support Branch, Operations Division, Philadelphia District, and is subject to inspection to insure compliance with the terms of the contract.
The presence or absence of an inspector does not relieve the contractor from any requirements of the contract.
The contractor shall perform Tests, Trials and other operational performance demonstrations as required in Clause E-1, “INSPECTION”, and Clause E-3, “QUALITY ASSURANCE AND CONTROL”, of this contract.
The contractor shall provide reasonable advance notice (no less than 1 full working day) to the COR prior to any testing or trials. If the COR, after having received such notification, is not present at the designated time and place for the Inspection or test, the contractor shall proceed with the inspection or test. The COR retains the right to have a designated representative, including crewmembers, attend and witness the test without prior notification to the contractor.
Untimely notification will result in postponement or repetition of the test at no additional cost to the Government.
Lack of notification will require retesting at no additional cost to the Government.
All delays caused by improper notification are the responsibility and to the account of the contractor.
The contractor shall furnish a competent and authorized individual to witness and document the results of all inspections or tests.
The contractor is responsible for notifying and coordinating all tests with the USCG, ABS and manufacturers’ representatives where it is required in the specifications. Testing shall be in accordance with the USCG, ABS and manufacturer’s requirements unless noted within the repair Clause itself.
All tests shall be documented and include the information required in Clause E-3, “QUALITY ASSURANCE AND CONTROL”. This test documentation shall be signed by all personnel present at the test and be presented to the COR within 24 hours of the completion of the test.
All watertight, oiltight and weather tight work shall be tested for tightness prior to the final coat of paint. The contractor may elect to primer-coat the surface to prevent rust from forming, however any paint damaged by the testing shall be restored to original at no additional cost to the Government.
Testing shall be in accordance with “Rules for Building and Classing Steel Vessels”, published by the ABS and CFR 46, “Shipping”. Testing procedures, other than hydrostatic testing, shall be submitted to the COR for approval. Submittals shall include complete particulars on the testing procedure(s) proposed and, if air testing is used, the method of controlling the air pressure. Water used for testing shall be potable quality to prevent contamination of the compartments and piping.
Any pneumatic, hydro and/or hydraulic testing shall be performed with double gage and double relief valve protection to prevent over-pressurization of the area, component or equipment being tested.
B. CHECKPOINTS
The presence of the word “CHECKPOINT” in these specifications shall be interpreted by the contractor as a stopping point, beyond which he/she shall not proceed until the required inspection, test, measurement, etc., is completed.
The contractor shall provide advance notice (no less than 8 hours) to the COR prior to the arrival at a CHECKPOINT. If the COR, after having received notification, is not present at the designated time and location for the inspection or test, the contractor shall proceed with the inspection or test. The results of the CHECKPOINT inspection or test shall be documented as required above.
The contractor shall not be relieved of responsibility for the proper performance of all work where a CHECKPOINT is specified.
The end of each specification Clause shall be regarded as a CHECKPOINT, whether stated or not.
Upon completion of the work listed in each specific repair Clause, the contractor shall provide, in Condition Report format, a list of all completed CHECKPOINTs.
C. DOCK TRIALS AND DREDGING SEA TRIALS
Each of the Line Items shall be individually inspected and tested as specified as part of the Provisional Acceptance.
Dock and Dredging Sea Trials shall be performed as part of the Provisional and Final Acceptances.
The trials shall be conducted in the presence of the COR. The crew will operate the vessel and all of its machinery and equipment during the Dock Trials and Dredging Sea Trials.
The Government will furnish all fuels and lubricants.
The contractor shall provide land and water transportation to and from the sea trial site to the contractor’s facility for the COR staff and all contractor personnel, the cost of which shall be included in the Drydocking Clause, No. H- 101.
The cost of performing the sea trials and dock trials shall be included in the cost of the respective Line Items.
The contractor shall provide the Government with 48 hours advance notice of when it will be ready to start both trial periods.
1. DOCK TRIAL REQUIREMENTS
Upon completion of all Line Items, a complete dock trial shall be performed by the contractor on all items worked on by the contractor and any related systems directly impacted by the work. The contractor shall estimate on 24 hours to complete this trial and provide this amount of time in the schedule without delaying overall completion of the work.
The dock trial period includes, but is not limited to, startup and running of the main propulsion, dredge, and ships service generator engines, and dredge pumps; running of the bow thruster, pressurization of the controllable pitch propulsion system, operation of the hopper door operating mechanisms, and operation of the vessel’s hydraulic and electrical systems.
The contractor shall have sufficient personnel aboard to: check for leaks on all watertight and oiltight work performed by contractor personnel and to adjust and/or correct same items to make leak-free; and adjust machinery that was repaired or removed by the contractor to run within normal pressure and temperature ranges as defined by the manufacturer.
During this time, the crew shall be starting and testing equipment and machinery that has not been operational during the shipyard period.
2. DREDGING SEA TRIAL REQUIREMENTS
Upon completion of the dock trial, a sea trial using seawater pumped through the dredging system test shall be performed in an area in the proximity of the contractor’s yard which will be designated by the COR. The contractor shall estimate on 12 hours to complete this trial and shall include the cost of all contractor and subcontractor personnel, including manufacturer representatives, in the cost of the respective specification Clause. The contractor shall also provide this amount of time in the schedule without delaying overall completion of the work.
NOTE: The 12 hour time requirement listed above does not include transit time to and from the contractor’s facility.
The dredging sea trial period includes, but is not limited to, testing of the dragarm winches by lowering, seating and raising the dragarms; full operation of all engines, reduction gear, controllable pitch propulsion system and the bow thruster; and full operation of the dredge pumps and cycling of all dredging valves.
All systems, components and machinery repaired or removed by the contractor shall be tested during this period.
The contractor shall have sufficient personnel aboard to: check for leaks on all watertight and oiltight work performed by contractor personnel and to adjust and/or correct same items to make leak-free; and adjust machinery to run within normal pressure and temperature ranges as defined by the manufacturer.
Upon successful completion of the sea trail, the vessel will be Finally Accepted and will depart for its next dredging assignment.
The contractor shall provide launch and van/transportation services from the drop-off point at the end of the Dredging Sea Trials back to the contractor’s facility for all personnel on the sea trial, and include this cost in the cost of Clause H-101.
3. DOCKING AND UNDOCKING INSPECTION AND OPERATING
REQUIREMENTS
The contractor shall perform an inspection of the drydock immediately prior to the docking and the undocking of the vessel. The contractor’s representative, Dockmaster, Captain, Chief Engineer and the COR shall jointly perform these inspections in accordance with the requirements listed under Clause H-
101. All deficiencies must be corrected to the satisfaction of all concerned prior to the docking and/or undocking sequences commencing.
Transfer of any fluid while on drydock, movement of any vessel equipment and removal and reinstallation of any component of the vessel as part of the repairs listed herein shall be coordinated with the Dock Master in order to maintain stability of the vessel while in the drydock.
TP-7 WORKMANSHIP & CONSTRUCTION STANDARDS
A. GENERAL REQUIREMENTS FOR UTILITIES AND SERVICES
All Utilities and Services necessary to perform and complete the work listed in the repair Clauses shall be included in the price bid for that item. This includes any and all services and any all labor trades necessitated by these Technical Provisions and by OSHA, EPA, USCG and the ABS in order to safely complete the work listed herein.
B. GENERAL REQUIREMENTS FOR ACCESS
After careful planning and subject to the approval of the COR, the Contractor may cut and/or remove plating or framing members from the vessel for access to machinery, piping, wiring and equipment. Wherever possible, the contractor shall identify and use previously made accesses. Under the same conditions, the Contractor may also remove piping, wiring, fixtures, fittings, etc., for access and clearance to perform required work.
At the completion of required work, all removals shall be restored. Replacement shall consist of returning the removed equipment, piping, wiring, structural members and plating to their original locations and reinstallation.
All accesses shall be submitted to the COR in writing, including a drawing with the approximate size and location of the accesses, on a Condition Report for review and approval.
The cost for all removals and reinstallations shall be included in the cost of the respective Clause.
Where parts, components or equipment are damaged as a result of the removals, the contractor shall replace them in kind at no additional cost to the Government. Fit and finish shall be restored and damaged paint shall be renewed at no additional cost to the Government.
Installations shall be in accordance with the original construction drawings or the referenced standards (Refer to TP- 3).
All removed equipment shall be tested as part of the Tests and Trials required in TP-6 listed above.
Any removals for access shall be temporarily supported if lack of such support could cause failure or damage to adjacent systems, distortion of adjacent framing or plating, or result in a safety hazard.
The contractor shall maintain a hazard-free access in and out of any space at all times throughout the availability of the vessel.
Any temporary openings in the deck or any other area that may constitute a fall hazard shall be railed and combed off. Horizontal openings, such as those on the deck, shall be protected with contractor-furnished temporary combing and safety netting around the entire perimeter of the deck opening when the opening is not in use. The cost of providing this protection shall be included in the cost of the repair Clause.
C. GENERAL REQUIREMENTS FOR HULL AND STRUCTURAL WORK
All new hull plating and shapes shall be fabricated from ABS Structural Steel or ASTM A36, “Specification for Structural Steel”.
Due regard shall be paid to details in both the design and construction of all new and/or modified structures, to prevent structural discontinuities and other stress concentrations.
Where openings must be provided in the structure to gain access internally, the contractor shall provide adequate compensation to maintain the original structural integrity while the opening is present. All compensation shall be approved by the ABS.
Watertight and oiltight integrity of all bulkheads and decks shall be maintained at all times throughout the repair period.
Openings created by permanent removal or addition of piping, wiring or other materials shall be closed by means of watertight penetrations or insert plates of equal thickness flush-welded to the bulkheads.
All welds shall be ground flush and smooth.
Sections of stiffeners, beams, girders, etc., shall be welded to the bulkheads to maintain continuity of structure.
Openings cut into decks and bulkheads shall be adequately compensated in accordance with ABS requirements to maintain original strength, unless the opening is cut in such a manner that it can be rewelded to existing framing members.
D. GENERAL REQUIREMENTS FOR FOUNDATIONS AND SUPPORTS
Suitable foundations shall be provided under all new units of machinery. Foundations shall be built up of plates and structural shapes to the dimensions required for satisfactory support, and shall assure rigidity, freedom from vibration and designed for secure containment of the equipment in event of crash stops. Foundations shall be constructed to the machinery manufacturer’s requirements, unless otherwise specified in the repair Clause.
Where dripping water or oil can be expected, the top plates of foundations shall project beyond the edges of the bedplates or bases of units being supported and formed into spill containment/drip pans. Flat bars welded around the edges of the top plates, or combing welded around the deck near the foundation, may be used to retain any leakage. Valved drains shall be provided at the ends or corners of the pans to facilitate fluid removal or recovery.
Foundations shall extend beyond the equipment fore and aft or transversely to distribute the load and to avoid excessive weight concentrations.
Doublers, insert plates, girders, headers and stanchions shall be fitted and under-deck framing shall be reinforced to support units mounted on deck.
E. GENERAL REQUIREMENTS FOR MATERIALS
All materials provided by the contractor shall be suitable for marine applications and shall be subject to approval of the COR prior to installation.
Abrasion Resistant Steel, where required, shall be T-1 AR steel, Type A, Grade 321HB, 321 Brinell Hardness.
Stainless steel, where required, shall be AISI 316 stainless steel.
All fasteners shall be installed using non-metallic gasket material when placed against any dissimilar surface.
F. GENERAL REQUIREMENTS FOR PIPING
All piping required in these specifications shall be designed and installed to obtain optimum operating conditions, and shall be compatible with the machinery or equipment serviced, including pressure, volume and temperature requirements.
All piping, valves and fittings shall comply with material specifications of the design standards for that particular service.
New piping added to or replacing an existing system shall duplicate that system, both in size, material, and routing, unless otherwise specified.
New piping, where installed in coordination with new equipment or machinery, shall be installed in a manner that does not adversely impact personnel with tripping or overhead hazards.
New fuel oil, lube oil, or hydraulic piping shall be steel or black iron, Schedule 80, to match existing pipe material.
Black iron pipe shall be pickled prior to installation.
New raw, jacket or sanitary water piping shall be with 90-10 copper-nickel, Schedule 80.
New drain piping shall be replaced in kind.
Piping shall be led directly as per existing application. The finished installation shall include the pipe, valves, unions, elbows, reducers, tees and fittings.
Unions and flanges shall be provided to facilitate installation and subsequent removal. High-pressure flanges shall be used where originally provided.
Flexible connections to machinery components shall be provided where vibration may be anticipated.
Piping shall not pass over switchboards and be kept clear of switchgear, wiring, etc.
All work shall be templated from the vessel.
Piping shall be secured by supports and hangers so as to avoid excessive strains; avoid the weight of the piping being transmitted to valves and fittings; minimize the effects of vibration, shock, pitching and rolling of the vessel;
and permit proper thermal expansion and contraction.
Provision may be made for expansion and contraction by changes in direction of pipe runs or by use of expansion bends, joints, loops or offsets.
Galvanizing destroyed by welding or other activity shall be restored to original. All new steel galvanized pipe shall be hot dipped galvanized.
Joints for all steel piping shall be screwed or compression fittings for sizes 2” and below and shall be flanged for sizes 2-1/2” and above.
All burrs shall be removed from the ends of all piping after any cutting or threading. Pipe ends shall be dressed with a reamer before installation.
Valve type shall be consistent with the service. All valve materials shall be stainless steel or bronze to match existing. New valves to be of flanged or union nut bonnet type. All valves are to be pressure-tested in the presence of the COR or their designated representative, and if necessary the USCG, prior to installation on the vessel.
Where three or more valves are located together for the same service, they shall be combined into a manifold.
Any new fuel supply lines shall include a new shut-off valve, one at each tank and one at each fuel pump.
A brass or aluminum label plate shall be attached to the hand-wheel of all new valves to indicate its function.
New valves to go into seawater service shall be stainless steel or bronze and have a pressure rating appropriate for that service.
Valves and operating mechanism shall be readily accessible.
Where pipes are carried through watertight bulkheads, decks or tank tops, the watertight integrity of the structure shall be maintained.
Heat sensitive materials shall not be used in piping systems that penetrate watertight subdivisions.
Where overboard discharge lines or valves are attached to the inside of the hull, the hull shall be reinforced to maintain the original strength and integrity.
Spool pieces with flanges shall be used for all galvanized pipe deck and bulkhead penetrations to prevent damage to galvanizing due to welding.
Black iron pipe penetrations through watertight bulkheads and decks shall be accomplished by welding pipe to a sleeve that is then welded to bulkhead or deck.
All fastenings used to connect valves to shell connections shall be of stainless steel.
Where dissimilar metals occur, the contractor shall insulate to prevent electrolytic action.
Any new piping shall be color-coated in accordance with U.S. Navy standards – purple for fuel oil, blue for potable water, etc.
G. GENERAL REQUIREMENTS FOR MACHINERY SYSTEMS
Where new machinery and equipment is to be installed, or when existing machinery and equipment is relocated, the contractor shall mount the items on foundations as specified elsewhere herein.
All fastenings, bolts, (fitted or otherwise) studs and nuts shall be installed using anti-seize compound.
Any defective or missing standard, fasteners, washers, gaskets, grommets, shall be replaced with material that matches existing performance standards.
Bottoming taps shall be used wherever new holes are drilled and tapped.
Where detailed disassembly, assembly, or installation procedures appear in this specifications, they are presented for the contractor's information and convenience in estimating the possible extent of the work to be done. The inclusion of these detailed procedures does not relieve the contractor of responsibility for doing all work necessary and in the proper manner for satisfactorily accomplishing the specified ultimate objective.
H. GENERAL REQUIREMENTS FOR ELECTRICAL SYSTEMS
All electrical installations as set forth elsewhere in these specifications shall be in compliance with the referenced rules, regulations and standards, especially with regard to ambient and working temperature requirements.
Electric cable shall be either commercial marine type cable or armored cable. All new cable installed on weather decks or where exposed to seawater spray shall be bronze or stainless steel armored. All new cables installed inside shall be bronze or aluminum armored.
Electric cable shall be capable of handling the required amperage.
Electrical installations shall be such so as to eliminate the possibility of mechanical injury or damage from the accumulation of dust, oil, vapors, steam, dripping liquids, etc.
New cable runs shall be supported at intervals of no more than 18” apart where vertical and 14” apart where horizontal. Straps, hangers, and standoffs shall be aluminum with stainless steel fasteners. Plastic type straps are permitted only behind sheathing/paneling. No cable runs will be permitted below the deck-plates, except for bilge pump wiring. Cable penetrations, where required to be watertight, shall have approved kick-plates, stuffing tubes, etc., and shall be filled with duct seal, or pitch where originally used.
All electrical supplies and/or installations to meet CFR 46, as well as all applicable NEMA, IEEE and ANSI standards.
I. GENERAL REQUIREMENTS FOR HOT WORK
Prior to commencing any hot work, the contractor shall take steps necessary to remove any flammable or combustible material from the affected area.
The contractor shall supply all personnel performing hot work operations with suitable breathing, clothing, vision, and hearing protection to protect personnel from fumes, sparks, bright light, and noise resulting from hot work operations.
The contractor shall also supply and post permits stating that spaces where hot work is being performed are safe for hot work to be performed.
The contractor shall provide at least l fire watch for no more than 4 welders and/or burners/arc-gougers and have line of sight contact with these operations at all times. They shall be responsible for providing the appropriate A/B/C rated fire extinguishers in sufficient capacity to cope with a fire in their areas. They shall also be responsible for securing the area against latent fire hazards l/2 hour after hot work operations have stopped. If work is being performed on a bulkhead, a fire watch shall be posted on both sides of the bulkhead, with the same latent fire hazard monitoring to apply on both sides of the bulkhead.
While contractor personnel are performing firewatch services, they shall have no additional responsibilities and no additional work to perform during this time.
J. GENERAL REQUIREMENTS FOR WELDING
Only welders who have successfully passed the qualifications test of the ABS, the USN or the USCG for steel welding shall do all welding under this contract.
The contractor shall bear the expense of conducting these tests, and shall certify by name to the COR those welders who have successfully passed the prescribed tests. The contractor shall require any welder to repeat these tests when, in the opinion of the COR or his appointed representative, the work of the welder indicates a reasonable doubt of his efficiency. In such cases the welder shall be recertified as above.
The electrodes used throughout the work shall be suitable for use with the parent metal at each weld. Electrodes shall be received on the job in unbroken packages bearing the manufacturers' label or be otherwise marked.
Certified statements shall accompany each shipment of electrodes to the effect that sample pieces, representative of each kind and size in each shipment, have satisfactorily passed the tests required by the ABS, the USCG, and/or the USN for welding on the parent material. The COR shall be provided with documentation that certifies compatibility of electrode with parent material.
Welding procedures, where welding to a casting or a forging, shall be submitted to the COR for approval prior to welding. The procedure shall cover the type of weld process, welding electrode, pre-heat, welding sequence and stress relief required.
All welding shall be smooth, tight and free from undercuts, porosity, craters and gas inclusions.
Shell and deck butts and flush seams shall be back chipped or gouged to sound metal from the closing side before welding.
All sharp and/or rough edges shall be ground smooth and all weld splatter shall be removed.
All welds for temporary dogs used during modifications or to secure plate in place while welding shall be ground flush with the surrounding metal.
Assembly of all welded joints before welding shall be such as to secure proper gaps in butt welds and metal contact in fillet welds. Welding shall not be used to close openings larger than stipulated for each plate thickness by the
ABS.
All watertight seal welds shall be of a “bead” type. No “weave” welding is permitted.
Welding procedures, as to direction, length, number, temperature and sequence, shall be carefully planned to minimize distortion and locked-in stresses.
Any welding to or of hull shell plating, watertight and/or oil-tight bulkheads shall be inspected by the ABS. This includes the removal of existing plate, examination of the remaining surrounding plate, examination of the fit-up, and examination of the final welding.
The contractor shall maintain a log of all welders who worked on the vessel throughout the repair period, their certification and the repair Clauses on which they worked. This log shall be made accessible to the COR at any time during normal business hours.
Testing of welds, where required, shall be addressed under the individual repair Clauses.
The contractor shall provide a certified statement from the manufacturer for each shipment of electrodes used.
Documentation shall also be provided stating that the electrode is compatible with the parent/base metal.
K. GENERAL REQUIREMENTS FOR WORKMANSHIP
All parts of the work intended to join or bear upon others shall be cut or trimmed to fit neatly.
All faying surfaces shall be clean and smooth before bolting up. Shims or liners shall not be used for the purpose of overcoming a bad fit.
Ends of outstanding flanges shall be cropped.
Lightening holes may be punched, sawn or sheared and all burrs and cutting slag shall be removed. Weld spatter shall be removed from all plating and stiffeners.
All mounting holes shall be drilled and reamed. Holes in members having sharp curvature shall be avoided whenever possible.
All frames and longitudinals shall have limber holes and/or snipes of adequate size to allow water to flow to the lowest point of each compartment and to allow air to escape.
All joints or areas of connection between dissimilar metals shall be properly insulated by gasket material.
All fastenings used for attaching dissimilar materials shall be made of AISI type 304 or type 316 series stainless steel.
All labor shall be specially skilled for each kind of work, thorough, first-class in every respect and under competent direction. All laborers shall have the required OSHA training associated with their activities, including, but not limited to, hearing protection, respiratory protection, vision protection, etc.
Where work of one trade joins, passes through or is on other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damaging of previously acceptable construction shall be cause for rejection.
L. GENERAL REQUIREMENTS FOR PAINTING
The contractor shall cover all zinc anodes, transducers, draft indicators, windows, propellers hubs, propellers, propeller shafts, shaft bearings, rudders stocks, hopper door bearings, bow thruster and other hull fixtures, deck equipment or fixtures and ventilation inlets that could be damaged or introduce contamination into the vessel from the high pressure water blasting and or painting of the entire hull of the vessel.
When performing blasting or painting operations on portions of the hull, the contractor shall protect any of the aforementioned equipment or fittings that may be damaged by the high pressure water blasting and or painting. The contractor is responsible for repairing or replacing any equipment or fittings not properly protected.
COR approval of protection is required before starting any high pressure water blasting. A daily walk-through with the painting foreman/superintendent prior to work starting shall be performed to ensure that all area are protected and that any damaged or missing protection is restored prior to the start of any sandblasting or painting.
The contractor shall provide adequate dermal and respiratory protection for all blasters and painters.
The contractor shall close any areas until vapors from solvents, paints, and curing coatings have been adequately ventilated and dispersed. During any painting operations, and while paints are curing, the Competent Person shall restrict all hot work in the area.
All areas contaminated with grease, oil, lubricants or other foreign matter shall be cleaned with solvent. After removal of contaminates clean the affected areas in accordance with the paint system manufacturers recommendations.
Unless otherwise specified, all high pressure water blasting shall be performed in accordance with WJ-3 surface finish requirements of Steel Structures Painting Council Specification No. SSPC-SP-12 to remove all rust, old paint, mill scale, rubber, and remaining oil, grease, dirt and foreign matter. No more than flash rust, slight shadows, streaks or discoloration shall remain. Any surface preparation required in this package shall be to this Specification unless stated otherwise and shall meet the paint manufacturer’s requirements.
Any new plate to be installed that comes with a preconstruction primer from the plate manufacturer or supplier shall be prepared to a WJ-4 surface finish requirement in accordance with Steel Structures Painting Council Specification No. SSPC-SP-12.
Defective shell plate discovered during blasting shall be reported to the COR immediately.
Colors specified shall conform to the color spots shown on Federal Standard No. 595, COLORS. All coatings shall be in accordance with all current EPA regulations and guidelines and must receive prior approval by the COR. The Contractor shall provide material safety data sheets for each paint used.
Colors shall conform to Federal Standard 595, in accordance with the following schedule.
AREA COLOR AND FS595 NUMBER
Hull Exterior Black/17038 Deckhouse Exterior Old Ivory/13695 Decks & Housetop Deck Red/10076 Hull & Deckhouse Interior White/27880 Deck Fittings Yellow/13655 Hull Markings White/27880 Stacks Black/17038 Exterior Deck Coaming Striping Red/11136 Handrails & Stair Rails Black/17038 Antifouling 1st Coat Manufacturer Contrastng Color Antifouling 2nd Coat Manufacturer’s Red
The components of all paints shall be ground and mixed to produce a viscous, smooth, homogeneous, lump-free mixture. All paint, when applied, shall provide a satisfactory film and a smooth, even surface with a dry film thickness in accordance with the paint manufacturer's requirements.
Before purchasing or applying paint, the contractor shall submit to the KO the name of the manufacturer together with supporting evidence that such paint conforms to the specifications.
All paints used in the performance of this work shall be within the manufacturer’s specified closed container and “pot” shelf life. All paints/coatings shall be from the same manufacturer.
All coatings shall be delivered to the worksite in sealed containers. Each container shall show: name of manufacturer, name of paint, formula of paint, batch number, and date of manufacture (not coded).
The paint system shall be applied in strict accordance with the manufacturer's guidelines and recommendations, including time between coats, proper application equipment, thinning and disposal of excess paint and thinner and cleaning of equipment.
The Contractor shall provide the services of the paint manufacturer’s authorized representative to witness and verify in writing the surface preparation and paint application. Representative does not have to be present during entire time preparation and/or painting is being performed.
At the conclusion of the repairs, the paint representative shall provide the COR with a written, signed document clearly stating that the surface preparation, weather conditions, coating application and coating thickness for each area were inspected and meet the manufacturer's requirements for the coatings used. The cost of providing this representative shall be included in the Hull Painting Line Item.
All painting of interior and exterior hull surfaces below the main deck shall be completed and accepted by the COR prior to refloating the vessel.
The contractor shall furnish the COR with a thickness gauge, or have made available, suitable for use on steel to verify proper wet/dry film paint thickness on areas that have been coated from a bare surface.
All over spray of any new paint onto existing finished surfaces shall be removed and all surface repaired to original condition.
If any other vessels on drydock and/or the piers located next to the drydock are being sand- or grit-blasted, or if prevailing winds can or do carry sandblast sand or grit, or other contaminants such as wheat/corn dust, iron ore dust, coal dust, wood dust, etc., that may enter the vessel’s ventilation and intake systems, the contractor shall seal off all ventilation, air conditioning, engine room, generator room, exhaust, tank and fan vents and openings, and all other intake or exhaust venting/piping in addition to the protection listed above.