This is a Standard Form 30 Amendment of Solicitation/Modification of Contract issued by the U.S. Army Corps of Engineers, W071 Endist Omaha, with an effective date of 08 SEP 2026. The amendment modifies solicitation W9128F26QA094 to incorporate updated technical specifications for a 60kW Stationary Standby Generator Set for the Tri-Lakes Project at Chatfield Dam.
The contract is a fixed-price simplified acquisition under FAR Part 13 for the purchase, delivery, and startup services of one Generac Industrial Power Model SD060 generator or approved government equivalent. The generator must be 60kW/75kVA rated capacity, 3-phase diesel-powered with 480V AC electrical output (12-lead reconnectable alternator factory strapped for 480V High/Series Wye), 3-wire Wye connected, 60 Hz frequency, 0.8 power factor, and 100A molded-case 3-pole circuit breaker. The unit requires an open-skid/tank-less fuel configuration with 1/2" NPT female connections and engine-driven mechanical fuel pump, weather protective outdoor pad-mounted enclosure with 120V AC jacket water heater (block heater), and digital controller with manual start capability. Required electrical accessories include a 10-Amp NFPA 110 compliant battery charger and starting battery. Startup services must include pre-start inspection, initial startup verification of operational tolerances and engine safety shutdowns with 480V AC 3-phase output and 60 Hz frequency verification, standard manufacturer functional run testing under available building load or no-load conditions per OEM protocols (formal resistive load bank testing not required), and handover documentation including OEM commissioning checklist, factory warranty registration, operator training, and delivery of all keys and operating/maintenance manuals. Delivery must occur FOB destination to the Tri-Lakes Project Office at 9307 S. Wadsworth Blvd., Littleton, CO 80128 within twenty weeks of contract award, with shipments allowed only Monday through Friday 7:00 a.m. to 4:00 p.m. excluding Federal Holidays and requiring minimum 24-hour advance notice. The technical point of contact is Michael Savage at 720-922-3845 (office) or 303-709-2948 (cell).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions Received with Government Response - W9128F26QA094.pdf | ||
| Solicitation - W9128F26QA094.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Description/Specifications/Statement of Work
Miscellaneous text in this section has been modified from:
Technical Specifications
Tri-Lakes Project, Chatfield Dam
60kW Stationary Standby Generator Set
1. INTENT
This contract is a fixed-price contract under Federal Acquisition Regulation (FAR) Part 13 simplified acquisition procedures. It is for the purchase and delivery of one (1) 60kW Stationary Standby Generator Set for the Tri-Lakes Project, Chatfield Dam meeting specifications in Section 3.0.
2. SCOPE
The successful bidder shall be required to furnish, deliver and provide startup services for the stationary standby generator set to the Tri-Lakes Project Office Maintenance Yard by the date shown in Section 4.0 Shipment and Delivery. Generator shall be ready for use at the time of delivery, with all specified equipment and accessories installed at the time of delivery. All specified Documentation, Operating Manuals, and Service Manuals shall be furnished prior to final acceptance. Final acceptance shall not be made until all contractual components have been successfully delivered. All components shall be new, delivered fully functional, and shall be damage free in order to be accepted.
3. TECHNICAL SPECIFICATIONS:
Generac Industrial Power Model SD060 or approved Government equivalent.
GENERAL EQUIPMENT SPECIFICATIONS
W9128F26QA0940001
Model: 60kW 3-Phase Standard Diesel (Open-Skid style with Enclosure)
Rated Capacity: 60kW / 75kVA
Duty Rating: Standby
Emissions Compliance: EPA Certified for Stationary Emergency Applications
ELECTRICAL SPECIFICATIONS
System Voltage: 277 / 480V
Phase / Wiring: 3-Phase, 3-Wire Wye connected
Frequency: 60 Hz
Power Factor: 0.8
Rated Amperage (A): 90 Amps per phase (approximate)
Circuit Breaker: 100A, Molded-Case, 3-Pole
MECHANICAL & FUEL SYSTEM REQUIREMENTS
Fuel Type: Diesel
Fuel Tank Configuration: Open-Skid / Tank-less (For connection to existing external aboveground diesel storage tank)
Fuel Lift Configuration: Engine-driven mechanical fuel pump (No external/auxiliary fuel pump required)
Fuel Connections: 1/2" NPT female (Supply and Return)
ENCLOSURE & ENVIRONMENTAL
Enclosure Type: Weather Protective Enclosure (Outdoor Pad Mounted)
Cold Weather Package: MUST INCLUDE 120V AC Jacket Water Heater (Block Heater)
CONTROLS & ACCESSORIES
Controls & Starting: Digital Controller with manual start capability (No Automatic Transfer Switch integration required)
Electrical Accessories: MUST INCLUDE 10-Amp NFPA 110 Compliant Battery Charger and Starting Battery
4. STARTUP SERVICES (to include but are not limited to the following)
Pre-Start Inspection: Check fluids & filters, mechanical systems, exhaust & air intake, and electrical connections.
Start-Up Inspection: Perform no-load start, verify operational tolerances, and perform any necessary output calibrations.
Load Testing Inspection: Perform load step, block load and sustained load run testing utilizing either the building's actual load or a portable load bank.
Handover Documentation: Provide warranty registration, owner training and a commissioning log.
5. SHIPMENT AND DELIVERY
All items shall be delivered FOB destination to the Tri-Lakes Project within twenty (20) weeks of contract award. The contractor shall be responsible for packing and shipping the components in a manner that will ensure undamaged and complete arrival to the Tri-Lakes Project.
No shipments are allowed other than normal business hours or Monday through Friday 7:00 a.m.
to 4:00 p.m., excluding Federal Holidays. A minimum of 24 hour notice must be given prior to scheduled delivery to ensure staff will be available to receive shipment.
The bidder shall include all shipping/ handling charges to deliver equipment to:
US ARMY CORPS OF ENGINEERS
Tri-Lakes Project Office
9307 S. Wadsworth Blvd.
Littleton, CO 80128
All submittals and correspondences shall be directed to:
US ARMY CORPS OF ENGINEERS
Tri-Lakes Project Office
9307 S. Wadsworth Blvd.
Littleton, CO 80128
Technical Point of Contact:
Michael Savage
720-922-3845 Ofc.
303-709-2948 Cell
To:
Technical Specifications
Tri-Lakes Project, Chatfield Dam
60kW Stationary Standby Generator Set
1. INTENT
This contract is a fixed-price contract under Federal Acquisition Regulation (FAR) Part 13 simplified acquisition procedures. It is for the purchase and delivery of one (1) 60kW Stationary Standby Generator Set for the Tri-Lakes Project, Chatfield Dam meeting specifications in Section 3.0.
2. SCOPE
The successful bidder shall be required to furnish, deliver and provide startup services for the stationary standby generator set to the Tri-Lakes Project Office Maintenance Yard by the date shown in Section 4.0 Shipment and Delivery. Generator shall be ready for use at the time of delivery, with all specified equipment and accessories installed at the time of delivery. All specified Documentation, Operating Manuals, and Service Manuals shall be furnished prior to final acceptance. Final acceptance shall not be made until all contractual components have been successfully delivered. All components shall be new, delivered fully functional, and shall be damage free in order to be accepted.
3. TECHNICAL SPECIFICATIONS:
Generac Industrial Power Model SD060 or approved Government equivalent.
GENERAL EQUIPMENT SPECIFICATIONS
Model: 60kW 3-Phase Standard Diesel (Open-Skid style with Enclosure)
Rated Capacity: 60kW / 75kVA
Duty Rating: Standby
Emissions Compliance: EPA Certified for Stationary Emergency Applications
ELECTRICAL SPECIFICATIONS
System Voltage: 480V AC (12-Lead Reconnectable Alternator, factory strapped for 480V High /Series Wye)
Phase / Wiring: 3-Phase, 3-Wire Wye connected
Frequency: 60 Hz
Power Factor: 0.8
Rated Amperage (A): 90 Amps per phase (approximate)
Circuit Breaker: 100A, Molded-Case, 3-Pole
MECHANICAL & FUEL SYSTEM REQUIREMENTS
Fuel Type: Diesel
Fuel Tank Configuration: Open-Skid / Tank-less (For connection to existing external aboveground diesel storage tank)
Fuel Lift Configuration: Engine-driven mechanical fuel pump (No external/auxiliary fuel pump required)
Fuel Connections: 1/2" NPT female (Supply and Return)
ENCLOSURE & ENVIRONMENTAL
Enclosure Type: Weather Protective Enclosure (Outdoor Pad Mounted)
Cold Weather Package: MUST INCLUDE 120V AC Jacket Water Heater (Block Heater)
CONTROLS & ACCESSORIES
Controls & Starting: Digital Controller with manual start capability (No Automatic Transfer Switch integration required)
Electrical Accessories: MUST INCLUDE 10-Amp NFPA 110 Compliant Battery Charger and Starting Battery
4. STARTUP SERVICES (to include but are not limited to the following)
Pre-Start Inspection: Check engine oil, coolant levels, filters, mechanical mounting, exhaust & air intake clearances, fuel supply connections, and electrical line/control terminations.
Start-Up Inspection: Perform initial start-up, verify operational tolerances, check engine safety shutdowns, and verify steady-state output voltage (480V AC, 3-Phase) and frequency (60 Hz).
Load Testing Inspection: Perform standard manufacturer functional run testing under available building load or no-load conditions as required by Original Equipment Manufacturer (OEM) startup protocols. (Formal resistive load bank, step load, and block load testing are not required).
Handover Documentation: Complete and submit the official OEM commissioning/startup checklist, register the full factory warranty, provide standard operator orientation/training, and deliver all keys and O&M manuals for Government acceptance.
5. SHIPMENT AND DELIVERY
All items shall be delivered FOB destination to the Tri-Lakes Project within twenty (20) weeks of contract award. The contractor shall be responsible for packing and shipping the components in a manner that will ensure undamaged and complete arrival to the Tri-Lakes Project.
No shipments are allowed other than normal business hours or Monday through Friday 7:00 a.m.
to 4:00 p.m., excluding Federal Holidays. A minimum of 24 hour notice must be given prior to scheduled delivery to ensure staff will be available to receive shipment.
The bidder shall include all shipping/ handling charges to deliver equipment to:
US ARMY CORPS OF ENGINEERS
Tri-Lakes Project Office
9307 S. Wadsworth Blvd.
Littleton, CO 80128
All submittals and correspondences shall be directed to:
US ARMY CORPS OF ENGINEERS
Tri-Lakes Project Office
9307 S. Wadsworth Blvd.
Littleton, CO 80128
Technical Point of Contact:
Michael Savage
720-922-3845 Ofc.
303-709-2948 Cell
| IDCode: J |
| Page: 1 |
| Pages: 8 |
| AmendNo: 0001 |
| EffDate: 08 SEP 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W9128F |
| AdmCode: |
| IssuedBy: W071 ENDIST OMAHA |
KO CONTRACTING OFFICE, 1616 CAPITOL AVENUE
OMAHA, NE 68102-4901
UNITED STATES
CLINTON RUSSELL, EMAIL: CLINTON.E.RUSSELL@USACE.ARMY.MIL TELEPHONE: 402-995-2086
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W9128F26QA094 |
| SolDate: 01 SEP 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: Amendment 0001 |
The purpose of this amendment is to incorporate updated Technical Specifications. See Section SF 30 Block 14 Continuation Page for details.
| ContNameTitle: |
| CoNameTitle: MIKA MAHYENGA |
| ContDate: |
| CODate: 08 SEP 2026 |