Bid Abstract - W9128F26BA003 - Lower Brule Phase 2.pdf

PDF 378 KB Posted

Attached to
Big Bend Lower Brule North Ecosystem Restoration, Element 1 Phase 2, Lower Brule, SD Federal contract opportunity
Solicitation number
W9128F26BA003
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This document is an Abstract of Offers for a Construction project for the Lower Brule North Ecosystem Restoration Project at Big Bend Dam in Fort Thompson, SD, solicited by the US Army Corps of Engineers. The solicitation (W9128F26BA003) was issued on 17-Nov-25 with an opening date of 19-Dec-25, and received 11 competitive offers from various construction companies. The project involves multiple line items including L-Head Breakwater Structures placement, mobilization/demobilization, stone (riprap) placement, excavation (cut and fill), borrow source material, topsoil, aggregate surface course, and culvert pipe placement. Total offered amounts range from approximately $8.2 million to $14.9 million, with unit prices varying significantly across different offerors for each line item. All bidders provided 20% bid security and acknowledged the three amendments issued for this solicitation.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED 3. DATE OPENED

17-Nov-25 19-Dec-25

I CERTIFY THAT I HAVE OPENED, READ AND

AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED

X

C. REASONABLE CONTRACT

7A 7B 7 D. E. F.

ITEM # DESCRIPTION OF OFFER ITEM EST. QTY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

0001 Entire work, complete, for placement of the L-Head Breakwater Structures (Placement of riprap stone / Choke stone in the water) as shown on the drawings and in the specifications 1,175 L.F 311.00$ 365,425.00$ 150.00$ 176,250.00$ 1,750.00$ 2,056,250.00$ 515.73$ 605,982.75$ 210.00$ 246,750.00$ 319.24$ 375,107.00$

0002 Entire work, complete, for the mobilization / demobilization of all equipment as shown on the drawings & in the specifications 1 Job 743,760.00$ 743,760.00$ 445,000.00$ 445,000.00$ 1,553,053.00$ 1,553,053.00$ 1,050,000.00$ 1,050,000.00$ 2,420,000.00$ 2,420,000.00$ 800,000.00$ 800,000.00$

Entire work, complete, for all plant, material, and labor required for: Stone (Riprap) as shown on the drawings and in the specifications 65,500 Tons 83.65$ 5,479,075.00$ 63.50$ 4,159,250.00$ 76.80$ 5,030,400.00$ 94.25$ 6,173,375.00$ 78.50$ 5,141,750.00$ 55.18$ 3,614,290.00$

Entire work, complete, for All plant, material, and labor required for: Excavation Cut as shown on the drawings and in the specifications 90,000 CY 1.77$ 159,300.00$ 11.00$ 990,000.00$ 6.30$ 567,000.00$ 7.40$ 666,000.00$ 8.00$ 720,000.00$ 4.57$ 411,300.00$

Entire work, complete, for All plant, material, and labor required for: Excavation Fill as shown on the drawings and in the specifications 115,000 CY 13.31$ 1,530,650.00$ 16.00$ 1,840,000.00$ 2.50$ 287,500.00$ 7.80$ 897,000.00$ 8.00$ 920,000.00$ 9.75$ 1,121,250.00$

Entire work, complete, for All plant, material, and labor required for: Borrow Source Excess Material as shown on the drawings and in the specifications 25,000 CY 16.03$ 400,750.00$ 33.00$ 825,000.00$ 45.55$ 1,138,750.00$ 16.44$ 411,000.00$ 16.50$ 412,500.00$ 16.24$ 406,000.00$

Entire work, complete, for All plant, material, and labor required for: Loamy Topsoil Material as shown on the drawings and in the specifications 35,525 CY 24.40$ 866,810.00$ 5.00$ 177,625.00$ 49.50$ 1,758,487.50$ 26.29$ 933,952.25$ 30.00$ 1,065,750.00$ 33.88$ 1,203,587.00$

Entire work, complete, for aggregate surface course as shown on the drawings and in the specifications 6,600 CY 63.87$ 421,542.00$ 85.00$ 561,000.00$ 98.50$ 650,100.00$ 85.72$ 565,752.00$ 90.00$ 594,000.00$ 91.31$ 602,646.00$

Entire work, complete, for All plant, material, and labor required for: Placement of culvert pipes as shown on the drawings and in the specifications 9 Each 91,857.00$ 826,713.00$ 60,000.00$ 540,000.00$ 35,000.00$ 315,000.00$ 57,589.67$ 518,307.03$ 40,000.00$ 360,000.00$ 36,443.00$ 327,987.00$

0010 All remaining work Except for Items listed below 1 Job 689,516.00$ 689,516.00$ 1,250,000.00$ 1,250,000.00$ 1,500,000.00$ 1,500,000.00$ 2,144,520.22$ 2,144,520.22$ 2,750,000.00$ 2,750,000.00$ 1,680,236.00$ 1,680,236.00$

TOTAL AMOUNT (Items 0001 through 0010) 11,483,541.00$ 10,964,125.00$ 14,856,540.50$ 13,965,889.25$ 14,630,750.00$ 10,542,403.00$

OFFEROR

7A 7B 7 D.

ITEM # DESCRIPTION OF OFFER ITEM EST. QTY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

Entire work, complete, for placement of the L-Head Breakwater Structures (Placement of riprap stone / Choke stone in the water) as shown on the drawings and in the specifications 1,175 L.F 250.00$ 293,750.00$ 162.00$ 190,350.00$ 450.00$ 528,750.00$

0002 Entire work, complete, for the mobilization / demobilization of all equipment as shown on the drawings & in the specifications 1 Job 2,758,449.44$ 2,758,449.44$ 322,000.00$ 322,000.00$ 2,000,000.00$ 2,000,000.00$

Entire work, complete, for all plant, material, and labor required for: Stone (Riprap) as shown on the drawings and in the specifications 65,500 Tons 70.00$ 4,585,000.00$ 67.50$ 4,421,250.00$ 86.00$ 5,633,000.00$

Entire work, complete, for All plant, material, and labor required for: Excavation Cut as shown on the drawings and in the specifications 90,000 CY 5.00$ 450,000.00$ 3.30$ 297,000.00$ 6.00$ 540,000.00$

Entire work, complete, for All plant, material, and labor required for: Excavation Fill as shown on the drawings and in the specifications 115,000 CY 3.00$ 345,000.00$ 3.60$ 414,000.00$ 12.00$ 1,380,000.00$

Entire work, complete, for All plant, material, and labor required for: Borrow Source Excess Material as shown on the drawings and in the specifications 25,000 CY 15.00$ 375,000.00$ 5.36$ 134,000.00$ 42.00$ 1,050,000.00$

Entire work, complete, for All plant, material, and labor required for: Loamy Topsoil Material as shown on the drawings and in the specifications 35,525 CY 30.00$ 1,065,750.00$ 16.00$ 568,400.00$ 21.00$ 746,025.00$

Entire work, complete, for aggregate surface course as shown on the drawings and in the specifications 6,600 CY 50.00$ 330,000.00$ 45.60$ 300,960.00$ 48.00$ 316,800.00$

Entire work, complete, for All plant, material, and labor required for: Placement of culvert pipes as shown on the drawings and in the specifications 9 Each 44,950.10$ 404,550.90$ 30,000.00$ 270,000.00$ 52,000.00$ 468,000.00$

0010 All remaining work Except for Items listed below 1 Job 1,279,578.00$ 1,279,578.00$ 1,276,693.00$ 1,276,693.00$ 1,850,000.00$ 1,850,000.00$

TOTAL AMOUNT (Items 0001 through 0010) 11,887,078.34$ 8,194,653.00$ 14,512,575.00$ -$ -$ -$

Bid Security - 20% - Yes C. AMENDMENTS ACKNOWLEDGED - Yes

NO. 11

OFFEROR

CAGE -

NO. 8NO. 7NO. 6

OFFEROR

Loiseau Construction, Inc 1002 W. Elm Avenue Flandrau, SD 57028

CAGE - 6BA02

Bid Security - 20% - Yes C. AMENDMENTS ACKNOWLEDGED - Yes

Bid Security - 20% - Yes C. AMENDMENTS ACKNOWLEDGED - Yes

NO. 10

OFFEROR

CAGE -

Bid Security - 20% - Yes C. AMENDMENTS ACKNOWLEDGED - Yes

OFFEROR

CAGE -

NO. 9

Bid Security - 20% - Yes C. AMENDMENTS ACKNOWLEDGED - Yes

OFFEROR

A-G-E Corporation 704 W. Hwy 14 Fort Pierre, SD 57532

CAGE - 4UDY2

Bid Security - 20% - Yes C. AMENDMENTS ACKNOWLEDGED - Yes

Three Oaks Construction Inc.

515 South Flynn St.

North Sioux City, SD 57049

CAGE - 9PPC1

CAGE - 46V78

Bid Security - 20% - Yes C. AMENDMENTS ACKNOWLEDGED - Yes

NO. 4

OFFEROR

Morris Inc.

NO. 5

OFFEROR

Sharpe Enterprises 1908 N. Garfield Pierre, SD 57501

220 W. Hwy 14/34 Fort Pierre, SD 57501

Bid Security - 20% - Yes C. AMENDMENTS ACKNOWLEDGED - Yes

CAGE - 6EKG3 CAGE - 0ELU6

Bid Security - 20% - Yes C. AMENDMENTS ACKNOWLEDGED - Yes

NO. 3

OFFEROR

Meyers Construction Inc.

79849 Hwy 2 Broken Bow, NE 68822

6. NUMBER OF AMENDMENTS ISSUED - 3

Big Bend Dam, Fort Thompson SD Lower Brule North Ecosystem Restoration Project

CAGE - 997S3

Bid Security - 20% - Yes C. AMENDMENTS ACKNOWLEDGED - Yes

Bid Security - 20% - Yes C. AMENDMENTS ACKNOWLEDGED - Yes

(Without Profit)

(Including Profit)

CAGE - 0C704B. REASONABLE CONTRACT

OFFEROR OFFEROR

920 Central Ave, #10 4141 B Street, Suite 306

A. HIRED LABOR

IGE Midwest Construction Company Togiak Logistics Services LLC

Nebraska City, NE 68410 Anchorage, AK 99503

NO. 1 NO. 2

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

W9128F26BA003

4. ISSUING OFFICE

8. GOVERNMENT ESTIMATE

(Check A, B or C AND COMPLETE D, E AND F)

5. PROJECT TITLE

9. OFFERS

TO THIS SOLICITATION

SIGNATURE

l PAGES NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

Nadine Catania - Contracting Officer/ Clinton Russell - Contracting Specialist

OMAHA, NE 68102-1618

1616 CAPITOL AVENUE

CONTRACTING DIVISION (CENWO-CT)

US ARMY CORPS OF ENGINEERS

19 December 2025