Amendment No. 0004 - Bid opening is extended to August 5 2008 at 2 00 PM local time.

View the file

Other files

File Type Posted
RFIs30Jul08.pdf PDF
Amend0004-Dwgs.pdf PDF
APPGTRKC-GradingPlan.dwg DWG drawing
APPGTRKC-SitePlanforBidders.dwg DWG drawing
APGTTRKC-CSx-ing1.dwg DWG drawing
APGTTRKC-BoringLog.dwg DWG drawing
APGTTRKC-CrossSection.dwg DWG drawing
APPGTRKC-E S.dwg DWG drawing
APGTTRKC-CSx-ing2.dwg DWG drawing
08B0016-Specs-Amnd0003.pdf PDF
08B0016-Dwgs-Amnd0003.pdf PDF
SiteVisitRoster.PDF PDF
Amend2.pdf PDF
08B0016-AMND1.PDF PDF
W912BU-08-B-0016 DWGS2.pdf PDF
W912BU-08-B-0016-SPECS.PDF PDF
W912BU-08-B-0016 DWGS1.pdf PDF
W912BU-08-B-0016 DWGS3.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TESTTRACKAPG

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

THE BID OPENING DATE IS EXTENDED TO 2:00 PM, LOCAL TIME, AUGUST 5, 2008.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-08-B-0016

X 9B. DATED (SEE ITEM 11)

16-Jun-2008

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) AUTOMOTIVE TECHNOLOGY EVALUATION FACILITY, ABERDEEN PROVING GROUND, HARFORD COUNTY, MARYLAND

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Jul-2008

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

Amendment No. 0004 Invitation for Bids

W912BU-08-B-0016

14. DESCRIPTION OF AMENDMENT (continued)

a. CLARIFICATIONS: Please see attached sheet of clarifications.

b. CONTRACT DRAWINGS: Please delete previously issued Sheet C15 and substitute revised Sheet C15, with a revision date of 18 July 2008, attached hereto.

c. Please indicate receipt of this amendment on Standard Form 30 (AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT) as Amendment No. 0004. Failure to acknowledge all amendments may be cause for rejection of the offer.

ATEF Clarifications

1) Drawing S1 (Sheet 164 or 165), entitled “Sound Wall – Plan, Elevation, Details:”

Delete text “64 REQ.” from Section 2 detail entitled “Typical Elevation.” Length of sound wall, indicated on Drawing C23 (Sheet 26 or 165), entitled Plan Sta. 136+50 to Sta. 155+50,” is correct.

2) Spec Section 02 01 00 entitled “UNEXPLODED ORDNANCE (UXO) DETECTION, PRELIMINARY IDENTIFICATION AND REMOVAL COORDINATION:” Delete subparagraph 1.7.2 entitled “Edgewood Area Health and Safety.” Contract work is in Aberdeen area only.

3) Smallest ordnance found, per UXO report attached to Section 02 01 00, entitled

“UNEXPLODED ORDNANCE (UXO) DETECTION, PRELIMINARY

IDENTIFICATION AND REMOVAL COORDINATION” (Amendment No. 0003) , indicates smallest ordnance found in the top 2 feet of the project footprint was 30 mm.

4) Caisson reinforcement, indicated in Detail 10 on Drawing S2, may be # 3 hoop bars in lieu of #3 spirals.

5) Drawing ES04, on plan entitled “New Work Plan (Partial),” between A-A' , the detail designator should be “6/ES05,” not “2/ES05.”

6) Reference medium voltage splice points and termination points: There will be no splices on MV cables. An existing OH run will be terminated at an existing pole, provided with cut-offs at that pole, new MV cable from the cut-offs that goes UG (to cross the planned track), comes up adjacent to an existing pole (on the other side of the planned track), gets provided with another set of cut-offs, then gets connected to the rest of the existing overhead lines which are to remain. The two poles where the MV lines went down and came up will be provided with guy wires.

7) Reference telecommunications splice points and termination points: The existing copper communications line(s) are to be spliced (with the new cable) at the last HH where it goes UG and before it crosses the planned track. From this splice it goes UG crosses the track then comes out adjacent to an existing pole and gets reconnected/spliced to the OH existing cable(s).

8) The protocol for the extension of communications cable would be to match the existing ones. If for example, the existing is 300-pairs of #22, then the new cable will be 300-pairs of #22.

9) Existing ODALS: Please see attached manufacturer cuts.

10) Clarification of quantity and location of new manholes and handholes: Two (2) electric (E) MH and eleven (11) communications (C) HH. Note. There might be instances that additional MHs/HHs may be necessary for longer runs, and/or where a run(s) will be decided on the field to be re-routed and/or relocated.

ATEF Clarifications

11) Underground duct banks concrete encasement rule: (a) UG MV - Always concrete encased. (b) UG LV - Always direct-buried conduit unless it crosses road/railway, then it will be concrete encased across the road/railway only. (c) UG Comm - Like the UG LV, always direct-buried conduit unless it crosses road/railway, then it will be concrete encased across the road/railway only.

12) Conduit requirements: The rule here is #filled + spare. If for example two comm conduits were filled, then an extra/spare 4" will be provided. Accordingly, for power, if one is filled, then an extra/spare 4" (unfilled) will be provided.