REGISTER_AM0005.pdf

PDF 715 KB Posted

Attached to
Big Bend Depressing Air System Replacement Federal contract opportunity
Solicitation number
W9128F24R0044
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This document is a Submittal Register for a federal contract opportunity to replace the depressing air system at Big Bend Dam in South Dakota. The project scope includes replacing the existing four air compressors with two larger 2-stage rotary screw, oil-less compressors, replacing a damaged accumulator tank, and adding two additional accumulator tanks. The project also involves replacing the undersized air supply piping to decrease system recovery time and increase compressor capacity.

The estimated magnitude of construction is between $500,000 and $1,000,000, with a NAICS code of 238290 - Other Building Equipment Contractors. A site visit is scheduled for February 21, 2024. The contract duration is 365 days from the date of award. The solicitation will be posted on SAM.gov, and offerors must be registered in the SAM database to access the documents.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 7 PAGES

Depressing Air System Replacement, Big Bend Dam, SD

01 12 00 SD-01 Preconstruction Submittals

G AOProposed Methods of Operation

1.9 G AOProgress Charts

1.2Construction Right-of-Way

SD-11 Closeout Submittals

1.10Warranty of Construction

01 30 00.24 SD-01 Preconstruction Submittals

AT Level I Training Sign In

Sheets

G POSecurity Personnel List

G POPersonnel Risk Assessment iWATCH and/or CorpsWatch

Training Sign In Sheets

OPSEC Training Sign In Sheets

E-Verify

01 33 00 SD-01 Preconstruction Submittals

1.8 G AOSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7.1 G AOACCIDENT PREVENTION PLAN

(APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 G AOAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Am-0005

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 7 PAGES

01 35 26 1.6.1.4Crane Operators/Riggers

1.7.3.1 G AOStandard Lift Plan

1.7.3.2 G AOCritical Lift Plan

1.8Activity Hazard Analysis (AHA)

1.12.4Certificate of Compliance

License Certificates

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G AOContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9Verification Statement

01 57 20.00 10 SD-01 Preconstruction Submittals

1.7 GEnvironmental Protection Plan

01 78 23 SD-10 Operation and Maintenance

Data

G G-AOO&M Database

01 78 39.00 24 SD-03 Product Data

1.7.2 G DO100 Percent Preliminary As-Built

Drawings

SD-11 Closeout Submittals

1.7.3 G DOFinal As-Built Drawings

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1 G POCompetent Person

1.5.2.4 G POLead Waste Management Plan

3.2.2.1 G POWritten Evidence of TSD

Approval

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 7 PAGES

02 83 00 SD-06 Test Reports

1.3.2 G POSampling and Analysis

SD-11 Closeout Submittals

3.2.2.1 G POHazardous Waste Manifest

3.2.2.1 G POTurn-In Documents or Weight

Tickets

03 60 00.01 26 SD-01 Preconstruction Submittals

3.4.1 G HDCConcrete Removal and Disposal

Plan

3.4.3 G HDCSaw Cutting Procedure

3.4.4 G HDCCore Drilling Procedure

3.4.8 G HDCConcrete Imaging Report

3.4.12 G HDCRepair Procedure of Concrete

Surfaces

09 90 00.01 26 SD-01 Preconstruction Submittals

1.4 G CSafety and Health Provisions

SD-03 Product Data

2.1 G CPaint Formulas

2.2 G CSolvents and Thinners

SD-06 Test Reports

3.4 G CInspection Reports

13 48 00.00 26 SD-02 Shop Drawings

1.5 G HDCDetail Drawings

1.6 G HDCDetail Drawings

SD-03 Product Data

3.4 G HDCConcrete Anchors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 7 PAGES

13 48 00.00 26 1.4.4 G HDCSeismic Equipment Certification

SD-05 Design Data

1.5 G HDCStructural Design Calculations for

Seismic Restraints

1.6 G HDCStructural Design Calculations for

Seismic Restraints

SD-06 Test Reports

3.5.2.1 G HDCConcrete Anchor Test Reports

3.5.1 G HDCContractor Qualification Testing

22 15 14.00 40 SD-01 Preconstruction Submittals

3.1.1 G HDCTank Installation Plan

3.1.1 G HDCTank Removal Plan

SD-02 Shop Drawings

2.1 GInstallation Drawings

SD-03 Product Data

2.3.1 GAboveground Piping Materials

2.2.1 GPiping Specialties

2.4.2 GSupporting Elements

2.2.2 GValves

3.1.2.1 GAccessories

2.4.1 GMiscellaneous Materials

2.4.3 G HDCCooling Water Strainer Product

Data

SD-05 Design Data

2.2.3 G HDCAccumulator Tank Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 7 PAGES

22 15 14.00 40 2.2.3.1 G HDCAccumulator Tank Drainage

Lines Design Data

SD-06 Test Reports

3.2.1.3Piping System Test Report

3.1.2.7Concrete Imaging Report

SD-07 Certificates

2.3.1 GAboveground Piping Materials

2.2.2 GValves

3.1.2.1 GCleaning Method

3.2.1.1 G HDCTest Gate Certification

22 15 19 SD-01 Preconstruction Submittals

1.4.1 G HDCWork Plan

3.3.1 G HDCField Test Procedures

SD-03 Product Data

2.1 GAir compressor

SD-06 Test Reports

3.3.1 GAir compressor performance tests

3.3.1.2 GSound level tests

SD-07 Certificates

1.4.2 G HDCFactory Testing Certification

2.1.1 G HDC*Am5 Manufacturer's Certifications

2.1.2 G HDC*Am5 Guaranteed Performance

SD-10 Operation and Maintenance

Data

3.5 G HDCOperation And Maintenance Data

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 7 PAGES

22 15 19 1.7Posted operating instructions

26 05 00.00 26 SD-03 Product Data

2.2.1 G HDCRigid Metal Conduit

2.2.2 G HDCRigid Metallic Conduit Fittings

2.2.3 G HDCConduit Hangers

2.3 G HDCEscutcheons and Nameplates

26 05 19.00 26 SD-03 Product Data

2.1 G HDCInsulated Wire and Cable

3.1.9Wire Marking

2.3Terminations

SD-06 Test Reports

1.5.1 G HDCInspection and Tests

3.2.1 G HDCInsulation Resistance Test

40 17 30.00 40 SD-03 Product Data

2.1.1 GWelding Equipment

2.1.1 GWelding Rods and Accessories

SD-06 Test Reports

3.2.1.1Radiographs

SD-07 Certificates

1.3 GCertified Welding Procedure

Specifications

1.3 GCertified Brazing Procedure

Specifications

1.3 GCertified Procedure Qualification

Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 7 PAGES

40 17 30.00 40 1.3 GCertified Welder Performance

Qualifications

1.3 GCertified Brazer Performance

Qualifications

1.3.3.1Certificates of Conformance

1.3 G HDCCertified Weld Inspector

Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS