Map 5 - Downstream Loop 3 Mowing.pdf

PDF 1 MB Posted

Attached to
Garrison Project Recreation Mowing
Solicitation number
W9128F25QA043
Issued by

About this file

The file is a PDF map detailing the mowing requirements for Loop 3 at the Downstream Campground, part of a larger recreation area maintenance contract. The map shows an aerial view of the campground loop with three yellow-highlighted sections representing mowing zones, covering a total of 7.70 acres. The specific mowing instructions are to mow all highlighted areas, maintain a 6-foot width along roadways, and trim around trees, fire rings, structures, and posts. The map includes a scale (0 to 500 feet), a north arrow, and provides precise geographic context for the maintenance area within a forested and waterfront landscape.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Downstream Campground Loop 3

Loop 3 Mowing 3

Loop 3 Mowing 2

Loop 3 Mowing

0 500250 Feet

7.70 acres

Mow all highlighted areas, 6' along all roadways and trim around all trees, fire rings, structures, and posts.

File details come from the government source that posted it. Updated .