This document is a Submittal Register for a federal contract opportunity to replace the depressing air system at Big Bend Dam in South Dakota. The project scope includes replacing the existing four air compressors with two larger 2-stage rotary screw, oil-less compressors, replacing a damaged accumulator tank, and adding two additional accumulator tanks. The project also involves replacing the undersized air supply piping to decrease system recovery time and increase compressor capacity.
The estimated magnitude of construction is between $500,000 and $1,000,000, with a NAICS code of 238290 - Other Building Equipment Contractors. A site visit is scheduled for February 21, 2024. The contract duration is 365 days from the date of award. The solicitation will be posted on SAM.gov, and offerors must be registered in the SAM database to access the documents.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9128F24R0044 - AM0007.pdf | ||
| W9128F24R0044 - AM0006.pdf | ||
| 22 15 19 Am-0005.pdf | ||
| W9128F24R0044_AM0005.pdf | ||
| W9128F24R0044_AM0005 Narrative.pdf | ||
| W9128F24R0044 AM0003.pdf | ||
| Site Visit W9128F24R0044 BB Depressing Air 3-12-24.pdf | ||
| W9128F24R0044 - AM0004.pdf | ||
| 22 15 19 Am-0003.pdf | ||
| W91218F24R0044 AM0003.pdf | ||
| W9128F24R0044 AM0001.pdf | ||
| 22 15 19 Am-0002.pdf | ||
| AM0002.pdf | ||
| Site Visit Roster W9128F24R0044 BB Depressing Air.pdf | ||
| 2 of 4 W9128F24R0044 Specs Depressing Air System Replacement.pdf | ||
| 4 of 4 W9128F24R0044 Reference Drawings Depressing Air System Replacement.pdf | ||
| 1 of 4 W9128F24R0044 - BB DEPRESSING AIR SOLICITATION.pdf | ||
| 3 of 4 W9128F24R0044 Contract Drawings Depressing Air System Replacement.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 7 PAGES
Depressing Air System Replacement, Big Bend Dam, SD
01 12 00 SD-01 Preconstruction Submittals
G AOProposed Methods of Operation
1.9 G AOProgress Charts
1.2Construction Right-of-Way
SD-11 Closeout Submittals
1.10Warranty of Construction
01 30 00.24 SD-01 Preconstruction Submittals
AT Level I Training Sign In
Sheets
G POSecurity Personnel List
G POPersonnel Risk Assessment iWATCH and/or CorpsWatch
Training Sign In Sheets
OPSEC Training Sign In Sheets
E-Verify
01 33 00 SD-01 Preconstruction Submittals
1.8 G AOSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7.1 G AOACCIDENT PREVENTION PLAN
(APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 G AOAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Am-0005
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 7 PAGES
01 35 26 1.6.1.4Crane Operators/Riggers
1.7.3.1 G AOStandard Lift Plan
1.7.3.2 G AOCritical Lift Plan
1.8Activity Hazard Analysis (AHA)
1.12.4Certificate of Compliance
License Certificates
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G AOContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9Verification Statement
01 57 20.00 10 SD-01 Preconstruction Submittals
1.7 GEnvironmental Protection Plan
01 78 23 SD-10 Operation and Maintenance
Data
G G-AOO&M Database
01 78 39.00 24 SD-03 Product Data
1.7.2 G DO100 Percent Preliminary As-Built
Drawings
SD-11 Closeout Submittals
1.7.3 G DOFinal As-Built Drawings
02 83 00 SD-01 Preconstruction Submittals
1.5.1.1 G POCompetent Person
1.5.2.4 G POLead Waste Management Plan
3.2.2.1 G POWritten Evidence of TSD
Approval
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 7 PAGES
02 83 00 SD-06 Test Reports
1.3.2 G POSampling and Analysis
SD-11 Closeout Submittals
3.2.2.1 G POHazardous Waste Manifest
3.2.2.1 G POTurn-In Documents or Weight
Tickets
03 60 00.01 26 SD-01 Preconstruction Submittals
3.4.1 G HDCConcrete Removal and Disposal
Plan
3.4.3 G HDCSaw Cutting Procedure
3.4.4 G HDCCore Drilling Procedure
3.4.8 G HDCConcrete Imaging Report
3.4.12 G HDCRepair Procedure of Concrete
Surfaces
09 90 00.01 26 SD-01 Preconstruction Submittals
1.4 G CSafety and Health Provisions
SD-03 Product Data
2.1 G CPaint Formulas
2.2 G CSolvents and Thinners
SD-06 Test Reports
3.4 G CInspection Reports
13 48 00.00 26 SD-02 Shop Drawings
1.5 G HDCDetail Drawings
1.6 G HDCDetail Drawings
SD-03 Product Data
3.4 G HDCConcrete Anchors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 7 PAGES
13 48 00.00 26 1.4.4 G HDCSeismic Equipment Certification
SD-05 Design Data
1.5 G HDCStructural Design Calculations for
Seismic Restraints
1.6 G HDCStructural Design Calculations for
Seismic Restraints
SD-06 Test Reports
3.5.2.1 G HDCConcrete Anchor Test Reports
3.5.1 G HDCContractor Qualification Testing
22 15 14.00 40 SD-01 Preconstruction Submittals
3.1.1 G HDCTank Installation Plan
3.1.1 G HDCTank Removal Plan
SD-02 Shop Drawings
2.1 GInstallation Drawings
SD-03 Product Data
2.3.1 GAboveground Piping Materials
2.2.1 GPiping Specialties
2.4.2 GSupporting Elements
2.2.2 GValves
3.1.2.1 GAccessories
2.4.1 GMiscellaneous Materials
2.4.3 G HDCCooling Water Strainer Product
Data
SD-05 Design Data
2.2.3 G HDCAccumulator Tank Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 7 PAGES
22 15 14.00 40 2.2.3.1 G HDCAccumulator Tank Drainage
Lines Design Data
SD-06 Test Reports
3.2.1.3Piping System Test Report
3.1.2.7Concrete Imaging Report
SD-07 Certificates
2.3.1 GAboveground Piping Materials
2.2.2 GValves
3.1.2.1 GCleaning Method
3.2.1.1 G HDCTest Gate Certification
22 15 19 SD-01 Preconstruction Submittals
1.4.1 G HDCWork Plan
3.3.1 G HDCField Test Procedures
SD-03 Product Data
2.1 GAir compressor
SD-06 Test Reports
3.3.1 GAir compressor performance tests
3.3.1.2 GSound level tests
SD-07 Certificates
1.4.2 G HDCFactory Testing Certification
2.1.1 G HDC*Am5 Manufacturer's Certifications
2.1.2 G HDC*Am5 Guaranteed Performance
SD-10 Operation and Maintenance
Data
3.5 G HDCOperation And Maintenance Data
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 7 PAGES
22 15 19 1.7Posted operating instructions
26 05 00.00 26 SD-03 Product Data
2.2.1 G HDCRigid Metal Conduit
2.2.2 G HDCRigid Metallic Conduit Fittings
2.2.3 G HDCConduit Hangers
2.3 G HDCEscutcheons and Nameplates
26 05 19.00 26 SD-03 Product Data
2.1 G HDCInsulated Wire and Cable
3.1.9Wire Marking
2.3Terminations
SD-06 Test Reports
1.5.1 G HDCInspection and Tests
3.2.1 G HDCInsulation Resistance Test
40 17 30.00 40 SD-03 Product Data
2.1.1 GWelding Equipment
2.1.1 GWelding Rods and Accessories
SD-06 Test Reports
3.2.1.1Radiographs
SD-07 Certificates
1.3 GCertified Welding Procedure
Specifications
1.3 GCertified Brazing Procedure
Specifications
1.3 GCertified Procedure Qualification
Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 7 PAGES
40 17 30.00 40 1.3 GCertified Welder Performance
Qualifications
1.3 GCertified Brazer Performance
Qualifications
1.3.3.1Certificates of Conformance
1.3 G HDCCertified Weld Inspector
Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
File details come from the government source that posted it. Updated .