14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
THIS AMENDMENT DOES NOT EXTEND THE BID OPENING DATE OF 27 AUGUST 2008 AT 2:00 P.M.
CONTINUED ON NEXT PAGE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
MODIFICATION OF CONTRACTS/ORDER
NO.
E. IMPORTANT: Contractor
15B. CONTRACTOR/OFFEROR
is not, copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer tended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
is extended, B.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-
TRACT ORDER NO. IN ITEM 10A.
2. AMENDMENT/MODIFICATION NO.
6. ISSUED BY
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) is required to sign this document and return
15A. NAME AND TITLE OF SIGNER (Type or print)
PAGE OF PAGES 1. CONTRACT ID CODE
5. PROJECT NO. (If applicable) 4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE
7. ADMINISTERED BY (If other than Item 6)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY
16C. DATE SIGNED
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10B. DATED (SEE ITEM 13)
CODE CODE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
is not ex-copies to the issuing office.
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
(Signature of person authorized to sign) (Signature of Contracting Officer)
USAPPC V2.00
10A.
30-105-02
US ARMY ENGINEER DISTRICT, PHILADELPHIA
ATTN: MICHELLE BERTOLINE
WANAMAKER BUILDING, 100 PENN SQUARE EAST
PHILADELPHIA, PENNYLVANIA 19107-3390
US ARMY ENGINEER DISTRICT, PHILADELPHIA
WANAMAKER BUILDING, 100 PENN SQUARE EAST
PHILADELPHIA, PENNSYLVANIA 19107-3390
CODE
FACILITY CODE
0003 8/21/2008
W912BU-08-B-0017
22 July 2008
Beach Nourishment, Delaware Coast, Dewey Beach with Options for Rehoboth Beach, Bethany Beach and S. Bethany Beach
This page was intentionally left blank for duplex printing.
Amendment No. 0003 Invitation for Bids
W912BU-08-B-0017
14. DESCRIPTION OF AMENDMENT (continued)
a. BID SCHEDULE:
(1) BID SCHEDULE: Please delete page 00010-4 in its entirety and substitute revised page 00010-4, annotated Amendment No. 0003, attached hereto.
b. SPECIAL CONTRACT REQUIREMENTS
(1) Section 00841 – VIBRATIONAL CORE LOGS - FENWICK: Please insert new pages 00841-9 through 13, annotated Amendment No. 0003, attached hereto.
(2) Section 00842 - VIBRATIONAL CORE SAMPLE GRAIN SIZE DISTRIBUTION CURVES:
Please insert new pages 00842-44 though 54, annotated Amendment No. 0003, attached hereto.
c. TECHNICAL SPECIFICATIONS:
(1) Section 01 11 00 – SUMMARY OF WORK: Please section 01 11 00 in its entirety and substitute revised section 01 11 00, annotated Amendment No. 0003, attached hereto.
(2) Section 35 31 00 – BEACHFILL: Please delete pages 35 31 00-3 through 9 in their entirety and substitute revised pages 35 31 00-3 through 9, annotated Amendment No. 0003, attached hereto.
d. CONTRACT DRAWINGS:
(1) Please delete drawings 63424, 63434, and 63435 in their entirety and substitute revised drawings of the same numbers, with the latest revision date of 21 August 2008, attached hereto.
e. Please indicate receipt of this amendment on Standard Form 1442(SOLICITATION, OFFER, AND AWARD) as Amendment No. 0003. Failure to acknowledge all amendments may be cause for rejection of the offer.
BIDDING SCHEDULE
(To be attached to Standard Form 1442)
SCHEDULE B
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount
Base Bid Items
B1. Mobilization and Demobilization 1 Job L.S. $
B2. Beachfill Dewey, Borrow "Area G" 300,000 C.Y. $ $
B3. MEC Modifications and Monitoring 1 Job L.S. $
TOTAL ESTIMATED AMOUNT BASE BID: $
Option Items
B4. Option 1 - Beachfill Dewey, Borrow Area "Area G" 50,000 C.Y. $ $
B5. Option 2 - Beachfill Dewey, Borrow Area "Area G" 50,000 C.Y. $ $
B6. Option 3 - Beachfill Dewey, Borrow Area "Area G" 50,000 C.Y. $ $
B7. Option 4 - Beachfill Dewey, Borrow Area "Area G" 50,000 C.Y. $ $
Option 5 B8. Mobilization and Demobilization Between Work Areas (Pipeline Relocation) 1 Job L.S. $
B9. Beachfill Rehoboth, Borrow Area "Area G" 100,000 C.Y. $ $
TOTAL ESTIMATED OPTION 5 AMOUNT: $
B10. Option 6 - Beachfill Rehoboth, Borrow Area "Area G" 50,000 C.Y. $ $
DOCUMENT 00010 Page 3
SCHEDULE B (cont'd)
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount
B11. Option 7 - Beachfill Rehoboth, Borrow Area "Area G" 50,000 C.Y. $ $
B12. Option 8 - Beachfill Rehoboth, Borrow Area "Area G" 50,000 C.Y. $ $
Option 9 B13. Mobilization and Demobilization Between Work Areas (Dredge Movement and Pipeline Relocation) 1 Job L.S. $
B14. Beachfill Bethany & South Bethany, Borrow Area "Area E" 100,000 C.Y. $ $
TOTAL ESTIMATED OPTION 9 AMOUNT: $
B15. Option 10 - Beachfill Bethany & South Bethany, Borrow Area "Area E" 50,000 C.Y. $ $
B16. Option 11 - Beachfill Bethany & South Bethany, Borrow Area "Area E" 50,000 C.Y. $ $
SCHEDULE B
TOTAL ESTIMATED BASE AND OPTIONS AMOUNT: $
NOTES: See Section 01 11 00 SUMMARY OF WORK for description of work for each Bid Schedule. Pricing must be submitted for all items on Bid Schedule A and Bid Schedule B. Bidders are directed to Section 00100, Clause 52.217-5, Evaluation of Options, for discussion of evaluation of options. Upon completion of evaluations of all bids, award will be made on ONLY one bid schedule. In accordance with FAR 52.214-19, page 00100-4, award will be made to the lowest bidder under Schedule A if funds are available. If sufficient funding is not available for Schedule A, an award will be made to the lowest bidder for Schedule B, whose bid conforms to the solicitation, is most advantageous to the Government, and is within the funds available which will be announced at the time of the bid opening.
DOCUMENT 00010 Page 4
DRILLING LOG
DE State Plane (NAD 83 Ft)
173,306.6 N; 766,989.8 E Date: February 12th, 2004
SHEET 1
OF 1 SHEETS
1. PROJECT: USACE-Fenwick Island Storm Damage Reduction Project 10. SIZE AND TYPE OF BIT 4”
2. Station: FVC-9
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
3. DRILLING AGENCY: Aqua Survey 12. MANUFACTURER'S DESIGNATION OF DRILL
4. HOLE NO. (As shown on drawing title and file number)
FVC-9
13. TOTAL NO. OF OVER-
BURDEN SAMPLS TAKEN
DISTURBED
UNDISTURBED
5. NAME OF DRILLER
14. TOTAL NO. OF
CORE BOXES ~
15. ELEVATION OF
GROUND WATER
6. DIRECTION OF HOLE
� VERTICAL � INCLINED DEG. FROM VERTICAL
16. DATE HOLE
STARTED
2/12/04
COMPLETED
2/12/04
7. THICKNESS OF OVERBURDEN 17. ELEVATION TOP OF HOLE -41.5 ft
8. DEPTH DRILLED INTO ROCK 18. TOTAL % CORE RECOVERY FOR BORING ~ 86%
9. TOTAL DEPTH OF HOLE 7.0 ft. 19. SIGNATURE OF INSPECTOR
Sediment Surface
Elevation
ELEVATION
a
DEPTH
b
LEGEND
c
CLASSIFICATION OF MATERIALS
(Description) d
USCS
e
BOX OR
SAMPLE
NO.
f
REMARKS
(Drilling time, water loss, depth of weathering, etc., if significant) g
-41.5
-42.5
-43.5
-44.5
-45.5
-46.5
-47.5
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
2.5 Y 2.5/0 Black medium to coarse SAND
2.5 Y 6/1 gray very fine silty SAND
SP-SM
Two pictures were taken.
IFB W912BU-08-B-0017
Section 00841 Page 9
173,506.0 N, 771,037.2 E Date: February 12th, 2004
SHEET 1
OF 1 SHEETS
1. PROJECT: USACE-Fenwick Island Storm Damage Reduction Project 10. SIZE AND TYPE OF BIT 4”
2. Station: FVC-10
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
3. DRILLING AGENCY: Aqua Survey 12. MANUFACTURER'S DESIGNATION OF DRILL
4. HOLE NO. (As shown on drawing title and file number)
FVC-10
13. TOTAL NO. OF OVER-
BURDEN SAMPLS TAKEN
DISTURBED
UNDISTURBED
5. NAME OF DRILLER
14. TOTAL NO. OF
CORE BOXES ~
15. ELEVATION OF
GROUND WATER
6. DIRECTION OF HOLE
� VERTICAL � INCLINED DEG. FROM VERTICAL
16. DATE HOLE
STARTED
2/12/04
COMPLETED
2/12/04
7. THICKNESS OF OVERBURDEN 17. ELEVATION TOP OF HOLE -38 ft
8. DEPTH DRILLED INTO ROCK 18. TOTAL % CORE RECOVERY FOR BORING ~ 84%
9. TOTAL DEPTH OF HOLE 6.3 ft. 19. SIGNATURE OF INSPECTOR
Sediment Surface
Elevation
ELEVATION
a
DEPTH
b
LEGEND
c
CLASSIFICATION OF MATERIALS
(Description) d
USCS
e
BOX OR
SAMPLE
NO.
f
REMARKS
(Drilling time, water loss, depth of weathering, etc., if significant)
-38
-39
-40
-41
-42
-43
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
10 YR 4/1 Dark gray medium to coarse SAND
10 YR 5/2 Grayish brown medium to fine SAND
10 YR 4/1 Dark Gray fine SAND
10 YR 7/1 Light Gray very fine SAND
SP
SP
Three pictures were taken.
IFB W912BU-08-B-0017
Section 00841 Page 10
172,816.1 N, 773,983.4 E Date: February 12th, 2004
SHEET 1
OF 1 SHEETS
1. PROJECT: USACE-Fenwick Island Storm Damage Reduction Project 10. SIZE AND TYPE OF BIT 4”
2. Station: FVC-11
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
3. DRILLING AGENCY: Aqua Survey 12. MANUFACTURER'S DESIGNATION OF DRILL
4. HOLE NO. (As shown on drawing title and file number)
FVC-11
13. TOTAL NO. OF OVER-
BURDEN SAMPLS TAKEN
DISTURBED
UNDISTURBED
5. NAME OF DRILLER
14. TOTAL NO. OF
CORE BOXES ~
15. ELEVATION OF
GROUND WATER
6. DIRECTION OF HOLE
� VERTICAL � INCLINED DEG. FROM VERTICAL
16. DATE HOLE
STARTED
2/12/04
COMPLETED
2/12/04
7. THICKNESS OF OVERBURDEN 17. ELEVATION TOP OF HOLE -49.6ft
8. DEPTH DRILLED INTO ROCK 18. TOTAL % CORE RECOVERY FOR BORING ~ 83%
9. TOTAL DEPTH OF HOLE 6.6 ft. 19. SIGNATURE OF INSPECTOR
Sediment Surface
Elevation
ELEVATION
a
DEPTH
b
LEGEND
c
CLASSIFICATION OF MATERIALS
(Description) d
USCS
e
BOX
OR
SAMP
LE
NO.
f
REMARKS
(Drilling time, water loss, depth of weathering, etc., if significant)
-49.6
-50.6
-51.6
-52.6
-53.6
-54.6
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
2.5 YR 4/1 Gray medium to coarse SAND with
moderate silt
2.5 YR 3/1 Very dark gray sandy CLAY
10 YR 6/1 Gray medium SAND
CL
SP
Three pictures were taken.
IFB W912BU-08-B-0017
Section 00841 Page 11
171,748.3 N, 778,626.5 E Date: February 12th, 2004
SHEET 1
OF 1 SHEETS
1. PROJECT: USACE-Fenwick Island Storm Damage Reduction Project 10. SIZE AND TYPE OF BIT 4”
2. Station: FVC-12
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
3. DRILLING AGENCY: Aqua Survey 12. MANUFACTURER'S DESIGNATION OF DRILL
4. HOLE NO. (As shown on drawing title and file number)
FVC-12
13. TOTAL NO. OF OVER-
BURDEN SAMPLS TAKEN
DISTURBED
UNDISTURBED
5. NAME OF DRILLER
14. TOTAL NO. OF
CORE BOXES ~
15. ELEVATION OF
GROUND WATER
6. DIRECTION OF HOLE
� VERTICAL � INCLINED DEG. FROM VERTICAL
16. DATE HOLE
STARTED
2/12/04
COMPLETED
2/12/04
7. THICKNESS OF OVERBURDEN 17. ELEVATION TOP OF HOLE -41.5 ft
8. DEPTH DRILLED INTO ROCK 18. TOTAL % CORE RECOVERY FOR BORING ~ 83%
9. TOTAL DEPTH OF HOLE 6.0 ft. 19. SIGNATURE OF INSPECTOR
Sediment Surface
Elevation
ELEVATION
a
DEPTH
b
LEGEND
c
CLASSIFICATION OF MATERIALS
(Description) d
USCS
e
BOX OR
SAMPLE
NO.
f
REMARKS
(Drilling time, water loss, depth of weathering, etc., if significant)
-41.5
-42.5
-43.5
-44.5
-45.5
-46.5
-47.5
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
Gley 2.5/N Black medium to fine SAND
5Y 4/1 Dark grey fine SAND
5Y 4/1 Dark grey medium to coarse SAND with intermitent pockets of clay (same hue/chroma), also small pebbles <0.25 inches
SP-SM
Three pictures were taken.
IFB W912BU-08-B-0017
Section 00841 Page 12
167,443.8 N; 776,324.1 E Date: February 12th, 2004
SHEET 1
OF 1 SHEETS
1. PROJECT: USACE-Fenwick Island Storm Damage Reduction Project 10. SIZE AND TYPE OF BIT 4”
2. Station: FVC-13
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
3. DRILLING AGENCY: Aqua Survey 12. MANUFACTURER'S DESIGNATION OF DRILL
4. HOLE NO. (As shown on drawing title and file number)
FVC-13
13. TOTAL NO. OF OVER-
BURDEN SAMPLS TAKEN
DISTURBED
UNDISTURBED
5. NAME OF DRILLER
14. TOTAL NO. OF
CORE BOXES ~
15. ELEVATION OF
GROUND WATER
6. DIRECTION OF HOLE
� VERTICAL � INCLINED DEG. FROM VERTICAL
16. DATE HOLE
STARTED
2/12/04
COMPLETED
2/12/04
7. THICKNESS OF OVERBURDEN 17. ELEVATION TOP OF HOLE -45 ft
8. DEPTH DRILLED INTO ROCK 18. TOTAL % CORE RECOVERY FOR BORING ~ 85%
9. TOTAL DEPTH OF HOLE 6.5 ft. 19. SIGNATURE OF INSPECTOR
Sediment Surface
Elevation
ELEVATION
a
DEPTH
b
LEGEND
c
CLASSIFICATION OF MATERIALS
(Description) d
USCS
e
BOX OR
SAMPLE
NO.
f
REMARKS
(Drilling time, water loss, depth of weathering, etc., if significant)
-46
-47
-48
-49
-50
-50
-54
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
10 YR 5/3 Brown medium SAND with a few shell fragments
2.5 Y 4/1 Dark gray medium SAND with few shell
fragments
2.5 Y 4/1 Dark gray very fine SAND
SP
Three pictures were taken.
IFB W912BU-08-B-0017
Section 00841 Page 13
C-4
Sample composite of 1.0 – 2.7 ft.
P er ce nt
F in er
Grain Size (mm)
100.00 10.00 1.00 0.10 0.00
Section 00842 Page 44
Amendment No. 0003
C-8
Sample composite of 1.0 – 1.7 ft.
er ce nt
F in er
Grain Size (mm)
100.00 10.00 1.00 0.10 0.00
Section 00842 Page 45
Amendment No. 0003
C-12
Sample composite of 1.0 – 2.2 ft.
er ce nt
F in er
Grain Size (mm)
100.00 10.00 1.00 0.10 0.00
Section 00842 Page 46
Amendment No. 0003
C-14
Sample composite of 1.0 – 5.7 ft.
er ce nt
F in er
Grain Size (mm)
100.00 10.00 1.00 0.10 0.00
Section 00842 Page 47
Amendment No. 0003
C-16
Sample composite of 1.0 – 5.0 ft.
er ce nt
F in er
Grain Size (mm)
100.00 10.00 1.00 0.10 0.00
Section 00842 Page 48
Amendment No. 0003
C-18
Sample composite of 1.0 – 4.0 ft.
er ce nt
F in er
Grain Size (mm)
100.00 10.00 1.00 0.10 0.00
Section 00842 Page 49
Amendment No. 0003
C-20
Sample composite of 1.0 – 4.0 ft.
er ce nt
F in er
Grain Size (mm)
100.00 10.00 1.00 0.10 0.00
Section 00842 Page 50
Amendment No. 0003
C-22
Sample composite of 1.0 – 3.3 ft.
er ce nt
F in er
Grain Size (mm)
100.00 10.00 1.00 0.10 0.00
Section 00842 Page 51
Amendment No. 0003
C-24
Sample composite of 1.0 – 3.8 ft.
er ce nt
F in er
Grain Size (mm)
100.00 10.00 1.00 0.10 0.00
Section 00842 Page 52
Amendment No. 0003
C-26
Sample composite of 1.0 – 4.3 ft.
er ce nt
F in er
Grain Size (mm)
100.00 10.00 1.00 0.10 0.00
Section 00842 Page 53
Amendment No. 0003
C-28
Sample composite of 1.0 – 2.8 ft.
er ce nt
F in er
Grain Size (mm)
100.00 10.00 1.00 0.10 0.00
Section 00842 Page 54
Amendment No. 0003
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SCOPE
This section presents a general description of the work to be accomplished under this contract at Rehoboth Beach, Dewey Beach, Bethany Beach and South Bethany in Delaware.
1.2 DESCRIPTION OF WORK
The contract work consists of a Base Bid to place approximately 300,000 cubic yards of beachfill between in Dewey Beach.
The contract work also consists of separate optional items to place additional beachfill in Dewey Beach (Options 1 through 4), Rehoboth Beach (Options 5 through 8) and in Bethany Beach and South Bethany (Options 9 through 11).
Where additional beachfill options for Dewey Beach are awarded, the additional beachfill will be placed immediately after the bid quantity to achieve the template shown on the contract drawings. Upon receipt of the pre-placement surveys as specified in Section 01 71 23 SURVEY REQUIREMENTS, and prior to commencement of beachfill work, the Government may re-issue revised beachfill sections advancing the seaward edge of berm, incorporating any options awarded.
If options are awarded for Rehoboth Beach, the beachfill will be placed as shown on the drawings. Upon receipt of the pre-placement surveys as specified in Section 01 71 23 SURVEY REQUIREMENTS, and prior to commencement of beachfill work, the Government will re-issue revised beachfill sections incorporating all options awarded.
Beachfill awarded in Bethany Beach and South Bethany shall be placed between Station N-12+00 and Station N64+11.18 in Bethany and Station S-15+00 and Station S52+70.60 in South Bethany at the specific locations as directed by the Contracting Officer.
The borrow areas are located in the vicinity of known World War II era firing ranges. The Contractor shall develop an unexploded ordnance work plan, and, the Contractor shall be required to implement some precautionary measures. See Section 01 35 30 MUNITIONS AND EXPLOSIVES OF CONCERN (MEC) CONSTRUCTION SUPPORT for those requirements.
1.3 REQUIRED ORDER OF WORK
The Contractor shall commence the contract work at the south end of the project area, in Dewey Beach, and progress north towards Rehoboth Beach.
1.4 ALTERNATE BID SCHEDULES: BID SCHEDULE A AND BID SCHEDULE B
The Government reserves the right to award one of the two bid schedules, Bid Schedule A or Bid Schedule B, as noted in Section 00010.
SECTION 01 11 00 Page 1
1.4.1 Bid Schedule A
The Contractor shall use the Fenwick borrow area for placement of sand in Dewey and Rehoboth Beaches, and Borrow area "Area E" for placement of sand in Bethany Beach and South Bethany.
1.4.2 Bid Schedule B
The Contractor shall use Area G borrow area for placement of sand in Dewey and Rehoboth Beaches, and Borrow area "Area E" for placement of sand in Bethany Beach and South Bethany.
1.5 CONTRACTOR ACCESS
Access to the work site is available by land and water. Access to the shorefront shall be at the locations indicated on the drawings. Access to the borrow areas is by water only. The Contractor shall be responsible for all investigations necessary to establish the specific routes to be used for the contract work. The Contractor shall be responsible for compliance with all applicable Federal, State, County, and local regulations regarding weight limitations and other vehicle restrictions regarding the use of these routes.
1.6 ENVIRONMENTAL WINDOWS
See Section 01 57 20 ENVIRONMENTAL PROTECTION for the environmental window applicable for dredging in the Borrow areas, and Piping Plover and Colonial Nesting Birds restrictions for beachfill operations.
1.7 CONTRACTOR'S WORK LIMIT
The Contractor's work limit is as shown on the contract drawings. The Contractor is prohibited from operating landward of the Contractor's work limit. The Contractor shall not enter upon, affect, or damage, in any way, areas and structures outside that limit of work.
1.8 WORK HOURS
The Contractor may work 24 hours per day, 7 days per week, to complete the contract work.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
SECTION 01 11 00 Page 2
Amendment No. 0003Amendment No. 0003 the material in the offshore borrow area is believed to be as indicated by the results of Government-conducted sampling. Vibrational core sample grain size distribution curves are included in Section 00842. Vibrational core logs are included on the drawings. Vibrational core logs for Fenwick are included in Section 00841 The locations of the vibrational core holes in the borrow areas are shown on the drawings. The information depicted on the vibrational core logs represent the results of subsurface explorations made on the dates indicated and can only be considered as conditions existing at that time. Boulders, cobbles, clay balls, and munitions and explosives of concern (MEC) may also be encountered in the borrow areas. The borrow areas are located in the vicinity of known World War II era firing ranges. See Section 01 35 30 MUNITIONS AND EXPLOSIVES OF CONCERN (MEC) CONSTRUCTION SUPPORT for all requirements related to potentially encountering MEC in the borrow areas.
1.4.2 Location of Borrow Areas
The locations of the borrow areas and the limits to which removal of material is permitted are shown on the drawings.
1.4.2.1 Maximum Allowable Depth for Removal
The maximum allowable depths for removal of material from the borrow areas are as indicated on the drawings. Unless specifically directed by the Contracting Officer, no payment will be made for material removed from below this depth or from outside the borrow area limits.
1.4.3 Nature of Borrow Areas
The surveys of the borrow areas shown on the drawings are the most recent survey available. The borrow area conditions are dynamic in nature.
Therefore the contours shown on the drawings may not be an accurate representation of the depths and conditions existing at the commencement of dredging operations under this contract.
1.4.4 Before- and After-Dredging Surveys
Before- and after- dredging surveys shall be conducted as specified in Section 01 71 23 SURVEY REQUIREMENTS and Special Clause: QUANTITY SURVEYS.
1.4.5 Commercial Fishing Equipment
The Contractor shall be aware that there is a potential for commercial fishing equipment (ie. conch pots, black seabass pots, and commercial gill nets), marked by buoys, that could be deployed within the borrow areas at the time of dredging. The Contractor shall exercise caution to avoid this gear to the maximum extent practicable. If the gear cannot be avoided, the Contractor may proceed at risk to his own equipment. The Corps of Engineers or the sponsor (DNREC) or both will attempt to notify the commercial fishermen of the dredging operations and have them remove their fishing equipment prior to dredging.
1.5 SITE CONDITIONS
Bidders are expected to examine the site of the work in accordance with Contract Clause: SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK to determine the conditions affecting their operations. The entire work site is designated as a hard hat area in accordance with EM 385-1-1. Access to the contractor staging area and beachfill site is available at the
SECTION 35 31 00 Page 3 locations shown on the drawings. In the areas where boardwalk is located within the Contractor's Work Limit, as shown on the drawings, the Contractor will not be allowed to stage equipment on the boardwalk.
1.6 RESTRICTIONS ON BEACHFILL OPERATIONS
The Contractor shall close the beach, utilizing temporary fencing, barricades, and signage, in maximum 1000 foot sections, to allow placement of beachfill. After acceptance of a section, the Contractor will be permitted to advance the closed section of beach. All other sections of the beach, except staging areas, are to remain open to the general public.
Ramps over the pipeline shall be provided at all street ends and at boar dwalk entrances to the beach to allow public access to the ocean. The ramps shall be 6 feet wide (measured along the pipeline), with 3:1 slopes and one foot minimum of cover over the pipeline. The Contractor shall ensure that any movement of pipeline or equipment is conducted with recognition to the public presence, in accordance with the approved Accident Prevention Plan.
All beach closings shall be coordinated with the Beach Patrol and Fire Department to ensure access by emergency vehicles.
1.7 Dedicated Public Safety Personnel
The Contractor shall provide a minimum of two public safety persons to patrol the perimeter of the closed beach area and direct the public to not enter the construction area. They shall have no other responsibilities.
These dedicated public safety personnel shall be provided between 8:00 am and 5:00 pm, during active construction operations.
1.8 DEBRIS PREVENTION
The Contractor shall propose, and submit for approval, a method to ensure that debris (either dredged from the borrow area or deposited by the Contractor's personnel) is not deposited upon the beach and buried by beachfill material. A proposed monitoring program shall be included, using the Contractor's personnel, to monitor the proposed debris-prevention method's results. Debris includes cobbles, clay balls, shells, and man-made trash and materials.
1.9 FUEL OIL HANDLING
The Contractor shall ensure that all fuel oil transfer operations to or from his plant comply with all applicable Federal, State, and municipal laws, codes, and regulations. The Contractor shall incorporate in his accident prevention plan, required under Paragraph "Accident Prevention Plan", sufficient information to demonstrate compliance with 33 CFR 156 and all other applicable laws, codes, and regulations.
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 CONSTRUCTION BASELINE
See Section 01 71 23 SURVEY REQUIREMENTS for the requirement to establish and stake and flag a construction baseline.
SECTION 35 31 00 Page 4
3.2 PRE-PLACEMENT CONDITION SURVEYS
The beachfill area conditions are dynamic in nature. Conditions existing during the preparation of this contract may not be an accurate representation of the beachfill area conditions existing at the commencement of beachfill operations. Consequently, the Contractor shall obtain pre-placement condition survey cross sections, in accordance with Section 01 71 23 SURVEY REQUIREMENTS. Upon receipt of the pre-placement surveys as specified in Section 01 71 23 SURVEY REQUIREMENTS, the Government will re-issue revised beachfill sections. Commencement of beachfill will not be permitted until these surveys have been submitted and approved, and revised beachfill section re-issued by the Government.
3.3 MAINTENANCE OF DRAINANGE OUTFALLS
The Contractor shall maintain drainage of all outfalls at all times throughout the duration of the contract.
3.4 REMOVAL OF STRUCTURES
All existing structures, including but not limited to, the volleyball poles and bases, will be removed by others.
3.5 PLACEMENT OF BEACHFILL
3.5.1 General
Beachfill material shall be placed and shaped to the beachfill template lines, grades, slopes, and elevations shown on the contract drawings. There shall be no pronounced ridges or wash holes in the final grades and slopes unless otherwise indicated. Beachfill lines and grades shall extend linearly between before- and after-beachfill survey lines as specified in Section 01 71 23 SURVEY REQUIREMENTS, with no scallops in planform contours.
The required placement quantity of sand between survey lines will be determined by the average-end-area method using the difference in cross-sectional area between (1) the cross-section surveys obtained by the Contractor before the beachfill operations in accordance with Section 01 71 23 SURVEY REQUIREMENTS and (2) the template lines shown on the drawings.
For placement, a vertical tolerance of plus 0.2 feet and minus 0 will be permitted on the berm portion of the beach. Beachfill shall be placed to the minimum seaward edge of berm and to the foreshore slope indicated on the drawings, however the Contractor may adjust the construction template by advancing the seaward edge of berm (at the same elevation) and adjusting the foreshore slope to achieve the required placement quantity within the footprint of the beachfill template shown on the drawings. An example of an adjusted construction template is attached to this section.
In the event that the berm elevation, the minimum seaward edge of berm or the required placement quantities are not met, the Contractor shall recommence beachfill operations until the requirements are met. The Contractor will not be required to recommence beachfill operations in the event of erosion and/or storm damage in areas where beachfill has been completed and the survey data demonstrates compliance with the contract requirements.
SECTION 35 31 00 Page 5
Payment will be made for placement only to the lines and grades shown on the contract drawings (see Measurement and Payment paragraph below). In the event the Contractor adjusts the construction template as specified herein, payment will be made for measured quantity, not exceeding the required placement quantity. Payment will not be made for material placed above the required berm elevation, or placed seaward of the toe of slope. The toe of slope shall be defined as the point of intersection of the template as shown on the drawings with the before-placement survey cross section.
The Contractor shall conduct his work operations so that no areas landward of the work limits shown on the Contract Drawings are disturbed.
Land-based equipment shall be used for grading the beachfill material.
3.5.2 Removal of Debris
When MEC or MEC-like items are detected on the beach, the Contractor shall implement the procedures specified in Section 01 35 30 MUNITIONS AND EXPLOSIVES OF CONCERN (MEC) CONSTRUCTION SUPPORT. When any non-MEC item that physically should not be able to pass through the intake screening opening is detected in the discharge screening device, the Contractor shall implement the following procedures:
a. The Contractor shall stop dredging and beachfill work.
b. The Contractor shall report the incident to the COR.
c. Intake and/or discharge screening devices shall be repaired if necessary.
d. Beachfill and/or dredging work will not be permitted to re-commence until notification from the Contracting Officer.
During the operation of placing beachfill material, all debris resulting from construction operations shall be removed from the work site and disposed of at no additional cost to the Government. Such disposal shall comply with all applicable Federal, state and local laws. Such materials shall be removed from the site of the work before the date of completion of the work under these specifications. Debris may be temporarily stored on-site in a dumpster or roll-off box. Do not bury any debris collected in the screening device in the beachfill.
3.5.3 Placement of Beachfill Beneath Existing Beach Structures
Placement and grading of beachfill material by hand may be required beneath existing beach structures. The Contractor shall protect the existing beach structures from damage. Placement of beachfill material beneath structures shall be done in a manner that minimizes the ponding of water. If ponded areas are created due to the Contractor's operations the Contractor shall pump these areas dry at no additional cost to the Government. Any structures damaged shall be repaired at no additional cost to the Government.
3.5.4 Hydraulic and Hopper Dredges
All pipelines used with hydraulic dredges shall be kept in good condition at all times, and any leaks or breaks shall be promptly repaired. Material excavated by hopper dredge shall be loaded into bins or hoppers and pumped directly to the beachfill area by a means which shall prevent the loss of
SECTION 35 31 00 Page 6 any material into the ocean. Special care shall be taken to ensure that hoppers do not leak during any phase of the contract work.
3.5.5 Submerged Dredge Pipe
Barricades, warning signs, and lights shall be provided by the Contractor, subject to the approval of the Contracting Officer as part of the accident prevention plan, for the protection and safety of the public using the adjacent beach areas. The beachfill dredge pipe shall be clearly marked with buoy signs or other signage approved by the Contracting Officer at a distance of 200 feet seaward of the low water line at all locations that the dredge pipe is landed. This sign shall warn the public of the location and danger of the submerged pipe. All barricades, warning signs, and lights shall be installed prior to the start of any work. See Section 00800 SPECIAL CLAUSES for requirements to notify the Coast Guard to issue a "Notice to Mariners."
3.5.6 Removal of Stakes and Markers
The Contractor shall remove all stakes, markers, temporary fencing, burlap, or other items used in the construction of the beach immediately after completion and before approval of an acceptance section, or as otherwise directed by the Contracting Officer. All stakes, markers, temporary fencing, burlap, or other items used in the construction that become uncovered after approval of the acceptance section shall be removed within 24 hours of their detection.
3.6 SITE RESTORATION
If the Contractor removes any dune fencing and/or post and rail fencing or affects any dunes for access, the Contractor shall rebuild the damaged dune, replant any damaged dune grass, and reinstall fencing, as necessary, to restore the area to original conditions. Any materials required to establish or stabilize access points for vehicle use at those street ends shall be approved by the COR and provided and removed by the Contractor.
Any additional parking that the Contractor requires, outside the work limits, shall be coordinated directly with the appropriate local officials.
3.7 CONTRACTOR QUALITY CONTROL
3.7.1 Contractor Reports
The Contractor shall prepare and maintain Daily Report of Operations forms, and shall furnish signed copies thereof with the daily Quality Control Records required in Section 01 45 01 CONTRACTOR QUALITY CONTROL to the Contracting Officer. Copies of the Daily Report of Operations forms to be used are included at the end of this Section. The Contractor shall indicate on these daily forms the location and depth of dredging in the borrow area.
The location shall be easily located on the map of the borrow area provided as a submittal.
3.7.2 Samples and Testing
The Contractor shall obtain samples of beachfill material from the finished beach at 500 foot intervals not more than two days following placement and final grading of beachfill and have them tested for grain size distribution in accordance with ASTM D 422. All testing shall be performed by a Corps of Engineers approved laboratory as specified in Section 01 45 01 CONTRACTOR QUALITY CONTROL. Samples shall be obtained at approximately
SECTION 35 31 00 Page 7 elevation +4.00 NAVD 88. The results of each test shall be recorded on ENG Form 2087, a copy of which is included in Section 00890 of this contract.
The Contractor shall also record on ENG Form 2087 the location of the dredge within the borrow area and the depth of dredging at the time of placement of the sand sampled. Test results shall be submitted to the Contracting Officer within one week after completion of the laboratory testing.
3.7.3 Form Preparation
Instructions regarding the preparation of all required forms will be provided at the Contractor Quality Control Coordination Meeting.
3.8 MEASUREMENT AND PAYMENT
3.8.1 Mobilization and Demobilization
All costs connected with the mobilization and demobilization of the Contractor's plant and equipment required for placement of beachfill will be paid for at the contract lump sum prices for these items as listed in the Bidding Schedule. Sixty percent (60%) of the lump sum price will be paid to the Contractor upon completion of his mobilization at the work site. The remaining forty percent (40%) will be included in the final payment for work under this contract.
3.8.1.1 Contractor Furnished Cost Data
In the event the Contracting Officer considers that the amount in this item (sixty percent) which represents mobilization, does not bear a reasonable relation to the cost of the work in this contract, the Contracting Officer may require the Contractor to furnish cost data to justify this portion of the bid price. Failure to justify such price to the satisfaction of the Contracting Officer will result in the payment of actual mobilization costs, as determined by the Contracting Officer, at the completion of mobilization. The payment of the remainder of this item will be included in the final payment under the contract. The determination of the Contracting Officer in these circumstances is not subject to appeal.
3.8.1.2 Mobilization and Demobilization Costs
All costs in connection with the mobilization and demobilization of the Contractor's plant and equipment as defined below shall be included in the contract lump sum price for Bid Item Nos. A1 and B1, "Mobilization and Demobilization".
a. Mobilization shall include all costs for operations accomplished prior to commencement of actual beachfill placement; that is transfer of all plant and equipment to the work site, initial installation of pipelines, and all other incidentals in advance of beachfill placement operations.
b. Demobilization shall include general preparation for transfer of the plant and equipment to the Contractor's home or standby base, removal of pipelines, cleanup, and the transfer of plant and equipment to the home or standby base.
3.8.2 Beachfill
The work specified in this section for placing and grading of beachfill material in the designated areas and within the tolerances specified herein
SECTION 35 31 00 Page 8 will be measured for payment by the cubic yard of sand placed on the beach.
Payment will be made at the contract unit prices per cubic yard for the beachfill Bid Items listed on the Bid Schedules. Payment for these Bid Items shall also include full compensation to the Contractor for performing all pre-placement condition surveys and quantity surveys, providing public safety personnel, and performing all material testing required. If the Contractor fails to remove boulders, cobbles, clay balls, or other debris from the beach, that completed fill section will not be accepted for payment.
a. The total number of cubic yards placed will be computed by the average-end-area method from cross-section surveys obtained by the Contractor before and after the beachfill operations as specified in Section 01 71 23 SURVEY REQUIREMENTS and as required by Special Clause:
QUANTITY SURVEYS. The volume so computed will be the pay quantity for the contract. A deduction of one cubic yard will be made from the pay quantity for every cubic yard of material removed from below the maximum allowable depths indicated for each area of the borrow area.
Any deductions will be based on before-dredging surveys conducted prior to dredging the borrow area and after-dredging surveys conducted following dredging of the borrow area as specified in Section 01 71 23
SURVEY REQUIREMENTS.
3.8.3 Mobilization and Demobilization Between Work Areas
Payment will be made at the contract unit price under Items A8 and B8, "Mobilization and Demobilization Between Work Areas (Pipeline Relocation)," and Items A13 and B13, "Mobilization and Demobilization Between Work Areas (Dredge Movement and Pipeline Relocation)" as listed in the bidding schedule for pipeline and equipment from one beachfill area to another and the relocation and transfer of plant if applicable from one borrow area to another, subject to the same terms and conditions as specified in the paragraph: "Mobilization and Demobilization" with respect to reasonable relation of the bid price compared to the cost of the work associated with the transfer operations.