Abstract of Bids for W9128F24B0018.pdf
PDF 368 KB Posted
- Solicitation number
- W9128F24B0018
About this file
This document is an Abstract of Bids for solicitation W9128F24B0018 for the Bank Stabilization, Spillway Channel, Oahe Dam project in Pierre, SD. The solicitation is for stabilizing the emergency spillway upstream channel through excavation, shaping, geotextile fabric installation, and riprap stone placement. The solicitation was issued on 13-Aug-24 with bids due on 18-Sep-24. The government estimate for the base bid is $1,930,190.00, with additional options totaling $840,201.00. Six offerors submitted bids, with prices ranging from $2,669,217.00 to $5,253,609.50 for the base bid and all options. The procurement is being conducted by the U.S. Army Corps of Engineers, Engineering District Omaha.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE DUE
13-Aug-24 18-Sep-24
I CERTIFY THAT I HAVE OPENED, READ
AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED
Unique ID: HWSZR9YRRHV4 Unique ID: F1JWKEL887A6 Unique ID: CHWKANT8L8N3 Unique ID: QGKURV69M6H9 Unique ID: S4AHBH6KJXM1 Unique ID: JCP6F9KM9TN9
AMENDMENTS
7A 7B 7C D. E. F.
ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL
0001 Mobilization & Demobilization 1 Job xx 53,440.00$ xx 100,000.00$ xx 260,000.00$ xx 209,500.00$ xx 250,837.57$ xx 350,000.00$ xx 600,000.00$
0002 Develop and Restore Random Fill Borrow Site
0002A Strip Topsoil from Borrow Sites 1,700 CY 6.09$ 10,353.00$ 5.50$ 9,350.00$ 1.95$ 3,315.00$ 5.00$ 8,500.00$ 11.78$ 20,026.00$ 20.00$ 34,000.00$ 4.00$ 6,800.00$
0002B Excavate Random Fill for Spillway Slope Regrading 26,660 CY 15.23$ 405,118.00$ 4.00$ 106,400.00$ 3.40$ 90,440.00$ 3.00$ 79,800.00$ 9.36$ 248,976.00$ 15.00$ 399,000.00$ 12.00$ 319,200.00$
0002C Replace Topsoil 7,700 CY 14.53$ 24,701.00$ 10.00$ 17,000.00$ 2.35$ 3,995.00$ 5.00$ 8,500.00$ 3.37$ 5,729.00$ 20.00$ 34,000.00$ 4.00$ 6,800.00$
0003 Topsoil - Upstream Spillway Channel Area and Riprap Stockpile Areas
8,700 CY 14.53$ 126,411.00$ 50.00$ 435,000.00$ 8.40$ 73,080.00$ 5.00$ 43,500.00$ 14.60$ 127,020.00$ 20.00$ 174,000.00$ 4.00$ 34,800.00$
0004 Compacted Fill for Grading Upstream Spillway Channel Side Slopes
26,600 CY 13.24$ 352,184.00$ 10.00$ 266,000.00$ 3.60$ 95,760.00$ 7.00$ 186,200.00$ 3.66$ 97,356.00$ 15.00$ 399,000.00$ 10.00$ 266,000.00$
0005 Stone for Riprap – Contractor upplied (Type A) 24,080 Tons 120.80$ 1,833,744.00$ 95.50$ 1,449,690.00$ 80.90$ 1,228,062.00$ 68.00$ 1,032,240.00$ 117.97$ 1,790,784.60$ 85.00$ 1,290,300.00$ 68.00$ 1,032,240.00$
0006 Stone for Riprap – Government Supplied (Type A) 6,600 Tons 46.43$ 812,525.00$ 20.00$ 350,000.00$ 20.00$ 350,000.00$ 13.00$ 227,500.00$ 16.41$ 287,175.00$ 30.00$ 525,000.00$ 12.00$ 210,000.00$
0007 Geotextile 22,800 SY 3.94$ 89,832.00$ 5.00$ 114,000.00$ 3.30$ 75,240.00$ 2.75$ 62,700.00$ 6.96$ 156,688.00$ 7.00$ 159,600.00$ 3.00$ 68,400.00$
Seeding – Spillway Slope, Riprap Stockpile Area, Borrow Site
7.5 Acre 2,568.00$ 19,260.00$ 5,000.00$ 37,500.00$ 4,320.00$ 32,400.00$ 3,500.00$ 26,250.00$ 9,470.15$ 71,026.13$ 5,000.00$ 37,500.00$ 4,000.00$ 30,000.00$
0009 Erosion Control Blanket 8,500 SY 5.27$ 44,795.00$ 5.00$ 42,500.00$ 4.05$ 34,425.00$ 3.00$ 25,500.00$ 6.55$ 55,675.00$ 5.00$ 42,500.00$ 4.00$ 34,000.00$
0010 All Remaining Work Job LS xx 84,740.00$ xx 325,000.00$ xx 422,500.00$ xx 20,000.00$ xx 103,438.52$ xx 200,000.00$ xx 700,000.00$
TOTAL BASIC AMOUNT 3,857,103.00$ 3,252,440.00$ 2,669,217.00$ 1,930,190.00$ 3,214,731.82$ 3,644,900.00$ 3,308,240.00$
Excavate Additional Random Fill From Borrow Area for SpillwaySlope Regrading
4,200 CY 13.16$ 55,272.00$ 4.00$ 16,800.00$ 2.85$ 11,970.00$ 3.00$ 12,600.00$ 19.72$ 82,824.00$ 15.00$ 63,000.00$ 12.00$ 50,400.00$
0012 Topsoil - Upstream Spillway Channel Area 745 CY 12.55$ 9,349.75$ 50.00$ 37,250.00$ 4.20$ 3,129.00$ 5.00$ 3,725.00$ 21.31$ 15,875.95$ 20.00$ 14,900.00$ 4.00$ 2,980.00$
Compacted Fill for Grading Upstream Spillway Channel Side Slopes
4,200 CY 11.44$ 48,048.00$ 10.00$ 42,000.00$ 2.70$ 11,340.00$ 7.00$ 29,400.00$ 3.47$ 14,574.00$ 15.00$ 63,000.00$ 10.00$ 42,000.00$
0014 Stone for Riprap – Contractor Supplied (Type A) 5,160 Tons 104.35$ 538,446.00$ 95.50$ 492,780.00$ 72.25$ 372,810.00$ 68.00$ 350,880.00$ 130.56$ 673,689.60$ 85.00$ 438,600.00$ 68.00$ 350,880.00$
0015 Geotextile 3,600 SY 3.41$ 12,276.00$ 5.00$ 18,000.00$ 3.10$ 11,160.00$ 2.75$ 9,900.00$ 7.33$ 26,388.00$ 7.00$ 25,200.00$ 3.00$ 10,800.00$
0016 Seeding 0.5 Acre 2,218.00$ 1,109.00$ 5,000.00$ 2,500.00$ 3,900.00$ 1,950.00$ 3,500.00$ 1,750.00$ 9,470.15$ 4,735.08$ 5,000.00$ 2,500.00$ 4,000.00$ 2,000.00$
0017 Erosion Control Blanket 1,350 SY 4.55$ 6,142.50$ 5.00$ 6,750.00$ 3.65$ 4,927.50$ 3.00$ 4,050.00$ 11.91$ 16,078.50$ 5.00$ 6,750.00$ 4.00$ 5,400.00$
0018 All Remaining Work Option 1 Job LS xx 27,610.00$ xx 25,000.00$ xx 86,000.00$ xx 8,000.00$ xx 6,035.87$ xx 100,000.00$ xx 150,000.00$
OPTION 1 TOTAL AMOUNT 698,253.25$ 641,080.00$ 503,286.50$ 420,305.00$ 840,201.00$ 713,950.00$ 614,460.00$
Excavate Additional Random Fill From Borrow Area for Spillway Slope Regrading
4,200 CY 13.16$ 55,272.00$ 4.00$ 16,800.00$ 2.90$ 12,180.00$ 3.00$ 12,600.00$ 19.72$ 82,824.00$ 15.00$ 63,000.00$ 12.00$ 50,400.00$
0020 Topsoil - Upstream Spillway Channel Area 745 CY 12.55$ 9,349.75$ 50.00$ 37,250.00$ 4.25$ 3,166.25$ 5.00$ 3,725.00$ 21.31$ 15,875.95$ 20.00$ 14,900.00$ 4.00$ 2,980.00$
0021 Compacted Fill for Grading Upstream Spillway Channel Side Slopes
4,200 CY
11.44$ 48,048.00$ 10.00$ 42,000.00$ 2.70$ 11,340.00$ 7.00$ 29,400.00$ 3.47$ 14,574.00$ 15.00$ 63,000.00$ 10.00$ 42,000.00$
0022 Stone for Riprap – Contractor Supplied (Type A) 5,160 Tons 104.35$ 538,446.00$ 95.50$ 492,780.00$ 73.35$ 378,486.00$ 68.00$ 350,880.00$ 130.56$ 673,689.60$ 85.00$ 438,600.00$ 68.00$ 350,880.00$
0023 Geotextile 3,600 SY 3.41$ 12,276.00$ 5.00$ 18,000.00$ 2.30$ $ 8,280.00 $ 2.75 9,900.00$ 7.33$ 26,388.00$ 7.00$ 25,200.00$ 3.00$ 10,800.00$
0024 Seeding 0.5 Acre 2,218.00$ 1,109.00$ 5,000.00$ 2,500.00$ 3,900.00$ $ 1,950.00 $ 3,500.00 1,750.00$ 9,470.15$ 4,735.08$ 5,000.00$ 2,500.00$ 4,000.00$ 2,000.00$
0025 Erosion Control Blanket 1,350 SY 4.55$ 6,142.50$ 5.00$ 6,750.00$ 3.65$ $ 4,927.50 $ 3.00 4,050.00$ 11.91$ 16,078.50$ 5.00$ 6,750.00$ 4.00$ 5,400.00$
0026 All Remaining Work Option 2 Job LS xx 27,610.00$ xx 25,000.00$ xx $ 84,800.00 xx 8,000.00$ xx 6,035.87$ xx 100,000.00$ xx 150,000.00$
OPTION 2 TOTAL AMOUNT 698,253.25$ 641,080.00$ $ 505,129.75 420,305.00$ 840,201.00$ 713,950.00$ 614,460.00$
TOTAL BASE and ALL OPTIONS 5,253,609.50$ 4,534,600.00$ $ 3,677,633.25 2,770,800.00$ 4,897,133.82$ 5,072,800.00$ 4,537,160.00$
CAGE Code: 46V78
SAM Exclusion:
POC:
C. AMENDMENTS ACKNOWLEDGED: 1
NO. 6
A. OFFEROR
Sharpe Enterprises, Inc.
1908 N Garfield Pierre, SD 57501
OMAHA, NE 68102-1618
1616 CAPITOL AVENUE
CONTRACTING DIVISION (CENWO-CT)
US ARMY CORPS OF ENGINEERS
9. OFFERS
TO THIS SOLICITATION
SIGNATURE
NAME AND TITLE OF CERTIFYING OFFICIAL (Type) Nadine L. Catania
NO. 1 NO. 2
ABSTRACT OF PROPOSALS
1. SOLICITATION NUMBER
W9128F24B00
4. ISSUING OFFICE
8. GOVERNMENT ESTIMATE5. PROJECT TITLE
A. OFFEROR A. OFFEROR
515 South Flynn Street 2972 25th St NE
A. HIRED LABOR
N/A Three Oaks Construction, Inc HSG Park JV 2 LLC
North Sioux City, SD 57049 Harvey ND 58341 CAGE Code: 9PPC1B. REASONABLE CONTRACT
SAM Exclusion:
CAGE Code: 9KD00
SAM Exclusion: (Without Profit)
POC:
C. AMENDMENTS ACKNOWLEDGED: 1
POC:
C. AMENDMENTS ACKNOWLEDGED: 1
6. NUMBER OF AMENDMENTS ISSUED - 1
OA Spillway Bank Stablization - 12348
SAM Exclusion:
POC:
C. AMENDMENTS ACKNOWLEDGED: 1
NO. 3
A. OFFEROR
Morris, Inc.
220 W. Hwy 14/34 Fort Pierre, SD 57501 CAGE Code: 0ELU6 CAGE Code: 4UDY2
SAM Exclusion:
NO. 4
A. OFFEROR
Meridiam Partners 1001 W. Arizona Ave.
Denver CO 80223 CAGE Code:
POC:
C. AMENDMENTS ACKNOWLEDGED: 1
SAM Exclusion:
POC:
C. AMENDMENTS ACKNOWLEDGED: 1
NO. 5
A. OFFEROR
AGE Corp 704 W Highway 14/34 Fort Pierre, SD 57532
19 Sept 2024
File details come from the government source that posted it. Updated .